Proposal for 20kWp Rooftop Solar
Installation
Submitted to
Mr. D.K. Singh
Rewa,
Madhya Pradesh 486001
Submitted by
Pragati Energy, Pauranik Tola, Civil Lines, Satna (Madhya Pradesh) 485001, Tel 8826406459, 9039064323,
E-mail: [email protected]
M/S Rajkiran Enterprises near College choraha john Tower
Ankit Sharma 8827577100 Rahul Dwivedi 883974771
Laxmikant Mishra 7509441010
Proposal
About Pragati Energy
Pragati Energy is most experienced and reputed solar photovoltaic companies in India. Pragati Energy
was established and operationalized in 2009 by two young woman entrepreneurs. Having registered
office and manufacturing center at PauranikTola,Civil Lines Satna (MP) manufacturing unit registered
as small scale industry (SSI) at DIC Satna (Madhya Pradesh )
Pragati Energy, Empanelled channel Partner of Madhya Pradesh Poorv Kshetra Vidyut Vitaran
Company Ltd under Ministry of New and Renewable Energy (MNRE),Govt of India for Grid
Connected solar power plant
Pragati Energy design, manufacture, build and operate solar photovoltaic (PV) systems and plants
varying from Watt to KW scale. All the projects are designed and integrated as per guidelines of
Ministry Of New and Renewable Energy(MNRE) and also as per the best global practices. The
systems are designed to meet diversified needs- from rural electrification to powering urban growth
areas, defense outposts to banking centres, residential apartments to industrial complex - in all
sectors, we offer the most efficient and innovative solar systems.
Pragati Energy are also focus safety issue for Installation of solar PV plant. Pragati Energy have
awarded A class Electrical License by Chief Electrical Inspector state of Madhya Pradesh
About Grid Tied Solar Rooftop Photovoltaic
A Grid Tied Solar Rooftop Photo Voltaic (SPV) power plant consists of SPV array, Module Mounting
Structure, Power Conditioning Unit (PCU) consisting of Maximum Power Point Tracker (MPPT),
Inverter, and Controls & Protections, interconnect cables, Distribution boxes and switches. PV Array is
mounted on a suitable structure. Grid tied SPV system is without battery and should be designed with
necessary features to supplement the grid power during day time. Components and parts used in the
SPV power plants including the PV modules, metallic structures, cables, junction box, switches, PCUs
etc., should conform to the BIS or IEC or international specifications, wherever such specifications are
available and applicable. Solar PV system shall consist of following equipments/components.
SUMMARY OF PROJECT PARTICULARS
Particulars Units
Project Capacity (kWp) 20
Procurement, construction and installation (in 2
months)
Annual power generation from project (KWh) 30,717
Cost Of Solar Power Plant in INR with GST 8,25,000
Payment Schedule
40% of the net payable amount as mobilization advance along with the signing of the MoU/ sanction
order of the project.
50% of the net payable amount before supply of the solar unit .at site
10% of the net payable amount after installation and commissioning of the solar units
Scope of Work
The scope of work of Pragati Energy shall include;
1. Scoping study in the identification of site;
2. Submission of drawing, Bill of Material
3. Supply of IEC approved material.
4. Installation and commissioning of the systems as per specification;
5. Capacity building and Training
6. First year AMC is included
Warranties:
a) Material Warranty:
i. Material Warranty is defined as: Solar system to be warranted in period of Five (5) years from the
date of installation
ii. Defects and/or failures due to manufacturing
iii. Defects and/or failures due to quality of materials
b) Performance Warranty:
i. The predicted electrical degradation of power generated is 20% of the minimum rated power over the
25 year period and 10% after ten years period of the full rated original output.
Monthly PV Performance Data
Requested Location: Rewa
Lat (deg N): 24.53
Long (deg E): 81.3
Elev (m): 372
DC System Size (kW): 20
Module Type: Standard
Array Type: Fixed (roof mount)
Array Tilt (deg): 20
Array Azimuth (deg): 180
System Losses: 14 %
Invert Efficiency: 96 %
DC to AC Size Ratio: 1.2
Capacity Factor (%) 17.5 %
Energy Analysis
Solar Radiation AC Energy
Month ( kWh / m2 / day ) ( kWh )
January 5.39 2,553
February 6.18 2,582
March 6.94 3,138
April 6.78 2,887
May 6.81 2,963
June 5.52 2,346
July 4.60 2,079
August 4.58 2,091
September 5.02 2,225
October 6.07 2,789
November 5.48 2,486
December 5.45 2,578
Annual 5.74 30,717
Bill Of Material (BOM)
S.No
Description Qty UOM Make
.
MODULES 1 Solar PV Modules 535Wp –Mono perc - C-si 38 Numbers Adani
equivalent
STRUCTU
2 Module Mounting Structure 1 set
RE
Array Junction Box / DCDB ( Include at
3 1 set set
Inverter )
Luminous /
20KW Grid connected Solar inverter (415V, Growatt/
Inverter 4 1 nos
50 Hz, 3P) equivalent
Havells /
Poly cab /
solar
Mtr
5 Suitable, EBXL-XLPO-Copper Solar Cable 400 Kable /
Siechem or
equivalent
Cables &
Connector Havells /
s Poly cab /
solar
Inverter to ACDB to main LT box 4 C X20
6 100 mtr Kable /
sq mm, XLPE insulated FRLS Cu armored
Siechem or
equivalent
7 MC4 Connector with terminals 100 nos
ACDB 8 ACDB 1 nos Hensel
SMA /
Schneider /
Monitorin
Delta /
g&
9 web logger with RS 485 1 nos ABB /
COMMUNI
Fronius /
CATION
equivalent
10 Lighting Arrestors
1 nos JMV
Chemical earthing with GI rod 50mm
PROTECTI 11 die x 2mtr and filling compound
ON
2 nos JMV
13 GI Strip 25 X 3mm thick - As per
site Kg
TECHNICAL SPECIFICATIONS
System shall consist of following equipments/components.
1. Solar PV modules consisting of required number of Crystalline PV cells.
2. Grid interactive Power Conditioning Unit with Remote Monitoring System
3. Mounting structures
4. ACDB.
5. Earthing and lightening protections.
6. IR/UV protected PVC Cables, pipes and accessories
SOLAR PHOTOVOLTAIC MODULES:
1. PV modules qualify the latest edition of IEC 61215/IS14286. In addition, the modules also conform
to IEC 61730 Part-1 - requirements for construction & Part 2 – requirements for testing, for safety
qualification or equivalent IS.
a) The total solar PV array capacity is 50 (kWp) and comprise of solar crystalline modules of minimum
500 Wp and above wattage.
c) Protective devices against surges at the PV module is provided. Low voltage drop bypass diodes
also provided
ARRAY STRUCTURE
a) Hot dip galvanized MS mounting structures / Aluminium structures will be used for mounting
the modules/ panels/arrays. Each structure have angle of inclination as per the site conditions
to take maximum insolation
b) The Mounting structure have designed to withstand the 150 KM/ hour wind speed
c) Structural material have corrosion resistant and electrolytically compatible with the materials
used in the module frame, its fasteners, nuts and bolts.
PCU/ Inverter:
As SPV array produce direct current electricity, it is necessary to convert this direct current into
alternating current and adjust the voltage levels to match the grid voltage. Conversion shall be
achieved using an electronic Inverter and the associated control and protection devices. All these
components of the system are termed the “Power Conditioning Unit (PCU)”. In addition, the PCU shall
also house MPPT (Maximum Power Point Tracker), an interface between Solar PV array & the
Inverter, Inverter output have compatible with the grid frequency. Technical features of the inverter is
followings :
Switching devices IGBT/MOSFET
Control Microprocessor /DSP
Nominal AC output voltage 415V, 3 Phase, 50 Hz
and frequency
Output frequency 50 Hz
Grid Frequency + 3 Hz or more
Synchronization range
Ambient temperature -20.deg C to 50.deg C
considered
Humidity 95 % Non-condensing
Protection of Enclosure IP-20(Minimum) for indoor.
IP-65(Minimum) for outdoor.
Grid Frequency Tolerance + 3 or more
range
Grid Voltage tolerance -0.20.15
No-load losses Less than 1% of rated power
Inverter efficiency(minimum) >97%
THD < 3%
PF > 0.9
PCU/inverter is capable of complete automatic operation including wake-up, synchronization &
shutdown.
Built-in meter and data logger to monitor plant performance
Power conditioning unit / inverter is comply with applicable IEC/ equivalent BIS standard for efficiency
measurements and environmental tests as per standard codes IEC 61683/IS 61683 and IEC 60068-2
(1,2,14,30)/ Equivalent BIS Std.
The MPPT units environmental testing is qualify IEC 60068-2 (1, 2, 14, 30)/ Equivalent BIS std
AC DISTRIBUTION PANEL BOARD (ACDB):
a) AC Distribution Panel Board (DPB) control the AC power from PCU/ inverter, and have
necessary surge arrestors. Interconnection from ACDB to mains at LT Bus bar while in grid tied
mode.
b) All switches and the circuit breakers, connectors is conform to IEC 60947, part I, II and III/
IS60947 part I, II and III.
c) All the Panel’s is metal clad, totally enclosed, rigid, floor mounted, air - insulated, cubical type
suitable for operation on three phase / single phase, 415 or 230 volts, 50 Hz
d) The panels is designed for minimum expected ambient temperature of 45 degree Celsius, 80
percent humidity and dusty weather.
PROTECTIONS
System will be provided with all necessary protections like earthing, Lightning, and grid islanding as
per IEC
CABLES
Cables of appropriate size to be used in the system with following characteristics:
i. As per IEC 60227/IS 694 /IEC 60502/IS1554 / TUV 2Pfg1169/08.2007 or VDE EPV 01:2008-02 or
UL4703 certified standards
ii. Temp. Range: –10degC to +80degC.
iii. Voltage rating 660/1000V
iv. Excellent resistance to heat, cold, water, oil, abrasion, UV radiation
v. Flexible
vi. Suitable sizes of cables will be used to keep the voltage drop (power loss) of the entire solar system
to the minimum (2%).