0% found this document useful (0 votes)
94 views7 pages

Estimation Kivnon K11s

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views7 pages

Estimation Kivnon K11s

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

QUOTATION PK180128

AGVs Kitting
Quot. nº: PK180128
Date: 27/03/2018
Customer: Renault SOMACA
Project: AGVs Kitting
Contact: Khalid Labrini / Meryeme Benjelloun Agent: www.kivnon.com

ref, Description Q RRP disc. unit price Total (€)

1 AGVs 387.600,00

K11M AGV K11 MOUSE TWO-WAY MAGNETIC


TWO-WAY automatic guided vehicle, of small dimensions, 1900x460x281mm, 16 32.300,00 25% 24.225,00 387.600,00
MAGNETIC guided. Designed to carry trolleys, with the ability to drive under them, pick
them up and deliver them automatically. Model and equipment:

K11-M215 AGV K11 type TWO-WAY with 300N (600kg) towing power. X 29.765,00 #####
EXK11M Accessories K11 MOUSE TWO-WAY
EXMRF Radio Modem X 340,00 340,00
EXMWF WiFi Modem X 1.305,00 #####
EXCBL2 In loop batteries charging system 2 X 890,00 890,00

2 AGV COMPLEMENTS 9.243,75

CASK1 COMPLEMENTS AGVS K10, K11 AND K32 SERIES


MAGV AGV manipulation
KE1380 JOYSTICK 1 500,00 15% 425,00 425,00
KE1375 TOWING TOOL AGVS K10-K11-K32 1 475,00 15% 403,75 403,75
CBAT Batteries charging system
KE1550 16A IN LOOP BATTERY CHARGING STATION 5 1.500,00 15% 1.275,00 6.375,00
KE1600 90Ah CHARGING AND EXCHANGE BATTERY STATION 1 2.400,00 15% 2.040,00 2.040,00

3 CIRCUIT COMPLEMENTS 24.830,20

GUIA Guidance elements


KE1511 ADHESIVE MAGNETIC TAPE 50MM (15m ROLL) 80 130,00 15% 110,50 8.840,00
KE1515 RFID TAG CONTROL PVC (10 UNITS) 48 65,00 15% 55,25 2.652,00
KE1518 ADHESIVE CIRCULAR TAG PROTECTION (10 UNITS) 51 27,00 15% 22,95 1.170,45
CONF Configuration devices
KE1324B SOFTWARE APP FOR TAGS CONFIGURATION. INCLUDES SMARTPHONE 1 920,00 15% 782,00 782,00
PLC PLC local traffic management
KE1405 LOCAL TRAFFIC MANAGEMENT BOX WITH PLC, HMI AND RADIO 3 4.465,00 15% 3.795,25 11.385,75

4 PROJECT 14.122,00

PROJECT MANAGEMENT 1 3.500,00 3.500,00


DESIGN AND CONFIGURATION OF CIRCUITS, TAGS, ETC. 1 2.800,00 2.800,00
ELECTRICAL DESIGN FOR PLCs 1 1.400,00 1.400,00
MECHANICAL DESIGN OF WHEELED BASEPLATES 1 2.335,00 2.335,00
PLCs PROGRAMMING 1 2.335,00 2.335,00
PROJECT DOCUMENTATION (IN ENGLISH) 1 785,00 785,00

MEALS, ACCOMMODATIONS EXPENSES AND TRAVEL COSTS


MEALS, ACCOMMODATIONS EXPENSES AND TRAVEL COSTS: 1 technician, 1 day 1 967,00 967,00

5 CIRCUIT IMPLANTATION 32.244,00

CIRCUIT INSTALLATION
Assembly and installation of guidance devices
ADHESIVE MAGNETIC TAPE (m) 1.200 5,00 6.000,00
RFID CONTROL TAG ON PAVEMENT SURFACE 480 5,00 2.400,00
RFID CONTROL TAG CONFIGURATION AND RECORDING 480 5,00 2.400,00

RADIO EQUIPMENT Installation and connection


LOCAL TRAFFIC MANAGEMENT BOX WITH PLC, HMI AND RADIO 3 1.000,00 3.000,00

ELECTRIC INSTALLATION
Supply, installation and connection of FIELD ELEMENTS
VALIDATION BUTTON 3 224,00 672,00

Assembly, installation and connection of BATTERY CHARGING


16A IN LOOP BATTERY CHARGING STATION 5 850,00 4.250,00
90Ah CHARGING AND EXCHANGE BATTERY STATION 1 50,00 50,00

MEALS, ACCOMMODATIONS EXPENSES AND TRAVEL COSTS


Quot. nº: PK180128
Date: 27/03/2018
Customer: Renault SOMACA
Project: AGVs Kitting
Contact: Khalid Labrini / Meryeme Benjelloun Agent: www.kivnon.com

ref, Description Q RRP disc. unit price Total (€)

MEALS, ACCOMMODATIONS EXPENSES AND TRAVEL COSTS: 4 technicians, 11 1 13.472,00 13.472,00


days

6 START UP 17.378,00

FUNCTIONING TESTS 1 2.470,00 2.470,00


START UP AND ASSISTANCE DURING PRODUCTION 1 5.670,00 5.670,00
TRAINING 1 935,00 935,00

MEALS, ACCOMMODATIONS EXPENSES AND TRAVEL COSTS


MEALS, ACCOMMODATIONS EXPENSES AND TRAVEL COSTS: 3 technicians, 8 1 8.303,00 8.303,00
days
Quot. nº: PK180128
Date: 27/03/2018
Customer: Renault SOMACA
Project: AGVs Kitting
Contact: Khalid Labrini / Meryeme Benjelloun Agent: www.kivnon.com

ref, Description Q RRP disc. unit price Total (€)

QUOTATION SUMMARY

1 AGVs (3 K10-M215) 387.600,00


2 AGV COMPLEMENTS 9.243,75
3 CIRCUIT COMPLEMENTS 24.830,20
4 PROJECT 14.122,00
5 CIRCUIT IMPLANTATION 32.244,00
6 START UP 17.378,00

TOTAL QUOTATION € 485.417,95

7 OPTIONAL: MONITORING SOFTWARE 10.445,00

COMFORT PANEL SIEMENS 19" WITH WINCC LICENCE 1 5.775,00 5.775,00


CONFIGURATION OF MONITORING SOFTWARE 1 4.670,00 4.670,00

Not included:
o Taxes
o Civil work
o WiFi network
o Electrical connection to traffic management cabinets 220VAC 2P+PE 6A
o Electrical connection to battery charge cabinets 220VAC 2P+PE 6A
o Interferencies resolution, pavement preparation, etc.
o Transport trolleys and its adaptation to the AGV
o Transport to Casablanca
o All work or material not specified in this quotation

Offer expiration:
This is an estimated price based on the limited information recived. For a formal
o
calculation, Kivnon requires further information

Delivery time:
o AGVs between 8 and 12 weeks after the acceptance of the order
o Project and installation to be planned with Project department

Payment terms, 30 days after invoice date:


o Billing according to the following breakdown:
o 30% with the acceptance of the order
o 60% after the delivery of the equipment and materials
o 10% after delivery of the installation
Quot. nº: PK180128
Date: 27/03/2018
Customer: Renault SOMACA
Project: AGVs Kitting
Contact: Khalid Labrini / Meryeme Benjelloun www.kivnon.com

TIME STUDY
circuit stretches according to speed AGV stopped
slow slow medium fast total Stopped STRETCHE
Trajet 1: Kit Volant (m/min) (m/min) (m/min) (m/min) distance manoeuvres
TOTAL
S
15 30 48 60 401 or waiting
from to Action (m) (m) (m) (m) (m) (min) (min) (min)

0 0,00 0,00
Picking Line Route 40,1 50,125 110,275 200,5 6,64 6,64
Leave full / Pick empty 0 1,00 1,00 7,64
Line Picking Route 40,1 50,125 110,275 200,5 6,64 14,28
Leave empty / Pick full 0 1,00 1,00 15,28
0 0,00 15,28

TOTALS 80,2 100,25 220,55 0 401 2 15,28 15,28

Notes: AGV theoretical cycle


AGV cycle (min) 15,28
AGV on route (min) 13,28
Battery charging (min) 30% 3,98
Traffic (min) 10% 1,33
nº AGV cycles 1
Total whole cycle min 20,60
AGV average speed m/min 19,47
Production cycle
Pieces/trolley ieces/AGV 3
Jph pieces/hour 20,00
Pieces cycle min/piece 3,00
AGV cycle min/AGV 9,00
Result
Required AGV 3 76,3%
Suggested AGVs 3 76,3%
Time allowed per AGV (min) 6,40
In loop battery chargers
Required chargers 1 58,0%
Suggested chargers 1 58,0%
Quot. nº: PK180128
Date: 27/03/2018
Customer: Renault SOMACA
Project: AGVs Kitting
Contact: Khalid Labrini / Meryeme Benjelloun www.kivnon.com

circuit stretches according to speed AGV stopped


slow slow medium fast total Stopped STRETCHE
Trajet 2: PO4 Gauche (m/min) (m/min) (m/min) (m/min) distance manoeuvres
TOTAL
S
15 30 48 60 675 or waiting
from to Action (m) (m) (m) (m) (m) (min) (min) (min)

0 0,00 0,00
Picking Line Route 67,5 84,375 185,625 337,5 11,18 11,18
Leave full / Pick empty 0 1,00 1,00 12,18
Line Picking Route 67,5 84,375 185,625 337,5 11,18 23,36
Leave empty / Pick full 0 1,00 1,00 24,36
0 0,00 24,36

TOTALS 135 168,75 371,25 0 675 2 24,36 24,36

Notes: AGV theoretical cycle


AGV cycle (min) 24,36
AGV on route (min) 22,36
Battery charging (min) 30% 6,71
Traffic (min) 10% 2,24
nº AGV cycles 1
Total whole cycle min 33,30
AGV average speed m/min 20,27
Production cycle
Pieces/trolley ieces/AGV 2
Jph pieces/hour 20,00
Pieces cycle min/piece 3,00
AGV cycle min/AGV 6,00
Result
Required AGV 6 92,5%
Suggested AGVs 6 92,5%
Time allowed per AGV (min) 2,70
In loop battery chargers
Required chargers 2 60,4%
Suggested chargers 2 60,4%
Quot. nº: PK180128
Date: 27/03/2018
Customer: Renault SOMACA
Project: AGVs Kitting
Contact: Khalid Labrini / Meryeme Benjelloun www.kivnon.com

circuit stretches according to speed AGV stopped


slow slow medium fast total Stopped STRETCHE
Trajet 3: PO4 Droite (m/min) (m/min) (m/min) (m/min) distance manoeuvres
TOTAL
S
15 30 48 60 720 or waiting
from to Action (m) (m) (m) (m) (m) (min) (min) (min)

0 0,00 0,00
Picking Line Route 72 90 198 360 11,93 11,93
Leave full / Pick empty 0 1,00 1,00 12,93
Line Picking Route 72 90 198 360 11,93 24,85
Leave empty / Pick full 0 1,00 1,00 25,85
0 0,00 25,85

TOTALS 144 180 396 0 720 2 25,85 25,85

Notes: AGV theoretical cycle


AGV cycle (min) 25,85
AGV on route (min) 23,85
Battery charging (min) 30% 7,16
Traffic (min) 10% 2,39
nº AGV cycles 1
Total whole cycle min 35,39
AGV average speed m/min 20,34
Production cycle
Pieces/trolley ieces/AGV 2
Jph pieces/hour 20,00
Pieces cycle min/piece 3,00
AGV cycle min/AGV 6,00
Result
Required AGV 6 98,3%
Suggested AGVs 6 98,3%
Time allowed per AGV (min) 0,61
In loop battery chargers
Required chargers 2 60,7%
Suggested chargers 2 60,7%