Communications - Equipment Delivery Lead Time

Uploaded by

william6703
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Communications - Equipment Delivery Lead Time

Uploaded by

william6703
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

System Works : Communication

No. System Main Equipment Brand/Supplier Origin Delivery Lead Time


1. Digital Transmission System (DTS) 1. SDH Belden OTN Belgium 11 - 12 weeks
2. DC Rectifier Thytron China 8 - 12 weeks
3. UPS & Battery Right Power China 8 - 12 weeks
2. Passenger Information System (PIS) 1. Local Control Unit ASGB Local 8 - 12 weeks
2. Display Unit AGSB Local 8- 12 weeks
3. Public Address System (PA) 1. Main PA Unit R2P Netspire Germany 20 - 24 weeks
2. Speakers TOA Taiwan 20 - 24 weeks
3. Microphone R2P Netspire Germany 20 - 24 weeks
4. Automatic Fare Collection System (AFC) 1. POS NSS IT China 8 - 12 weeks
2. ACG NSS IT China 8 - 12 weeks
3. TVM NSS IT Local 6 - 8 weeks
5. Card Access System (CAS) 1. Door Controller EntryPass Local 8 - 12 weeks
2. Accessories - Reader, etc EntryPass Local 8 - 12 weeks
6. CCTV System 1. Network Video Recorder Bosch Germany 5 - 6 weeks
2. Camera Bosch Germany 5 - 6 weeks
7. PABX System 1. IP Phone Alcatel-Lucent France 8 - 12 weeks
2. Layer 2 Switch HP Aruba USA 4 - 5 weeks
8. ICT System Layer 3 Switch Cisco USA 4 - 5 weeks
9. SCADA 1. Remote Terminal Unit Willowglen Local 8 - 12 weeks
2. Sensors Willowglen Local 8 - 12 weeks