BOQ For Additional Minor Junctions - 10.11.2024 IE

Uploaded by

LASA Ranebennur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
147 views13 pages

BOQ For Additional Minor Junctions - 10.11.2024 IE

Uploaded by

LASA Ranebennur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Two Lanning with paved Shoulder of Gadag to Honnali (Km 105.500 to Km 205.290 of SH 57 and Km 215.335 to Km 253.713 of SH 26), 138.

2 Km in the State of Karnataka, India on Hybrid Annuity Basis


Concessionaire: M/s Sadbhav Gadag Highway Private Limited
Client: KSHIP
Independent Engineer: LEA Associates South Asia Pvt. Ltd. EPC Contrctor-Gawar Construction Company

TOP SHEET BOQ FOR Additional Minor Junctions

NH SOR 2022-2023 Final Rate Arrived


Chapter
Description Unit after adding lead Qty Amount Remarks
No
Item No. Page No. charges

A B C D E F G H=F X G I
2 Site Clearance
Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials
i 2.05 (ii) A 10 Cum 402.00 817.10 328,474.30
separately, including all labour, usage charges of all machinery, lift, load, unload, transportation etc., complete. etc., complete (Dismantled material to be
transported mechanically).Bituminous courses - By Mechanical Means

3 EARTHWORK, EROSION CONTROL AND DRAINAGE

Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres.Excavation for roadwork in soil by hydraulic excavator
including cutting and loading in tippers, trimming bottom and side s lopes, in accordance with requirements of lines, grades and crosssections, and
i 3.06 17 Cum 76.00 4,608.83 350,271.45
transporting to the embankment location , with all lifts and lead upto 1000 m, including all labour, load, unload, usage charges of allmachinery, etc.,
complete.

Construction of Embankment with Material obtained from Borrow pits


Construction of embankment with approved material obtained from borrow pits laid in layers not exceeding 250 mm loose thickness, spreading, breaking
ii 3.16 21 clods, removal of roots and other organic materials to the required line, grade and cross section including watering, consolidation by roll er to the ' desired Cum 424.00 11063.99 4,691,131.62
field density not less than 95% of maximum dry density including all lead, lifts,loading, unloading, all labour, usage charges of all machinery etc., complete as
per table 300-2.

Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits,transporting to site, spreading, grading to required
slope and compacted to meet requirement of table No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding
iii 3.18 22 water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., Cum 426.00 8,171.00 3,480,847.07
speading, grading by motor grador, consolidation by roller including all lead, lifts, loading, unloading, all labour, usage charges of machinery etc., complete.
(New road formation)

iv Granular Shoulder Cum 1,373.20 - -


SUB-BASES, BASES (NON-BITUMINOUS)
4
AND SHOULDERS

Granular Sub-Base with Close /CoarseGraded Material (Table:- 400-1) By Mix in Place Method
Construction of granular sub-base by providing spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front
i 4.01 B (v) 33 end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401, including protection of edges of GSB Cum 2,228.70 3,268.40 7,284,285.31
layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all
lead, lifts etc., complete. (Compacted thickness). Grading-V Material (Close graded)

Wet Mix Macadam (Plant Mix Method)


Providing, laying, spreading and compacting graded stone aggregate as per table 400-12 & 400-13, to wet mix macadam specification including premixing
the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on
ii 4.14 A 44 Cum 3,401.00 4,085.50 13,894,789.75
well prepared surface and compacting with vibratory roller to achieve the desired densityof 98% including protection of edges ofWMM layer, cost of all
materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc.,
complete, with lead of mixed material up to I Km.(Compacted thickness) Laying Using Mechanical Paver

5 BASES AND SURFACE COURSE (BITUMINOUS)


Prime Coat
Providing and applying primer coat withSS1 bitumen emulsion complying [S 8887 on prepared surface of granular Base including clearing of road surface
i 5.01 A (i) 51 Sqm 47.75 16,342.00 780,330.74
and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per table-500-3, including cost of all materials, labour, usage charges of all
machinery, lead, lift, loading & unloading etc., complete, execpt lead for emulsion.
Tack Coat on Granular Surface.
Providing and applying tack coat with bitumen emulsion(RSl) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular
ii 5.02 (ii) a 54 Sqm 5.32 16,342.00 86,939.47
surface cleaned with mechanical broom & dusting by air compressor and spraying including cost of all materials, labour, usage charges of all machinery,
lead, lift, loading & unloading etc., complete, execpt lead for emulsion
Tack Coat on Bituminous Surface.
Providing and applying tack coat with bitumen emulsion (RSl) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous
iii 5.02 (i) a 53 surface cleaned with mechanical broom & dusting by air compressor and spraying including cost of all materials, labour; usage charges of all machinery, Sqm 4.45 16,342.00 72,721.92
lead, lift, loading & unloading etc., complete,
execpt lead for emulsion
NH SOR 2022-2023 Final Rate Arrived
Chapter
Description Unit after adding lead Qty Amount Remarks
No
Item No. Page No. charges

Dense Graded Bituminous Macadam Grading-I


Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates as per table 500-7 of specified
grading premixed with bituminous binder VG-30 grade . paving bitumen as per clause 504.3.1 complying with 1S-73-20 13 of specified grading, premixed
with bituminous binder at 4.0 percent by weight of total mix and filler at 2 percent by weight of agegate, transporting the hot mix to work site, laying with a
iv 5.04 (i) a 57 Cum 6,040.03 - -
hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve
the desired compaction as per MoRTH specification clause No. 505 complete in all respects including cost of all materials all labour, usage charges of all
machinery, all lead, lifts, loading, unloading stacking transporting etc., complete, except lead for bitumen, with a lead of mixed material upto 1 km, excluding
cost of primer/ tack coat. 75-100 mm compacted Thinkness

Dense Graded Bituminous Macadam Grading -II


Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates as per table 500-7 of specified
grading premixed with bituminous binder VG-30 'grade paving bitumen as per clause 504.3.1 complying with IS-73-2013 of specified grading, premixed with
bituminous binder at4.5 percent by weight of total . mix and fi Uer, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor
5.04 (ii) a 58 Cum 6,854.07 1,307.36 8,960,739.70
control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MoRTH specification clause No. 505 complete in all respects including cost of all materials all labour, usage charges of all machinery, all lead, lifts, loading,
unloading stacking transporting etc., complete, except lead for bitumen, with a lead of mixed material upto 1 km, excluding cost of primer/ tack coat 50-75
mm compacted thickness

Bituminous Concrete Grading-II


Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates as per table 500-7 of specified grading
premixed with bituminous binder VG-30 grade paving bitumen as per clause 504.3. 1 complying with IS-73-2013 of specified grading, premixed with
bituminous binder @ 5.4 per cent of mix and filler @2% by weight of agregate, transporting the hot mix to work site, laying with a hydrostatic paver finisher
v 5.05 (ii) a 61 Cum 6,988.16 653.68 4,568,021.83
with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction
as per MORTH specification clause No. 507complete in all respects including cost of all materials all labour, usage charges of all machinery all lead, lifts,
loading, unloading stacking transporting etc., complete, except lead for bitumen, with a lead of mixed material upto I km, excluding cost of primer/ tack
coat.30-40 mm compacted thickness
8 Traffic signs and markings
Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm
i 8.13 110 is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes, including, barricading, Sqm 612.00 2,343.12 1,433,986.80
traffic diversion as per IRC-35,cleaning the surface of dirt, dust and other foriegn matter, demarcation at site, traffic control,cost of all materials all labour,
lead, lifts, loading, unloading transporting etc., complete. 2.5 mm Thick
Retro-Reflectorised Traffic Signs
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC :67 made ofClass-8 Type IV retro reflective sheetingfixed
over 2 mm thick aluminiumsheeting vide clause 801.3, 4mm thickAluminium composite material sheetincluding lettering depending on thesize of the sign
fixed over back support
ii 8.04 105 frame of min 25 x 25 x 3mm Anglemounted on a mild steel circular pipe65 NB 3.60mtrs high (min effectiveheight 1.30 mtrs), 3.2 mm thicknessfirmly fixed to
the ground by means ofproperly designed foundation with M25grade cement concrete 45 cm x 45 cmx 60 cm, 60 cm below ground level asper approved
drawing. The sign shall
be maintained as per section 12 ofIRC67, as per clauses including curing,cost of all materials all labour, lead,lifts, loading, unloading transportingetc.,
B(VII) complete.
75cm circular Nos 6,983.00 126.00 879,858.00
B(iii) 75cm Equilateral triangle Nos 9,534.00 126.00 1,201,284.00
B(xvi) 75 cm high octagon Nos 6,698.00 63.00 421,974.00
6 PIPE CULVERT

Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing,
i 9.01 I-B(i) 129 removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material, including all labour, usage charges of Cum 87.00 3,009.83 261,854.78
machinery, lead, lifts, loading,unloading transporting etc., complete.Ordinary soil - Mechanical Means (Depth upto 3 m)

Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in SingleRow.Providing & laying Reinforced cement
concrete pipe NP4/ prestressed concrete pipe for culverts on first class bedding of granular material in single row, including fixing collar with with cement
mortar 1 :2, but excluding excation, protection works, backfilling,
ii 9.04 B 132 Metre 7,524.00 630.00 4,740,120.00
concrte and masonry works in headwall and parapetes, including cost of all materials all labour, usage charges of machinery, lead, lifts, loading, unloading
transporting etc., complete.of granular material in single row,including fixing collar with with cement mortar 1 :2, but excluding excation, protection works,
backfilling, concrte and masonry works in headwalland parapetes.900mm Dia
Providing & laying Plain/Reinforced Cement Concrete in open foundation & complete as per drawing & tecnical 2100 pecification for Pipe Culvert complete
as per Drawing and Technical Specifications ,including cost of all materials, formwork,centering, vibrating, compacting,alliabour,usage charges of machinery,
iii 9.06 133 -
lead, lifts,loading, unloading transporting, stacking, curing, finishing the exposed faces etc.,complete. (excluding cost of steel and fabrication charges)PCC
Grade MI5 using batching plant transit mixer & Concrete pump

iv 9.06 A Case-I 133 PCC Grade MI5 using batching plant transit mixer & Concrete pump Cum 5,525.88 114.70 633,841.09

v 9.06 C Case-I 133 RCC Grade M20 using batching plant transit mixer & Concrete pump Cum 6,226.92 968.54 6,030,991.36

vi 9.06 E Case-II 133 RCC Grade M25 using batching plant, transit mixer & Manual Placing Cum 6,977.56 198.45 1,384,696.78
NH SOR 2022-2023 Final Rate Arrived
Chapter
Description Unit after adding lead Qty Amount Remarks
No
Item No. Page No. charges

Supplying, Fitting and Placing un-coated TMT Fe-500 grade bar Reinforcement
in Foundation complete as per Drawing and Technical Specifications. including straightening bar, cutting, bending, hooking binding with approved quality
viii 9.07 134 binding wire,after placing in position, tying, lapping and or welding whereever required ( laps, hooks wastages shall not be measured & paid) incluidng Mt 80,675.23 23.30 1,879,888.49
cost of all materials, fabrication charges, all labour, material, usage chargesof machinery, lead, lifts, loading, unloading,stacking, transporting etc.,
complete.

Total Amount 63,367,048.00


MINOR JUNCTION QTY/CUM

Height Dismantling Excavation Earthen


SI NO CHAINAGE Side Length Width TOTAL AREA OGL FRL Crust Emb ht. Embankment Subgrade G. SHOULDER GSB WMM PRIME COAT TACK COAT D.B.M TACK COAT B.C REMARK'S
(FRL-OGL) Existing Road upto emb. Top Shoulder

1 121+060 LHS 55 7.50 412.50 729.039 728.669 -0.37 1.07 -1.44 20.63 -594.00 206.25 82.50 103.13 412.50 412.50 33.00 412.50 16.50 Village road

2 121+110 RHS 70 5.70 399.00 728.373 728.499 0.126 1.07 -0.944 19.95 -376.66 199.50 79.80 99.75 399.00 399.00 31.92 399.00 15.96 Ashram Road

3 135+170 RHS 55 6.50 357.50 620.264 621.200 0.936 1.07 -0.134 17.88 -47.91 178.75 71.50 89.38 357.50 357.50 28.60 357.50 14.30 For Temple

4 135+450 RHS 55 5.70 313.50 619.120 620.757 1.637 1.07 0.567 15.68 177.75 156.75 62.70 78.38 313.50 313.50 25.08 313.50 12.54 For Temple

5 135+800 LHS 55 5.20 286.00 621.811 622.404 0.593 1.07 -0.477 14.30 -136.42 143.00 57.20 71.50 286.00 286.00 22.88 286.00 11.44 Village road

6 147+235 RHS 81 5.70 461.70 574.117 578.17 4.053 1.07 2.983 23.09 1,377.25 230.85 92.34 115.43 461.70 461.70 36.94 461.70 18.47

7 147+235 LHS 55 5.13 282.32 573.866 578.17 4.304 1.07 3.234 14.12 913.01 141.16 56.46 70.58 282.32 282.32 22.59 282.32 11.29

8 147+770 LHS 55 5.20 286.00 582.701 584.15 1.449 1.07 0.379 14.30 108.39 143.00 57.20 71.50 286.00 286.00 22.88 286.00 11.44

9 147+770 RHS 55 6.20 341.00 582.554 584.15 1.596 1.07 0.526 17.05 179.37 170.50 68.20 85.25 341.00 341.00 27.28 341.00 13.64

10 164+590 LHS 55 5.60 308.00 521.784 523.517 1.733 1.07 0.663 15.40 204.20 154.00 61.60 77.00 308.00 308.00 24.64 308.00 12.32 Village road

11 164+590 RHS 55 5.50 302.50 522.101 523.517 1.416 1.07 0.346 15.13 104.67 151.25 60.50 75.63 302.50 302.50 24.20 302.50 12.10

12 165+890 LHS 55 4.33 238.15 517.766 517.633 -0.133 1.07 -1.203 11.91 -286.49 119.08 47.63 59.54 238.15 238.15 19.05 238.15 9.53 Village road

13 165+890 RHS 55 4.33 238.15 517.402 517.633 0.231 1.07 -0.839 11.91 -199.81 119.08 47.63 59.54 238.15 238.15 19.05 238.15 9.53

14 179+820 LHS 55 5.33 293.15 531.48 532.091 0.611 1.07 -0.459 14.66 -134.56 146.58 58.63 73.29 293.15 293.15 23.45 293.15 11.73 Village road

15 179+820 RHS 55 5.20 286.00 531.318 532.091 0.773 1.07 -0.297 14.30 -84.94 143.00 57.20 71.50 286.00 286.00 22.88 286.00 11.44

16 180+250 LHS 55 4.00 220.00 525.324 529.141 3.817 1.07 2.747 11.00 604.34 110.00 44.00 55.00 220.00 220.00 17.60 220.00 8.80 Village road

17 180+250 RHS 55 8.60 473.00 525.876 529.141 3.265 1.07 2.195 23.65 1,038.23 236.50 94.60 118.25 473.00 473.00 37.84 473.00 18.92

18 183+620 LHS 9.5 3.00 28.50 537.324 538.436 1.112 1.07 0.042 1.43 1.20 14.25 5.70 7.13 28.50 28.50 2.28 28.50 1.14 Village road

19 183+620 RHS 7.5 3.00 22.50 537.451 538.436 0.985 1.07 -0.085 1.13 -1.91 11.25 4.50 5.63 22.50 22.50 1.80 22.50 0.90

20 183+670 LHS 5 4.00 20.00 539.075 539.686 0.611 1.07 -0.459 1.00 -9.18 10.00 4.00 5.00 20.00 20.00 1.60 20.00 0.80 Village road

21 183+670 RHS 8 4.00 32.00 538.885 539.686 0.801 1.07 -0.269 1.60 -8.61 16.00 6.40 8.00 32.00 32.00 2.56 32.00 1.28

22 186+250 RHS 10 7.00 70.00 528.09 528.621 0.531 1.07 -0.539 3.50 -37.73 35.00 14.00 17.50 70.00 70.00 5.60 70.00 2.80 Temple

23 187+050 RHS 9 3.75 33.75 532.986 534.544 1.558 1.07 0.488 1.69 16.47 16.88 6.75 8.44 33.75 33.75 2.70 33.75 1.35 Village road

24 187+260 RHS 17 4.00 68.00 532.643 535.342 2.699 1.07 1.629 3.40 110.77 34.00 13.60 17.00 68.00 68.00 5.44 68.00 2.72 Village road

25 188+020 RHS 55 6.05 332.75 531.436 532.825 1.389 1.07 0.319 16.64 106.15 166.38 66.55 83.19 332.75 332.75 26.62 332.75 13.31 Temple

26 194+540 LHS 44 3.75 165.00 577.312 578.342 1.03 1.07 -0.04 8.25 -6.60 82.50 33.00 41.25 165.00 165.00 13.20 165.00 6.60 Village road

27 199+260 RHS 25 5.00 125.00 557.221 557.995 0.774 1.07 -0.296 6.25 -37.00 62.50 25.00 31.25 125.00 125.00 10.00 125.00 5.00 Village road

28 199+343 RHS 39 5.00 195.00 557.268 557.901 0.633 1.07 -0.437 9.75 -85.22 97.50 39.00 48.75 195.00 195.00 15.60 195.00 7.80 Village road

29 199+505 RHS 96 5.00 480.00 554.374 557.435 3.061 1.07 1.991 24.00 955.68 240.00 96.00 120.00 480.00 480.00 38.40 480.00 19.20 Village road

30 203+600 LHS 55 5.72 314.60 581.984 584.325 2.341 1.07 1.271 15.73 399.86 157.30 62.92 78.65 314.60 314.60 25.17 314.60 12.58 Major Junction

31 203+600 RHS 55 5.89 323.95 581.479 584.325 2.846 1.07 1.776 16.20 575.34 161.98 64.79 80.99 323.95 323.95 25.92 323.95 12.96 Major Junction

32 215+360 RHS 30 5.00 150.00 565.349 566.063 0.714 1.07 -0.356 7.50 -53.40 75.00 30.00 37.50 150.00 150.00 12.00 150.00 6.00 Village road

33 215+690 RHS 11 6.45 70.95 566.47 567.039 0.569 1.07 -0.501 3.55 -35.55 35.48 14.19 17.74 70.95 70.95 5.68 70.95 2.84

34 216+000 RHS 55 5.85 321.75 570.611 570.867 0.256 1.07 -0.814 16.09 -261.90 160.88 64.35 80.44 321.75 321.75 25.74 321.75 12.87 Village road

35 216+003 LHS 55 5.94 326.59 570.611 570.867 0.256 1.07 -0.814 16.33 -265.84 163.30 65.32 81.65 326.59 326.59 26.13 326.59 13.06 Local Road

36 216+284 RHS 55 4.90 269.50 574.381 575.070 0.689 1.07 -0.381 13.48 -102.68 134.75 53.90 67.38 269.50 269.50 21.56 269.50 10.78 Hospital

37 217+333 RHS 55 8.88 488.13 582.499 582.469 -0.03 1.07 -1.1 24.41 -536.94 244.06 97.63 122.03 488.13 488.13 39.05 488.13 19.53 Village road

38 222+174 RHS 55 9.13 501.88 546.126 547.118 0.992 1.07 -0.078 25.09 -39.15 250.94 100.38 125.47 501.88 501.88 40.15 501.88 20.08 Village road

39 222+187 LHS 55 8.88 488.13 545.901 547.165 1.264 1.07 0.194 24.41 94.70 244.06 97.63 122.03 488.13 488.13 39.05 488.13 19.53 Local Road

40 226+366 LHS 71 6.50 461.50 559.689 561.448 1.759 1.07 0.689 23.08 317.97 230.75 92.30 115.38 461.50 461.50 36.92 461.50 18.46 Village road

41 227+360 RHS 55 5.50 302.50 554.612 554.998 0.386 1.07 -0.684 15.13 -206.91 151.25 60.50 75.63 302.50 302.50 24.20 302.50 12.10 Local Road

42 228+555 LHS 32 5.00 160.00 548.103 550.361 2.258 1.07 1.188 8.00 190.08 80.00 32.00 40.00 160.00 160.00 12.80 160.00 6.40 Local Road

43 229+853 LHS 55 5.99 329.29 548.286 549.47 1.184 1.07 0.114 16.46 37.54 164.64 65.86 82.32 329.29 329.29 26.34 329.29 13.17 Village road

44 231+352 RHS 55 6.26 344.30 546.578 549.324 2.746 1.07 1.676 17.22 577.05 172.15 68.86 86.08 344.30 344.30 27.54 344.30 13.77 Local Road

45 231+370 LHS 55 5.99 329.29 546.822 549.325 2.503 1.07 1.433 16.46 471.87 164.64 65.86 82.32 329.29 329.29 26.34 329.29 13.17 Village road

46 231+370 RHS 55 5.99 329.29 547.01 549.325 2.315 1.07 1.245 16.46 409.96 164.64 65.86 82.32 329.29 329.29 26.34 329.29 13.17

47 235+000 LHS 12 9.50 114.00 542.89 543.16 0.27 1.07 -0.8 5.70 -91.20 57.00 22.80 28.50 114.00 114.00 9.12 114.00 4.56 Kiregeri

48 235+690 LHS 55 5.96 327.91 542.303 545.883 3.58 1.07 2.51 16.40 823.05 163.95 65.58 81.98 327.91 327.91 26.23 327.91 13.12 Village road

49 235+735 RHS 55 5.81 319.55 542.474 545.883 3.409 1.07 2.339 15.98 747.43 159.77 63.91 79.89 319.55 319.55 25.56 319.55 12.78

50 237+504 RHS 55 6.45 354.75 549.334 550.406 1.072 1.07 0.002 17.74 0.71 177.38 70.95 88.69 354.75 354.75 28.38 354.75 14.19 Crusher Road

51 238+185 LHS 13 4.00 52.00 544.384 546.266 1.882 1.07 0.812 2.60 42.22 26.00 10.40 13.00 52.00 52.00 4.16 52.00 2.08 Village road

52 239+783 LHS 10 9.00 90.00 549.746 550.896 1.15 1.07 0.08 4.50 7.20 45.00 18.00 22.50 90.00 90.00 7.20 90.00 3.60 Puradageri

53 239+783 RHS 55 10.00 550.00 550.237 550.896 0.659 1.07 -0.411 27.50 -226.05 275.00 110.00 137.50 550.00 550.00 44.00 550.00 22.00

54 241+295 LHS 15 5.00 75.00 546.674 547.182 0.508 1.07 -0.562 3.75 -42.15 37.50 15.00 18.75 75.00 75.00 6.00 75.00 3.00 Hallur

55 241+300 RHS 11 4.50 49.50 546.515 547.428 0.913 1.07 -0.157 2.48 -7.77 24.75 9.90 12.38 49.50 49.50 3.96 49.50 1.98 Hallur
MINOR JUNCTION QTY/CUM

Height Dismantling Excavation Earthen


SI NO CHAINAGE Side Length Width TOTAL AREA OGL FRL Crust Emb ht. Embankment Subgrade G. SHOULDER GSB WMM PRIME COAT TACK COAT D.B.M TACK COAT B.C REMARK'S
(FRL-OGL) Existing Road upto emb. Top Shoulder

56 241+947 LHS 12 4.00 48.00 555.898 557.218 1.32 1.07 0.25 2.40 12.00 24.00 9.60 12.00 48.00 48.00 3.84 48.00 1.92 Hallur

57 242+170 LHS 25 6.00 150.00 549.058 552.349 3.291 1.07 2.221 7.50 333.15 75.00 30.00 37.50 150.00 150.00 12.00 150.00 6.00 Petrol Pump

58 242+920 LHS 40 5.20 208.00 550.735 550.777 0.042 1.07 -1.028 10.40 -213.82 104.00 41.60 52.00 208.00 208.00 16.64 208.00 8.32

59 243+000 LHS 55 6.00 330.00 551.295 552.748 1.453 1.07 0.383 16.50 126.39 165.00 66.00 82.50 330.00 330.00 26.40 330.00 13.20 Village road

60 247+910 RHS 55 5.86 322.30 552.021 552.779 0.758 1.07 -0.312 16.12 -100.70 161.15 64.46 80.58 322.30 322.30 25.78 322.30 12.89 Hanuma Sagar

61 248+066 RHS 55 6.06 333.41 550.128 550.671 0.543 1.07 -0.527 16.67 -175.71 166.71 66.68 83.35 333.41 333.41 26.67 333.41 13.34 Hanuma Sagar

62 248+692 RHS 55 7.00 385.00 549.333 549.929 0.596 1.07 -0.474 19.25 -182.49 192.50 77.00 96.25 385.00 385.00 30.80 385.00 15.40 Village road

63 252+153 LHS 10 5.00 50.00 550.135 550.814 0.679 1.07 -0.391 2.50 -19.55 25.00 10.00 12.50 50.00 50.00 4.00 50.00 2.00 BT Road

Total Qty. 16,342.00 817.10 4,608.83 11,063.99 8,171.00 - - 3,268.40 4,085.50 16,342.01 16,342.01 1,307.36 16,342.01 653.68
ADDITIONAL MINOR JUNCTION

As per Site
CHAINAGE
SI NO SIDE LENGTH WIDTH TOTAL AREA REMARKS

1 121+060 LHS 55 7.50 412.50 SG to BC

2 121+110 RHS 70 5.70 399.00 SG to BC

3 135+170 RHS 55 6.50 357.50 Not started Temple Location

4 135+450 RHS 55 5.70 313.50 Not started Temple Location

5 135+800 LHS 55 5.20 286.00 Not Required

6 147+235 RHS 81 5.70 461.70 Emb to BC

7 147+235 LHS 55 5.13 282.32 Emb to BC

8 147+770 LHS 55 5.20 286.00 Emb to BC

9 147+770 RHS 55 6.20 341.00 Emb to BC

10 164+590 LHS 55 5.60 308.00 SG to BC (WIP)

11 164+590 RHS 55 5.50 302.50 SG to BC (WIP)

12 165+890 LHS 55 4.33 238.15 Required at site 10 mtrs

13 165+890 RHS 55 4.33 238.15 Exitising PQC road

14 179+820 LHS 55 5.33 293.15 Required at site

15 179+820 RHS 55 5.20 286.00 Required at site

16 180+250 LHS 55 4.00 220.00 Emb to DBM (WIP)

17 180+250 RHS 55 8.60 473.00 Emb to DBM (WIP)

1 183+620 LHS 9.5 3.00 28.50 GSB to DBM

2 183+620 RHS 7.5 3.00 22.50 GSB to DBM

3 183+670 LHS 5 4.00 20.00 GSB to DBM

4 183+670 RHS 8 4.00 32.00 GSB to DBM

5 186+250 RHS 10 7.00 70.00 Temple GSB to DBM

6 187+050 RHS 9 3.75 33.75 Earth work completed

7 187+260 RHS 17 4.00 68.00 GSB to DBM

8 188+020 RHS 55 6.05 332.75 Temple at RHS,Not required

9 194+540 LHS 44 3.75 165.00 WMM to BC

10 199+260 RHS 25 5.00 125.00 GSB WIP

11 199+343 RHS 39 5.00 195.00 GSB WIP

12 199+505 RHS 96 5.00 480.00 Emb to BC

13 203+600 LHS 55 5.72 314.60 Separate COS

14 203+600 RHS 55 5.89 323.95 Separate COS


Two Lanning with paved Shoulder of Gadag to Honnali (Km 105.500 to Km 205.290 of SH 57 and Km 215.335 to Km 253.713 of SH 26), 138.2 Km in the State of Karnataka, India on Hybrid Annuity Basis
Concessionaire: M/s Sadbhav Gadag Highway Private Limited
Client: KSHIP
Independent Engineer: LEA Associates South Asia Pvt. Ltd. EPC Contrctor-Gawar Construction Company
Measurement sheet for Additional Junctions Pipe culvert

Qty after 5%
Sl.no Item No. Page No. Particulars Nos Length Width Depth Qty Total Qty Unit Remark
Contigency
1 8.13 110 Road Marking 2343.116 Sqm
Logitudinal lines 126 44 0.15 831.6 873.180
Centrel Line 63 33 0.15 311.85 327.442 63
TM03 63 10 0.2 126 132.300 48
63 5 0.2 63 66.150 0.761904761904762
TM04 63 3.6 0.1 22.68 23.814
AM06 63 0.2 2.2 27.72 29.106
63 0.3 1.5 28.35 29.768
63 0.3 1.5 28.35 29.768
AM01 63 0.2 2.2 27.72 29.106
63 0.25 1.2 18.9 19.845
BM04 252 0.75 1.85 349.65 367.133
BM05 378 1.5 0.5 283.5 297.675
126 0.5 0.5 31.5 33.075
Stop Sign 63 0.5 2.05 1.25 80.72 84.755

2 8.04 105 Stop Sign 63 1 63.000 63.000 Each


Spreed Breaker Sign 63 1 63.000 63.000 Each
Pedestrian Crossing Sign 63 1 63.000 63.000 Each
Junction Ahead 63 2 126.000 126.000 Each

3 9.01 I-B(i) 129 Excavation for Pipe Cuvert 63 10 2.5 1.82 2866.50 3009.825 3009.825 Cum

4 9.06 A Case-I 133 PCC Below Precast pipe culvert 114.704 Cum
63 10.2 1.7 0.1 109.24 114.704
5 9.06 C Case-I 133 M20 concrete for encasement 968.535225 Cum
63 10 1.5 1.4 1323.00 1389.150
Deduction 63 3.14 0.20 10 400.59 420.615
6 9.06 E Case-II 133 Slab M25 198.450 Cum
63 10 1.5 0.2 189.00 198.450
7 9.07 134 Reinforcement for Encasement Slab 63 0.35 22.19 23.302 23.302 MT

630.000 Rm
8 9.04 B 132 900 mm Pipe 63 10 630
Project: Two Lanning with paved Shoulder of Gadag to Honnali (Km 105.500 to Km 205.290 of SH 57 and Km 215.335 to Km 253.713 of SH 26), 138.2 Km in the State of Karnataka, India on Hybrid Annuity Basis
Concessionaire: M/s Sadbhav Gadag Highway Private Limited
Client: Karnataka State Improvement Project (KSHIP-III)

Independent Engineer: LEA Associates South Asia Pvt. Ltd. EPC Contrctor-Gawar Construction Company
Large Quantity Rates of Rate After
Rate Ananlysis
Project for Changeofof Scope (Gadag-Honnali)
Cement Cement / Current effecting Annexure-A
Rates(As / Steel / Adopted Steel / Rates as Rise/fall in Lead in Total Final Rate
NH SOR 2022-2023 As per Mix Diff, in Cost of Source to Plant Plant
Km to site
(Total (for mix material) Transporti
Haulage
Chapter per NH Bitumen the Bitumen per base rate Material Haulage Transporti Transporti Arrived after
Description Unit Design at Rate Material Lead in Lead - Charges Remark
No Item No. Page No. SOR Requirem Materials per MT as ANNEXUR of finished Requirem Charges on on ng/ Lead adding lead
site (in Rs.) (in Rs.) Km Initial Tonn/
Dharwad ent Req. per SOR E-B item in ent Tonne-KM Charges Charges Charges charges
A B C D E F
2022-2023 G (AsHper I=Min(G,H) 2022-23
J (in K
Rs.) L=K-J M=LxI N=F+M
SOR O P Q R=OxPxQ LeadS of 1 Cum-KM T U=SxT V=R+U W=N+V X
(in Rs.) SOR) (in Rs.) (in Rs.) Km)
2 Site Clearance
Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 meters,
2.05 stacking serviceable and unserviceable materials separately, including all labour, usage charges of all
machinery, lift, load, unload, transportation etc., complete. etc., complete (Dismantled material to be
transported mechanically).
2.05 (ii) A 10 Bituminous courses - By Mechanical Means Cum 402.00 - - - - - - 402.00 - - - - - - - - 402.00
3 EARTHWORK, EROSION CONTROL AND DRAINAGE - - - -
Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000
metres.Excavation for roadwork in soil by hydraulic excavator including cutting and loading in tippers,
3.06 17 trimming bottom and side s lopes, in accordance with requirements of lines, grades and crosssections, Cum 76.00 - - - - - - 76.00 - - - - - - - - 76.00
and transporting to the embankment location , with all lifts and lead upto 1000 m, including all labour, load,
unload, usage charges of allmachinery, etc., complete.

Construction of Embankment with Material obtained from Borrow pits


Construction of embankment with approved material obtained from borrow pits laid in layers not exceeding
250 mm loose thickness, spreading, breaking clods, removal of roots and other organic materials to the
3.16 21 Cum 424.00 - - - - - - 424.00 - - - - - - - - 424.00
required line, grade and cross section including watering, consolidation by roll er to the ' desired field
density not less than 95% of maximum dry density including all lead, lifts,loading, unloading, all labour,
usage charges of all machinery etc., complete as per table 300-2.

Construction of Embankment with Material Deposited from Roadway Cutting


Construction of embankment with approved materials deposited at site from roadway cutting and
excavation from drain and foundation of other structures graded and compacted to meet requirement of
3.17 22 table 300-2.laid in layers not exceeding 250 mm loose thickness, spreading, breaking clods, removal of Cum 53.00 - - - - - - 53.00 - - - - - - - - 53.00
roots and other organic materials to the required line, grade and cross section including watering,
spreading, grading by motor grader and consolidation by roller with desired field density not less than 95%
of maximum dry density withina lead of 100 meters, including aU lead

Construction of Subgrade and Earthen Shoulders


Construction of sub-grade and earthen shoulders with approved material obtained from borrow
pits,transporting to site, spreading, grading to required slope and compacted to meet requirement of table
No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding
3.18 22 Cum 426.00 0.110 - - - - - - 426.00 - - - - - - - - 426.00
water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the
required camber, grade and cross section etc., speading, grading by motor grador, consolidation by roller
including all lead, lifts, loading, unloading, all labour, usage charges of machinery etc., complete. (New
road formation)
SUB-BASES, BASES (NON-BITUMINOUS)
4 - - - -
AND SHOULDERS
Granular Sub-Base with Close /CoarseGraded Material (Table:- 400-1) By Mix in Place Method
Construction of granular sub-base by providing spreading in uniform layers with motor grader on prepared
surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller
4.01 B (v) 33 to achieve the desired density, complete as per clause 401, including protection of edges of GSB layer, Cum 2,137.00 - - - - - - 2137.00 - - - - 8.19 11.20 91.70 91.700 2,228.70
cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance
of diversion road, loading & unloading all lead, lifts etc., complete. (Compacted thickness). Grading-V
Material (Close graded)

Wet Mix Macadam (Plant Mix Method)


Providing, laying, spreading and compacting graded stone aggregate as per table 400-12 & 400-13, to
wet mix macadam specification including premixing the Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on
4.14 A 44 Cum 2,313.00 - - - - - - 2313.00 - - - - 40.00 27.20 1,088.00 1,088.000 3,401.00
well prepared surface and compacting with vibratory roller to achieve the desired densityof 98% including
protection of edges ofWMM layer, cost of all materials, labour, usage charges of all machinery, lighting,
guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete, with
lead of mixed material up to I Km.(Compacted thickness) Laying Using Mechanical Paver

5 BASES AND SURFACE COURSE (BITUMINOUS) - - - -


Prime Coat
Providing and applying primer coat withSS1 bitumen emulsion complying [S 8887 on prepared surface of
5.01 A (i) 51 granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using Sqm 74.00 0.0008 0.0007 0.0007 87,628.00 48,393.00 ### (27.46) 46.54 0.0007 309.00 5.60 1.21 - - - 1.211 47.75
mechanical means. as per table-500-3, including cost of all materials, labour, usage charges of all
machinery, lead, lift, loading & unloading etc., complete, execpt lead for emulsion.
Tack Coat on Granular Surface.
Providing and applying tack coat with bitumen emulsion(RSl) using emulsion pressure distributor at the
5.02 (ii) a 54 rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom & dusting by air Sqm 14.70 0.0003 0.0003 0.0003 87,628.00 48,393.00 ### (9.81) 4.89 0.0003 309.00 5.60 0.43 - - - 0.433 5.32
compressor and spraying including cost of all materials, labour, usage charges of all machinery, lead, lift,
loading & unloading etc., complete, execpt lead for emulsion
Tack Coat on Bituminous Surface.
Providing and applying tack coat with bitumen emulsion (RSl) using emulsion pressure distributor at the
rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom & dusting by
5.02 (i) a 53 Sqm 11.95 0.0002 0.0002 0.0002 87,628.00 48,393.00 ### (7.85) 4.10 0.0002 309.00 5.60 0.35 - - - 0.346 4.45
air compressor and spraying including cost of all materials, labour; usage charges of all machinery, lead,
lift, loading & unloading etc., complete,
execpt lead for emulsion
Tack coat on cement concrete pavement
Providing and applying tack coat with bitumen emulsion (RSl) using emulsion pressure distributor at the
5.02 (iii) a 54 rate of 0.30 kg per sqm on the prepared cement concrete surface cleaned with mechanical broom & Sqm 17.45 0.0002 0.0003 0.0002 87,628.00 48,393.00 ### (8.83) 8.62 0.0002 309.00 5.60 0.39 - - - 0.389 9.01
dusting by air compressor and spraying including cost of all materials, labour, usage charges of all
machinery, lead, lift, loading & unloading etc., complete, execpt lead for emulsion
Large Quantity Rates of Rate After
Rate Ananlysis
Project for Changeofof Scope (Gadag-Honnali)
Cement Cement / Current effecting Annexure-A
Rates(As / Steel / Adopted Steel / Rates as Rise/fall in Lead in Total Final Rate
NH SOR 2022-2023 As per Mix Diff, in Cost of Source to Plant Plant
Km to site
(Total (for mix material) Transporti
Haulage
Chapter per NH Bitumen the Bitumen per base rate Material Haulage Transporti Transporti Arrived after
Description Unit Design at Rate Material Lead in Lead - Charges Remark
No Item No. Page No. SOR Requirem Materials per MT as ANNEXUR of finished Requirem Charges on on ng/ Lead adding lead
site (in Rs.) (in Rs.) Km Initial Tonn/
Dharwad ent Req. per SOR E-B item in ent Tonne-KM Charges Charges Charges charges
A B C D E F
2022-2023 G (AsHper I=Min(G,H) 2022-23
J (in K
Rs.) L=K-J M=LxI N=F+M
SOR O P Q R=OxPxQ LeadS of 1 Cum-KM T U=SxT V=R+U W=N+V X
(in Rs.) SOR) (in Rs.) (in Rs.) Km)
Dense Graded Bituminous Macadam Grading-I
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using
crushed aggregates as per table 500-7 of specified grading premixed with bituminous binder VG-30
grade . paving bitumen as per clause 504.3.1 complying with 1S-73-20 13 of specified grading, premixed
with bituminous binder at 4.0 percent by weight of total mix and filler at 2 percent by weight of agegate,
5.04 (i) a 57 transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the Cum 9,400.00 0.1037 0.0924 0.0924 87,628.00 48,393.00 ### (3,625.31) 5774.69 0.092 309.00 5.60 159.89 8.1875 12.88 105.46 265.344 6,040.03
required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve
the desired compaction as per MoRTH specification clause No. 505 complete in all respects including cost
of all materials all labour, usage charges of all machinery, all lead, lifts, loading, unloading stacking
transporting etc., complete, except lead for bitumen, with a lead of mixed material upto 1 km, excluding
cost of primer/ tack coat. 75-100 mm compacted Thinkness

Bituminous Concrete Grading -I


Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed
aggregates as per table 500-7 of spec ifi ed grading premixed with bituminous binder VG-30 grade paving
bitumen as per clause 504.3. 1 complying witb IS-73-20 13 of specified grading, premixed with bituminous
binder at 5.2 percent of mix and filler at 2% by weight of agregate, transporting the hot mix to work site,
5.05 (i) a 59 laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, Cum 11,349.00 0.1296 0.1227 0.1227 87,628.00 48,393.00 ### (4,815.04) 6533.96 0.123 309.00 5.60 212.36 8.1875 13.16 107.75 320.107 6,854.07
rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 507 complete in all respects including cost of all materials all labour,
usage charges of all machinery, all lead, lifts, loading, unloading stacking transporting etc., comp lete,
except lead for bitumen, with a lead of mixed material upto I km, excluding cost of primer/ tack coat. 50
mm compacted thickness.

Bituminous Concrete Grading-II


Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed
aggregates as per table 500-7 of specified grading premixed with bituminous binder VG-30 grade paving
bitumen as per clause 504.3. 1 complying with IS-73-2013 of specified grading, premixed with bituminous
binder @ 5.4 per cent of mix and filler @2% by weight of agregate, transporting the hot mix to work site,
5.05 (ii) a 61 laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, Cum 11,660.00 0.1306 0.1274 0.1274 87,628.00 48,393.00 ### (5,000.11) 6659.89 0.127 309.00 5.60 220.52 8.1875 13.16 107.75 328.270 6,988.16
rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MORTH specification clause No. 507complete in all respects including cost of all materials all labour,
usage charges of all machinery all lead, lifts, loading, unloading stacking transporting etc., complete,
except lead for bitumen, with a lead of mixed material upto I km, excluding cost of primer/ tack coat.30-40
mm compacted thickness
TRAFFIC SIGNS, MARKINGS
8 - - - - -
AND OTHER ROAD APPURTENANCES
Retro-Reflectorised Traffic Signs
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC :67 made
of Class-8 Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3,
4mm thick Aluminiumcomposite material sheet including lettering depending on the size of the sign fixed
over back support frame of min 25 x 25 x 3mm Angle mounted on a mild steel circul ar pipe 65 NB
8.04 - 0.00 - - - -
3.60mtrs high (min effective height 1.30 mtrs), 3.2 mm thickness firmly fixed to the ground by means of
properly designed foundation with M25 grade cement concrete 45 cm x 45 em x 60 cm, 60 cm below
ground level as per approved drawing. The sign shall be maintained as per section 12 ofIRC 67, as per
clauses including curing, cost of all materials all labour, lead, lifts, loading, unloading transporting etc.,
complete.
8.04 A (ii) 104 90mm equilateral triangle Each 4,033.00 - - - - - - 4033.00 - - - - - - - - 4,033.00
8.04 A (viii) 104 60 cm circular Each 5,747.00 - - - - - - 5747.00 - - - - - - - - 5,747.00
8.04 A (x) 104 80 X 60 cm Rectangular Each 4,636.00 - - - - - - 4636.00 - - - - - - - - 4,636.00
8.04 A (xii) 104 60 X 45 cm Rectangular Each 9,517.00 - - - - - - 9517.00 - - - - - - - - 9,517.00
Painting Two Coats on New Concrete Surfaces
8.08 108 Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered Sqm 85.00 - - - - - - 85.00 - - - - - - - - 85.00
concrete surfaces

Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass beads on
Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass
beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per
8.13 110 Sqm 612.00 - - - - - - 612.00 - - - - - - - - 612.00
IRC:35. The finished surface to be level, uniform and free from streaks and holes, including, barricading,
traffic diversion as per IRC-35,cleaning the surface of dirt, dust and other foriegn matter, demarcation at
site, traffuc control,cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete.
2.5 mm Thick

Retro-Reflectorised Traffic Signs


Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC :67 made
ofClass-8 Type IV retro reflective sheetingfixed over 2 mm thick aluminiumsheeting vide clause 801.3,
4mm thickAluminium composite material sheetincluding lettering depending on thesize of the sign fixed
over back support
8.04 105 frame of min 25 x 25 x 3mm Anglemounted on a mild steel circular pipe65 NB 3.60mtrs high (min
effectiveheight 1.30 mtrs), 3.2 mm thicknessfirmly fixed to the ground by means ofproperly designed
foundation with M25grade cement concrete 45 cm x 45 cmx 60 cm, 60 cm below ground level asper
approved drawing. The sign shall
be maintained as per section 12 ofIRC67, as per clauses including curing,cost of all materials all labour,
lead,lifts, loading, unloading transportingetc., complete.
B(VII) 75cm circular - - 6983.00 - - - - - - - - 6,983.00
B(xvi) 75 cm high octagon - - 6698.00 - - - - - - - - 6,698.00
9 PIPE CULVERT - - - - -
Earth work in excavation of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,
9.01 I-B(i) 129 dressing of sides and bottom and backfilling with approved material, including all labour, usage charges of Cum 87.00 - - - - - - 87.00 - - - - - - - - 87.00
machinery, lead, lifts, loading,unloading transporting etc., complete.Ordinary soil - Mechanical Means
(Depth upto 3 m)

PCC 1:3:6 in Foundation.Providing & laying Plain cement concrete 1:3: 6 nominal mix in foundation
with crushed stone aggregates 40mm nominal size mechanically mixed,placed in foundation and
9.03 131 Cum 4,737.00 0.260 0.230 0.230 6,100.00 6,250.00 150.00 34.50 4771.50 0.230 45.00 5.60 57.96 8.1875 27.2800 223.36 281.315 5,052.82
compated by vibration including curing, including cost of all materials all labour, usage charges of
machinery, lead, lifts ,loading, unloading transporting etc.,complete.
Large Quantity Rates of Rate After
Rate Ananlysis
Project for Changeofof Scope (Gadag-Honnali)
Cement Cement / Current effecting Annexure-A
Rates(As / Steel / Adopted Steel / Rates as Rise/fall in Lead in Total Final Rate
NH SOR 2022-2023 As per Mix Diff, in Cost of Source to Plant Plant
Km to site
(Total (for mix material) Transporti
Haulage
Chapter per NH Bitumen the Bitumen per base rate Material Haulage Transporti Transporti Arrived after
Description Unit Design at Rate Material Lead in Lead - Charges Remark
No Item No. Page No. SOR Requirem Materials per MT as ANNEXUR of finished Requirem Charges on on ng/ Lead adding lead
site (in Rs.) (in Rs.) Km Initial Tonn/
Dharwad ent Req. per SOR E-B item in ent Tonne-KM Charges Charges Charges charges
A B C D E F
2022-2023 G (AsHper I=Min(G,H) 2022-23
J (in K
Rs.) L=K-J M=LxI N=F+M
SOR O P Q R=OxPxQ LeadS of 1 Cum-KM T U=SxT V=R+U W=N+V X
(in Rs.) SOR) (in Rs.) (in Rs.) Km)
Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding
in SingleRow.Providing & laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for
culverts on first class bedding of granular material in single row, including fixing collar with with cement
mortar 1 :2, but excluding excation, protection works, backfilling,
9.04 B 132 Metre 10,110.00 - - - - - - 7524.00 - - - - - - - - 7,524.00
concrte and masonry works in headwall and parapetes, including cost of all materials all labour, usage
charges of machinery, lead, lifts, loading, unloading transporting etc., complete.of granular material in
single row,including fixing collar with with cement mortar 1 :2, but excluding excation, protection works,
backfilling, concrte and masonry works in headwalland parapetes.900mm Dia

Providing & laying Plain/Reinforced Cement Concrete in open foundation & complete as per drawing
& tecnical 2100 pecification for Pipe Culvert complete as per Drawing and Technical
Specifications ,including cost of all materials, formwork,centering, vibrating, compacting,alliabour,usage
9.06 133
charges of machinery, lead, lifts,loading, unloading transporting, stacking, curing, finishing the exposed
faces etc.,complete. (excluding cost of steel and fabrication charges)PCC Grade MI5 using batching
plant transit mixer & Concrete pump
9.06 A Case-
133 PCC Grade MI5 using batching plant transit mixer & Concrete pump Cum 5,198.00 0.260 0.275 0.260 6,100.00 6,250.00 150.00 39.00 5237.00 0.260 45.00 5.60 65.52 8.1875 27.2800 223.36 288.875 5,525.88
I
9.06 C Case-
133 RCC Grade M20 using batching plant transit mixer & Concrete pump Cum 5,864.00 0.380 0.347 0.347 6,100.00 6,250.00 150.00 52.08 5916.08 0.347 45.00 5.60 87.49 8.1875 27.2800 223.36 310.842 6,226.92
I
9.06 E
133 RCC Grade M25 using batching plant, transit mixer & Manual Placing Cum ### 0.380 0.347 0.347 6,100.00 6,250.00 150.00 52.08 6890.08 0.347 45.00 5.60 87.49 - - - 87.487 6,977.56
Case-II
Supplying, Fitting and Placing un-coated TMT Fe-500 grade bar Reinforcement
in Foundation complete as per Drawing and Technical Specifications. including straightening bar, cutting,
bending, hooking binding with approved quality binding wire,after placing in position, tying, lapping and or
9.07 134 Mt 86,958.00 1.050 1.050 1.050 68,100.00 61,864.41 (6,235.59) (6,547.37) 80410.63 1.050 45.00 5.60 264.60 - - - 264.600 80,675.23
welding whereever required ( laps, hooks wastages shall not be measured & paid) incluidng cost
of all materials, fabrication charges, all labour, material, usage chargesof machinery, lead, lifts, loading,
unloading,stacking, transporting etc., complete.
Addional item Rates which are not found in SOR-2022-23 -
Rate Analysis
( Sub Grade of Rate - - - -
50% & Granular Sub Granular Shoulder (50% GSB Materials &50% SG Materials) Cum 1,281.50 - - - - - - 1281.50 - - - - 8.1875 11.20 91.7000 91.700 1,373.20
Base of Rate 50%)
ANNEXURE - B
Revised Material Rates
Prevail Market Rates (As per
Rate Considered in
Sl. No Description of Materials Unit Superintending Engineer, NH Remarks
SOR 2022-23
Circle Bangalore. Dharward)
1 2 3 4 5 6
1 VG-10 Bitumen (80/100 Grade) Bulk MT 50,652 48,818 M-076
2 VG-30 Bitumen (60/70 Grade) Bulk MT 51,370 48,384 M-075
3 VG-40 Bitumen (30/400 Grade) Bulk MT 54,760 51,118 M-074
4 Crumb Rubber Modified Bitumen-55 Grade Bulk MT 53,795 42,750 M-078 B
5 Rapid Setting Emulsion of packed (R/C drums) RS-1 MT 46,080 44,446 M-078
6 Slow Setting Emulsion of packed (R/C drums) SS1 MT 87,628 48,393 M-078 A
7 TMT Steel (Thermo Mechanically Treated) FE-500 MT 68,100 61,864 M-083
8 Corrosion resistant Structural Steel MT 76,270 64,407 M-088
9 Cement MT 6,100 6,250 M-081

Lead details
1 Bitumen Km. 309.00 From Source to Plant Lead chart Sheet Attached
2 Cement Km. 45.00 From Source to Plant The Cement & Steel Leads shall not added separately however, it
is inclusive of all leads, lifts and loading & unloading charges as
3 Steel Km. 45.00 From Source to Site per mentioned in point no-20 in general notes of SOR-2022-23.
4 Other Items ( Mix Materials) Km 40.00 From Plant to Site Lead chart Sheet Attached

Lead Charges as per NH SOR-2022-23, Dharward. [ Page no xliii & xliv]


1 Description of Materials Unit Density (MT/Cum) Large Project Rates per Cum (INR) Remarks

Materials
a Bitumen MT - 5.6
b Cement MT - 5.6
c Unit MT - 5.6
2 Mixed Materials (plant to Site)
a GSB CUM 2.00 11.2
b WMM CUM 2.00 27.2
c DBM CUM 2.30 12.88
d BC CUM 2.35 13.16
e Cement Concrete for all grades CUM 2.20 27.28
Lead Chart
Lead Chart From source to Plant(i.e; Bitumen) Lead Chart From source to Plant (i.e; Cement & Steel)
Lead Chart From Plant to Site (i.e;Concrete,Granular Sub Base, Wet Mix Macadam & Bituminous Works)

Haveri Itagi Camp @ Ch:-163+000 RHS


Itagi Camp @ Ch:-161+850 RHS Haveri (Existing Chainage) RHS
Itagi Camp @ Ch:-161+850
Haveri Haveri Gadag

Concrete,Granular Sub Base, Wet Mix Macadam &


Bituminous Material Camp
Emulsion & Bitumen

Existing Road
Cement

Steel
46

Existing Road
310 46 46 46 41.00

Itagi Ranebennur
Itagi Camp 161+850 RHS Itagi
MRPL Kuthethoor,Mangalore 161+850 RHS Itagi Camp 168+215 Varada Bridge ROB Ch 202+000
Camp

Emulsion & Bitumen Source Cement Steel


Concrete,Granular Sub Base, Wet Mix Macadam & Bituminous Material Camp
Location of Source MRPL Kuthethoor,Mangalore Location of Source Nearest Thaluka Place Haveri Location of Plant Itagi Camp @ Ch:-163+000 RHS (Existing Chainage)
Location of Site Itagi Camp @ Ch:-161+850 RHS Location of Site Ch.168+215 Varada Bridge Location of Site Ch.168+215 Varada Bridge
Initial Lead 1 Initial Lead 1 Initial Lead 1
Lead in Km 309 Lead in Km 45 45 Lead in Km 40.00
BAR BENDING SCHEDULE

Structure: Pipe Culvert Encasement (BHS) Barrel portion Width=1.840 mtr


Encasement Slab Thickness = 200 mm
Clear cover =40 mm
Cutting
Sr. No Description Shape Dia. spacing Nos Total CL Remark
Length

Bottom Main. 0.050


1 12 150 67 1.472 98.624
Bar 1.42

Bottom Dist. 0.050


2 12 150 10 9.972 99.72
Bar 9.92

Top Main. 0.050


3 12 150 67 1.472 98.624
Bar 1.42

0.050
4 Dist. Bar 9.92 12 150 10 9.972 99.72

Total Length 396.688


Unit Wt(Kg/mt). 0.888
Toatal Wt (Kg) 352.259