0% found this document useful (0 votes)
10 views1 page

Anexo 1 Tabla Final de Confiabilidad Petrobras

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views1 page

Anexo 1 Tabla Final de Confiabilidad Petrobras

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Techcorr 1/1

Anexo No. 1 Tabla Final de Confiabilidad Petrobras.xls


Calicatas 1,5Km
Reliability Analysis of Results Teletest Inspection by Ultrasonic Testing

Length Approach of
Damages to
Requires
Time Service
Pipe of 10" MAOP (psi) Repair for Immediate 29 Diameter (in) 5 MOP (psi) 400 SMYS (psi) 35000 Location Class Safety Factor
from Concepción
(mts) Integrity
Repair:
Repair
(years)

to La Paz. Planning Design


1,500 740 1 60% 19 10 3/4 Emin MOP (mm) 2.17 Enom (mm) 9.525 0.72 1 1.39
Inspection Factor
ANSI 300 Schedule 0.375 High risk Medium Risk Low Risk Leak ? Si Material API 5L B 1.39MAOP 1028.6
Replacement Criteria
Transducer Thickness Frequency of
Anomalies Orientation & Thick. Min. Thick. Max. Corrosion Rate Rc Integrity
Ring Place Location Direction Observations of Integrity Criticality Inspection Requires Repair Criteria 1,39MAOP to Repair MAOP Criteria
Place (mts) Severity (mm) (mm) (mm/a) (years)
(Km) Tint (mm) (years)
1 9.61 1.91 7.44 4 0.3 1 Planning Inspection Planning Inspection
2 9.96 1.91 7.79 4 0.3 1 Planning Inspection Planning Inspection
Calicatas inernas y externas en C-10

3 9.50 1.91 7.33 4 0.3 1 Planning Inspection Planning Inspection


4 9.53 1.91 7.36 4 0.3 1 Planning Inspection Planning Inspection
5 9.97 1.91 7.80 4 0.3 1 Planning Inspection Planning Inspection
6 9.70 1.91 7.53 4 0.3 1 Planning Inspection Planning Inspection
7 8.61 1.91 6.44 3 0.3 1 Planning Inspection Planning Inspection
8 9.70 1.91 7.53 4 0.3 1 Planning Inspection Planning Inspection
9 8.20 1.91 6.03 3 0.3 1 Planning Inspection Planning Inspection
10 7.03 1.91 4.86 3 0.3 1 Planning Inspection Planning Inspection
11 5.50 1.91 3.33 2 0.3 1 Planning Inspection Requires Immediate Repair
12 7.40 1.91 5.23 3 0.3 1 Planning Inspection Planning Inspection
13 8.10 1.91 5.93 3 0.3 1 Planning Inspection Planning Inspection
14 8.00 1.91 5.83 3 0.3 1 Planning Inspection Planning Inspection
15 8.00 1.91 5.83 3 0.3 1 Planning Inspection Planning Inspection
16 5.70 1.91 3.53 2 0.3 1 Planning Inspection Planning Inspection
FW 3.44 1.91 1.27 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
Calicatas 14 Validación

FW 3.30 1.91 1.13 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 4.38 1.91 2.21 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 3.82 1.91 1.65 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 2.98 1.91 0.81 0 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 2.82 1.91 0.65 0 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 4.83 1.91 2.66 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 3.87 1.91 1.70 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 2.79 1.91 0.62 0 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 3.11 1.91 0.94 0 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 2.99 1.91 0.82 0 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 4.68 1.91 2.51 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 4.39 1.91 2.22 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
Calicata 4 Validación

FW 5.63 1.91 3.46 2 0.3 1 Planning Inspection Planning Inspection


FW 5.95 1.91 3.78 2 0.3 1 Planning Inspection Planning Inspection
FW 5.54 1.91 3.37 2 0.3 1 Planning Inspection Requires Immediate Repair
FW 6.80 1.91 4.63 2 0.3 1 Planning Inspection Planning Inspection
FW 5.19 1.91 3.02 2 0.3 0 Planning Inspection Requires Immediate Repair
FW 4.97 1.91 2.80 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 4.89 1.91 2.72 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 5.36 1.91 3.19 2 0.3 1 Planning Inspection Requires Immediate Repair
FW 4.90 1.91 2.73 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 4.15 1.91 1.98 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 3.62 1.91 1.45 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
Calicata 9
FW 3.80 1.91 1.63 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 3.61 1.91 1.44 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 5.70 1.91 3.53 2 0.3 1 Planning Inspection Planning Inspection
BW 5.58 1.91 3.41 2 0.3 1 Planning Inspection Requires Immediate Repair
Calicata 10
FW 3.24 1.91 1.07 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
FW 3.11 1.91 0.94 0 0.3 0 Requires Immediate Repair Requires Immediate Repair
BW 1,98 VS 4.77 1.91 2.60 1 0.3 0 Requires Immediate Repair Requires Immediate Repair
Calicata 19
BW 2,80 VM 4.72 1.91 2.55 1 0.3 0 Requires Immediate Repair Requires Immediate Repair

9/16/2006 / V 1.o Gerencia Tecnica y Operativa


VoBo Repair Inspection Plan. C10 - La Paz, Inspected 2006 Techcorr Sur América