DISTRICT OFFICE: UMGUNGUNDLOVU
AREA OFFICES: Vulindlela, Umshwathi and Mpumalanga
Item No Description                                                       Unit       Quantity (Per
                                                                                      Financial
                                                                                        Year)
1       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Cost Centre
1.1     Lead Civil Engineer/ Project Manager (Category B)                Hours           960
1.2     Category C personnel                                             Month            12
1.3     Performance Information Reporting, Monitoring and                Month            12
        Evaluation personnel (Category D)
2       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Area Offices
2.1     Category C personnel (1 per Area Office - 3 x 12                 Month            36
        months)
2.2     Category D personnel (1 per Area Office - 3 x 12                 Month            36
        months)
3       Road Safety Audits
3.1     Perform Road Safety Audits as per the Road Safety                 km             350
        Audit Manual May 2012 Edition or latest - Surfaced
        Roads and Gravel Roads
4       Mentoring     of   Graduates,   Technicians,
        Technologists and Candidate Engineers (Not covered
        by ECSA)
4.1     Supervision, Training and Mentoring of 10 graduates              Month            12
        per month (Category C minimum 5 years post
        registration)
5       Disbursements
5.1     Reimbursement for travelling                                      km            222000
5.2     Accommodation                                                  Lump sum           1
5.3     Printing                                                       Lump sum               1
6       TIME BASIS: Categories as specified in the Board Notice for
        ECSA (As and when required)
6.1     Personnel - Category A                                           Hours           800
6.2     Personnel - Category B                                           Hours           800
6.3     Personnel - Category C                                           Hours           800
6.4     Personnel - Category C (All-inclusive rate Monthly               Month            1
        Costs)
6.5     Personnel - Category D                                           Hours           800
6.6     Personnel - Category D (All-inclusive rate Monthly               Month            1
        Costs)
7       Basic Engineering Fees as for Professional Services
        in terms of the Engineering Profession Act, 2000, (Act No.
        46 of 2000)
7.1     Basic Engineering Fees as for Professional Services in             %              N/A
        terms of the Engineering Profession Act, 2000, (Act No. 46
        of 2000) for: Inception, Concept & Viability, Design
        development, Documentation & Procurement, Contract
        Administration & Inspection and Close Out.
                                         Sub-Total 1 Based on 12 months calculations (To be
                                         carried over to Page C42)
      Rate         Amount (R)
        1,060.50    1,018,080.00
      108,108.00    1,297,296.00
       85,008.00    1,020,096.00
      108,108.00    3,891,888.00
       85,008.00    3,060,288.00
        3,210.90    1,123,815.00
      108,108.00    1,297,296.00
7.5                 1,665,000.00
                    900,000.00
                    200,000.00
        1,249.50     999,600.00
        1,060.50     848,400.00
          900.90     720,720.00
         614.25          614.25
         483.00      386,400.00
       85,008.00      85,008.00
8%                 Rate Only
  18,514,501.25
DISTRICT OFFICE: HARRY GWALA
AREA OFFICES:     Ixopo,   uMzimkhulu,    Underberg   and
 Kokstad
Item No Description                                                      Unit       Quantity (Per
                                                                                     Financial
                                                                                       Year)
1       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Cost Centre
1.1     Lead Civil Engineer/ Project Manager (Category B)               Hours           960
1.2     Category C personnel                                            Month            12
1.3     Performance Information Reporting, Monitoring and               Month            12
        Evaluation personnel (Category D)
2       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Area Offices
2.1     Category C personnel (1 per Area Office - 4 x 12                Month            48
        months)
2.2     Category D personnel (1 per Area Office - 4 x 12                Month            48
        months)
3       Road Safety Audits
3.1     Perform Road Safety Audits as per the Road Safety                km             350
        Audit Manual May 2012 Edition or latest - Surfaced
        Roads and Gravel Roads
4       Mentoring     of     Graduates,   Technicians,
        Technologists and Candidate Engineers (Not covered
        by ECSA)
4.1     Supervision, Training and Mentoring of 10 graduates             Month            12
        per month (Category C minimum 5 years post
        registration)
5       Disbursements
5.1     Reimbursement for travelling                                     km           222000
5.2     Accommodation                                                 Lump sum          1
5.3     Printing                                                      Lump sum           1
6       TIME BASIS: Categories as specified in the Board Notice for
        ECSA (As and when required)
6.1     Personnel - Category A                                          Hours           800
6.2     Personnel - Category B                                          Hours           800
6.3     Personnel - Category C                                          Hours           800
6.4     Personnel - Category C (All-inclusive rate Monthly              Month            1
        Costs)
6.5     Personnel - Category D                                          Hours           800
6.6     Personnel - Category D (All-inclusive rate Monthly              Month            1
        Costs)
7       Basic Engineering Fees as for Professional Services
        in terms of the Engineering Profession Act, 2000, (Act No.
        46 of 2000)
7.1     Basic Engineering Fees as for Professional Services in            %              N/A
        terms of the Engineering Profession Act, 2000, (Act No. 46
        of 2000) for: Inception, Concept & Viability, Design
        development, Documentation & Procurement, Contract
        Administration & Inspection and Close Out.
                                        Sub-Total 1 Based on 12 months calculations (To be
                                        carried over to Page C42)
      Rate         Amount (R)
        1,060.50    1,018,080.00
      108,108.00    1,297,296.00
       85,008.00    1,020,096.00
      108,108.00    5,189,184.00
       85,008.00    4,080,384.00
        3,210.90
                    1,123,815.00
      108,108.00
                    1,297,296.00
7.5                 1,665,000.00
                    900,000.00
                    200,000.00
        1,249.50     999,600.00
        1,060.50     848,400.00
          900.90     720,720.00
         614.25          614.25
         483.00      386,400.00
       85,008.00      85,008.00
8%                 Rate Only
  20,831,893.25
DISTRICT OFFICE: METRO
AREA OFFICES: North Metro and South Metro
Item No Description                                                       Unit       Quantity (Per
                                                                                      Financial
                                                                                        Year)
1       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Cost Centre
1.1     Lead Civil Engineer/ Project Manager (Category B)                Hours           960
1.2     Category C personnel                                             Month            12
1.3     Performance Information Reporting, Monitoring and                Month            12
        Evaluation personnel (Category D)
2       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Area Offices
2.1     Category C personnel (1 per Area Office - 2 x 12                 Month            24
        months)
2.2     Category D personnel (1 per Area Office - 2 x 12                 Month            24
        months)
3       Road Safety Audits
3.1     Perform Road Safety Audits as per the Road Safety                 km             350
        Audit Manual May 2012 Edition or latest - Surfaced
        Roads and Gravel Roads
4       Mentoring     of     Graduates,   Technicians,
        Technologists and Candidate Engineers (Not covered
        by ECSA)
4.1     Supervision, Training and Mentoring of 10 graduates              Month            12
        per month (Category C minimum 5 years post
        registration)
5       Disbursements
5.1     Reimbursement for travelling                                      km            222000
5.2     Accommodation                                                  Lump sum           1
5.3     Printing                                                       Lump sum               1
6       TIME BASIS: Categories as specified in the Board Notice for
        ECSA (As and when required)
6.1     Personnel - Category A                                           Hours           800
6.2     Personnel - Category B                                           Hours           800
6.3     Personnel - Category C                                           Hours           800
6.4     Personnel - Category C (All-inclusive rate Monthly               Month            1
        Costs)
6.5     Personnel - Category D                                           Hours           800
6.6     Personnel - Category D (All-inclusive rate Monthly               Month            1
        Costs)
7       Basic Engineering Fees as for Professional Services
        in terms of the Engineering Profession Act, 2000, (Act No.
        46 of 2000)
7.1     Basic Engineering Fees as for Professional Services in             %              N/A
        terms of the Engineering Profession Act, 2000, (Act No. 46
        of 2000) for: Inception, Concept & Viability, Design
        development, Documentation & Procurement, Contract
        Administration & Inspection and Close Out.
                                         Sub-Total 1 Based on 12 months calculations (To be
                                         carried over to Page C42)
     Rate          Amount (R)
       1,090.80     1,047,168.00
     111,196.80     1,334,361.60
      87,436.80     1,049,241.60
     111,196.80     2,668,723.20
      87,436.80     2,098,483.20
       3,302.64
                    1,155,924.00
     111,196.80
                    1,334,361.60
            7.50    1,665,000.00
                    900,000.00
                    200,000.00
       1,285.20     1,028,160.00
       1,090.80       872,640.00
         926.64       741,312.00
        631.80           631.80
        496.80       397,440.00
      87,436.80       87,436.80
8%                 Rate Only
                   16,580,883.80
DISTRICT OFFICE: UGU
AREA OFFICES: Harding, Port Shepstone and Umzumbe
Item No Description                                                      Unit       Quantity (Per
                                                                                     Financial
                                                                                       Year)
1       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Cost Centre
1.1     Lead Civil Engineer/ Project Manager (Category B)               Hours           960
1.2     Category C personnel                                            Month            12
1.3     Performance Information Reporting, Monitoring and               Month            12
        Evaluation personnel (Category D)
2       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Area Offices
2.1     Category C personnel (1 per Area Office - 3 x 12                Month            36
        months)
2.2     Category D personnel (1 per Area Office - 3 x 12                Month            36
        months)
3       Road Safety Audits
3.1     Perform Road Safety Audits as per the Road Safety                km             350
        Audit Manual May 2012 Edition or latest - Surfaced
        Roads and Gravel Roads
4       Mentoring     of     Graduates,   Technicians,
        Technologists and Candidate Engineers (Not covered
        by ECSA)
4.1     Supervision, Training and Mentoring of 10 graduates             Month            12
        per month (Category C minimum 5 years post
        registration)
5       Disbursements
5.1     Reimbursement for travelling                                     km           222000
5.2     Accommodation                                                 Lump sum          1
5.3     Printing                                                      Lump sum           1
6       TIME BASIS: Categories as specified in the Board Notice for
        ECSA (As and when required)
6.1     Personnel - Category A                                          Hours           800
6.2     Personnel - Category B                                          Hours           800
6.3     Personnel - Category C                                          Hours           800
6.4     Personnel - Category C (All-inclusive rate Monthly              Month            1
        Costs)
6.5     Personnel - Category D                                          Hours           800
6.6     Personnel - Category D (All-inclusive rate Monthly              Month            1
        Costs)
7       Basic Engineering Fees as for Professional Services
        in terms of the Engineering Profession Act, 2000, (Act No.
        46 of 2000)
7.1     Basic Engineering Fees as for Professional Services in            %              N/A
        terms of the Engineering Profession Act, 2000, (Act No. 46
        of 2000) for: Inception, Concept & Viability, Design
        development, Documentation & Procurement, Contract
        Administration & Inspection and Close Out.
                                        Sub-Total 1 Based on 12 months calculations (To be
                                        carried over to Page C42)
      Rate         Amount (R)
        1,060.50    1,018,080.00
      108,108.00    1,297,296.00
       85,008.00    1,020,096.00
      108,108.00    3,891,888.00
       85,008.00    3,060,288.00
        3,210.90
                    1,123,815.00
      108,108.00
                    1,297,296.00
7.5                 1,665,000.00
                    900,000.00
                    200,000.00
        1,249.50     999,600.00
        1,060.50     848,400.00
          900.90     720,720.00
         614.25          614.25
         483.00      386,400.00
       85,008.00      85,008.00
8%                 Rate Only
                   18,514,501.25
DISTRICT OFFICE: ILEMBE
AREA OFFICES: Maphumulo and Ndwendwe
Item No Description                                                      Unit       Quantity (Per
                                                                                     Financial
                                                                                       Year)
1       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Cost Centre
1.1     Lead Civil Engineer/ Project Manager (Category B)               Hours           960
1.2     Category C personnel                                            Month            12
1.3     Performance Information Reporting, Monitoring and               Month            12
        Evaluation personnel (Category D)
2       TIME BASIS: Categories as specified in the Board Notice for
        ECSA - Area Offices
2.1     Category C personnel (1 per Area Office - 2 x 12                Month            24
        months)
2.2     Category D personnel (1 per Area Office - 2 x 12                Month            24
        months)
3       Road Safety Audits
3.1     Perform Road Safety Audits as per the Road Safety                km             350
        Audit Manual May 2012 Edition or latest - Surfaced
        Roads and Gravel Roads
4       Mentoring     of     Graduates,   Technicians,
        Technologists and Candidate Engineers (Not covered
        by ECSA)
4.1     Supervision, Training and Mentoring of 10 graduates             Month            12
        per month (Category C minimum 5 years post
        registration)
5       Disbursements
5.1     Reimbursement for travelling                                     km           222000
5.2     Accommodation                                                 Lump sum          1
5.3     Printing                                                      Lump sum           1
6       TIME BASIS: Categories as specified in the Board Notice for
        ECSA (As and when required)
6.1     Personnel - Category A                                          Hours           800
6.2     Personnel - Category B                                          Hours           800
6.3     Personnel - Category C                                          Hours           800
6.4     Personnel - Category C (All-inclusive rate Monthly              Month            1
        Costs)
6.5     Personnel - Category D                                          Hours           800
6.6     Personnel - Category D (All-inclusive rate Monthly              Month            1
        Costs)
7       Basic Engineering Fees as for Professional Services
        in terms of the Engineering Profession Act, 2000, (Act No.
        46 of 2000)
7.1     Basic Engineering Fees as for Professional Services in            %              N/A
        terms of the Engineering Profession Act, 2000, (Act No. 46
        of 2000) for: Inception, Concept & Viability, Design
        development, Documentation & Procurement, Contract
        Administration & Inspection and Close Out.
                                        Sub-Total 1 Based on 12 months calculations (To be
                                        carried over to Page C42)
      Rate         Amount (R)
        1,060.50    1,018,080.00
      108,108.00    1,297,296.00
       85,008.00    1,020,096.00
      108,108.00    2,594,592.00
       85,008.00    2,040,192.00
        3,210.90
                    1,123,815.00
      108,108.00
                    1,297,296.00
7.5                 1,665,000.00
                    900,000.00
                    200,000.00
        1,249.50     999,600.00
        1,060.50     848,400.00
          900.90     720,720.00
         614.25          614.25
         483.00      386,400.00
       85,008.00      85,008.00
8%                 Rate Only
                   16,197,109.25
    DISTRICT OFFICE: KING CETSHWAYO
AREA OFFICES: Nkandla, Empangeni and Eshowe
Item No Description                                                      Unit         Quantity (Per
                                                                                       Financial
                                                                                         Year)
1        TIME BASIS: Categories as specified in the Board
         Notice for ECSA - Cost Centre
1.1      Lead Civil Engineer/ Project Manager (Category B)              Hours             960
1.2      Category C personnel                                           Month              12
1.3      Performance Information Reporting, Monitoring and              Month              12
         Evaluation personnel (Category D)
2        TIME BASIS: Categories as specified in the Board
         Notice for ECSA - Area Offices
2.1      Category C personnel (1 per Area Office - 3 x 12               Month              36
         months)
2.2      Category D personnel (1 per Area Office - 3 x 12               Month              36
         months)
3        Road Safety Audits
3.1      Perform Road Safety Audits as per the Road Safety                km              350
         Audit Manual May 2012 Edition or latest - Surfaced
         Roads and Gravel Roads
4        Mentoring of Graduates, Technicians,
         Technologists and Candidate Engineers (Services not
         covered by ECSA)
4.1      Supervision, Training and Mentoring of 10                      Month              12
         Candidates per month (Category C minimum 5 years
         post registration)
5        Disbursements
5.1      Reimbursement for travelling                                    km             222000
5.2      Accommodation                                                Lump sum            1
5.3      Printing                                                     Lump sum             1
6        TIME BASIS: Categories as specified in the Board
         Notice for ECSA (As and when required)
6.1      Personnel - Category A                                         Hours             800
6.2      Personnel - Category B                                         Hours             800
6.3      Personnel - Category C                                         Hours             800
6.4      Personnel - Category C (All-inclusive rate Monthly             Month              1
         Costs)
6.5      Personnel - Category D                                         Hours             800
6.6      Personnel - Category D (All-inclusive rate Monthly             Month              1
         Costs)
7        Basic Engineering Fees as for Professional Services
         in terms of the Engineering Profession Act, 2000, (Act No.
         46 of 2000)
7.1      Basic Engineering Fees as for Professional Services in           %               N/A
         terms of the Engineering Profession Act, 2000, (Act
          No. 46 of 2000) for: Inception, Concept &
         Viability, Design development, Documentation &
         Procurement, Contract Administration & Inspection
         and Close Out.
                                         Sub-Total 1 Based on 12 months calculations (To be carried
                                         over to Page C42)
      Rate         Amount (R)
        1,060.50     1,018,080.00
      108,108.00     1,297,296.00
       85,008.00     1,020,096.00
      108,108.00     3,891,888.00
       85,008.00     3,060,288.00
        3,210.90
                     1,123,815.00
      108,108.00
                     1,297,296.00
7.5                  1,665,000.00
                     900,000.00
                     200,000.00
        1,249.50      999,600.00
        1,060.50      848,400.00
          900.90      720,720.00
          614.25          614.25
          483.00      386,400.00
       85,008.00       85,008.00
8%                 Rate Only
  18,514,501.25
DISTRICT OFFICE: UMKHANYAKUDE
AREA OFFICE: Jozini, Huhluwe and uMhlabuyalingana
Item  Description                                                     Unit       Quantity (Per        Rate
No                                                                                Financial
                                                                                    Year)
1     TIME BASIS: Categories as specified in the Board Notice
      for ECSA - Cost Centre
1.1   Lead Civil Engineer/ Project Manager (Category B)             Hours            960                 1,060.50
1.2   Category C personnel                                          Month            12               108,108.00
1.3   Performance Information Reporting, Monitoring and             Month            12
      Evaluation personnel (Category D)
                                                                                                       85,008.00
2     TIME BASIS: Categories as specified in the Board Notice
      for ECSA - Area Offices
2.1   Category C personnel (1 per Area Office - 3 x 12              Month             36              108,108.00
      months)
2.2   Category D personnel (1 per Area Office - 3 x 12              Month             36               85,008.00
      months)
3     Road Safety Audits
3.1   Perform Road Safety Audits as per the Road Safety               km             350
      Audit Manual May 2012 Edition or latest - Surfaced                                                3,210.90
      Roads and Gravel Roads
4     Mentoring of Graduates, Technicians,
      Technologists and Candidate Engineers (Services not
      covered by ECSA)
4.1   Supervision, Training and Mentoring of 10 Candidates          Month             12
      per month (Category C minimum 5                                                                 108,108.00
      years post registration)
5     Disbursements
5.1   Reimbursement for travelling                                    km           222000        15
5.2   Accommodation                                                Lump sum          1
5.3   Printing                                                     Lump sum            1
6     TIME BASIS: Categories as specified in the Board Notice
      for ECSA (As and when required)
6.1   Personnel - Category A                                        Hours            800                1,249.50
6.2   Personnel - Category B                                        Hours            800                1,060.50
6.3   Personnel - Category C                                        Hours            800                  900.90
6.4   Personnel - Category C (All-inclusive rate Monthly            Month             1                   614.25
      Costs)
6.5   Personnel - Category D                                        Hours            800                  483.00
6.6   Personnel - Category D (All-inclusive rate Monthly            Month             1                85,008.00
      Costs)
7     Basic Engineering Fees as for Professional Services
      in terms of the Engineering Profession Act, 2000, (Act No.
      46 of 2000)
7.1   Basic Engineering Fees as for Professional Services in           %             N/A         8%
      terms of the Engineering Profession Act, 2000, (Act
      No. 46 of 2000) for: Inception, Concept &
      Viability, Design development, Documentation &
      Procurement, Contract Administration & Inspection
      and Close Out.
                                      Sub-Total 1 Based on 12 months calculations (To be
                                      carried over to Page C42)
                                                                                                                    20,179,50
Amount (R)
 1,018,080.00
 1,297,296.00
 1,020,096.00
 3,891,888.00
 3,060,288.00
 1,123,815.00
 1,297,296.00
 3,330,000.00
  900,000.00
  200,000.00
   999,600.00
   848,400.00
   720,720.00
       614.25
   386,400.00
    85,008.00
Rate Only
20,179,501.25
    DISTRICT OFFICE: ZULULAND
AREA OFFICES: Mahlabathini, Nongoma, Vryheid and Pongola
Item No Description                                                       Unit       Quantity (Per
                                                                                    Financial Year)
1        TIME BASIS: Categories as specified in the Board Notice
         for ECSA - Cost Centre
1.1      Lead Civil Engineer/ Project Manager (Category B) (2 x          Hours          1920
         12 months)
1.2      Category C personnel (2 x 12 months)                            Month            24
1.3      Performance Information Reporting, Monitoring and               Month            24
         Evaluation personnel (Category D) (2 x 12 months)
2        TIME BASIS: Categories as specified in the Board Notice
         for ECSA - Area Offices
2.1      Category C personnel (1 per Area Office - 4 x 12 months)        Month            48
2.2      Category D personnel (1 per Area Office - 4 x 12 months)        Month            48
3        Road Safety Audits
3.1      Perform Road Safety Audits as per the Road Safety                 km            700
         Audit Manual May 2012 Edition or latest - Surfaced
         Roads and Gravel Roads
4        Mentoring of Graduates, Technicians,
         Technologists and Candidate Engineers (Services not covered
         by ECSA)
4.1      Supervision, Training and Mentoring of 20 Candidates            Month            12
         per month (Category C minimum 5 years post registration)
5        Disbursements
5.1      Reimbursement for travelling                                      km          324000
5.2      Accommodation                                                  Lump sum         1
5.3      Printing                                                       Lump sum          1
6        TIME BASIS: Categories as specified in the Board Notice
         for ECSA (As and when required)
6.1      Personnel - Category A                                          Hours          1600
6.2      Personnel - Category B                                          Hours          1600
6.3      Personnel - Category C                                          Hours          1600
6.4      Personnel - Category C (All-inclusive rate Monthly              Month           2
         Costs)
6.5      Personnel - Category D                                          Hours          1600
6.6      Personnel - Category D (All-inclusive rate Monthly              Month           2
         Costs)
7        Basic Engineering Fees as for Professional Services in terms
         of the Engineering Profession Act, 2000, (Act No. 46 of
         2000)
7.1      Basic Engineering Fees as for Professional Services in           %              N/A
         terms of the Engineering Profession Act, 2000, (Act No. 46
         of 2000) for: Inception, Concept & Viability, Design
         development, Documentation & Procurement, Contract
         Administration & Inspection and  Close Out.
                                        Sub-Total 1 Based on 12 months calculations (To be carried
                                        over to Page C42)
     Rate         Amount (R)
       1,060.50     2,036,160.00
     108,108.00     2,594,592.00
      85,008.00     2,040,192.00
                               -
     108,108.00     5,189,184.00
      85,008.00     4,080,384.00
                              -
       3,210.90     2,247,630.00
     108,108.00     1,297,296.00
15                  4,860,000.00
                  1,300,000.00
                    400,000.00
       1,249.50     1,999,200.00
       1,060.50     1,696,800.00
         900.90     1,441,440.00
        614.25         1,228.50
        483.00       772,800.00
      85,008.00      170,016.00
8%                Rate Only
                  32,126,922.50
DISTRICT OFFICE: UTHUKELA
AREA OFFICE: Ladysmith, Bergville and Estcourt
Item No Description                                                     Unit       Quantity (Per
                                                                                  Financial Year)
1      TIME BASIS: Categories as specified in the Board Notice for
       ECSA - Cost Centre
1.1    Lead Civil Engineer/ Project Manager (Category B)              Hours             960
1.2    Category C personnel                                           Month             12
1.3    Performance Information Reporting, Monitoring and              Month             12
       Evaluation personnel (Category D)
2      TIME BASIS: Categories as specified in the Board Notice for
       ECSA - Area Offices
2.1    Category C personnel (1 per Area Office - 3 x 12               Month             36
       months)
2.2    Category D personnel (1 per Area Office - 3 x 12               Month             36
       months)
3      Road Safety Audits
3.1    Perform Road Safety Audits as per the Road Safety                km              350
       Audit Manual May 2012 Edition or latest - Surfaced
       Roads and Gravel Roads
4      Mentoring of Graduates, Technicians, Technologists and
       Candidate Engineers (Services not covered by ECSA)
4.1    Supervision, Training and Mentoring of 10 Candidates per       Month             12
       month (Category C minimum 5 years post registration)
5      Disbursements
5.1    Reimbursement for travelling                                     km            222000
5.2    Accommodation                                                 Lump sum           1
5.3    Printing                                                      Lump sum            1
6      TIME BASIS: Categories as specified in the Board Notice for
       ECSA (As and when required)
6.1    Personnel - Category A                                         Hours             800
6.2    Personnel - Category B                                         Hours             800
6.3    Personnel - Category C                                         Hours             800
6.4    Personnel - Category C (All-inclusive rate Monthly             Month              1
       Costs)
6.5    Personnel - Category D                                         Hours             800
6.6    Personnel - Category D (All-inclusive rate Monthly             Month              1
       Costs)
7      Basic Engineering Fees as for Professional Services
       in terms of the Engineering Profession Act, 2000, (Act No.
       46 of 2000)
7.1    Basic Engineering Fees as for Professional Services in            %              N/A
       terms of the Engineering Profession Act, 2000, (Act No. 46
       of 2000) for: Inception, Concept & Viability, Design
       development, Documentation & Procurement, Contract
       Administration & Inspection and Close Out.
                                       Sub-Total 1 Based on 12 months calculations (To be carried
                                       over to Page C42)
     Rate          Amount (R)
       1,090.80     1,047,168.00
     111,196.80     1,334,361.60
      87,436.80
                    1,049,241.60
     111,196.80     4,003,084.80
      87,436.80     3,147,724.80
       3,302.64
                    1,155,924.00
     111,196.80
                    1,334,361.60
            7.50    1,665,000.00
                     900,000.00
                     200,000.00
       1,285.20     1,028,160.00
       1,090.80       872,640.00
         926.64       741,312.00
        631.80            631.80
        496.80        397,440.00
      87,436.80        87,436.80
8%                 Rate Only
                   18,964,487.00
DISTRICT OFFICE: AMAJUBA
AREA OFFICE: Newcastle and Utrecht
Item No Description                                                   Unit      Quantity (Per        Rate
                                                                                 Financial
                                                                                   Year)
1      TIME BASIS: Categories as specified in the Board Notice
       for ECSA - Cost Centre
1.1    Lead Civil Engineer/ Project Manager (Category B)             Hours          960                1,090.80
1.2    Category C personnel                                          Month           12              111,196.80
1.3    Performance Information Reporting, Monitoring and             Month           12               87,436.80
       Evaluation personnel (Category D)
2      TIME BASIS: Categories as specified in the Board Notice
       for ECSA - Area Offices
2.1    Category C personnel (1 per Area Office - 2 x 12              Month           24              111,196.80
       months)
2.2    Category D personnel (1 per Area Office - 2 x 12              Month           24               87,436.80
       months)
3      Road Safety Audits
3.1    Perform Road Safety Audits as per the Road Safety              km            350
       Audit Manual May 2012 Edition or latest -                                                       3,302.64
       Surfaced Roads and Gravel Roads
4      Mentoring of graduates (Not covered by ECSA)
4.1    Mentoring of Graduates, Technicians,                          Month           12
       Technologists and Candidate Engineers (Services not                                           111,196.80
       covered by ECSA)
5      Supervision, Training and Mentoring of 10
       Candidates per month (Category C minimum 5 years
       post registration)
5.1    Reimbursement for travelling                                    km          222000                   7.50
5.2    Accommodation                                                Lump sum        2600
5.3    Printing                                                     Lump sum          1
6      TIME BASIS: Categories as specified in the Board Notice
       for ECSA (As and when required)
6.1    Personnel - Category A                                        Hours          800                1,285.20
6.2    Personnel - Category B                                        Hours          800                1,090.80
6.3    Personnel - Category C                                        Hours          800                  926.64
6.4    Personnel - Category C (All-inclusive rate Monthly            Month           1                   631.80
       Costs)
6.5    Personnel - Category D                                        Hours          800                  496.80
6.6    Personnel - Category D (All-inclusive rate Monthly            Month           1                87,436.80
       Costs)
7      Basic Engineering Fees as for Professional Services in
       terms of the Engineering Profession Act, 2000, (Act No. 46
       of 2000)
7.1    Basic Engineering Fees as for Professional Services in        %                N/A       8%
       terms of the Engineering Profession Act, 2000, (Act
       No. 46 of 2000) for: Inception, Concept & Viability,
       Design development, Documentation & Procurement,
       Contract
       Administration & Inspection and  Close Out.
                                     Sub-Total 1 Based on 12 months calculations (To be carried
                                      over to Page C42)
                                                                                                                   16,580,8
Amount (R)
 1,047,168.00
 1,334,361.60
 1,049,241.60
 2,668,723.20
 2,098,483.20
 1,155,924.00
 1,334,361.60
 1,665,000.00
 900,000.00
 200,000.00
 1,028,160.00
   872,640.00
   741,312.00
       631.80
   397,440.00
    87,436.80
Rate Only
16,580,883.80
DISTRICT OFFICE: UMZINYATHI
AREA OFFICE: Umsinga, Nqutu and Greytown
Item  Description                                                             Unit      Quantity (Per
No                                                                                       Financial
                                                                                           Year)
1     TIME BASIS: Categories as specified in the Board Notice for
      ECSA - Cost Centre
1.1   Lead Civil Engineer/ Project Manager (Category B)                     Hours            960
1.2   Category C personnel                                                  Month             12
1.3   Performance Information Reporting, Monitoring and                     Month             12
      Evaluation personnel (Category D)
2     TIME BASIS: Categories as specified in the Board Notice for
      ECSA - Area Offices
2.1   Category C personnel (1 per Area Office - 3 x 12 months)              Month             36
2.2   Category D personnel (1 per Area Office - 3 x 12 months)              Month             36
3     Road Safety Audits
3.1   Perform Road Safety Audits as per the Road Safety Audit                 km             350
      Manual May 2012 Edition or latest - Surfaced Roads and
      Gravel Roads
4     Mentoring of Graduates, Technicians, Technologists and
      Candidate Engineers (Services
      not covered by ECSA)
4.1   Supervision, Training and Mentoring of 10 Candidates per              Month             12
      month (Category C minimum 5 years post registration)
5     Disbursements
5.1   Reimbursement for travelling                                           km            222000
5.2   Accommodation                                                       Lump sum           1
5.3   Printing                                                            Lump sum            1
6     TIME BASIS: Categories as specified in the Board Notice for
      ECSA (As and when required)
6.1   Personnel   -   Category   A                                          Hours            800
6.2   Personnel   -   Category   B                                          Hours            800
6.3   Personnel   -   Category   C                                          Hours            800
6.4   Personnel   -   Category   C (All-inclusive rate Monthly Costs)       Month             1
6.5   Personnel - Category D                                                Hours            800
6.6   Personnel - Category D (All-inclusive rate Monthly Costs)             Month             1
7     Basic Engineering Fees as for Professional Services in terms
      of the Engineering Profession Act, 2000, (Act No. 46 of 2000)
7.1   Basic Engineering Fees as for Professional Services in                   %             N/A
      terms of the Engineering Profession Act, 2000, (Act No. 46
      of 2000) for: Inception, Concept & Viability, Design
      development, Documentation & Procurement, Contract
      Administration & Inspection and Close Out.
                                            Sub-Total 1 Based on 12 months calculations (To be carried
                                            over to Page C42)
Rate          Amount (R)
  1,060.50     1,018,080.00
108,108.00     1,297,296.00
 85,008.00
               1,020,096.00
108,108.00     3,891,888.00
 85,008.00     3,060,288.00
  3,210.90
               1,123,815.00
108,108.00
               1,297,296.00
       7.50    1,665,000.00
               900,000.00
               200,000.00
  1,249.50       999,600.00
  1,060.50       848,400.00
    900.90       720,720.00
   614.25            614.25
   483.00        386,400.00
 85,008.00        85,008.00
       0.08   Rate Only
              18,514,501.25
          ADDITIONAL SERVICES
          The Disbursements is applicable for all District Offices, tenderers must carry this sub-total to Page C41
Item No    Description                                  Unit           Quantity (Per
                                                                       Financial Year)
           ADDITIONAL SERVICES
8
8.1        Support   team       -   Planning   &          PS            1,200,000.00
           Reporting
           Handling Cost with respect to item             %             1,200,000.00
           (8.1)
8.2        Laboratory Testing                             PS            1,460,000.00
           Handling Cost with respect to item             %             1,460,000.00
           (8.2)
8.3        Surveyor                                       PS            2,700,000.00
           Handling Cost with respect to item             %             2,700,000.00
           (8.3)
8.4        Health & Safety                                PS             350,000.00
           Handling Cost with respect to item             %              350,000.00
           (8.4)
8.5        Environmental Impact Assessments               PS             900,000.00
           Handling Cost with respect to item             %              900,000.00
           (8.5)
8.6        Geotechnical Investigation                     PS            1,460,000.00
8.6(a)     Handling Cost with respect to item             %             1,460,000.00
           (8.6)
                                                                                  Sub-Total
          SIGNATURE OF BIDDER:          ………………………………………………………………………………………
          CAPACITY UNDER WHICH THIS BID IS SIGNED:            …………………………………………………………
          (Proof of authority must be submitted e.g. company resolution)
          DATE:     ……………………………………………
ust carry this sub-total to Page C41
                   Rate            Amount (R)
                    1              1,200,000.00
           8%                             96,000.00
                    1              1,460,000.00
           8%                            116,800.00
                    1              2,700,000.00
           8%                            216,000.00
                    1                  350,000.00
           8%                             28,000.00
                    1                  900,000.00
           8%                             72,000.00
                    1              1,460,000.00
           8%                            116,800.00
                                       8,715,600.00
……………………………………
 …………………………………
NO   DISTRICT OFFICE   District Office (Sub Total 1)    DISBURSEMENTS
                       Carried from Page C29-39         Sub-Total Carried
                                                        from Page C40
1    UMGUNGUNDLOVU                      18,514,501.25            8,715,600.00
2    HARRY GWALA                        20,831,893.25            8,715,600.00
3    METRO                              16,580,883.80            8,715,600.00
4    UGU                                18,514,501.25            8,715,600.00
5    ILEMBE                             16,197,109.25            8,715,600.00
6    KING CETSHWAYO                     18,514,501.25            8,715,600.00
7    UMKHANYAKUDE                       20,179,501.25            8,715,600.00
8    ZULULAND                           32,126,922.50            8,715,600.00
9    AMAJUBA                            16,580,883.80            8,715,600.00
10   UTHUKELA                           18,964,487.00            8,715,600.00
11   UMZINYATHI                         18,514,501.25            8,715,600.00
SUB-TOTAL             SUB-TOTAL 3               VAT AT 15%        TOTAL OFFERED
2(District Office     BASED ON 36 MONTHS                          AMOUNT INCLUDING
sub Total 1 +         CALCULATIONS                                VAT
Disbursements)        (subtotal two multiply by
                      three)
      27,230,101.25               81,690,303.75   12,253,545.56         93,943,849.31
      29,547,493.25               88,642,479.75   13,296,371.96        101,938,851.71
      25,296,483.80               75,889,451.40   11,383,417.71         87,272,869.11
      27,230,101.25               81,690,303.75   12,253,545.56         93,943,849.31
      24,912,709.25               74,738,127.75   11,210,719.16         85,948,846.91
      27,230,101.25               81,690,303.75   12,253,545.56         93,943,849.31
      28,895,101.25               86,685,303.75   13,002,795.56         99,688,099.31
      40,842,522.50              122,527,567.50   18,379,135.13        140,906,702.63
      25,296,483.80               75,889,451.40   11,383,417.71         87,272,869.11
      27,680,087.00               83,040,261.00   12,456,039.15         95,496,300.15
      27,230,101.25               81,690,303.75   12,253,545.56         93,943,849.31