Proposal for 5 kWp Rooftop Solar
Installation
Submitted to
PM Saur Ghar Scheme
Submitted by
Pragati Energy, Pauranik Tola,Civil Lines, Satna (Madhya
Pradesh) 485001, Tel 8826406459, 9039064323,
E-mail:
[email protected]Proposal
About Pragati Energy
Pragati Energy is most experienced and reputed solar photovoltaic companies in India.
Pragati Energy was established and operationalized in 2009 by two young woman
entrepreneurs. Having registered office and manufacturing center at PauranikTola,Civil
Lines Satna (MP) manufacturing unit registered as small scale industry (SSI) at DIC
Satna (Madhya Pradesh )
Pragati Energy, Empanelled channel Partner of Ministry of New and Renewable
Energy (MNRE),Govt of India for Grid Connected solar power plant
Pragati Energydesign, manufacture, build and operate solar photovoltaic (PV) systems
and plants varying from Watt to KW scale. All the projects are designed and integrated
as per guidelines of Ministry Of New and Renewable Energy(MNRE) and also as per the
best global practices. The systems are designed to meet diversified needs- from rural
electrification to powering urban growth areas, defence outposts to banking centres,
residential apartments to industrial complex - in all sectors, we offer the most efficient
and innovative solar systems.
PragatiEnergy are also focus safety issue for Installation of solar PV plant. Pragati
Energy have awarded A class Electrical License by Chief Electrical Inspector state of
Madhya Pradesh
About Grid Tied Solar Rooftop Photovoltaic
A Grid Tied Solar Rooftop Photo Voltaic (SPV) power plant consists of SPV array,
Module Mounting Structure, Power Conditioning Unit (PCU) consisting of Maximum
Power Point Tracker (MPPT), Inverter, and Controls & Protections, interconnect cables,
Distribution boxes and switches. PV Array is mounted on a suitable structure. Grid tied
SPV system is without battery and should be designed with necessary features to
supplement the grid power during day time. Components and parts used in the SPV
power plants including the PV modules, metallic structures, cables, junction box,
switches, PCUs etc., should conform to the BIS or IEC or international specifications,
wherever such specifications are available and applicable. Solar PV system shall consist
of following equipments/components.
SUMMARY OF PROJECT PARTICULARS
Particulars Units
Project Capacity (kWp) 5
Out put Voltage 415 V, 50 HZ, 3 Phase
Procurement, construction and installation (in 1
months)
Annual power generation from project (KWh) 7,772
Cost Of Solar Power Plant in INR 3,25,000
Subsidy (for 3 kWp) 78,000
Payment Schedule
30% of the net payable amount as mobilization advance along with the signing of the
MoU/ sanction order of the project.
40% of the net payable amount after supply of the solar unit .at site
30% of the net payable amount after installation and commissioning of the solar units
Scope of Work
The scope of work of PragatiEnergy shall include;
1. Scoping study in the identification of site;
2. Submission of drawing, Bill of Material
3. Supply of IEC approved material .
4. Installation and commissioning of the systems as per specification;
5. Capacity building and Training
6. First year AMC is included
Warranties:
a) Material Warranty:
i. Material Warranty is defined as: Solar system to be warranted in period of Five (5)
years from the date of installation
ii. Defects and/or failures due to manufacturing
iii. Defects and/or failures due to quality of materials
b) Performance Warranty:
i. The predicted electrical degradation of power generated is 20% of the minimum rated
power over the 25 year period and 10% after ten years period of the full rated original
output.
Monthly PV Performance Data
Requested Location: Tikamgarh
Lat (deg N): 24.73
Long (deg E): 78.82
Elev (m): 372
DC System Size (kW): 5
Module Type: Standard
Array Type: Fixed (roof mount)
Array Tilt (deg): 20
Array Azimuth (deg): 180
System Losses: 14 %
Invert Efficiency: 96 %
DC to AC Size Ratio: 1.2
Capacity Factor (%) 17.6 %
Energy Analysis
Solar Radiation AC Energy
Month 2
( kWh / m / day ) ( kWh )
January 5.50 660
February 6.43 671
March 6.92 786
April 6.74 720
May 6.87 753
June 5.22 557
July 4.40 502
August 4.09 465
September 5.87 653
October 6.02 688
November 5.55 627
December 5.37 639
Annual 5.75 7,721
Bill Of Material (BOM)
S.No. Description Qty UOM Make
Loom Solar /
Jackson /
MODULES 1 Solar PV Modules 530 Wp – Mono perc - C-si 9 /10 Numbers other
equivalent
make
STRUCTURE 2 Module Mounting Structure 1 set
Array Junction Box / DCDB ( Include at Inverter
3 1 set set
)
Luminous /
Power One
5 KW Grid connected Solar inverter (415 V, 50
Inverter 4 1 nos /Delta / ABB
Hz, Three Phase)
/ Fronius /
equivalent
Havels / Poly
cab / solar
Mtr
5 Suitable, EBXL-XLPO-Copper Solar Cable 100 Kable /
Siechem or
equivalent
Cables & Havels / Poly
Connectors cab / solar
Inverter to ACDB to main LT box 4 C X20 sq
6 20 mtr Kable /
mm, XLPE insulated FRLS Cu armoured
Siechem or
equivalent
7 MC4 Connector with terminals 20 nos
ACDB 8 ACDB 1 nos Hensel
SMA /
Monitoring
Schneider
&
9 web logger with RS 485 1 nos /Delta / ABB
COMMUNICA
/ Fronius /
TION
equivalent
10 Lighting Arrestors
1 nos JMV
Chemical earthing with GI rod 50mm dia
11
PROTECTION x 2mtr and filling compound
2 nos JMV
13 GI Strip 25 X 3mm thick - As per
site Kg
TECHNICAL SPECIFICATIONS
System shall consist of following equipments/components.
1. Solar PV modules consisting of required number of Crystalline PV cells.
2. Grid interactive Power Conditioning Unit with Remote Monitoring System
3. Mounting structures
4. ACDB.
5. Earthing and lightening protections.
6. IR/UV protected PVC Cables, pipes and accessories
SOLAR PHOTOVOLTAIC MODULES:
1. PV modules qualify the latest edition of IEC 61215/IS14286. In addition, the modules
also conform to IEC 61730 Part-1 - requirements for construction & Part 2 –
requirements for testing, for safety qualification or equivalent IS.
a) The total solar PV array capacity is 25 (kWp) and comprise of solar crystalline
modules of minimum 250 Wp and above wattage.
c) Protective devices against surges at the PV module is provided. Low voltage drop
bypass diodes also provided
ARRAY STRUCTURE
a) Hot dip galvanized MS mounting structures / Aluminium structures will be used
for mounting the modules/ panels/arrays. Each structure have angle of
inclination as per the site conditions to take maximum insolation
b) The Mounting structure have designed to withstand the 150 KM/ hour wind speed
c) Structural material have corrosion resistant and electrolytically compatible with
the materials used in the module frame, its fasteners, nuts and bolts.
PCU/ Inverter:
As SPV array produce direct current electricity, it is necessary to convert this direct
current into alternating current and adjust the voltage levels to match the grid voltage.
Conversion shall be achieved using an electronic Inverter and the associated control
and protection devices. All these components of the system are termed the “Power
Conditioning Unit (PCU)”. In addition, the PCU shall also house MPPT (Maximum Power
Point Tracker), an interface between Solar PV array & the Inverter, Inverter output have
compatible with the grid frequency. Technical features of the inverter is followings :
Switching devices IGBT/MOSFET
Control Microprocessor /DSP
Nominal AC output voltage 415V, 3 Phase, 50 Hz
and frequency
Output frequency 50 Hz
Grid Frequency + 3 Hz or more
Synchronization range
Ambient temperature -20.deg C to 50.deg C
considered
Humidity 95 % Non-condensing
Protection of Enclosure IP-20(Minimum) for indoor.
IP-65(Minimum) for outdoor.
Grid Frequency Tolerance + 3 or more
range
Grid Voltage tolerance -0.20.15
No-load losses Less than 1% of rated power
Inverter efficiency(minimum) >97%
THD < 3%
PF > 0.9
PCU/inverter is capable of complete automatic operation including wake-up,
synchronization & shutdown.
Built-in meter and data logger to monitor plant performance
Power conditioning unit / inverter is comply with applicable IEC/ equivalent BIS standard
for efficiency measurements and environmental tests as per standard codes IEC
61683/IS 61683 and IEC 60068-2 (1,2,14,30)/ Equivalent BIS Std.
The MPPT units environmental testing is qualify IEC 60068-2 (1, 2, 14, 30)/ Equivalent
BIS std
AC DISTRIBUTION PANEL BOARD (ACDB):
a) AC Distribution Panel Board (DPB) control the AC power from PCU/ inverter,
and have necessary surge arrestors. Interconnection from ACDB to mains at LT
Bus bar while in grid tied mode.
b) All switches and the circuit breakers, connectors is conform to IEC 60947, part I,
II and III/ IS60947 part I, II and III.
c) All the Panel’s is metal clad, totally enclosed, rigid, floor mounted, air - insulated,
cubical type suitable for operation on three phase / single phase, 415 or 230
volts, 50 Hz
d) The panels is designed for minimum expected ambient temperature of 45 degree
Celsius, 80 percent humidity and dusty weather.
PROTECTIONS
System will be provided with all necessary protections like earthing, Lightning, and grid
islanding as per IEC
CABLES
Cables of appropriate size to be used in the system with following characteristics:
i. As per IEC 60227/IS 694 /IEC 60502/IS1554 / TUV 2Pfg1169/08.2007 or VDE EPV
01:2008-02 or UL4703 certified standards
ii. Temp. Range: –10degC to +80degC.
iii. Voltage rating 660/1000V
iv. Excellent resistance to heat, cold, water, oil, abrasion, UV radiation
v. Flexible
vi. Suitable sizes of cables will be used to keep the voltage drop (power loss) of the
entire solar system to the minimum (2%)