RFI No NFEO-D-MCD-QG-CL-00405

Uploaded by

mithunmalchik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

NORTH FIELD EXPANSION (NFXP) PROJECT - OFFSHORE

TOPSIDES AND PIPELINES – EPCI

INSPECTION AND TEST PLAN FOR MICROTUNELLING WORKS

Request for Inspection (RFI)

Form No. G-001


Project D7264 RFI No. NFEO-D-MCD-QG-CL-00405
Request
Subcontractor Qcon/Terratest Qatar Date
25-Jun-2024
Inspection
Discipline Civil Date
26-Jun-2024 Time 3:00 PM

CR03 Launching shaft (Entry Pit) @ Cooling Water


Location System
Corridor Crossing
ITP Step
ITP No. NFEO-MCD-QM-ITP-00021 Rev. 01 No. 1.2.2

Drawing No. 402-30-PL-DWG-00008 Rev. 02


Inspection Point Sub Con. H Contractor W Company R/A

No. Inspection Items Quantity Remarks


Material Receiving Inspection for Spacers CR-10 for Pipe
1 Line TL-15 23 Nos
Reference MAR. No: NFEO-MCD-CL-MAR-00120_C
Attachments
No. Rev. Remarks

1 NFEO-MCD-QM-ITP-00021 01
2 402-30-PL-DWG-00008 02
Reason for RFI Rejection / Cancellation
1. Poor Workmanship 2. Use of Non-approved Material 3. Use of Wrong material
4. Deviation from DWG / SPC / MS 5. Deviation from ITP 6. Unacceptable Test Procedure
7. Incomplete Work 8. Safety Issues 9. Test Equipment Unavailability
12. Pre-Activity Comment No
10. Weather Conditions 11. Test Crew Not Available
cleared
13. Documentation Unavailability 14. Material Not Available 15. Other
Comments:

Accepted □ Accepted with Comments □ Rejected □ Cancelled □

TTQ CONST TTQ QC QCON QC MCD QC COMPANY


Designation Site Manger QC Inspector QCE/QCI QCS/QCI Sr. QC Inspector
Mohd. Fhakruddin / Abdul Waheed / Bhaskaran /
Name Sinu Koshy Qamar Abbas Saeed Ashraf Rafaqat Ali
Menta
Date 25-06-2024 25-06-2024 25-06-2024

Signature

NFEO-MCD-QM-ITP-00021_01
®·-�
NORTH FIELD EXPANSION {NFXP) PROJECT - OFFSHORE
1MCDERMOTT1

<!:• ,�
� -==
TOPSIDES AND PIPELINES - EPCI

INSPECTION & TEST PLAN FOR MICROTUNELLING WORKS · QATAROAS


Ocon TERRATEST
QATAR LLC

- NFEO-MCD-CL- - Technical
SPC-00003 Manager
Testing Laboratories
accreditations and
Project - Site
Accreditation
Specifications for Prior to start of manager Certificates +
1.1.3 Laboratory Personnel
MT
ISO 17020, ISO 17025
works - Qc Qualification
H H H R R
competence (certification
QCS 2014 Manager Records
and experience).
Section 3 Part - QA/QC
1.4.7 Engineer

1.2 MATERIAL
Documentation review and
approval: Materials - NFEO-MCD-CL- -
Certificate/ Materials Project
SPC-00003
Approval Request for any Manager Material
Project Documentation approved Prior to Deliver�
other material to be QA/QC Approval
1.2.1 Specifications for or reviewed with minor on site H H R R R/A
installed on site. If Manager
MT comments (MAR)
applicable, copies of - QCS 2014
QA/QC
relevant laboratory test Engineer
Section 8 Part 9
reports shall be attached to
the MAR

-
Project
Material Receiving Manager
NFEO-MCD-CL-
Inspection and Material
SPC-00003
- Site - Approved
Storage Conditions Manager
Project Document
Every Batch of - QA/QC
1.2.2
1. RC pipes
Specifications for Approved MAR
delivery Manager
(MIR} H H H w RIA
2. Spacers
MT- - QA/QC - Delivery
Note
3. Cement QCS 2014 Engineer
4. Bentonite Section 8 Part 9
- Store
keeper

NFEO -MCD-Q M -ITP-00021_01 Page 111 of28


QG Transmittal No. NFEO-T-QG-MCD-16424
Received: 12-MAY-2024

Company Comments Review Summary

PROJECT ID NFEO ORIGINATOR CODE MCD


Reference Rev. Rev. Date St. Class Discipline Doc Type
NFEO-MCD- B 2024-04-29 IFR 1 CL MAR
CL-MAR-00120

Review Details:
Previous Rev. Return Code:

Document received with Transmittal IN: NFEO-T-MCD-QG-34228


Receipt Date: 2024-04-29
The Document Review has been initiated on: 2024-04-30
Review Time Frame: 20 day(s)
Role Name Return Code Date of Comment
approver Vahraz Siahkalroudi B-Approved/Reviewed 2024-05-12
(C013022) with minor comments

If applicable as per Approver return code, comments are available either after this
page and/or as external attached comments below.
Number of annotation(s): 10

This page is automatically generated from PIMS and


shall be considered as official answer from COMPANY.
Ensure the sample
provided on site is aligned
with the detail drawing
CASING INSULATOR SPECIFICATION Detail support for 6" is
missing (CR#2 & 3)

PART# : 20-002-DWG-06-24
BAND
8" WIDE
14 GA. (.074") HOT ROLLED PICKLED STEEL
FUSION BONDED COATING 8-15 MIL THICK RUNNER
RIBBED FLANGES
Ø38" OD
LINER CARRIER PIPE
RISER 'B'
36.0°
PVC LINER (0.096") 2 TYP.

HARDNESS - DUROMETER "A" 80 +/- 5 Larger ID will change the


OPERATING TEMP: 140 F support configuration and
wheels details, Contractor
DIELECTRIC STRENGTH - 60,000 V to provide details
RUNNER
4.6300
2" WIDE X 1 1/2" HIGH MOLDED POLYMER
2 TOP
RISERS 54.0° Ø63" (1600mm) ID
CASING PIPE
10 GA. (.134) HOT ROLLED PICKLED STEEL
21.0°
MIG WELDED TO BAND
RISER 'A' = 0.6875 / 1.3125" TALL STEEL
REINFORCEMENT BAR
RISER 'B' =1.5" TALL 2 TOTAL
STEEL ROLLER
ASSEMBLY HARDWARE 1 PER RISER
4 SUPPORT PLATS 4 TOTAL
3 SETS PER FLANGE REACHING UNTIL
ENFORCING CASTER
5/16" -18 X 2" PLATED STEEL BOLTS LATERALLY
7.8700 2 STIFFENERS 5mm
5/16" PLATED STEEL WASHERS 16 TOTAL THICK
5/16" PLATED STEEL NUTS 8 TOTAL MAX LOAD CAPACITY PER SPACER
3,000 LBS DYNAMIC
SUPPORT PLATES * BIDIRECTIONAL CASING SPACER (STRAIGHT WHEELS). 6,000 LBS STATIC
GUIDES ARE NOT NEEDED*
10 GA. (.134) HOT ROLLED PICKLED STEEL
MIG WELDED TO BAND
SUPPORT PLATE #1 = 3.00" LONG
PIPE TYPE: STEEL
ROLLERS
STEEL ROLLER
3.63 OAH Drawn by: AS
Casing Spacer
6000 # CAPACITY EACH CASING SPACER
PLACEMENT SHOULD BE
Approved by: AP
MIG WELDED TO RISER EVERY 6-8 FT. OR 3
38" OD X 63" ID Date : 24/03/24
SPACERS PER JOINT

NFEO-MCD-CL-MAR-00120_B Page 14 of 37
Transmittal Number:
McDermott Middle East Inc. NFEO-T-MCD-QA015-00490
Date: May 16, 2024
TRANSMITTAL TO SUB-CONTRACTORS Project: D7264 - North Field Expansion(NFXP) Project
Offshore - EPCI

Attention: From:
Qatar Engineering & Construction Co. WLL (QCON) Document Controller
Qatar McDermott Middle East
Qatar P O Box 23957
Doha, State of Qatar
QATAR

Subject: D7264 NFXP - [RTV]: D7264-SC-CV-002 - ONSHORE CONSTRUCTION WORKS - QCON

REMARKS:

DOCUMENTS ENCLOSED:
Document Number Revision Document Title Document Status
NFEO-MCD-CL-DWG-00006 <<URL:174206517_19_-1_867069179_5279509_0_NFEO-MCD-CL-DWG-00006_02-3.PDF|
02-3 CONSTRUCTION OF TSF & BEACH PULL AREA GENERAL AFC - C - Not Accepted
LIFTING PLAN FOR LOADING & UNLOADING OF
CONTAINERS (4 SHEETS) - ONSHORE CONSTRUCTION
WORKS
NFEO-MCD-CL-DWG-00036 <<URL:178836866_7_-1_1706408034_946746_0_NFEO-MCD-CL-DWG-00036_C-3.PDF||18
C-3 LIFTING PLAN FOR LOADING & OFFALODING OF IFA - A - Approved.
DRILLING RIG PARTS AND PILING WORK MATERIALS Fabrication may proceed
USING 55TON MOBILE CRANE-ONSHORE
CONSTRUCTION WORKS
NFEO-MCD-CL-DWG-00040 <<URL:178836870_7_-1_1663166982_1343278_0_NFEO-MCD-CL-DWG-00040_C-3.PDF||1
C-3 NFXP-OFFSHORE PIPELINES AND CABLES LIFTING IFA - A - Approved.
PLAN-LOADING & UNLOADING MATERIAL CONTAINER Fabrication may proceed
AND MISCELLANEOUS MATERIALS -TSF LAYDOWN AREA
(100T CRAWLER CRANE)-ONSHORE CONSTRUCTION
WORKS
NFEO-MCD-CL-DWG-00044 <<URL:179387261_7_-1_498518576_954595_0_NFEO-MCD-CL-DWG-00044_C-3.PDF||181
C-3 LIFTING PLAN FOR LOADING & OFFALODING OF IFA - A - Approved.
DRILLING RIG PARTS AND PILING WORK MATERIALS Fabrication may proceed
USING 160TON MOBILE CRANE-ONSHORE
CONSTRUCTION WORKS
NFEO-MCD-CL-MAR-00077 <<URL:178575154_7_-1_269256722_5179290_0_NFEO-MCD-CL-MAR-00077_C-3.PDF||18
C-3 MATERIAL APPROVAL REQUEST FOR POLYSTRERENE IFA - C - Not Accepted
INSULLATION FORM - ONSHORE CONSTRUCTION
WORKS
NFEO-MCD-CL-MAR-00082 <<URL:178575161_3_-1_602869229_38259357_0_NFEO-MCD-CL-MAR-00082_B-3.PDF||1
B-3 MATERIAL APPROVAL REQUEST FOR ACID RESISTANT IFR - C - Not Accepted
CHAMICAL TILE - ONSHORE CONSTRUCTION WORKS
NFEO-MCD-CL-MAR-00120 <<URL:180959370_3_-1_562617630_4564286_0_NFEO-MCD-CL-MAR-00120_B-3.PDF||18
B-3 MATERIAL APPROVAL REQUEST FOR SPACERS IFR - B - Approved with
(ADVANCE PRODUCTS & SYSTEM LLC) - ONSHORE comments
CONSTRUCTION WORKS
NFEO-MCD-CL-MST-00004 <<URL:172365899_22_-1_2119009993_12084341_0_NFEO-MCD-CL-MST-00004_02-3.PDF
02-3 METHOD STATEMENT FOR CONSTRUCTION OF TSF & AFC - B - Approved with
BEACH PULL AREA - ONSHORE CONSTRUCTION WORKS comments
NFEO-MCD-EL-MST-00032 <<URL:180153787_11_-1_690302878_6131933_0_NFEO-MCD-EL-MST-00032_D-3.PDF||1
D-3 METHOD OF STATEMENT FOR INSTALLATION OF IFA - A - Approved.
PERMANENT SACRIFICIAL CATHODIC PROTECTION Fabrication may proceed
SYSTEM
NFEO-MCD-PL-MAR-00003 <<URL:180959372_3_-1_115880290_1646533_0_NFEO-MCD-PL-MAR-00003_B-3.PDF||18
B-3 MATERIAL APPROVAL REQUEST FOR JOTAPIPE RC490 IFR - C - Not Accepted
FOR REPAIRING DAMAGES ON FBE COATING TO BE
USED FOR BOTH FIELD JOINT AND MAINLINE COATING -
ONSHORE CONSTRUCTION WORKS
NFEO-MCD-QM-PRC-00794 <<URL:181106930_3_-1_40308919_7106369_0_NFEO-MCD-QM-PRC-00794_B-3.PDF||181
B-3 WELDER QUALIFICATION MATRIX - ONSHORE IFR - A - Approved.
CONSTRUCTION WORKS Fabrication may proceed
NFEO-MCD-SH-DWG-00025 <<URL:180913557_3_-1_1930776079_2120165_0_NFEO-MCD-SH-DWG-00025_B-3.PDF||1
B-3 LIFTING PLAN FOR LOADING, OFFLOADING, FIT UP, IFR - B - Approved with
ALIGNMENT AND INSTALLATION OF PIPE SPOOL BY 160 comments
TONNE CRANE AT BADER STREET AREA - ONSHRE
CONSTRUCTION WORKS
NFEO-MCD-SH-DWG-00026 <<URL:180913558_3_-1_1079077127_1771507_0_NFEO-MCD-SH-DWG-00026_B-3.PDF||1
B-3 LIFTING PLAN ARRANGEMENT FOR LOADING, IFR - B - Approved with
OFFLOADING,FIT UP, ALIGNMENT AND INSTALLATION OF comments
PIPE SPOOLS BY CRAWLER CRANE AT BADER STREET
AREA - ONSHORE CONSTRUCTION WORKS

Page 1 of 2
Transmittal Number:
McDermott Middle East Inc. NFEO-T-MCD-QA015-00490
Date: May 16, 2024
TRANSMITTAL TO SUB-CONTRACTORS Project: D7264 - North Field Expansion(NFXP) Project
Offshore - EPCI

NFEO-MCD-SH-PRC-00275 <<URL:178912604_7_-1_1797025664_2935643_0_NFEO-MCD-SH-PRC-00275_C-3.PDF||1
C-3 TRAFFIC MANAGEMENT PLAN EPC 1 - SITE LAYOUT IFA - C - Not Accepted
ONSHORE CONSTRUCTION WORKS

DISTRIBUTION:

Names Distribution Purpose Response Due Date

Wael Elbanna Issued for Information


Imam Mohamed Ibrahim Issued for Information
Yuwa Thapa Supplier Action Required 30-MAY-24

*** Attention ***


This transmittal including attachments is intended only for the person(s) or entity to which it is addressed and may contain confidential and/or legally privileged material and
information. Unauthorized disclosure, copying, distribution or use of this material and information may be unlawful and is prohibited. If you are not the intended recipient and
have received this transmittal in error, please contact the sender and delete all contents of this transmittal as well as any copies made.
Thank you!

Page 2 of 2
NORTH FIELD EXPANSION (NFXP)
PROJECT – OFFSHORE
Topsides and Pipelines: Engineering, Procurement, Construction, Installation and
Commissioning (EPCI)
COMPANY AGREEMENT No.: LTC/C/NFE/4665/19 CONTRACTOR Project No.: D7264

Asset : NFE

MATERIAL APPROVAL REQUEST FOR SPACERS


Document Title : (ADVANCE PRODUCTS & SYSTEM LLC) - ONSHORE
CONSTRUCTION WORKS

Document Number : NFEO-MCD-CL-MAR-00120

Discipline : CIVIL

Document Type : MATERIAL APPROVAL REQUEST

Document Class : 1

B 22-APR-2024 Issued for Review SS PGG JM HA NA


PEM /
DISCIPLINE
PREPARED REVIEWED APPROVED PD
REV. DATE REVISION STATUS
BY BY BY
APPROVED BY

McDermott www.mcdermott.com
McDermott Middle East Inc.

Qcon www.qcon.com.qa
QATAR ENGINEERING & CONSTRUCTION COMPANY W.L.L
NORTH FIELD EXPANSION (NFXP) PROJECT - OFFSHORE
TOPSIDES AND PIPELINES - EPCI

MATERIAL APPROVAL REQUEST FOR SPACERS (ADVANCE


PRODUCTS & SYSTEM LLC) - ONSHORE CONSTRUCTION
WORKS

REVISION HISTORY

Revision Date Revision Description

B 22-APR-2024 Issued for Review

HOLDS LIST

Hold. No. Page No. Hold Description

NFEO-MCD-CL-MAR-00120_B Page 2 of 37
NFEO-MCD-CL-MAR-00120_B Page 3 of 37
Qatar Engineering & Construction Company W.L.L
P.O. Box 24491, Doha, Qatar DRAWING / DOCUMENT
TRANSMITTAL MEMORANDUM
Head Office Tel: 0974 -44587200 Fax: 0974 -44587201/02

PROJECT:
QCON JOB No. A581 / 701
NORTH FIELD EXPANSION (NFXP) PROJECT – OFFSHORE
Topsides and Pipelines: Engineering, Procurement, Construction, Installation and
Commissioning (EPCI) TRANSMITTAL No. NFEO-QCON-MCD-T-0622
CONTRACTOR Project No.: D7264
TO
DATE OF ISSUE 09/Jun/2024
M/s. McDermott Middle East Inc.
6th Floor, Burj Doha Tower P.O. Box 23957 YOUR REF. No.
Al Dafna Area, WestBay Doha, State of Qatar DATE OF ISSUE
Attention : - STATUS CODE 6 For Cancellation
D7264 Document Control 1 Issued For information 7 As Per Your Request
2 Issued For Review 8 For Further Action
McDermott Middle East 3 Issued For Approval 9 As Built
[email protected] 4 Approved for Construction 10 Final
5 For your Records
Dear Sirs,
We enclose the following document(s) :
No.of
McDermott doc. Number Company Doc. Number Document Description REV STATUS CODE Copies REMARKS
/TYPE
MATERIAL APPROVAL REQUEST
D7264-SC-CV-02-A99-00132 NFEO-MCD-CL-MAR-00116 FOR SPACERS- ONSHORE C 3 PDF
CONSTRUCTION WORKS

MATERIAL APPROVAL REQUEST


FOR SPACERS (ADVANCE
D7264-SC-CV-02-A99-00153 NFEO-MCD-CL-MAR-00120 C 3 PDF
PRODUCTS & SYSTEM LLC) -
ONSHORE CONSTRUCTION WORKS

SPECIAL INSTRUCTIONS TYPE


T - TRANSPARENCY
P - PRINT
E-ELECTRONIC COPY
Originated by: Date: 09/06/2024 Received By:

Yuwaraj Thapa
Approved by Date: 09/06/2024

Date:
Wael El-Banna

Please acknowledge receipt by signing and returning attached Transmittal copy Back to Document Controller

DISTRIBUTION > | Project File |


Comments Resolution Sheet issued by QatarEnergy LNG Project management Team
Note: Supplier is requested to use this Excel spreadsheet to communicate answer's status for each PMT comment in line with the new submitted revision
Reply By Column: Enter the name of Supplier User who processed the comment's answer
Supplier's Response: Enter the Supplier's response status to the specific comment
Supplier's Answers
Document Number Revision Part Number Page From PMT Comments Reply By Supplier's Response
NFEO‐MCD‐CL‐MAR‐00120 B 14 Ciprian David No details of welding Andres Noted, Provided.
(C016357)
NFEO‐MCD‐CL‐MAR‐00120 B 14 Ciprian David Recommendation to add even the rubber beetwin Andres Noted, PVC Liner is provided as per the specifications
(C016357) casing spacer and external OD pipe mentioned in the drawing.
NFEO‐MCD‐CL‐MAR‐00120 B 14 Ciprian David The casing spacer should be verify and approved by Andres Noted, Casing Spacers are verified by TTQ
(C016357) third party recognise by CPY Engineering.
NFEO‐MCD‐CL‐MAR‐00120 B 14 Ciprian David What kind of test after welding ,MPI , DPI ? Andres MPI Testing will be done on the welding joints.
(C016357)
NFEO‐MCD‐CL‐MAR‐00120 B 14 Valentin Leica Detail support for 6" is missing (CR#2 & 3) Andres Noted. Proposed Spacers are used for ID1600 for CR‐
(C008712) 10.

NFEO‐MCD‐CL‐MAR‐00120 B 14 Valentin Leica Ensure the sample provided on site is aligned with Andres Noted. Sample provided is alined with drawing.
(C008712) the detail drawing

NFEO‐MCD‐CL‐MAR‐00120 B 14 Valentin Leica Larger ID will change the support configuration and Andres Noted. Proposed Spacers are used for ID1600 for CR‐
(C008712) wheels details, Contractor to provide details 10.
NORTH FIELD EXPANSION (NFXP)
PROJECT – OFFSHORE
Topsides and Pipelines: Engineering, Procurement, Construction, Installation and
Commissioning (EPCI)
COMPANY AGREEMENT No.: LTC/C/NFE/4665/19 CONTRACTOR Project No.: D7264

Asset : NFE

MATERIAL APPROVAL REQUEST FOR SPACERS (ADVANCE


Document Title : PRODUCTS & SYSTEM LLC) - ONSHORE CONSTRUCTION
WORKS

Document Number : NFEO-MCD-CL-MAR-00120

Discipline : CIVIL

Document Type : MATERIAL APPROVAL REQUEST

Document Class : 1

C 09-JUN-2024 Issued for Approval SS PGG JM WE HA

B 22-APR-2024 Issued for Review SS PGG JM WE HA

DISCIPLINE PEM / PD
PREPARED REVIEWED APPROVED
REV. DATE REVISION STATUS
BY BY BY
APPROVED BY

McDermott www.mcdermott.com
McDermott Middle East Inc.

Qcon www.qcon.com.qa
QATAR ENGINEERING & CONSTRUCTION COMPANY W.L.L

NFEO-MCD-CL-MAR-00120_C Page 1 of 37
NORTH FIELD EXPANSION (NFXP) PROJECT - OFFSHORE
TOPSIDES AND PIPELINES - EPCI

MATERIAL APPROVAL REQUEST FOR SPACERS (ADVANCE


PRODUCTS & SYSTEM LLC) - ONSHORE CONSTRUCTION
WORKS

REVISION HISTORY

Revision Date Revision Description

B 22-APR-2024 Issued for Review

C 09-JUN-2024 Issued for Approval

HOLDS LIST

Hold. No. Page No. Hold Description

NFEO-MCD-CL-MAR-00120_C Page 2 of 37
Material Approval Request
(MAR)
North Field Expansion (NFXP) Project – Onshore Tops
Project
ides & Pipelines (EPCI)
MAR No. NFEO-MCD-CL-MAR-00120
M/s. QATAR ENGINEERING & CONSTRUCTION COMP
Subcontractor ANY W.L.L Request Date 09-JUN-2024

Discipline Civil System 1

Description Requested
1 Item to be installed Spacers for Microtunnelling works
North Field Expansion (NFXP) Project-Onshore Topsides & Pip
2 Location to be Installed: elines (EPCI)
NFEO-MCD-CL-SPC-00003
3 Relevant Specifications/Codes/Standards/Drawing Reference NFEO-MCD-QM-SPC-00007
4 Manufacturer/Vendor/Supplier Name ADVANCE PRODUCTS & SYSTEM LLC

5 Brand and/or Model Name 38” OD X 63” ID Casing Spacer- Wheel Type

Reference Data
1 Previous Approved MAR experience, if any ■
2 Manufacturer/Vendor/Supplier Profile ■
3 Technical Data Sheet or equivalent ■
4 Material Test Report ■
5 Sample □
6 Others, if any □

We hereby certify that proposed material have been reviewed and our proposals are confirming with

Project specification ■ Alternative □ Equivalent □ Manufacturer’s specification □


Comments

Name / Signature / Date

Subcontractor (TTQ / Qcon) Project Quality (Qcon) Discipline (MCD) Project Quality (MCD)

CONTRACTOR’s Response Approved □ Approved with Comment □ Not Approved □

COMPANY’s Response Approved □ Approved with Comment □ Not Approved □

Name Signature Date

NFEO-MCD-CL-MAR-00120_C Page 3 of 37
CUSTOMER APPROVAL
CASING INSULATOR SPECIFICATION
PART# : 20-002-DWG-06-24 PRINT NAME SIGNATURE

BAND
8" WIDE
14 GA. (.074") HOT ROLLED PICKLED STEEL
FUSION BONDED COATING 8-15 MIL THICK RUNNER
RIBBED FLANGES
Ø38" OD
LINER CARRIER PIPE
RISER 'B'
36.0°
PVC LINER (0.096") 2 TYP.

HARDNESS - DUROMETER "A" 80 +/- 5


OPERATING TEMP: 140 F
DIELECTRIC STRENGTH - 60,000 V
RUNNER
4.6300
2" WIDE X 1 1/2" HIGH MOLDED POLYMER
2 TOP TYP. TYP.
3 3
RISERS 54.0° Ø63" (1600mm) ID
CASING PIPE
10 GA. (.134) HOT ROLLED PICKLED STEEL STEEL
21.0°
MIG WELDED TO BAND TYP. REINFORCEMENT BAR
3 2 TOTAL
RISER 'A' = 0.6875 / 1.3125" TALL
TYP.
RISER 'B' =1.5" TALL 3

STEEL ROLLER
ASSEMBLY HARDWARE 1 PER RISER
4 SUPPORT PLATS 4 TOTAL
3 SETS PER FLANGE REACHING UNTIL
ENFORCING CASTER
5/16" -18 X 2" PLATED STEEL BOLTS LATERALLY
7.8700 2 STIFFENERS 5mm
5/16" PLATED STEEL WASHERS 16 TOTAL THICK
5/16" PLATED STEEL NUTS 8 TOTAL MAX LOAD CAPACITY PER SPACER
3,000 LBS DYNAMIC
SUPPORT PLATES * BIDIRECTIONAL CASING SPACER (STRAIGHT WHEELS). 6,000 LBS STATIC
GUIDES ARE NOT NEEDED*
10 GA. (.134) HOT ROLLED PICKLED STEEL
MIG WELDED TO BAND
SUPPORT PLATE #1 = 3.00" LONG *** CONTROLLED COPY ***
PIPE(lbs/ft):XX PIPE TYPE: STEEL
ROLLERS THIS DRAWING AND PROPRIETARY
STEEL ROLLER DESIGN IS SOLELY THE PROPERTY
3.63 OAH OF ADVANCE PRODUCTS & Drawn by: AS
Casing Spacer
6000 # CAPACITY EACH CASING SPACER SYSTEMS, INC. AND IS SUBMITTED Approved by: AP
PLACEMENT SHOULD BE WITH THE UNDERSTANDING THAT
MIG WELDED TO RISER EVERY 6-8 FT. OR 3
38" OD X 63" ID Date : 09/06/24
SPACERS PER JOINT
IT WILL BE KEPT IN STRICT
UNLESS WRITTEN CONFIDENCE.
APPROVAL BY APS COPYRIGHT PROTECTED ©.
W
AT
ER
AR
E
A

W
AT
ER
3.224645

DE

AR
L-01

EA
1.991299

1.379651

TRANSFORM

ER

PARKING
BUS
1.402206

STREET
BADER
MAINTENANCE

TO
ROAD

MAINTENANCE

ROAD

L
R
IDO
RR
5.306339

R CO
LO

WE
PO
TW

KV
FU 2 & W

400
IND TURE 3
US
TR
Y

MHT

MHT

MHT
MHT

m)
MHT

(300
OR
RID
OR
RC
MHT

TE
WA
NG
OLI
CO
Qatargas Operating Company Ltd.
QATARGAS