0% found this document useful (0 votes)
38 views10 pages

Practice Exercise Procurement Warehouse Management Answers

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views10 pages

Practice Exercise Procurement Warehouse Management Answers

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

lOMoARcPSD|43496141

Practice Exercise Procurement Warehouse Management


answers
Integrated Business Processes With Sap Erp Systems (Asia Pacific University of
Technology and Innovation)

Scan to open on Studocu

Studocu is not sponsored or endorsed by any college or university


Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])
lOMoARcPSD|43496141

CT104-3-2-Integrated Business Processes with SAP


QUESTION 1

After executing an availability check for goods ordered, GBI discovered that the
inventory level of Road helmets has already dropped to its reorder level.

Now your task is to order the products from the supplier Olympic Protective Gear.
Olympic Protective Gear is a producer of premium quality helmets in town. Therefore,
GBI has decided to order 200 pieces from Olympic Protective Gear. Details are tabulated
in the table below:

Needed items Available data


Company Code US00
Purchasing Group N00
Plant SD00
Material Road Helmets
Quantity of items 200
Storage Location Trading Goods
Delivery lead time 150 Days
Bank Account number for the payment process 100000
Invoice Number INVOICE 00511-###
Tax Code XI

The procurement steps to be carried out are as follows:

1. Display Vendor master record.

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])


lOMoARcPSD|43496141

2. Create a complete Purchase Order

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])


lOMoARcPSD|43496141

3. Create and display a complete page of Goods Receipt for Purchase Order.

4. Create Invoice Receipt from Vendor

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])


lOMoARcPSD|43496141

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])


lOMoARcPSD|43496141

5. Create a Post Payment to Vendor process with its generated number.

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])


lOMoARcPSD|43496141

QUESTION 2

Upon receipt in San Diego, Road Helmets need to be transferred from the interim storage
area into the warehouse bin.

You are required to carry out the following steps:

1. Execute Bin Status report checking the bin before transferring the materials. (Before
Transfer). Note: The warehouse number is 100

2. Construct a Transfer Order (TO) to place the materials into a designated storage bin
(STBN-#-###). TO is a handoff from inventory management to warehouse management.
Then, display the generated document number (after saving).

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])


lOMoARcPSD|43496141

3. Confirm the Transfer Order and record generated document number. Confirming the
movement involves updating the transfer order to indicate that the movement was
completed.

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])


lOMoARcPSD|43496141

4. Execute Bin Status report checking the bin status (After Transferred).

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])


lOMoARcPSD|43496141

Downloaded by AUMPAPAT TANEEHIRANTHAWON ([email protected])

You might also like