RFI No NFEO-D-MCD-QG-CL-00405
RFI No NFEO-D-MCD-QG-CL-00405
1 NFEO-MCD-QM-ITP-00021 01
2 402-30-PL-DWG-00008 02
Reason for RFI Rejection / Cancellation
1. Poor Workmanship 2. Use of Non-approved Material 3. Use of Wrong material
4. Deviation from DWG / SPC / MS 5. Deviation from ITP 6. Unacceptable Test Procedure
7. Incomplete Work 8. Safety Issues 9. Test Equipment Unavailability
12. Pre-Activity Comment No
10. Weather Conditions 11. Test Crew Not Available
cleared
13. Documentation Unavailability 14. Material Not Available 15. Other
Comments:
Signature
NFEO-MCD-QM-ITP-00021_01
®·-�
NORTH FIELD EXPANSION {NFXP) PROJECT - OFFSHORE
1MCDERMOTT1
<!:• ,�
� -==
TOPSIDES AND PIPELINES - EPCI
- NFEO-MCD-CL- - Technical
SPC-00003 Manager
Testing Laboratories
accreditations and
Project - Site
Accreditation
Specifications for Prior to start of manager Certificates +
1.1.3 Laboratory Personnel
MT
ISO 17020, ISO 17025
works - Qc Qualification
H H H R R
competence (certification
QCS 2014 Manager Records
and experience).
Section 3 Part - QA/QC
1.4.7 Engineer
1.2 MATERIAL
Documentation review and
approval: Materials - NFEO-MCD-CL- -
Certificate/ Materials Project
SPC-00003
Approval Request for any Manager Material
Project Documentation approved Prior to Deliver�
other material to be QA/QC Approval
1.2.1 Specifications for or reviewed with minor on site H H R R R/A
installed on site. If Manager
MT comments (MAR)
applicable, copies of - QCS 2014
QA/QC
relevant laboratory test Engineer
Section 8 Part 9
reports shall be attached to
the MAR
-
Project
Material Receiving Manager
NFEO-MCD-CL-
Inspection and Material
SPC-00003
- Site - Approved
Storage Conditions Manager
Project Document
Every Batch of - QA/QC
1.2.2
1. RC pipes
Specifications for Approved MAR
delivery Manager
(MIR} H H H w RIA
2. Spacers
MT- - QA/QC - Delivery
Note
3. Cement QCS 2014 Engineer
4. Bentonite Section 8 Part 9
- Store
keeper
Review Details:
Previous Rev. Return Code:
If applicable as per Approver return code, comments are available either after this
page and/or as external attached comments below.
Number of annotation(s): 10
PART# : 20-002-DWG-06-24
BAND
8" WIDE
14 GA. (.074") HOT ROLLED PICKLED STEEL
FUSION BONDED COATING 8-15 MIL THICK RUNNER
RIBBED FLANGES
Ø38" OD
LINER CARRIER PIPE
RISER 'B'
36.0°
PVC LINER (0.096") 2 TYP.
NFEO-MCD-CL-MAR-00120_B Page 14 of 37
Transmittal Number:
McDermott Middle East Inc. NFEO-T-MCD-QA015-00490
Date: May 16, 2024
TRANSMITTAL TO SUB-CONTRACTORS Project: D7264 - North Field Expansion(NFXP) Project
Offshore - EPCI
Attention: From:
Qatar Engineering & Construction Co. WLL (QCON) Document Controller
Qatar McDermott Middle East
Qatar P O Box 23957
Doha, State of Qatar
QATAR
REMARKS:
DOCUMENTS ENCLOSED:
Document Number Revision Document Title Document Status
NFEO-MCD-CL-DWG-00006 <<URL:174206517_19_-1_867069179_5279509_0_NFEO-MCD-CL-DWG-00006_02-3.PDF|
02-3 CONSTRUCTION OF TSF & BEACH PULL AREA GENERAL AFC - C - Not Accepted
LIFTING PLAN FOR LOADING & UNLOADING OF
CONTAINERS (4 SHEETS) - ONSHORE CONSTRUCTION
WORKS
NFEO-MCD-CL-DWG-00036 <<URL:178836866_7_-1_1706408034_946746_0_NFEO-MCD-CL-DWG-00036_C-3.PDF||18
C-3 LIFTING PLAN FOR LOADING & OFFALODING OF IFA - A - Approved.
DRILLING RIG PARTS AND PILING WORK MATERIALS Fabrication may proceed
USING 55TON MOBILE CRANE-ONSHORE
CONSTRUCTION WORKS
NFEO-MCD-CL-DWG-00040 <<URL:178836870_7_-1_1663166982_1343278_0_NFEO-MCD-CL-DWG-00040_C-3.PDF||1
C-3 NFXP-OFFSHORE PIPELINES AND CABLES LIFTING IFA - A - Approved.
PLAN-LOADING & UNLOADING MATERIAL CONTAINER Fabrication may proceed
AND MISCELLANEOUS MATERIALS -TSF LAYDOWN AREA
(100T CRAWLER CRANE)-ONSHORE CONSTRUCTION
WORKS
NFEO-MCD-CL-DWG-00044 <<URL:179387261_7_-1_498518576_954595_0_NFEO-MCD-CL-DWG-00044_C-3.PDF||181
C-3 LIFTING PLAN FOR LOADING & OFFALODING OF IFA - A - Approved.
DRILLING RIG PARTS AND PILING WORK MATERIALS Fabrication may proceed
USING 160TON MOBILE CRANE-ONSHORE
CONSTRUCTION WORKS
NFEO-MCD-CL-MAR-00077 <<URL:178575154_7_-1_269256722_5179290_0_NFEO-MCD-CL-MAR-00077_C-3.PDF||18
C-3 MATERIAL APPROVAL REQUEST FOR POLYSTRERENE IFA - C - Not Accepted
INSULLATION FORM - ONSHORE CONSTRUCTION
WORKS
NFEO-MCD-CL-MAR-00082 <<URL:178575161_3_-1_602869229_38259357_0_NFEO-MCD-CL-MAR-00082_B-3.PDF||1
B-3 MATERIAL APPROVAL REQUEST FOR ACID RESISTANT IFR - C - Not Accepted
CHAMICAL TILE - ONSHORE CONSTRUCTION WORKS
NFEO-MCD-CL-MAR-00120 <<URL:180959370_3_-1_562617630_4564286_0_NFEO-MCD-CL-MAR-00120_B-3.PDF||18
B-3 MATERIAL APPROVAL REQUEST FOR SPACERS IFR - B - Approved with
(ADVANCE PRODUCTS & SYSTEM LLC) - ONSHORE comments
CONSTRUCTION WORKS
NFEO-MCD-CL-MST-00004 <<URL:172365899_22_-1_2119009993_12084341_0_NFEO-MCD-CL-MST-00004_02-3.PDF
02-3 METHOD STATEMENT FOR CONSTRUCTION OF TSF & AFC - B - Approved with
BEACH PULL AREA - ONSHORE CONSTRUCTION WORKS comments
NFEO-MCD-EL-MST-00032 <<URL:180153787_11_-1_690302878_6131933_0_NFEO-MCD-EL-MST-00032_D-3.PDF||1
D-3 METHOD OF STATEMENT FOR INSTALLATION OF IFA - A - Approved.
PERMANENT SACRIFICIAL CATHODIC PROTECTION Fabrication may proceed
SYSTEM
NFEO-MCD-PL-MAR-00003 <<URL:180959372_3_-1_115880290_1646533_0_NFEO-MCD-PL-MAR-00003_B-3.PDF||18
B-3 MATERIAL APPROVAL REQUEST FOR JOTAPIPE RC490 IFR - C - Not Accepted
FOR REPAIRING DAMAGES ON FBE COATING TO BE
USED FOR BOTH FIELD JOINT AND MAINLINE COATING -
ONSHORE CONSTRUCTION WORKS
NFEO-MCD-QM-PRC-00794 <<URL:181106930_3_-1_40308919_7106369_0_NFEO-MCD-QM-PRC-00794_B-3.PDF||181
B-3 WELDER QUALIFICATION MATRIX - ONSHORE IFR - A - Approved.
CONSTRUCTION WORKS Fabrication may proceed
NFEO-MCD-SH-DWG-00025 <<URL:180913557_3_-1_1930776079_2120165_0_NFEO-MCD-SH-DWG-00025_B-3.PDF||1
B-3 LIFTING PLAN FOR LOADING, OFFLOADING, FIT UP, IFR - B - Approved with
ALIGNMENT AND INSTALLATION OF PIPE SPOOL BY 160 comments
TONNE CRANE AT BADER STREET AREA - ONSHRE
CONSTRUCTION WORKS
NFEO-MCD-SH-DWG-00026 <<URL:180913558_3_-1_1079077127_1771507_0_NFEO-MCD-SH-DWG-00026_B-3.PDF||1
B-3 LIFTING PLAN ARRANGEMENT FOR LOADING, IFR - B - Approved with
OFFLOADING,FIT UP, ALIGNMENT AND INSTALLATION OF comments
PIPE SPOOLS BY CRAWLER CRANE AT BADER STREET
AREA - ONSHORE CONSTRUCTION WORKS
Page 1 of 2
Transmittal Number:
McDermott Middle East Inc. NFEO-T-MCD-QA015-00490
Date: May 16, 2024
TRANSMITTAL TO SUB-CONTRACTORS Project: D7264 - North Field Expansion(NFXP) Project
Offshore - EPCI
NFEO-MCD-SH-PRC-00275 <<URL:178912604_7_-1_1797025664_2935643_0_NFEO-MCD-SH-PRC-00275_C-3.PDF||1
C-3 TRAFFIC MANAGEMENT PLAN EPC 1 - SITE LAYOUT IFA - C - Not Accepted
ONSHORE CONSTRUCTION WORKS
DISTRIBUTION:
Page 2 of 2
NORTH FIELD EXPANSION (NFXP)
PROJECT – OFFSHORE
Topsides and Pipelines: Engineering, Procurement, Construction, Installation and
Commissioning (EPCI)
COMPANY AGREEMENT No.: LTC/C/NFE/4665/19 CONTRACTOR Project No.: D7264
Asset : NFE
Discipline : CIVIL
Document Class : 1
McDermott www.mcdermott.com
McDermott Middle East Inc.
Qcon www.qcon.com.qa
QATAR ENGINEERING & CONSTRUCTION COMPANY W.L.L
NORTH FIELD EXPANSION (NFXP) PROJECT - OFFSHORE
TOPSIDES AND PIPELINES - EPCI
REVISION HISTORY
HOLDS LIST
NFEO-MCD-CL-MAR-00120_B Page 2 of 37
NFEO-MCD-CL-MAR-00120_B Page 3 of 37
Qatar Engineering & Construction Company W.L.L
P.O. Box 24491, Doha, Qatar DRAWING / DOCUMENT
TRANSMITTAL MEMORANDUM
Head Office Tel: 0974 -44587200 Fax: 0974 -44587201/02
PROJECT:
QCON JOB No. A581 / 701
NORTH FIELD EXPANSION (NFXP) PROJECT – OFFSHORE
Topsides and Pipelines: Engineering, Procurement, Construction, Installation and
Commissioning (EPCI) TRANSMITTAL No. NFEO-QCON-MCD-T-0622
CONTRACTOR Project No.: D7264
TO
DATE OF ISSUE 09/Jun/2024
M/s. McDermott Middle East Inc.
6th Floor, Burj Doha Tower P.O. Box 23957 YOUR REF. No.
Al Dafna Area, WestBay Doha, State of Qatar DATE OF ISSUE
Attention : - STATUS CODE 6 For Cancellation
D7264 Document Control 1 Issued For information 7 As Per Your Request
2 Issued For Review 8 For Further Action
McDermott Middle East 3 Issued For Approval 9 As Built
[email protected] 4 Approved for Construction 10 Final
5 For your Records
Dear Sirs,
We enclose the following document(s) :
No.of
McDermott doc. Number Company Doc. Number Document Description REV STATUS CODE Copies REMARKS
/TYPE
MATERIAL APPROVAL REQUEST
D7264-SC-CV-02-A99-00132 NFEO-MCD-CL-MAR-00116 FOR SPACERS- ONSHORE C 3 PDF
CONSTRUCTION WORKS
Yuwaraj Thapa
Approved by Date: 09/06/2024
Date:
Wael El-Banna
Please acknowledge receipt by signing and returning attached Transmittal copy Back to Document Controller
NFEO‐MCD‐CL‐MAR‐00120 B 14 Valentin Leica Ensure the sample provided on site is aligned with Andres Noted. Sample provided is alined with drawing.
(C008712) the detail drawing
NFEO‐MCD‐CL‐MAR‐00120 B 14 Valentin Leica Larger ID will change the support configuration and Andres Noted. Proposed Spacers are used for ID1600 for CR‐
(C008712) wheels details, Contractor to provide details 10.
NORTH FIELD EXPANSION (NFXP)
PROJECT – OFFSHORE
Topsides and Pipelines: Engineering, Procurement, Construction, Installation and
Commissioning (EPCI)
COMPANY AGREEMENT No.: LTC/C/NFE/4665/19 CONTRACTOR Project No.: D7264
Asset : NFE
Discipline : CIVIL
Document Class : 1
DISCIPLINE PEM / PD
PREPARED REVIEWED APPROVED
REV. DATE REVISION STATUS
BY BY BY
APPROVED BY
McDermott www.mcdermott.com
McDermott Middle East Inc.
Qcon www.qcon.com.qa
QATAR ENGINEERING & CONSTRUCTION COMPANY W.L.L
NFEO-MCD-CL-MAR-00120_C Page 1 of 37
NORTH FIELD EXPANSION (NFXP) PROJECT - OFFSHORE
TOPSIDES AND PIPELINES - EPCI
REVISION HISTORY
HOLDS LIST
NFEO-MCD-CL-MAR-00120_C Page 2 of 37
Material Approval Request
(MAR)
North Field Expansion (NFXP) Project – Onshore Tops
Project
ides & Pipelines (EPCI)
MAR No. NFEO-MCD-CL-MAR-00120
M/s. QATAR ENGINEERING & CONSTRUCTION COMP
Subcontractor ANY W.L.L Request Date 09-JUN-2024
Description Requested
1 Item to be installed Spacers for Microtunnelling works
North Field Expansion (NFXP) Project-Onshore Topsides & Pip
2 Location to be Installed: elines (EPCI)
NFEO-MCD-CL-SPC-00003
3 Relevant Specifications/Codes/Standards/Drawing Reference NFEO-MCD-QM-SPC-00007
4 Manufacturer/Vendor/Supplier Name ADVANCE PRODUCTS & SYSTEM LLC
5 Brand and/or Model Name 38” OD X 63” ID Casing Spacer- Wheel Type
Reference Data
1 Previous Approved MAR experience, if any ■
2 Manufacturer/Vendor/Supplier Profile ■
3 Technical Data Sheet or equivalent ■
4 Material Test Report ■
5 Sample □
6 Others, if any □
We hereby certify that proposed material have been reviewed and our proposals are confirming with
Subcontractor (TTQ / Qcon) Project Quality (Qcon) Discipline (MCD) Project Quality (MCD)
NFEO-MCD-CL-MAR-00120_C Page 3 of 37
CUSTOMER APPROVAL
CASING INSULATOR SPECIFICATION
PART# : 20-002-DWG-06-24 PRINT NAME SIGNATURE
BAND
8" WIDE
14 GA. (.074") HOT ROLLED PICKLED STEEL
FUSION BONDED COATING 8-15 MIL THICK RUNNER
RIBBED FLANGES
Ø38" OD
LINER CARRIER PIPE
RISER 'B'
36.0°
PVC LINER (0.096") 2 TYP.
STEEL ROLLER
ASSEMBLY HARDWARE 1 PER RISER
4 SUPPORT PLATS 4 TOTAL
3 SETS PER FLANGE REACHING UNTIL
ENFORCING CASTER
5/16" -18 X 2" PLATED STEEL BOLTS LATERALLY
7.8700 2 STIFFENERS 5mm
5/16" PLATED STEEL WASHERS 16 TOTAL THICK
5/16" PLATED STEEL NUTS 8 TOTAL MAX LOAD CAPACITY PER SPACER
3,000 LBS DYNAMIC
SUPPORT PLATES * BIDIRECTIONAL CASING SPACER (STRAIGHT WHEELS). 6,000 LBS STATIC
GUIDES ARE NOT NEEDED*
10 GA. (.134) HOT ROLLED PICKLED STEEL
MIG WELDED TO BAND
SUPPORT PLATE #1 = 3.00" LONG *** CONTROLLED COPY ***
PIPE(lbs/ft):XX PIPE TYPE: STEEL
ROLLERS THIS DRAWING AND PROPRIETARY
STEEL ROLLER DESIGN IS SOLELY THE PROPERTY
3.63 OAH OF ADVANCE PRODUCTS & Drawn by: AS
Casing Spacer
6000 # CAPACITY EACH CASING SPACER SYSTEMS, INC. AND IS SUBMITTED Approved by: AP
PLACEMENT SHOULD BE WITH THE UNDERSTANDING THAT
MIG WELDED TO RISER EVERY 6-8 FT. OR 3
38" OD X 63" ID Date : 09/06/24
SPACERS PER JOINT
IT WILL BE KEPT IN STRICT
UNLESS WRITTEN CONFIDENCE.
APPROVAL BY APS COPYRIGHT PROTECTED ©.
W
AT
ER
AR
E
A
W
AT
ER
3.224645
DE
AR
L-01
EA
1.991299
1.379651
TRANSFORM
ER
PARKING
BUS
1.402206
STREET
BADER
MAINTENANCE
TO
ROAD
MAINTENANCE
ROAD
L
R
IDO
RR
5.306339
R CO
LO
WE
PO
TW
KV
FU 2 & W
400
IND TURE 3
US
TR
Y
MHT
MHT
MHT
MHT
m)
MHT
(300
OR
RID
OR
RC
MHT
TE
WA
NG
OLI
CO
Qatargas Operating Company Ltd.
QATARGAS