Analisa Pole Ms Tower

analisa pole

Uploaded by

set_one88
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views65 pages

Analisa Pole Ms Tower

analisa pole

Uploaded by

set_one88
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 65

COVER

SITE NAME : UNIVERSITAS SURABAYA


SITE ID : JI-09415
TOWER TYPE : POLE - 6M

Prepared by:

doc. no. Issued Submit Date Rev.

2024 28-Jun-24 0

1
LIST OF CONTENT

COVER ..............................................................................................................................................................1

LIST OF CONTENT .............................................................................................................................................2

LEMBAR ASSISTENSI .........................................................................................................................................4

KATA PENGANTAR............................................................................................................................................5

SUMMARY DESIGN ANALYSIS ..........................................................................................................................6

A. Tower Structure summary (Without an Antenna Attached) ..............................................................6

B. 3d View – Without antennas - Strength Assesment Tower.png .........................................................7

C. TOWER TECNICAL DATA. .....................................................................................................................8

A. Material Tower ....................................................................................................................................8

B. General Info Tower .............................................................................................................................8

C. Tower Outline......................................................................................................................................9

DESIGN CRITERIA............................................................................................................................................10

A. TOWER LOADING ............................................................................................................................. 10

Dead Load........................................................................................................................................ 10
Basic Wind Speed & Operational Wind Speed ................................................................................ 10
Load Combination ........................................................................................................................... 10
B. Design Strength of Structural Steel .................................................................................................. 11

C. Maximum Slenderness Ratio............................................................................................................ 11

D. Deflection and Deformation for Operational Requirements ........................................................... 11

MS TOWER ANALYSIS INPUT & RESULT .........................................................................................................13

A. Tower Structure ............................................................................................................................... 13

Input Geometry Tower.................................................................................................................... 13


3D View - Tower Geometri.png....................................................................................................... 14
B. Input Loading ................................................................................................................................... 15

3D View - Load Antennas.png ......................................................................................................... 19


C. Compressive Members analysis using Ms Tower ............................................................................ 20

Effective Yield Stress ....................................................................................................................... 20


Design Axial Strength ...................................................................................................................... 21
D. Tension Members analysis using Ms Tower .................................................................................... 21

Tension yielding in the gross section .............................................................................................. 21


2
E. Support Reaction.............................................................................................................................. 22

F. Tower Deformation & Displacement for Operational Requirement ............................................... 25

Envelope of Tower Rotations .......................................................................................................... 25


Rotations of Ancillary Axes.............................................................................................................. 25
Displacement................................................................................................................................... 28
ANCHORE BOLT & BASEPLATE CALCULATION ...............................................................................................29

ATTACHMENT.................................................................................................................................................31

MS TOWER OUTPUT - AFTER ADDITIONAL ANTENNAS ................................................................................32

3
LEMBAR ASSISTENSI

No. Status Revisi Tanggal Catatan Reviewer

1 A 28-Jun-24 Submit Report

4
KATA PENGANTAR

Bismillah,

Menindaklanjuti penunjukan dari PT. CENTRATAMA MENARA INDONESIA, tentang pekerjaan konsultan
untuk analysis tower POLE 6M dengan UNIVERSITAS SURABAYA (JI-09415), maka tim PT. Bhamasa
melakukan pekerjaan analisa struktur tower sesuai dengan penunjukan tersebut.

Review yang dilakukan adalah analisis kekuatan struktur tower berdasarkan standar analisis yang berlaku
pada struktur telekomunikasi yaitu EIA/TIA-222-G . Agar analisis sesuai dengan standar tersebut, maka
analisis menggunakan software Ms Tower yang sudah dilengkapi perhitungan beban akibat angin yang
terjadi pada struktur tower dan juga pada aksesoris tower seperti antenna telekomunikasi.

Dari hasil analisis, struktur tower perlu perkuatan untuk menerima beban dari rencana antenna,

Demikian laporan ini disampaikan, atas perhatian dan kerjasama yang telah terjalin, kami mengucapkan
terima kasih.

Jakarta, 28-Jun-24

Alfian Darmawan, ST

5
SUMMARY DESIGN ANALYSIS
A. Tower Structure summary (Without an Antenna Attached)
Tower Data Existing Structure
Tower Height : 6.0 m Base Level : 27.8 m
Base Width : 0.1398 m
Top Width : 0.1143 m
Tower Fabricator :-
Calculated by : Setiawan
Consultant : PT. Bhamasa
Antennas Loading
Dimension Elv Direction
Antenna Type QTY Remark
(m) (m) (degree)
Sectoral RF-GSM2.580 4 2.580x0.262x0.166 5.0 30.° 180.° 270.° TENANT
RRU RRU-LTE480 4 0.48x0.27x0.140 3.0 30.° 180.° 270.° TENANT
RRU RRU-LTE480 4 0.48x0.27x0.140 2.5 30.° 180.° 270.° TENANT
RRU FILTER 4 0.256x0.174x0.109 2.0 30.° 180.° 270.° TENANT
Design Output Summary

MAXIMUM STRESS RATIO (Wind Speed 120 kph - Fastest Mile )

Description Output Limitation Note


Leg 0.715 < 1 OK!

TWIST, SWAY & DISPLACEMENT (Wind Speed 84 kph - Fastest Mile )

Twist (degree) 0.051 < 1.000 OK!


Max. Sway (degree) 0.474 < 1.000 OK!
Max. Displacement (m) : H/200 0.022 < 0.060 OK!

SUPPORT REACTION TOWER

Compress Tension
Fx (kN) 2.115 -1.891
Lateral
Fy (kN) 1.969 -1.888
Axial Fz (kN) 73.35 -55.667
Jakarta, 28-06-2024
PT. BHAMASA

ALFIAN DARMAWAN, ST

6
B. 3d View – Without antennas - Strength Assesment Tower.png

7
C. TOWER TECNICAL DATA.

A. Material Tower

Steel materials to be used for the towers and appurtenances conform to the relevant Indonesian,
American or Japanese Industrial Standards. The assumed material properties of this tower :

B. General Info Tower

Tower Height : 12.0 m


Base Width : 0.221
Top Width : 0.114
Tower Fabricator : -
Calculated by : Setiawan
Consultant : PT. Bhamasa

8
C. Tower Outline

9
DESIGN CRITERIA

The design basis of the tower applied is Standard TIA/EIA-222-G (Structural Standards for Steel Antenna
Tower and Antenna Supporting Structure).The fabrication and materials of the tower will be according to
the relevant Indonesian Standard and/or Japanese Industrial Standard. The self-supporting tower has
triangular cross sections. All the legs and bracings are made of equal legs angles steel. All the connections
in the field are made with Steel Bolts, each fitted with one spring washer and nut.

A. TOWER LOADING
Dead Load
The selfweight of the structure and appurtenances, excluding guy assemblies has been calculated by the
software.

Basic Wind Speed & Operational Wind Speed


The analysis was conducted using a 3-second gust wind speed at 33 ft (10m) above the ground in exposure
category C for a 50-year mean recurrence interval (American standard ANSI/TIA-222-G or Indonesian
standar SNI 1727:2020 page 101) . Wind shall be considered to come from any horizontal direction.

- Basic wind speed for strength analysis : 120 km/h


- Operational Wind speed : 84 km/h.

The following additional design criteria were used:

- Topographic Categories : Category 1


Category 1 No abrupt changes in general topography, e.g. flat or rolling terrain, no wind speed-up
consideration shall be required.. [ ANSI/TIA-222-G : 2.6.6.2 ]

- Classification of Structures : Class II


Structures that due to height, use or location represent a substantial hazard to human life and/or
damage to property in the event of failure and/or used for services that may be provided by other
means. [ ANSI/TIA-222-G : Table 2-1 ] -[ SNI 1727:2020 : Tabel 1.5-1 kategori resiko III]

- Exposure Categories : Exposure B


Exposure B Urban and suburban areas, wooded areas, or other terrain with numerous closely
spaced obstructions having the size of single-family dwellings or larger. Use ofthis exposure shall
be limited those areas for which terrain representative of Exposure B surrounds the structure in all
directions for a distance of at least 2,630 ft [800 m] or ten times the height of the structure,
whichever is greater. [ ANSI/TIA-222-G : 2.6.5.1 ] – [ SNI 1727:2020 : 26.7.3]

Load Combination
Structures and foundations shall be designed so that their design strength equals or exceeds the load
effects of the factored loads in each of the following limit state combinations:

CL1 = 1.2 DL + 1.6 WL

CL2 = 0.9 DL + 1.6 WL

Where :

10
CL N : Load Combination

DL : Dead load of the structure and appurtenances.

WL : Design wind load on the structure, appurtenances, etc.

Services loads shall be defined by the following loading combination for a 84 km/h basic wing speed :

CLs = 1.0 DL + 1.0 WL

B. Design Strength of Structural Steel


This section relates to the strength design of structural steel angles, solid rounds and tubular members used
in latticed towers, poles and guyed masts. The following clauses are based on the AISC-LRFD-99. When the
requirements in AISC-LRFD-99 differ from this Standard, this Standard shall govern.

C. Maximum Slenderness Ratio


The maximum slenderness ratio (L/r) are as follows:

L/r = 150 for compression members of legs

L/r = 200 for compression members of bracings

L/r = 250 for compression redundant members

D. Deflection and Deformation for Operational Requirements


The operational requirements shall be based on an overall allowable 10db degradation in radio frequency
signal level. The minimum standard shall be based on condition of no ice and a wind load based on a 50
mph basic wind speed (22.4 m/s).

11
CONDITION PROPOSE ANTENNA

12
MS TOWER ANALYSIS INPUT & RESULT
A. Tower Structure
Input Geometry Tower
TITL1 PROJECT : UNIVERSITAS SURABAYA-POLE 6M
TITL2 SITE : PT CMI

COMPONENT
SUP
MOUNT
END

UNITS 1
PROFILE
FACES 1

WBASE 0.21143
RLBAS 27.8
PANEL 1 HT 2.80 TW 0.1143
$ FACE SH1 LEG 4 R1 80
FACE @MOUNT
PANEL 1 HT 0.20 TW 0.1143
$ FACE SH1 LEG 4 R1 80
FACE @SUP
$PANEL 2 HT 1.6 TW 0.1143
$ FACE SH1 LEG 4 R1 80
$PANEL 2 HT 1.4 TW 0.1143
$ FACE SH1 LEG 4 R1 80

END

SUPPORT
COORD 0.00 0.00 27.8 FIXED
COORD -1.00 0.00 27.8 PINNED
COORD 0.00 -1.00 27.8 PINNED

END

SECTIONS
LIBR Ukh IFACT 1

2 CHS60.5X3.9 FY 240
3 CHS89.1X5.5 FY 240
4 CHS114.3X6.0 FY 240 $PIPA 4"
5 EA50X50X5 FY 240
6 EA60X60X6 FY 240
80 DUMMY FY 240

END

13
3D View - Tower Geometri.png

14
B. Input Loading
PARAMETERS

ANGN 150.00
CODE TIA222G
VB 33.33 $ 120 kph Basic Wind Speed (3 Second Gust)
$VB 23.33 $
VICE 0
CLASS-G 2
TOPCAT-G 1
OVERLAP 0
END

TERRAIN
ANGLE 0 TCAT 2.00 MD 1.00 H 0.00
ANGLE 45 TCAT 2.00 MD 1.00 H 0.00
ANGLE 90 TCAT 2.00 MD 1.00 H 0.00
ANGLE 135 TCAT 2.00 MD 1.00 H 0.00
ANGLE 180 TCAT 2.00 MD 1.00 H 0.00
ANGLE 225 TCAT 2.00 MD 1.00 H 0.00
ANGLE 270 TCAT 2.00 MD 1.00 H 0.00
ANGLE 315 TCAT 2.00 MD 1.00 H 0.00
END

LOADS

CASE 100 Dead Load (Weight of tower plus ancillaries)


DL
CASE 200 wind at 0 to X axis
WL ANGLX 0.0 NOICE
CASE 220 wind at 45 to X axis
WL ANGLX 45.0 NOICE
CASE 240 wind at 90 to X axis
WL ANGLX 90.0 NOICE
CASE 260 wind at 135 to X axis
WL ANGLX 135.0 NOICE
CASE 280 wind at 180 to X axis
WL ANGLX 180.0 NOICE
CASE 300 wind at 225 to X axis
WL ANGLX 225.0 NOICE
CASE 320 wind at 270 to X axis
WL ANGLX 270.0 NOICE
CASE 340 wind at 315 to X axis
WL ANGLX 315.0 NOICE

15
$ LOADING COMBINATION 1
$ ==================================================================
CASE 500 Max. DL
COMBIN 100 1.200
CASE 520 Max DL + Wind at 0.0 to X NOICE
COMBIN 100 1.200
COMBIN 200 1.600
CASE 540 Max DL + Wind at 45.0 to X NOICE
COMBIN 100 1.200
COMBIN 220 1.600
CASE 560 Max DL + Wind at 90.0 to X NOICE
COMBIN 100 1.200
COMBIN 240 1.600
CASE 580 Max DL + Wind at 135.0 to X NOICE
COMBIN 100 1.200
COMBIN 260 1.600
CASE 600 Max DL + Wind at 180.0 to X NOICE
COMBIN 100 1.200
COMBIN 280 1.600
CASE 620 Max DL + Wind at 225.0 to X NOICE
COMBIN 100 1.200
COMBIN 300 1.600
CASE 640 Max DL + Wind at 270.0 to X NOICE
COMBIN 100 1.200
COMBIN 320 1.600
CASE 660 Max DL + Wind at 315.0 to X NOICE
COMBIN 100 1.200
COMBIN 340 1.600

$ LOADING COMBINATION 2
$ ==================================================================

CASE 1000 Max DL + Wind at 0.0 to X NOICE


COMBIN 100 0.900
COMBIN 200 1.600
CASE 1020 Max DL + Wind at 45.0 to X NOICE
COMBIN 100 0.900
COMBIN 220 1.600
CASE 1040 Max DL + Wind at 90.0 to X NOICE
COMBIN 100 0.900
COMBIN 240 1.600
CASE 1060 Max DL + Wind at 135.0 to X NOICE
COMBIN 100 0.900
COMBIN 260 1.600
CASE 1080 Max DL + Wind at 180.0 to X NOICE
COMBIN 100 0.900
COMBIN 280 1.600
CASE 1100 Max DL + Wind at 225.0 to X NOICE
COMBIN 100 0.900
COMBIN 300 1.600

16
CASE 1120 Max DL + Wind at 270.0 to X NOICE
COMBIN 100 0.900
COMBIN 320 1.600
CASE 1140 Max DL + Wind at 315.0 to X NOICE
COMBIN 100 0.900
COMBIN 340 1.600

$ LOADING COMBINATION 3 (SERVICE LOADS FOR 100 KPH BASIC WIND SPEED)
$ ==================================================================
CASE 2000 Max DL + Wind at 0.0 to X NOICE
COMBIN 100 1.000
COMBIN 200 1.000
CASE 2020 Max DL + Wind at 45.0 to X NOICE
COMBIN 100 1.000
COMBIN 220 1.000
CASE 2040 Max DL + Wind at 90.0 to X NOICE
COMBIN 100 1.000
COMBIN 240 1.000
CASE 2060 Max DL + Wind at 135.0 to X NOICE
COMBIN 100 1.000
COMBIN 260 1.000
CASE 2080 Max DL + Wind at 180.0 to X NOICE
COMBIN 100 1.000
COMBIN 280 1.000
CASE 2100 Max DL + Wind at 225.0 to X NOICE
COMBIN 100 1.000
COMBIN 300 1.000
CASE 2120 Max DL + Wind at 270.0 to X NOICE
COMBIN 100 1.000
COMBIN 320 1.000
CASE 2140 Max DL + Wind at 315.0 to X NOICE
COMBIN 100 1.000
COMBIN 340 1.000
END
ANCILLARIES

$DUMMY ENTRIES FOR GUIDENCE ONLY

LINEAR LIBR LINH


$ FEEDER
FEEDER-1RF-EXT XB 0.10 YB -0.06 ZB 0.00 XT 0.10 YT -0.06 ZT 05.00 LIB FEEDER_7/8 FACT 2 ANG 0
$---> TENANT1
FEEDER-2RF-EXT XB 0.10 YB -0.04 ZB 0.00 XT 0.10 YT -0.04 ZT 05.00 LIB FEEDER_7/8 FACT 2 ANG 0
$---> TENANT1
FEEDER-3RF-EXT XB 0.10 YB -0.02 ZB 0.00 XT 0.10 YT -0.02 ZT 05.00 LIB FEEDER_7/8 FACT 2 ANG 0
$---> TENANT1
FEEDER-4RF-EXT XB 0.02 YB -0.02 ZB 0.00 XT 0.02 YT -0.02 ZT 05.00 LIB FEEDER_7/8 FACT 2 ANG 0
$---> TENANT1

17
LARGE LIBR IBS_Anc

$ ANTENNA SECTOR
$=====================================================================================
============

EXT01-RF XA -0.386 YA 0.669 ZA 05.00 LIB RF-GSM2.580 ANG 030 AMASS 50 $---> TENANT1
EXT02-RF XA 0.669 YA -0.386 ZA 05.00 LIB RF-GSM2.580 ANG 180 AMASS 50 $---> TENANT1
EXT03-RF XA -0.386 YA -0.669 ZA 05.00 LIB RF-GSM2.580 ANG 270 AMASS 50 $---> TENANT1
EXT04-RF XA 0.386 YA 0.669 ZA 05.00 LIB RF-GSM2.580 ANG 090 AMASS 50 $---> TENANT1
EXT01-RRU XA -0.286 YA 0.569 ZA 03.00 LIB RRU-LTE480 ANG 090 AMASS 00 $---> TENANT1
EXT02-RRU XA 0.569 YA -0.286 ZA 03.00 LIB RRU-LTE480 ANG 340 AMASS 00 $---> TENANT1
EXT03-RRU XA -0.286 YA -0.569 ZA 03.00 LIB RRU-LTE480 ANG 200 AMASS 00 $---> TENANT1
EXT04-RRU XA 0.286 YA 0.569 ZA 03.00 LIB RRU-LTE480 ANG 090 AMASS 00 $---> TENANT1
EXT05-RRU XA -0.286 YA 0.569 ZA 02.50 LIB RRU-LTE480 ANG 090 AMASS 00 $---> TENANT1
EXT06-RRU XA 0.569 YA -0.286 ZA 02.50 LIB RRU-LTE480 ANG 340 AMASS 00 $---> TENANT1
EXT07-RRU XA -0.286 YA -0.569 ZA 02.50 LIB RRU-LTE480 ANG 200 AMASS 00 $---> TENANT1
EXT08-RRU XA 0.286 YA 0.569 ZA 02.50 LIB RRU-LTE480 ANG 090 AMASS 00 $---> TENANT1
EXT09-FLT XA -0.286 YA 0.569 ZA 02.00 LIB FILTER ANG 090 AMASS 00 $---> TENANT1
EXT10-FLT XA 0.569 YA -0.286 ZA 02.00 LIB FILTER ANG 340 AMASS 00 $---> TENANT1
EXT11-FLT XA -0.286 YA -0.569 ZA 02.00 LIB FILTER ANG 200 AMASS 00 $---> TENANT1
EXT12-FLT XA 0.286 YA 0.569 ZA 02.00 LIB FILTER ANG 090 AMASS 00 $---> TENANT1
$PR16-MW XA 0.000 YA 0.808 ZA 11.00 LIB SH1PR-2 ANG 090 AMASS 30 $---> TENANT1
$PR17-MW XA -0.808 YA 0.808 ZA 11.00 LIB SH1PR-2 ANG 340 AMASS 30 $---> TENANT1

END
END

18
3D View - Load Antennas.png

19
C. Compressive Members analysis using Ms Tower

Effective Yield Stress

For angular angle members, the effective yield stress for axial compression, F’y, shall be determined as
follows,

The width to thickness ratio (w/t) shall not exceed 25 for angle members.

For tubular round members, the diameter to thickness ratio (D/t) shall not exceed 400. The effective yield
stress, F’y, shall be determined as follows:

Where,

D = outer diameter of tubular member

t = wall thickness of tubular member

E = Elastic modulus of the tubular member

20
Design Axial Strength
The design axial strength of compression members shall be taken as φcPn

Where:

Ag = gross area of member, [mm2]

F’y = effective yield stress, [MPa]

E = modulus of elasticity, [MPa]

K = effective length factor

L = laterally unbraced length of member, [mm]

r = governing radius of gyration about the axis of buckling, [mm]

D. Tension Members analysis using Ms Tower

The design axial tensile strength, φtPn, of a member shall be taken as the lesser of yielding in the gross
section, rupture in the net effective section, or block shear rupture.

Tension yielding in the gross section

φt = 0.90

Pn = Fy Ag

Where:

Ag = gross area of member, [mm2]

Fy = specified minimum yield strength, [MPa]

21
E. Support Reaction
Case Node FX FY FZ MX MY MZ
(kN) (kN) (kN) (kN.m) (kN.m) (kN.m)
500 117 0.157 0.095 10.104 -0.014 0.09 0.013
115 -0.139 -0.005 -0.42 0 0 0
116 -0.018 -0.09 -0.224 0 0 0
Resultant 0 0 9.46 3.363 -3.483 0

520 117 -2.834 0.071 -34.531 -0.123 -2.592 -0.065


115 13.79 0.008 44.57 0 0 0
116 -0.041 -0.175 -0.563 0 0 0
Resultant 10.915 -0.097 9.476 3.599 38.819 -3.785

540 117 -1.875 -1.885 -53.277 1.657 -1.63 0.136


115 9.652 -0.002 31.144 0 0 0
116 -0.004 9.774 31.607 0 0 0
Resultant 7.773 7.887 9.474 -26.793 26.356 0.172

560 117 0.171 -2.771 -33.99 2.561 0.243 0.243


115 -0.078 -0.028 -0.312 0 0 0
116 0.008 13.525 43.778 0 0 0
Resultant 0.101 10.727 9.476 -38.059 -3.228 3.821

580 117 2.144 -1.937 10.402 1.916 1.968 0.212


115 -9.973 -0.046 -32.335 0 0 0
116 0.006 9.675 31.411 0 0 0
Resultant -7.823 7.692 9.478 -26.335 -33.525 5.435

600 117 3.035 0.115 54.647 0.101 2.703 0.117


115 -13.969 -0.018 -45.29 0 0 0
116 0.009 -0.006 0.12 0 0 0
Resultant -10.924 0.09 9.477 3.14 -45.746 3.817

620 117 2.115 1.969 73.35 -1.621 1.773 -0.127


115 -9.877 0.022 -31.916 0 0 0
116 -0.002 -9.893 -31.96 0 0 0
Resultant -7.764 -7.903 9.474 33.497 -33.301 -0.197

640 117 0.159 2.853 54.114 -2.522 -0.052 -0.227


115 -0.203 0.019 -0.535 0 0 0
116 -0.044 -13.608 -44.104 0 0 0
Resultant -0.089 -10.736 9.475 44.74 -3.746 -3.839

660 117 -1.846 2.108 9.765 -1.925 -1.804 -0.161

22
115 9.732 0.006 31.523 0 0 0
116 -0.068 -9.812 -31.81 0 0 0
Resultant 7.818 -7.698 9.477 33.044 26.56 -5.407

1000 117 -2.842 0.049 -36.955 -0.121 -2.585 -0.068


115 13.796 0.009 44.577 0 0 0
116 -0.036 -0.154 -0.51 0 0 0
Resultant 10.919 -0.097 7.111 2.76 39.621 -3.784

1020 117 -1.891 -1.888 -55.667 1.641 -1.632 0.132


115 9.666 0 31.178 0 0 0
116 0 9.777 31.598 0 0 0
Resultant 7.774 7.889 7.109 -27.588 27.176 0.17

1040 117 0.132 -2.766 -36.426 2.538 0.22 0.237


115 -0.044 -0.026 -0.209 0 0 0
116 0.012 13.522 43.746 0 0 0
Resultant 0.1 10.73 7.111 -38.838 -2.359 3.818

1060 117 2.083 -1.942 7.865 1.902 1.925 0.206


115 -9.919 -0.043 -32.16 0 0 0
116 0.01 9.681 31.408 0 0 0
Resultant -7.826 7.695 7.113 -27.135 -32.606 5.433

1080 117 2.964 0.088 52.011 0.107 2.651 0.113


115 -13.905 -0.017 -45.082 0 0 0
116 0.013 0.019 0.183 0 0 0
Resultant -10.928 0.09 7.111 2.294 -44.802 3.816

1100 117 2.053 1.924 70.68 -1.598 1.729 -0.128


115 -9.821 0.023 -31.735 0 0 0
116 0.002 -9.851 -31.836 0 0 0
Resultant -7.766 -7.905 7.109 32.608 -32.376 -0.195

1120 117 0.117 2.801 51.49 -2.492 -0.077 -0.228


115 -0.166 0.019 -0.423 0 0 0
116 -0.04 -13.559 -43.957 0 0 0
Resultant -0.089 -10.739 7.11 43.835 -2.87 -3.836

1140 117 -1.865 2.066 7.24 -1.904 -1.807 -0.163


115 9.748 0.006 31.564 0 0 0
116 -0.062 -9.772 -31.692 0 0 0
Resultant 7.821 -7.7 7.112 32.16 27.386 -5.405

2000 117 -1.712 0.066 -19.426 -0.081 -1.581 -0.041

23
115 8.567 0.004 27.716 0 0 0
116 -0.03 -0.129 -0.4 0 0 0
Resultant 6.825 -0.059 7.89 2.949 23.505 -2.37

2020 117 -1.121 -1.137 -31.124 1.017 -0.987 0.089


115 5.989 -0.006 19.342 0 0 0
116 -0.01 6.075 19.671 0 0 0
Resultant 4.858 4.932 7.889 -16.024 15.725 0.11

2040 117 0.138 -1.687 -19.094 1.579 0.169 0.155


115 -0.078 -0.018 -0.282 0 0 0
116 0.001 8.412 27.265 0 0 0
Resultant 0.061 6.707 7.89 -23.057 -2.742 2.389

2060 117 1.365 -1.181 8.604 1.185 1.242 0.131


115 -6.258 -0.026 -20.27 0 0 0
116 0.003 6.016 19.557 0 0 0
Resultant -4.89 4.809 7.891 -15.741 -21.659 3.393

2080 117 1.929 0.09 36.223 0.061 1.703 0.073


115 -8.759 -0.012 -28.365 0 0 0
116 0.002 -0.021 0.032 0 0 0
Resultant -6.828 0.057 7.89 2.659 -29.292 2.382

2100 117 1.353 1.253 47.904 -1.015 1.122 -0.074


115 -6.199 0.009 -20.011 0 0 0
116 -0.009 -6.201 -20.005 0 0 0
Resultant -4.855 -4.938 7.889 21.619 -21.519 -0.12

2120 117 0.128 1.803 35.894 -1.575 -0.016 -0.137


115 -0.154 0.01 -0.417 0 0 0
116 -0.031 -8.524 -27.588 0 0 0
Resultant -0.057 -6.711 7.889 28.643 -3.063 -2.396

2140 117 -1.111 1.332 8.212 -1.201 -1.099 -0.1


115 6.042 0.006 19.586 0 0 0
116 -0.043 -6.149 -19.908 0 0 0
Resultant 4.888 -4.812 7.89 21.338 15.857 -3.382

24
F. Tower Deformation & Displacement for Operational
Requirement

Envelope of Tower Rotations


(Degrees about global axes, 3 node plane)

• A rotation envelope giving maximum rotations about the global axes for the selected load cases.
These rotations are computed by considering the displacement of a plane through the leg nodes at the
top of each panel.

Pt Height LC X-Rot LC Y_Rot LC Z-Rot


4 33.8 2120 0.3947 2080 0.474 2120 0.0514
112 29.2 2040 0.0234 2000 0.0206 2040 0.0124

Pt Height LC X-Rot LC Y_Rot LC Z-Rot


4 33.8 2120 0.3947 2080 0.474 2120 0.0514
112 29.2 2040 0.0234 2000 0.0206 2040 0.0124

Rotations of Ancillary Axes


• The rotation of each large ancillary for each selected load case. The rotations are computed by
considering the displacement of a plane through the first three attachment nodes and are given in the
axes of the ancillary.

Ancillary Height Bearing Case Rot-x Rot-y Rot-z


EXT01-RF 5 30 2000 0.2034 0.1746 0.1533
2020 0.2197 0.0296 0.0812
2040 0.0752 0.1957 -0.0273
2060 0.1491 0.2283 -0.1166
2080 0.3327 0.1094 -0.1419
2100 0.3479 0.0944 -0.0681
2120 0.2037 0.2595 0.0398
2140 0.0195 0.2923 0.1277
EXT02-RF 5 180 2000 0.1254 0.2159 -0.0071
2020 0.2572 0.0395 -0.094
2040 0.2107 0.1878 -0.1125
2060 0.0097 0.3354 -0.0528
2080 0.2375 0.3258 0.0313
2100 0.3695 0.1501 0.1195
2120 0.3239 0.0773 0.1377
2140 0.1226 0.2256 0.0768
EXT03-RF 5 270 2000 0.2431 0.1596 -0.0588
2020 0.0566 0.2896 -0.0443
2040 0.1819 0.2524 0.0131
2060 0.3358 0.0685 0.0734

25
2080 0.3209 0.1656 0.0828
2100 0.1342 0.2963 0.0699
2120 0.1052 0.259 0.0122
2140 0.2588 0.0743 -0.0495
EXT04-RF 5 90 2000 0.2529 0.0888 0.1533
2020 0.0842 0.2051 0.0812
2040 0.1319 0.163 -0.0273
2060 0.2723 0.015 -0.1166
2080 0.2611 0.2334 -0.1419
2100 0.0922 0.3485 -0.0681
2120 0.1229 0.3062 0.0398
2140 0.2628 0.1293 0.1277
EXT01-RRU 3 90 2000 0.314 0.1367 0.1453
2020 0.0998 0.2818 0.0796
2040 0.1764 0.2346 -0.0253
2060 0.3439 0.0145 -0.1195
2080 0.3313 0.2649 -0.1427
2100 0.1167 0.409 -0.0753
2120 0.1584 0.3615 0.029
2140 0.3254 0.1424 0.1217
EXT02-RRU 3 340 2000 0.0399 0.3147 -0.0269
2020 0.2603 0.166 -0.1041
2040 0.3102 0.1129 -0.1207
2060 0.1693 0.3539 -0.0583
2080 0.0959 0.4309 0.018
2100 0.3162 0.283 0.0968
2120 0.367 0.0042 0.1134
2140 0.2261 0.2376 0.0498
EXT03-RRU 3 200 2000 0.2685 0.2096 -0.07
2020 0.3345 0.0392 -0.0559
2040 0.1942 0.2745 0.0024
2060 0.0819 0.356 0.061
2080 0.3431 0.254 0.0615
2100 0.4097 0.0048 0.0486
2120 0.2692 0.2312 -0.0103
2140 0.0076 0.3122 -0.0698
EXT04-RRU 3 90 2000 0.314 0.1367 0.1453
2020 0.0998 0.2818 0.0796
2040 0.1764 0.2346 -0.0253
2060 0.3439 0.0145 -0.1195
2080 0.3313 0.2649 -0.1427
2100 0.1167 0.409 -0.0753
2120 0.1584 0.3615 0.029
2140 0.3254 0.1424 0.1217
EXT05-RRU 2.5 90 2000 0.314 0.1367 0.1453

26
2020 0.0998 0.2818 0.0796
2040 0.1764 0.2346 -0.0253
2060 0.3439 0.0145 -0.1195
2080 0.3313 0.2649 -0.1427
2100 0.1167 0.409 -0.0753
2120 0.1584 0.3615 0.029
2140 0.3254 0.1424 0.1217
EXT06-RRU 2.5 340 2000 0.0399 0.3147 -0.0269
2020 0.2603 0.166 -0.1041
2040 0.3102 0.1129 -0.1207
2060 0.1693 0.3539 -0.0583
2080 0.0959 0.4309 0.018
2100 0.3162 0.283 0.0968
2120 0.367 0.0042 0.1134
2140 0.2261 0.2376 0.0498
EXT07-RRU 2.5 200 2000 0.2685 0.2096 -0.07
2020 0.3345 0.0392 -0.0559
2040 0.1942 0.2745 0.0024
2060 0.0819 0.356 0.061
2080 0.3431 0.254 0.0615
2100 0.4097 0.0048 0.0486
2120 0.2692 0.2312 -0.0103
2140 0.0076 0.3122 -0.0698
EXT08-RRU 2.5 90 2000 0.314 0.1367 0.1453
2020 0.0998 0.2818 0.0796
2040 0.1764 0.2346 -0.0253
2060 0.3439 0.0145 -0.1195
2080 0.3313 0.2649 -0.1427
2100 0.1167 0.409 -0.0753
2120 0.1584 0.3615 0.029
2140 0.3254 0.1424 0.1217
EXT09-FLT 2 90 2000 0.0173 0.0112 0.0023
2020 0.0025 0.0175 -0.0076
2040 0.0143 0.0187 -0.0124
2060 0.0226 0.0123 -0.0103
2080 0.0194 0.0008 -0.0061
2100 0.0045 0.0057 0.0044
2120 0.0125 0.0068 0.0091
2140 0.0207 0.0001 0.0066
EXT10-FLT 2 340 2000 0.0046 0.0201 0.0023
2020 0.0156 0.0083 -0.0076
2040 0.0225 0.0071 -0.0124
2060 0.0193 0.0171 -0.0103
2080 0.0074 0.018 -0.0061
2100 0.0038 0.0062 0.0044

27
2120 0.0106 0.0095 0.0091
2140 0.0072 0.0194 0.0066
EXT11-FLT 2 200 2000 0.0126 0.0111 -0.0171
2020 0.024 0 -0.0185
2040 0.0267 0.0068 -0.01
2060 0.0218 0.0054 0.0009
2080 0.0126 0.006 0.0049
2100 0.0001 0.0166 0.007
2120 0.0022 0.0239 -0.0013
2140 0.004 0.023 -0.0127
EXT12-FLT 2 90 2000 0.0173 0.0112 0.0023
2020 0.0025 0.0175 -0.0076
2040 0.0143 0.0187 -0.0124
2060 0.0226 0.0123 -0.0103
2080 0.0194 0.0008 -0.0061
2100 0.0045 0.0057 0.0044
2120 0.0125 0.0068 0.0091
2140 0.0207 0.0001 0.0066

Displacement
the horizontal displacement under service loads of a point from the unfactored no-wind load position

Node Case X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn


m m m rad rad rad
4 2000 -0.0174 0.0005 0 -0.00028 -0.0066 0.00051
2020 -0.0119 -0.0118 0 0.00415 -0.00444 -0.00016
2040 0.02.10 -0.0165 0 0.00592 0.00068 -0.0005
2060 0.0153 -0.0108 -0.0001 0.00395 0.00584 -0.0004
2080 0.0219 0.0022 -0.0003 -0.00068 0.00827 -0.00014
2100 0.0165 0.0145 -0.0003 -0.00511 0.00611 0.00056
2120 0.003 0.0192 -0.0002 -0.00689 0.00099 0.0009
2140 -0.0107 0.0135 -0.0001 -0.00492 -0.00416 0.00077

28
ANCHORE BOLT & BASEPLATE
CALCULATION

29
AnB-MAIN POLE.xlsx 1-1 6/28/2024

ANALISA ANGKUR (Anchor Bolt Analysis)


POLE 6M (MAIN POLE)
BEBAN POLE DATA BEBAN KOLOM
Gaya aksial akibat beban terfaktor, Pu = 48119 N
Momen akibat beban terfaktor, Mu-x = 1456000 Nmm
Momen akibat beban terfaktor, Mu-y = 1445000 Nmm
Gaya geser akibat beban terfaktor, Vu = 1670 N
Gaya tambahan akibat tarik arah vertikal,
DPuvi = Puv / nw = 12030 N

Gaya pada masing-masing angkur akibat momen dihitung sebagai berikut :


2 2
Gaya akibat momen pada arah x, Ruxi = (Mu ) * yi / (∑x + ∑y )
Gaya akibat momen pada arah y, Ruyi = (Mu ) * xi / ( ∑x + ∑y2 )
2

GAYA-GAYA PADA MASING-MASING BAUT


2 2
No xi yi xi yi Ruyi Ruxi Rui
1 0.00 90.00 0.00 8100.00 0.00 4013.89 16043.64
2 90.00 0.00 8100.00 0.00 4044.44 0.00 16074.19
3 0.00 -90.00 0.00 8100.00 0.00 -4013.89 8015.86
4 -90.00 0.00 8100.00 0.00 -4044.44 0.00 7985.31
Total ∑= 16200.0 16200.0 16074.19
Jumlah baut pada badan, nw = 4

Ru max = 16074.19 N
AnB-MAIN POLE.xlsx 1-3 6/28/2024

ANALISA Angkur (Bolt Analysis)

PLAT TUMPUAN (BASE PLATE) DATA PLAT TUMPUAN


Tegangan leleh baja, fy = 240 MPa
p
Tegangan tarik putus plat, fu = 370 MPa
Lebar plat tumpuan, B= 300 mm
Panjang plat tumpuan, L= 300 mm
Tebal plat tumpuan, t= 12 mm
ANGKUR DATA ANGKUR
Jenis Angkur, Tipe : A307
Tegangan tarik putus Angkur, fub = 410 MPa
Tegangan leleh Angkur, fy = 240 MPa
Type Angkur M20
Diameter Angkur, d = 20 mm

1. GAYA TARIK PADA Angkur

Gaya tarik pada Angkur, Tu1 = 16074 N


Tegangan tarik putus Angkur, f ub = 410 MPa
Luas penampang Angkur, Ab = π/ 4 * d2 = 314 mm2
Faktor reduksi kekuatan tarik, Øt = 0.90
b
Tahanan tarik nominal Angkur, Tn = 0.75 * Ab * fu = 96604 N
Tahanan tarik Angkur, Øt * Tn = 86943.577 N
Syarat yang harus dipenuhi :

Tu1 < Øt * T n

16074.19444 < 86943.57669 → AMAN (OK)

2. GAYA GESER PADA Angkur

Gaya geser pada Angkur, Vu1 = Vu / n = 418 N


b
Tegangan tarik putus Angkur, fu = 410 MPa
Jumlah penampang geser, m= 1
Faktor pengaruh ulir pada bidang geser, r1 = 0.4
Luas penampang Angkur, Ab = π / 4 * d 2 = 314 mm2
Faktor reduksi kekuatan geser, Øf = 0.75
Tahanan geser nominal, V n = r 1 * m * A b * f ub = 51522 N
Tahanan geser Angkur, Øf * Vn = 38641.58964 N
Syarat yang harus dipenuhi :

Vu1 < Øf * V n

417.5 < 38641.58964 → AMAN (OK)


AnB-MAIN POLE.xlsx 2-3 6/28/2024

3. GAYA TUMPU PADA Angkur

Gaya tumpu pada Angkur, Ru1 = Vu1 = 418 N


Diameter Angkur, d= 20 mm
Tebal plat tumpu, t= 12 mm
p
Tegangan tarik putus plat, fu = 370 MPa
p
Tahanan tumpu nominal, Rn = 2.4 * d * t * fu = 213120 N
Tahanan tumpu, Øf * Rn = 159840 N
Syarat yang harus dipenuhi :
Ru1 < Øf * R n

417.5 < 159840 → OK

4. KOMBINASI GESER DAN TARIK

Koeffisien Geser r2 = 1
Gaya geser akibat beban terfaktor, Vu1 = Vu / n = 417.50 N
Tahanan geser Angkur, Øf * Vn = 38641.58964 N

Gaya tarik akibat beban terfaktor, Tu1 = 16074 N


Tahanan tarik Angkur, Øt * Tn = 86943.57669 N

Syarat yang harus dipenuhi :

Tu1 Vu1 * r2
+ ≤ 1
Øt * Tn Øf * Vn

0.184880759 + 0.010804421 → OK

Syarat yang harus dipenuhi :


2 2
Tu1 Vu1
Øt * Tn
+ Øf * Vn
≤ 1

0.034180895 + 0.000116736 → OK

Konstanta tegangan untuk Angkur mutu tinggi, f1 = 807 MPa


f2 = 621 MPa
Faktor pengaruh ulir pada bidang geser, r2 = 1.9
Tegangan geser akibat beban terfaktor, fuv = Vu / ( n * Ab ) = 0.33 MPa
Kuat geser Angkur, φf * r1 * m * fu =b
123.00 MPa
Syarat yang harus dipenuhi :
fuv = Vu / ( n * Ab ) ≤ φf * r1 * m * fub

0.332 ≤ 123.000 → AMAN (OK)


AnB-MAIN POLE.xlsx 3-3 6/28/2024

Gaya tarik akibat beban terfaktor, Tu1 = 16074 N


Tahanan tarik Angkur, φf * Tn = φf * f1 * Ab = 190145 N
Syarat yang harus dipenuhi :

Tu1 ≤ φf * f1 * Ab

16074.194 ≤ 190144.895 → AMAN (OK)

Kuat tarik Angkur, ft = 0.75 * fub = 307.50 MPa


Batas tegangan kombinasi, f1 - r2 * fuv = 806.37 MPa
f2 = 621.00 MPa
Syarat yang harus dipenuhi :

ft ≤ f1 - r2 * fuv

307.500 ≤ 806.369 → AMAN (OK)

Syarat yang harus dipenuhi :

ft ≤ f2

307.500 ≤ 621.000 → AMAN (OK)


AnB-MAIN POLE.xlsx 1-2 6/28/2024

ANALISA BASE PLATE (Base plate Analysis)


BEBAN KOLOM DATA BEBAN KOLOM
Tower setelah penambahan beban baru
Gaya aksial tekan akibat beban terfaktor, (compress) Puc = 65815 N
Momen akibat beban terfaktor, Muc-x = 1450000 Nmm
Momen akibat beban terfaktor, Muc-y = 1592000 Nmm
Gaya geser akibat beban terfaktor, Vuc = 1906 N

Gaya aksial tarik akibat beban terfaktor, (tension) Put = 48119 N


Momen akibat beban terfaktor, Mut-x = 1456000 Nmm
Momen akibat beban terfaktor, Mut-y = 1445000 Nmm
Gaya geser akibat beban terfaktor, Vut = 1670 N

PLAT TUMPUAN (BASE PLATE) DATA PLAT TUMPUAN


Tegangan leleh baja, fy = 240 MPa
p
Tegangan tarik putus plat, fu = 410 MPa
Lebar plat tumpuan, (diameter) B= 300 mm
Panjang plat tumpuan, (diameter) L= 300 mm
Tebal plat tumpuan, t= 12 mm
KOLOM PEDESTRAL DATA KOLOM BETON
Kuat tekan beton, (K-225) fc' = 18.675 MPa
Lebar penampang kolom, I = 400 mm
Panjang penampang kolom, J = 400 mm

1. TAHANAN TUMPU BETON

Gaya tekan total pada plat tumpuan, Puc = 65815 N


Luas plat tumpuan baja, A1 = 70685.83471 mm2
Luas penampang kolom pedestral, A2 = 160000 mm2
Section Modulus sumbu -x Sx 2650718.801 mm3
Section Modulus sumbu -y Sy 2650718.801 mm3
Tegangan tumpu nominal, fcn = 0.85 * fc' * √ ( A2 / A1 ) = 23.882 MPa
fcn = 1.70 * fc' = 31.748 MPa
Tegangan tumpu nominal beton yg digunakan, fcn = 23.882 MPa
Faktor reduksi kekuatan tekan beton, Ø= 0.65
Tegangan tumpu beton yg diijinkan, Ø* fcn = 15.523 MPa
Tegangan tumpu maksimum yang terjadi pada beton,
fcu-1 = Puc / A1 + Mu-x/Sx + Mu-y/Sy= 2.079 MPa
fcu-2= Puc / A1 - Mu-x/Sx - Mu-y/Sy= -0.217 MPa
Tegangan tumpu maksimum yang terjadi pada beton fcu= 2.079 MPa
Syarat yang harus dipenuhi :
fcu ≤ Ø * fcn
2.079 < 15.523 → OK
AnB-MAIN POLE.xlsx 2-2 6/28/2024

2. TAHANAN TARIK BASE PLATE (TENSION)

Gaya tarik maksimum pada angkur, Tu1 = Ru max = 16074 N


Momen yang terjadi pada plat akibat beban terfaktor, (jepit - bebas)
a1 = 71 mm
Mup-2 = Tu1 * a1 = 1141268 Nmm
BF1 = 205 mm
2
Modulus penampang plastis plat, (jepit - bebas) Z1 = 1/4 * BF2 * t = 7380 mm3
Tahanan momen nominal plat, (jepit - bebas) Mn1 = fy * Z1 = 1771200 Nmm
Faktor reduksi kekuatan lentur, Øb = 0.90
Tahanan momen plat, Øb * Mn1 = 1594080 Nmm

Syarat yang harus dipenuhi :


Mup-1 ≤ Øb * Mn1
1141267.806 < 1594080.000 → OK
30
AnB-SUPPORT POLE.xlsx 1-1 6/28/2024

ANALISA ANGKUR (Anchor Bolt Analysis)


POLE 6M (SUPPORT POLE)
BEBAN POLE DATA BEBAN KOLOM
Gaya aksial akibat beban terfaktor, Pu = 39951 N
Momen akibat beban terfaktor, Mu-x = 0 Nmm
Momen akibat beban terfaktor, Mu-y = 0 Nmm
Gaya geser akibat beban terfaktor, Vu = 12324 N
Gaya tambahan akibat tarik arah vertikal,
DPuvi = Puv / nw = 9988 N

Gaya pada masing-masing angkur akibat momen dihitung sebagai berikut :


2 2
Gaya akibat momen pada arah x, Ruxi = (Mu ) * yi / (∑x + ∑y )
Gaya akibat momen pada arah y, Ruyi = (Mu ) * xi / ( ∑x + ∑y2 )
2

GAYA-GAYA PADA MASING-MASING BAUT


2 2
No xi yi xi yi Ruyi Ruxi Rui
1 59.00 40.00 3481.00 1600.00 0.00 0.00 9987.75
2 -59.00 40.00 3481.00 1600.00 0.00 0.00 9987.75
3 59.00 -40.00 3481.00 1600.00 0.00 0.00 9987.75
4 59.00 40.00 3481.00 1600.00 0.00 0.00 9987.75
Total ∑= 13924.0 6400.0 9987.75
Jumlah baut pada badan, nw = 4

Ru max = 9987.75 N
AnB-SUPPORT POLE.xlsx 1-3 6/28/2024

ANALISA Angkur (Bolt Analysis)

PLAT TUMPUAN (BASE PLATE) DATA PLAT TUMPUAN


Tegangan leleh baja, fy = 240 MPa
p
Tegangan tarik putus plat, fu = 370 MPa
Lebar plat tumpuan, B= 168 mm
Panjang plat tumpuan, L= 150 mm
Tebal plat tumpuan, t= 12 mm
ANGKUR DATA ANGKUR
Jenis Angkur, Tipe : A307
Tegangan tarik putus Angkur, fub = 410 MPa
Tegangan leleh Angkur, fy = 240 MPa
Type Angkur M16
Diameter Angkur, d = 16 mm

1. GAYA TARIK PADA Angkur

Gaya tarik pada Angkur, Tu1 = 9988 N


Tegangan tarik putus Angkur, f ub = 410 MPa
Luas penampang Angkur, Ab = π/ 4 * d2 = 201 mm2
Faktor reduksi kekuatan tarik, Øt = 0.90
b
Tahanan tarik nominal Angkur, Tn = 0.75 * Ab * fu = 61827 N
Tahanan tarik Angkur, Øt * Tn = 55643.889 N
Syarat yang harus dipenuhi :

Tu1 < Øt * T n

9987.75 < 55643.88908 → AMAN (OK)

2. GAYA GESER PADA Angkur

Gaya geser pada Angkur, Vu1 = Vu / n = 3081 N


b
Tegangan tarik putus Angkur, fu = 410 MPa
Jumlah penampang geser, m= 1
Faktor pengaruh ulir pada bidang geser, r1 = 0.4
Luas penampang Angkur, Ab = π / 4 * d 2 = 201 mm2
Faktor reduksi kekuatan geser, Øf = 0.75
Tahanan geser nominal, V n = r 1 * m * A b * f ub = 32974 N
Tahanan geser Angkur, Øf * Vn = 24730.61737 N
Syarat yang harus dipenuhi :

Vu1 < Øf * V n

3081 < 24730.61737 → AMAN (OK)


AnB-SUPPORT POLE.xlsx 2-3 6/28/2024

3. GAYA TUMPU PADA Angkur

Gaya tumpu pada Angkur, Ru1 = Vu1 = 3081 N


Diameter Angkur, d= 16 mm
Tebal plat tumpu, t= 12 mm
p
Tegangan tarik putus plat, fu = 370 MPa
p
Tahanan tumpu nominal, Rn = 2.4 * d * t * fu = 170496 N
Tahanan tumpu, Øf * Rn = 127872 N
Syarat yang harus dipenuhi :
Ru1 < Øf * R n

3081 < 127872 → OK

4. KOMBINASI GESER DAN TARIK

Koeffisien Geser r2 = 1
Gaya geser akibat beban terfaktor, Vu1 = Vu / n = 3081.00 N
Tahanan geser Angkur, Øf * Vn = 24730.61737 N

Gaya tarik akibat beban terfaktor, Tu1 = 9988 N


Tahanan tarik Angkur, Øt * Tn = 55643.88908 N

Syarat yang harus dipenuhi :

Tu1 Vu1 * r2
+ ≤ 1
Øt * Tn Øf * Vn

0.179494104 + 0.124582414 → OK

Syarat yang harus dipenuhi :


2 2
Tu1 Vu1
Øt * Tn
+ Øf * Vn
≤ 1

0.032218133 + 0.015520778 → OK

Konstanta tegangan untuk Angkur mutu tinggi, f1 = 807 MPa


f2 = 621 MPa
Faktor pengaruh ulir pada bidang geser, r2 = 1.9
Tegangan geser akibat beban terfaktor, fuv = Vu / ( n * Ab ) = 3.83 MPa
Kuat geser Angkur, φf * r1 * m * fu =b
123.00 MPa
Syarat yang harus dipenuhi :
fuv = Vu / ( n * Ab ) ≤ φf * r1 * m * fub

3.831 ≤ 123.000 → AMAN (OK)


AnB-SUPPORT POLE.xlsx 3-3 6/28/2024

Gaya tarik akibat beban terfaktor, Tu1 = 9988 N


Tahanan tarik Angkur, φf * Tn = φf * f1 * Ab = 121693 N
Syarat yang harus dipenuhi :

Tu1 ≤ φf * f1 * Ab

9987.750 ≤ 121692.733 → AMAN (OK)

Kuat tarik Angkur, ft = 0.75 * fub = 307.50 MPa


Batas tegangan kombinasi, f1 - r2 * fuv = 799.72 MPa
f2 = 621.00 MPa
Syarat yang harus dipenuhi :

ft ≤ f1 - r2 * fuv

307.500 ≤ 799.721 → AMAN (OK)

Syarat yang harus dipenuhi :

ft ≤ f2

307.500 ≤ 621.000 → AMAN (OK)


AnB-SUPPORT POLE.xlsx 1-2 6/28/2024

ANALISA BASE PLATE (Base plate Analysis)


BEBAN KOLOM DATA BEBAN KOLOM
Tower setelah penambahan beban baru
Gaya aksial tekan akibat beban terfaktor, (compress) Puc = 39223 N
Momen akibat beban terfaktor, Muc-x = 0 Nmm
Momen akibat beban terfaktor, Muc-y = 0 Nmm
Gaya geser akibat beban terfaktor, Vuc = 12133 N

Gaya aksial tarik akibat beban terfaktor, (tension) Put = 39951 N


Momen akibat beban terfaktor, Mut-x = 0 Nmm
Momen akibat beban terfaktor, Mut-y = 0 Nmm
Gaya geser akibat beban terfaktor, Vut = 12324 N

PLAT TUMPUAN (BASE PLATE) DATA PLAT TUMPUAN


Tegangan leleh baja, fy = 240 MPa
p
Tegangan tarik putus plat, fu = 410 MPa
Lebar plat tumpuan, (diameter) B= 168 mm
Panjang plat tumpuan, (diameter) L= 150 mm
Tebal plat tumpuan, t= 12 mm
KOLOM PEDESTRAL DATA KOLOM BETON
Kuat tekan beton, (K-225) fc' = 18.675 MPa
Lebar penampang kolom, I = 400 mm
Panjang penampang kolom, J = 400 mm

1. TAHANAN TUMPU BETON

Gaya tekan total pada plat tumpuan, Puc = 39223 N


Luas plat tumpuan baja, A1 = 22167.07776 mm2
Luas penampang kolom pedestral, A2 = 160000 mm2
Section Modulus sumbu -x Sx 465508.633 mm3
Section Modulus sumbu -y Sy 465508.633 mm3
Tegangan tumpu nominal, fcn = 0.85 * fc' * √ ( A2 / A1 ) = 39.998 MPa
fcn = 1.70 * fc' = 31.748 MPa
Tegangan tumpu nominal beton yg digunakan, fcn = 31.748 MPa
Faktor reduksi kekuatan tekan beton, Ø= 0.65
Tegangan tumpu beton yg diijinkan, Ø* fcn = 20.636 MPa
Tegangan tumpu maksimum yang terjadi pada beton,
fcu-1 = Puc / A1 + Mu-x/Sx + Mu-y/Sy= 1.769 MPa
fcu-2= Puc / A1 - Mu-x/Sx - Mu-y/Sy= 1.769 MPa
Tegangan tumpu maksimum yang terjadi pada beton fcu= 1.769 MPa
Syarat yang harus dipenuhi :
fcu ≤ Ø * fcn
1.769 < 20.636 → OK
AnB-SUPPORT POLE.xlsx 2-2 6/28/2024

2. TAHANAN TARIK BASE PLATE (TENSION)

Gaya tarik maksimum pada angkur, Tu1 = Ru max = 19976 N


Momen yang terjadi pada plat akibat beban terfaktor, (jepit - bebas)
a1 = 59 mm
Mup-2 = Tu1 * a1 = 1178555 Nmm
BF1 = 168 mm
2
Modulus penampang plastis plat, (jepit - bebas) Z1 = 1/4 * BF2 * t = 6048 mm3
Tahanan momen nominal plat, (jepit - bebas) Mn1 = fy * Z1 = 1451520 Nmm
Faktor reduksi kekuatan lentur, Øb = 0.90
Tahanan momen plat, Øb * Mn1 = 1306368 Nmm

Syarat yang harus dipenuhi :


Mup-1 ≤ Øb * Mn1
1178554.500 < 1306368.000 → OK
ATTACHMENT

31
MS TOWER OUTPUT - AFTER ADDITIONAL
ANTENNAS

32
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 09:23 AM
SITE : PT CMI

Y
X
theta: 300 phi: 30

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M


Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 09:23 AM
SITE : PT CMI

Y X
theta: 180 phi: 0

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M


Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 09:23 AM
SITE : PT CMI

X Y
theta: 270 phi: 0

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M


Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 09:23 AM
SITE : PT CMI

Z X
theta: 0 phi: 90

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M


Page 1 of 1
28 Jun 2024
9:23 AM

TITL1 PROJECT : UNIVERSITAS SURABAYA-POLE 6M


TITL2 SITE : PT CMI

COMPONENT
SUP
MOUNT

END

UNITS 1
PROFILE
FACES 1

WBASE 0.21143
RLBAS 27.8

PANEL 1 HT 2.80 TW 0.1143


$ FACE SH1 LEG 4 R1 80
FACE @MOUNT
PANEL 1 HT 0.20 TW 0.1143
$ FACE SH1 LEG 4 R1 80
FACE @SUP

$PANEL 2 HT 1.6 TW 0.1143


$ FACE SH1 LEG 4 R1 80
$PANEL 2 HT 1.4 TW 0.1143
$ FACE SH1 LEG 4 R1 80

END

SUPPORT
COORD 0.00 0.00 27.8 FIXED
COORD -1.00 0.00 27.8 PINNED
COORD 0.00 -1.00 27.8 PINNED

END

SECTIONS
LIBR Ukh IFACT 1

2 CHS60.5X3.9 FY 240
3 CHS89.1X5.5 FY 240
4 CHS114.3X6.0 FY 240 $PIPA 4"
5 EA50X50X5 FY 240
6 EA60X60X6 FY 240
80 DUMMY FY 240

END

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.td


Page 1 of 3
28 Jun 2024
9:23 AM

PARAMETERS

ANGN 150.00
CODE TIA222G
VB 33.33 $ 120 kph Basic Wind Speed (3 Second Gust)
$VB 23.33 $
VICE 0
CLASS-G 2
TOPCAT-G 1
OVERLAP 0

END

TERRAIN

ANGLE 0 TCAT 2.00 MD 1.00 H 0.00


ANGLE 45 TCAT 2.00 MD 1.00 H 0.00
ANGLE 90 TCAT 2.00 MD 1.00 H 0.00
ANGLE 135 TCAT 2.00 MD 1.00 H 0.00
ANGLE 180 TCAT 2.00 MD 1.00 H 0.00
ANGLE 225 TCAT 2.00 MD 1.00 H 0.00
ANGLE 270 TCAT 2.00 MD 1.00 H 0.00
ANGLE 315 TCAT 2.00 MD 1.00 H 0.00

END

LOADS

CASE 100 Dead Load (Weight of tower plus ancillaries)


DL

CASE 200 wind at 0 to X axis


WL ANGLX 0.0 NOICE

CASE 220 wind at 45 to X axis


WL ANGLX 45.0 NOICE

CASE 240 wind at 90 to X axis


WL ANGLX 90.0 NOICE

CASE 260 wind at 135 to X axis


WL ANGLX 135.0 NOICE

CASE 280 wind at 180 to X axis


WL ANGLX 180.0 NOICE

CASE 300 wind at 225 to X axis


WL ANGLX 225.0 NOICE

CASE 320 wind at 270 to X axis


WL ANGLX 270.0 NOICE

CASE 340 wind at 315 to X axis


WL ANGLX 315.0 NOICE

$ LOADING COMBINATION 1
$ ==================================================================

CASE 500 Max. DL


COMBIN 100 1.200

CASE 520 Max DL + Wind at 0.0 to X NOICE


COMBIN 100 1.200
COMBIN 200 1.600

CASE 540 Max DL + Wind at 45.0 to X NOICE


COMBIN 100 1.200
COMBIN 220 1.600

CASE 560 Max DL + Wind at 90.0 to X NOICE


COMBIN 100 1.200
COMBIN 240 1.600

CASE 580 Max DL + Wind at 135.0 to X NOICE


COMBIN 100 1.200
COMBIN 260 1.600

CASE 600 Max DL + Wind at 180.0 to X NOICE


COMBIN 100 1.200

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.twr


Page 2 of 3
28 Jun 2024
9:23 AM

COMBIN 280 1.600

CASE 620 Max DL + Wind at 225.0 to X NOICE


COMBIN 100 1.200
COMBIN 300 1.600

CASE 640 Max DL + Wind at 270.0 to X NOICE


COMBIN 100 1.200
COMBIN 320 1.600

CASE 660 Max DL + Wind at 315.0 to X NOICE


COMBIN 100 1.200
COMBIN 340 1.600

$ LOADING COMBINATION 2
$ ==================================================================

CASE 1000 Max DL + Wind at 0.0 to X NOICE


COMBIN 100 0.900
COMBIN 200 1.600

CASE 1020 Max DL + Wind at 45.0 to X NOICE


COMBIN 100 0.900
COMBIN 220 1.600

CASE 1040 Max DL + Wind at 90.0 to X NOICE


COMBIN 100 0.900
COMBIN 240 1.600

CASE 1060 Max DL + Wind at 135.0 to X NOICE


COMBIN 100 0.900
COMBIN 260 1.600

CASE 1080 Max DL + Wind at 180.0 to X NOICE


COMBIN 100 0.900
COMBIN 280 1.600

CASE 1100 Max DL + Wind at 225.0 to X NOICE


COMBIN 100 0.900
COMBIN 300 1.600

CASE 1120 Max DL + Wind at 270.0 to X NOICE


COMBIN 100 0.900
COMBIN 320 1.600

CASE 1140 Max DL + Wind at 315.0 to X NOICE


COMBIN 100 0.900
COMBIN 340 1.600

$ LOADING COMBINATION 3 (SERVICE LOADS FOR 100 KPH BASIC WIND SPEED)
$ ==================================================================

CASE 2000 Max DL + Wind at 0.0 to X NOICE


COMBIN 100 1.000
COMBIN 200 1.000

CASE 2020 Max DL + Wind at 45.0 to X NOICE


COMBIN 100 1.000
COMBIN 220 1.000

CASE 2040 Max DL + Wind at 90.0 to X NOICE


COMBIN 100 1.000
COMBIN 240 1.000

CASE 2060 Max DL + Wind at 135.0 to X NOICE


COMBIN 100 1.000
COMBIN 260 1.000

CASE 2080 Max DL + Wind at 180.0 to X NOICE


COMBIN 100 1.000
COMBIN 280 1.000

CASE 2100 Max DL + Wind at 225.0 to X NOICE


COMBIN 100 1.000
COMBIN 300 1.000

CASE 2120 Max DL + Wind at 270.0 to X NOICE


COMBIN 100 1.000
COMBIN 320 1.000

CASE 2140 Max DL + Wind at 315.0 to X NOICE

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.twr


Page 3 of 3
28 Jun 2024
9:23 AM

COMBIN 100 1.000


COMBIN 340 1.000

END

ANCILLARIES

$DUMMY ENTRIES FOR GUIDENCE ONLY

LINEAR LIBR LINH

$ FEEDER
FEEDER-1RF-EXT XB 0.10 YB -0.06 ZB 0.00 XT 0.10 YT -0.06 ZT 05.00 LIB FEEDER_7/8 FACT 2 ANG 0 $--
FEEDER-2RF-EXT XB 0.10 YB -0.04 ZB 0.00 XT 0.10 YT -0.04 ZT 05.00 LIB FEEDER_7/8 FACT 2 ANG 0 $--
FEEDER-3RF-EXT XB 0.10 YB -0.02 ZB 0.00 XT 0.10 YT -0.02 ZT 05.00 LIB FEEDER_7/8 FACT 2 ANG 0 $--
FEEDER-4RF-EXT XB 0.02 YB -0.02 ZB 0.00 XT 0.02 YT -0.02 ZT 05.00 LIB FEEDER_7/8 FACT 2 ANG 0 $--

LARGE LIBR IBS_Anc

$ ANTENNA SECTOR
$=================================================================================================

EXT01-RF XA -0.386 YA 0.669 ZA 05.00 LIB RF-GSM2.580 ANG 030 AMASS 50 $---> TENANT1
EXT02-RF XA 0.669 YA -0.386 ZA 05.00 LIB RF-GSM2.580 ANG 180 AMASS 50 $---> TENANT1
EXT03-RF XA -0.386 YA -0.669 ZA 05.00 LIB RF-GSM2.580 ANG 270 AMASS 50 $---> TENANT1
EXT04-RF XA 0.386 YA 0.669 ZA 05.00 LIB RF-GSM2.580 ANG 090 AMASS 50 $---> TENANT1

EXT01-RRU XA -0.286 YA 0.569 ZA 03.00 LIB RRU-LTE480 ANG 090 AMASS 00 $---> TENANT1
EXT02-RRU XA 0.569 YA -0.286 ZA 03.00 LIB RRU-LTE480 ANG 340 AMASS 00 $---> TENANT1
EXT03-RRU XA -0.286 YA -0.569 ZA 03.00 LIB RRU-LTE480 ANG 200 AMASS 00 $---> TENANT1
EXT04-RRU XA 0.286 YA 0.569 ZA 03.00 LIB RRU-LTE480 ANG 090 AMASS 00 $---> TENANT1

EXT05-RRU XA -0.286 YA 0.569 ZA 02.50 LIB RRU-LTE480 ANG 090 AMASS 00 $---> TENANT1
EXT06-RRU XA 0.569 YA -0.286 ZA 02.50 LIB RRU-LTE480 ANG 340 AMASS 00 $---> TENANT1
EXT07-RRU XA -0.286 YA -0.569 ZA 02.50 LIB RRU-LTE480 ANG 200 AMASS 00 $---> TENANT1
EXT08-RRU XA 0.286 YA 0.569 ZA 02.50 LIB RRU-LTE480 ANG 090 AMASS 00 $---> TENANT1

EXT09-FLT XA -0.286 YA 0.569 ZA 02.00 LIB FILTER ANG 090 AMASS 00 $---> TENANT1
EXT10-FLT XA 0.569 YA -0.286 ZA 02.00 LIB FILTER ANG 340 AMASS 00 $---> TENANT1
EXT11-FLT XA -0.286 YA -0.569 ZA 02.00 LIB FILTER ANG 200 AMASS 00 $---> TENANT1
EXT12-FLT XA 0.286 YA 0.569 ZA 02.00 LIB FILTER ANG 090 AMASS 00 $---> TENANT1

$PR16-MW XA 0.000 YA 0.808 ZA 11.00 LIB SH1PR-2 ANG 090 AMASS 30 $---> TENANT1
$PR17-MW XA -0.808 YA 0.808 ZA 11.00 LIB SH1PR-2 ANG 340 AMASS 30 $---> TENANT1

END

END

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.twr


Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 09:23 AM
SITE : PT CMI

Design Ratios - % of Code Capacity:


<= 50
<= 95
<= 100
<= 105
<= 110
> 110

Y
X
theta: 300 phi: 30

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M


Page 1 of 7
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:23 AM
SITE : PT CMI

MSTOWER V6 Member checking to TIA-222-G (140401)


Job: POLE 6M
Date: 28-JUN-24 09:10:18
PROJECT : UNIVERSITAS SURABAYA-POLE 6M
SITE : PT CMI
L O A D C A S E S
Case Y/N Title
100 N DEAD LOAD (WEIGHT OF TOWER PLUS ANCILLARIES)
200 N WIND AT 0 TO X AXIS
220 N WIND AT 45 TO X AXIS
240 N WIND AT 90 TO X AXIS
260 N WIND AT 135 TO X AXIS
280 N WIND AT 180 TO X AXIS
300 N WIND AT 225 TO X AXIS
320 N WIND AT 270 TO X AXIS
340 N WIND AT 315 TO X AXIS
500 Y MAX. DL
520 Y MAX DL + WIND AT 0.0 TO X NOICE
540 Y MAX DL + WIND AT 45.0 TO X NOICE
560 Y MAX DL + WIND AT 90.0 TO X NOICE
580 Y MAX DL + WIND AT 135.0 TO X NOICE
600 Y MAX DL + WIND AT 180.0 TO X NOICE
620 Y MAX DL + WIND AT 225.0 TO X NOICE
640 Y MAX DL + WIND AT 270.0 TO X NOICE
660 Y MAX DL + WIND AT 315.0 TO X NOICE
1000 Y MAX DL + WIND AT 0.0 TO X NOICE
1020 Y MAX DL + WIND AT 45.0 TO X NOICE
1040 Y MAX DL + WIND AT 90.0 TO X NOICE
1060 Y MAX DL + WIND AT 135.0 TO X NOICE
1080 Y MAX DL + WIND AT 180.0 TO X NOICE
1100 Y MAX DL + WIND AT 225.0 TO X NOICE
1120 Y MAX DL + WIND AT 270.0 TO X NOICE
1140 Y MAX DL + WIND AT 315.0 TO X NOICE
2000 Y MAX DL + WIND AT 0.0 TO X NOICE
2020 Y MAX DL + WIND AT 45.0 TO X NOICE
2040 Y MAX DL + WIND AT 90.0 TO X NOICE
2060 Y MAX DL + WIND AT 135.0 TO X NOICE
2080 Y MAX DL + WIND AT 180.0 TO X NOICE
2100 Y MAX DL + WIND AT 225.0 TO X NOICE
2120 Y MAX DL + WIND AT 270.0 TO X NOICE
2140 Y MAX DL + WIND AT 315.0 TO X NOICE
Y = Cases to be checked
N = Not Used
Report Units:
Dims., lengths, areas ... mm, mm2
Forces ..................... kN
Moments, Torques ........... kNm
Stresses ..............N/mm2 (MPa)
Cantilevered pole

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 2 of 7
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:23 AM
SITE : PT CMI

Computed capacities assume pole is predominantly subject to bending.


Symbols:
fy = yield stress
fy' = effective yield stress
Resistance factors:
Compression, ø= 0.90
Flexure, ø= 0.90
Nu = Axial force in member, c=compression
Mu = Moment, x=about X axis, y=about Y axis, r=resultant
Tu = Torque in member
øNn = Axial design strength
øMn = Flexural design strength
øTn = Torsional design strength, 0=not considered
* = Load/Capacity ratio > 1.0
Shaft Members - Cross-section: Circular
Memb Ht D t fy fy' LC Nu Mxu Myu Mru Tu øNn øMn øTn ratio
Cross arms
4 33.55 89 5.5 240 240 600 0 0 0 0 0 312 8 0 0.001
5 31.05 89 5.5 240 240 620 3 0 0 1 0 312 8 0 0.069
6 30.80 89 5.5 240 240 660 0 0 0 0 0 312 8 0 0.032
7 33.55 114 6.0 240 240 600 0 0 0 0 0 441 15 0 0.000
8 31.05 114 6.0 240 240 600 3 0 8 8 0 441 15 0 0.551
9 31.00 114 6.0 240 240 600 7 0 11 11 0 441 15 0 0.715
10 33.55 89 5.5 240 240 600 0 0 0 0 0 312 8 0 0.001
11 31.05 89 5.5 240 240 560 1 1 0 1 0 312 8 0 0.129
12 30.80 89 5.5 240 240 620 1 0 0 0 0 312 8 0 0.040
13 33.55 89 5.5 240 240 600 0 0 0 0 0 312 8 0 0.001
14 31.05 89 5.5 240 240 520 2 0 1 1 0 312 8 0 0.068
15 30.80 89 5.5 240 240 560 0 0 0 0 0 312 8 0 0.029
104 30.80 114 6.0 240 240 620 74 5 6 8 0 441 15 0 0.683
105 29.20 114 6.0 240 240 620 75 0 1 1 0 441 15 0 0.220
106 27.80 114 6.0 240 240 620 73 2 2 2 0 441 15 0 0.324
110 29.20 61 3.9 240 240 1000 49 0 0 0 0 150 3 0 0.430
111 27.80 61 3.9 240 240 600 47 0 0 0 0 150 3 0 0.317
112 29.20 61 3.9 240 240 560 48 0 0 0 0 150 3 0 0.428
113 27.80 61 3.9 240 240 640 46 0 0 0 0 150 3 0 0.308
Warnings
Member: 16 Section shape 9 Unsupported not supported for design code
Mass Summary
Sect Size fy L (m) M (kg)
2 CHS60.5X3.9 Y 240 6.71 36.50
3 CHS89.1X5.5 Y 240 9.00 102.05
4 CHS114.3X6.0 Y 240 6.00 96.15
5 EA50X50X5 Y 240 1.92 7.24
6 EA60X60X6 Y 240 3.60 19.53
80 DUMMY Y 240 0.69 0.07
--------
261.54
Mstower V6 Reactions (060619)

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 3 of 7
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:23 AM
SITE : PT CMI

PROJECT : UNIVERSITAS SURABAYA-POLE 6M


SITE : PT CMI

L O A D C A S E S
Case Y/N Title
100 N DEAD LOAD (WEIGHT OF TOWER PLUS ANCILLARIES)
200 N WIND AT 0 TO X AXIS
220 N WIND AT 45 TO X AXIS
240 N WIND AT 90 TO X AXIS
260 N WIND AT 135 TO X AXIS
280 N WIND AT 180 TO X AXIS
300 N WIND AT 225 TO X AXIS
320 N WIND AT 270 TO X AXIS
340 N WIND AT 315 TO X AXIS
500 Y MAX. DL
520 Y MAX DL + WIND AT 0.0 TO X NOICE
540 Y MAX DL + WIND AT 45.0 TO X NOICE
560 Y MAX DL + WIND AT 90.0 TO X NOICE
580 Y MAX DL + WIND AT 135.0 TO X NOICE
600 Y MAX DL + WIND AT 180.0 TO X NOICE
620 Y MAX DL + WIND AT 225.0 TO X NOICE
640 Y MAX DL + WIND AT 270.0 TO X NOICE
660 Y MAX DL + WIND AT 315.0 TO X NOICE
1000 Y MAX DL + WIND AT 0.0 TO X NOICE
1020 Y MAX DL + WIND AT 45.0 TO X NOICE
1040 Y MAX DL + WIND AT 90.0 TO X NOICE
1060 Y MAX DL + WIND AT 135.0 TO X NOICE
1080 Y MAX DL + WIND AT 180.0 TO X NOICE
1100 Y MAX DL + WIND AT 225.0 TO X NOICE
1120 Y MAX DL + WIND AT 270.0 TO X NOICE
1140 Y MAX DL + WIND AT 315.0 TO X NOICE
2000 Y MAX DL + WIND AT 0.0 TO X NOICE
2020 Y MAX DL + WIND AT 45.0 TO X NOICE
2040 Y MAX DL + WIND AT 90.0 TO X NOICE
2060 Y MAX DL + WIND AT 135.0 TO X NOICE
2080 Y MAX DL + WIND AT 180.0 TO X NOICE
2100 Y MAX DL + WIND AT 225.0 TO X NOICE
2120 Y MAX DL + WIND AT 270.0 TO X NOICE
2140 Y MAX DL + WIND AT 315.0 TO X NOICE
Y = Cases to be checked
N = Not Used

Centroid of supports: -0.333 -0.333 27.800


SUPPORT REACTIONS (Applied to tower)
Case Node FX FY FZ MX MY MZ
500 117 0.157 0.095 10.104 -0.014 0.090 0.013
115 -0.139 -0.005 -0.420 0.000 0.000 0.000
116 -0.018 -0.090 -0.224 0.000 0.000 0.000
Resultant 0.000 0.000 9.460 3.363 -3.483 0.000 at centroid
520 117 -2.834 0.071 -34.531 -0.123 -2.592 -0.065

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 4 of 7
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:23 AM
SITE : PT CMI

115 13.790 0.008 44.570 0.000 0.000 0.000


116 -0.041 -0.175 -0.563 0.000 0.000 0.000
Resultant 10.915 -0.097 9.476 3.599 38.819 -3.785 at centroid
540 117 -1.875 -1.885 -53.277 1.657 -1.630 0.136
115 9.652 -0.002 31.144 0.000 0.000 0.000
116 -0.004 9.774 31.607 0.000 0.000 0.000
Resultant 7.773 7.887 9.474 -26.793 26.356 0.172 at centroid
560 117 0.171 -2.771 -33.990 2.561 0.243 0.243
115 -0.078 -0.028 -0.312 0.000 0.000 0.000
116 0.008 13.525 43.778 0.000 0.000 0.000
Resultant 0.101 10.727 9.476 -38.059 -3.228 3.821 at centroid
580 117 2.144 -1.937 10.402 1.916 1.968 0.212
115 -9.973 -0.046 -32.335 0.000 0.000 0.000
116 0.006 9.675 31.411 0.000 0.000 0.000
Resultant -7.823 7.692 9.478 -26.335 -33.525 5.435 at centroid
600 117 3.035 0.115 54.647 0.101 2.703 0.117
115 -13.969 -0.018 -45.290 0.000 0.000 0.000
116 0.009 -0.006 0.120 0.000 0.000 0.000
Resultant -10.924 0.090 9.477 3.140 -45.746 3.817 at centroid
620 117 2.115 1.969 73.350 -1.621 1.773 -0.127
115 -9.877 0.022 -31.916 0.000 0.000 0.000
116 -0.002 -9.893 -31.960 0.000 0.000 0.000
Resultant -7.764 -7.903 9.474 33.497 -33.301 -0.197 at centroid
640 117 0.159 2.853 54.114 -2.522 -0.052 -0.227
115 -0.203 0.019 -0.535 0.000 0.000 0.000
116 -0.044 -13.608 -44.104 0.000 0.000 0.000
Resultant -0.089 -10.736 9.475 44.740 -3.746 -3.839 at centroid
660 117 -1.846 2.108 9.765 -1.925 -1.804 -0.161
115 9.732 0.006 31.523 0.000 0.000 0.000
116 -0.068 -9.812 -31.810 0.000 0.000 0.000
Resultant 7.818 -7.698 9.477 33.044 26.560 -5.407 at centroid
1000 117 -2.842 0.049 -36.955 -0.121 -2.585 -0.068
115 13.796 0.009 44.577 0.000 0.000 0.000
116 -0.036 -0.154 -0.510 0.000 0.000 0.000
Resultant 10.919 -0.097 7.111 2.760 39.621 -3.784 at centroid
1020 117 -1.891 -1.888 -55.667 1.641 -1.632 0.132
115 9.666 0.000 31.178 0.000 0.000 0.000
116 0.000 9.777 31.598 0.000 0.000 0.000
Resultant 7.774 7.889 7.109 -27.588 27.176 0.170 at centroid
1040 117 0.132 -2.766 -36.426 2.538 0.220 0.237
115 -0.044 -0.026 -0.209 0.000 0.000 0.000
116 0.012 13.522 43.746 0.000 0.000 0.000
Resultant 0.100 10.730 7.111 -38.838 -2.359 3.818 at centroid
1060 117 2.083 -1.942 7.865 1.902 1.925 0.206
115 -9.919 -0.043 -32.160 0.000 0.000 0.000
116 0.010 9.681 31.408 0.000 0.000 0.000

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 5 of 7
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:23 AM
SITE : PT CMI

Resultant -7.826 7.695 7.113 -27.135 -32.606 5.433 at centroid


1080 117 2.964 0.088 52.011 0.107 2.651 0.113
115 -13.905 -0.017 -45.082 0.000 0.000 0.000
116 0.013 0.019 0.183 0.000 0.000 0.000
Resultant -10.928 0.090 7.111 2.294 -44.802 3.816 at centroid
1100 117 2.053 1.924 70.680 -1.598 1.729 -0.128
115 -9.821 0.023 -31.735 0.000 0.000 0.000
116 0.002 -9.851 -31.836 0.000 0.000 0.000
Resultant -7.766 -7.905 7.109 32.608 -32.376 -0.195 at centroid
1120 117 0.117 2.801 51.490 -2.492 -0.077 -0.228
115 -0.166 0.019 -0.423 0.000 0.000 0.000
116 -0.040 -13.559 -43.957 0.000 0.000 0.000
Resultant -0.089 -10.739 7.110 43.835 -2.870 -3.836 at centroid
1140 117 -1.865 2.066 7.240 -1.904 -1.807 -0.163
115 9.748 0.006 31.564 0.000 0.000 0.000
116 -0.062 -9.772 -31.692 0.000 0.000 0.000
Resultant 7.821 -7.700 7.112 32.160 27.386 -5.405 at centroid
2000 117 -1.712 0.066 -19.426 -0.081 -1.581 -0.041
115 8.567 0.004 27.716 0.000 0.000 0.000
116 -0.030 -0.129 -0.400 0.000 0.000 0.000
Resultant 6.825 -0.059 7.890 2.949 23.505 -2.370 at centroid
2020 117 -1.121 -1.137 -31.124 1.017 -0.987 0.089
115 5.989 -0.006 19.342 0.000 0.000 0.000
116 -0.010 6.075 19.671 0.000 0.000 0.000
Resultant 4.858 4.932 7.889 -16.024 15.725 0.110 at centroid
2040 117 0.138 -1.687 -19.094 1.579 0.169 0.155
115 -0.078 -0.018 -0.282 0.000 0.000 0.000
116 0.001 8.412 27.265 0.000 0.000 0.000
Resultant 0.061 6.707 7.890 -23.057 -2.742 2.389 at centroid
2060 117 1.365 -1.181 8.604 1.185 1.242 0.131
115 -6.258 -0.026 -20.270 0.000 0.000 0.000
116 0.003 6.016 19.557 0.000 0.000 0.000
Resultant -4.890 4.809 7.891 -15.741 -21.659 3.393 at centroid
2080 117 1.929 0.090 36.223 0.061 1.703 0.073
115 -8.759 -0.012 -28.365 0.000 0.000 0.000
116 0.002 -0.021 0.032 0.000 0.000 0.000
Resultant -6.828 0.057 7.890 2.659 -29.292 2.382 at centroid
2100 117 1.353 1.253 47.904 -1.015 1.122 -0.074
115 -6.199 0.009 -20.011 0.000 0.000 0.000
116 -0.009 -6.201 -20.005 0.000 0.000 0.000
Resultant -4.855 -4.938 7.889 21.619 -21.519 -0.120 at centroid
2120 117 0.128 1.803 35.894 -1.575 -0.016 -0.137
115 -0.154 0.010 -0.417 0.000 0.000 0.000
116 -0.031 -8.524 -27.588 0.000 0.000 0.000
Resultant -0.057 -6.711 7.889 28.643 -3.063 -2.396 at centroid
2140 117 -1.111 1.332 8.212 -1.201 -1.099 -0.100

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 6 of 7
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:23 AM
SITE : PT CMI

115 6.042 0.006 19.586 0.000 0.000 0.000


116 -0.043 -6.149 -19.908 0.000 0.000 0.000
Resultant 4.888 -4.812 7.890 21.338 15.857 -3.382 at centroid
SUPPORT REACTIONS (Along Leg)
Case Memb Fx Fy Fz Mx My Mz
500 106 -10.104 0.157 -0.095 -0.013 -0.014 -0.090
111 0.442 0.007 -0.005 0.000 0.000 0.000
113 0.241 0.019 0.018 0.000 0.000 0.000
520 106 34.531 -2.834 -0.071 0.065 -0.123 2.592
111 -46.655 0.133 0.008 0.000 0.000 0.000
113 0.590 -0.001 0.041 0.000 0.000 0.000
540 106 53.277 -1.875 1.885 -0.136 1.657 1.630
111 -32.605 0.078 -0.002 0.000 0.000 0.000
113 -33.084 0.100 0.004 0.000 0.000 0.000
560 106 33.990 0.171 2.771 -0.243 2.561 -0.243
111 0.321 -0.018 -0.028 0.000 0.000 0.000
113 -45.820 0.150 -0.008 0.000 0.000 0.000
580 106 -10.402 2.144 1.937 -0.212 1.916 -1.968
111 33.837 -0.126 -0.046 0.000 0.000 0.000
113 -32.867 0.135 -0.006 0.000 0.000 0.000
600 106 -54.647 3.035 -0.115 -0.117 0.101 -2.703
111 47.395 -0.177 -0.018 0.000 0.000 0.000
113 -0.113 0.041 -0.009 0.000 0.000 0.000
620 106 -73.350 2.115 -1.969 0.127 -1.621 -1.773
111 33.409 -0.093 0.022 0.000 0.000 0.000
113 33.456 -0.090 0.002 0.000 0.000 0.000
640 106 -54.114 0.159 -2.853 0.227 -2.522 0.052
111 0.572 0.034 0.019 0.000 0.000 0.000
113 46.155 -0.168 0.044 0.000 0.000 0.000
660 106 -9.765 -1.846 -2.108 0.161 -1.925 1.804
111 -32.991 0.114 0.006 0.000 0.000 0.000
113 33.289 -0.123 0.068 0.000 0.000 0.000
1000 106 36.955 -2.842 -0.049 0.068 -0.121 2.585
111 -46.663 0.129 0.009 0.000 0.000 0.000
113 0.533 -0.005 0.036 0.000 0.000 0.000
1020 106 55.667 -1.891 1.888 -0.132 1.641 1.632
111 -32.641 0.075 0.000 0.000 0.000 0.000
113 -33.076 0.094 0.000 0.000 0.000 0.000
1040 106 36.426 0.132 2.766 -0.237 2.538 -0.220
111 0.213 -0.020 -0.026 0.000 0.000 0.000
113 -45.788 0.143 -0.012 0.000 0.000 0.000
1060 106 -7.865 2.083 1.942 -0.206 1.902 -1.925
111 33.655 -0.126 -0.043 0.000 0.000 0.000
113 -32.866 0.129 -0.010 0.000 0.000 0.000
1080 106 -52.011 2.964 -0.088 -0.113 0.107 -2.651

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 7 of 7
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:23 AM
SITE : PT CMI

111 47.178 -0.176 -0.017 0.000 0.000 0.000


113 -0.181 0.037 -0.013 0.000 0.000 0.000
1100 106 -70.680 2.053 -1.924 0.128 -1.598 -1.729
111 33.220 -0.093 0.023 0.000 0.000 0.000
113 33.325 -0.094 -0.002 0.000 0.000 0.000
1120 106 -51.490 0.117 -2.801 0.228 -2.492 0.077
111 0.453 0.032 0.019 0.000 0.000 0.000
113 46.000 -0.170 0.040 0.000 0.000 0.000
1140 106 -7.240 -1.865 -2.066 0.163 -1.904 1.807
111 -33.035 0.111 0.006 0.000 0.000 0.000
113 33.165 -0.126 0.062 0.000 0.000 0.000
2000 106 19.426 -1.712 -0.066 0.041 -0.081 1.581
111 -29.010 0.091 0.004 0.000 0.000 0.000
113 0.421 0.003 0.030 0.000 0.000 0.000
2020 106 31.124 -1.121 1.137 -0.089 1.017 0.987
111 -20.248 0.053 -0.006 0.000 0.000 0.000
113 -20.588 0.070 0.010 0.000 0.000 0.000
2040 106 19.094 0.138 1.687 -0.155 1.579 -0.169
111 0.292 -0.010 -0.018 0.000 0.000 0.000
113 -28.533 0.104 -0.001 0.000 0.000 0.000
2060 106 -8.604 1.365 1.181 -0.131 1.185 -1.242
111 21.214 -0.074 -0.026 0.000 0.000 0.000
113 -20.461 0.091 -0.003 0.000 0.000 0.000
2080 106 -36.223 1.929 -0.090 -0.073 0.061 -1.703
111 29.686 -0.101 -0.012 0.000 0.000 0.000
113 -0.024 0.030 -0.002 0.000 0.000 0.000
2100 106 -47.904 1.353 -1.253 0.074 -1.015 -1.122
111 20.949 -0.052 0.009 0.000 0.000 0.000
113 20.944 -0.049 0.009 0.000 0.000 0.000
2120 106 -35.894 0.128 -1.803 0.137 -1.575 0.016
111 0.444 0.023 0.010 0.000 0.000 0.000
113 28.875 -0.094 0.031 0.000 0.000 0.000
2140 106 -8.212 -1.111 -1.332 0.100 -1.201 1.099
111 -20.497 0.076 0.006 0.000 0.000 0.000
113 20.836 -0.069 0.043 0.000 0.000 0.000

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 1 of 3
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:49 AM
SITE : PT CMI

Mstower V6 Ancillary Rotations(060619)


PROJECT : UNIVERSITAS SURABAYA-POLE 6M
SITE : PT CMI
ANCILLARY ROTATIONS

L O A D C A S E S
Case Y/N Title
100 N DEAD LOAD (WEIGHT OF TOWER PLUS ANCILLARIES)
200 N WIND AT 0 TO X AXIS
220 N WIND AT 45 TO X AXIS
240 N WIND AT 90 TO X AXIS
260 N WIND AT 135 TO X AXIS
280 N WIND AT 180 TO X AXIS
300 N WIND AT 225 TO X AXIS
320 N WIND AT 270 TO X AXIS
340 N WIND AT 315 TO X AXIS
500 N MAX. DL
520 N MAX DL + WIND AT 0.0 TO X NOICE
540 N MAX DL + WIND AT 45.0 TO X NOICE
560 N MAX DL + WIND AT 90.0 TO X NOICE
580 N MAX DL + WIND AT 135.0 TO X NOICE
600 N MAX DL + WIND AT 180.0 TO X NOICE
620 N MAX DL + WIND AT 225.0 TO X NOICE
640 N MAX DL + WIND AT 270.0 TO X NOICE
660 N MAX DL + WIND AT 315.0 TO X NOICE
1000 N MAX DL + WIND AT 0.0 TO X NOICE
1020 N MAX DL + WIND AT 45.0 TO X NOICE
1040 N MAX DL + WIND AT 90.0 TO X NOICE
1060 N MAX DL + WIND AT 135.0 TO X NOICE
1080 N MAX DL + WIND AT 180.0 TO X NOICE
1100 N MAX DL + WIND AT 225.0 TO X NOICE
1120 N MAX DL + WIND AT 270.0 TO X NOICE
1140 N MAX DL + WIND AT 315.0 TO X NOICE
2000 Y MAX DL + WIND AT 0.0 TO X NOICE
2020 Y MAX DL + WIND AT 45.0 TO X NOICE
2040 Y MAX DL + WIND AT 90.0 TO X NOICE
2060 Y MAX DL + WIND AT 135.0 TO X NOICE
2080 Y MAX DL + WIND AT 180.0 TO X NOICE
2100 Y MAX DL + WIND AT 225.0 TO X NOICE
2120 Y MAX DL + WIND AT 270.0 TO X NOICE
2140 Y MAX DL + WIND AT 315.0 TO X NOICE
Y = Cases to be checked
N = Not Used
ENVELOPE OF TOWER ROTATIONS (Degrees about global axes)
Pt Height LC X-Rot LC Y_Rot LC Z-Rot
4 33.80 2120 0.3947 2080 0.4740 2120 0.0514
112 29.20 2040 0.0234 2000 0.0206 2040 0.0124
ENVELOPE OF TOWER ROTATIONS (Degrees about global axes)
Pt Height LC X-Rot LC Y_Rot LC Z-Rot
4 33.80 2120 0.3947 2080 0.4740 2120 0.0514
112 29.20 2040 0.0234 2000 0.0206 2040 0.0124
ROTATIONS OF ANCILLARY AXES (Degrees)
Ancillary Height Bearing Case Rot-x Rot-y Rot-z
EXT01-RF 5.000 30.000 2000 0.2034 0.1746 0.1533
2020 0.2197 0.0296 0.0812
2040 0.0752 0.1957 -0.0273
2060 0.1491 0.2283 -0.1166
2080 0.3327 0.1094 -0.1419
2100 0.3479 0.0944 -0.0681
2120 0.2037 0.2595 0.0398
2140 0.0195 0.2923 0.1277
EXT02-RF 5.000 180.000 2000 0.1254 0.2159 -0.0071
2020 0.2572 0.0395 -0.0940
2040 0.2107 0.1878 -0.1125
2060 0.0097 0.3354 -0.0528
2080 0.2375 0.3258 0.0313
2100 0.3695 0.1501 0.1195
2120 0.3239 0.0773 0.1377
2140 0.1226 0.2256 0.0768
EXT03-RF 5.000 270.000 2000 0.2431 0.1596 -0.0588
2020 0.0566 0.2896 -0.0443
2040 0.1819 0.2524 0.0131
2060 0.3358 0.0685 0.0734
2080 0.3209 0.1656 0.0828
2100 0.1342 0.2963 0.0699
2120 0.1052 0.2590 0.0122
2140 0.2588 0.0743 -0.0495
EXT04-RF 5.000 90.000 2000 0.2529 0.0888 0.1533

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 2 of 3
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:49 AM
SITE : PT CMI

2020 0.0842 0.2051 0.0812


2040 0.1319 0.1630 -0.0273
2060 0.2723 0.0150 -0.1166
2080 0.2611 0.2334 -0.1419
2100 0.0922 0.3485 -0.0681
2120 0.1229 0.3062 0.0398
2140 0.2628 0.1293 0.1277
EXT01-RRU 3.000 90.000 2000 0.3140 0.1367 0.1453
2020 0.0998 0.2818 0.0796
2040 0.1764 0.2346 -0.0253
2060 0.3439 0.0145 -0.1195
2080 0.3313 0.2649 -0.1427
2100 0.1167 0.4090 -0.0753
2120 0.1584 0.3615 0.0290
2140 0.3254 0.1424 0.1217
EXT02-RRU 3.000 340.000 2000 0.0399 0.3147 -0.0269
2020 0.2603 0.1660 -0.1041
2040 0.3102 0.1129 -0.1207
2060 0.1693 0.3539 -0.0583
2080 0.0959 0.4309 0.0180
2100 0.3162 0.2830 0.0968
2120 0.3670 0.0042 0.1134
2140 0.2261 0.2376 0.0498
EXT03-RRU 3.000 200.000 2000 0.2685 0.2096 -0.0700
2020 0.3345 0.0392 -0.0559
2040 0.1942 0.2745 0.0024
2060 0.0819 0.3560 0.0610
2080 0.3431 0.2540 0.0615
2100 0.4097 0.0048 0.0486
2120 0.2692 0.2312 -0.0103
2140 0.0076 0.3122 -0.0698
EXT04-RRU 3.000 90.000 2000 0.3140 0.1367 0.1453
2020 0.0998 0.2818 0.0796
2040 0.1764 0.2346 -0.0253
2060 0.3439 0.0145 -0.1195
2080 0.3313 0.2649 -0.1427
2100 0.1167 0.4090 -0.0753
2120 0.1584 0.3615 0.0290
2140 0.3254 0.1424 0.1217
EXT05-RRU 2.500 90.000 2000 0.3140 0.1367 0.1453
2020 0.0998 0.2818 0.0796
2040 0.1764 0.2346 -0.0253
2060 0.3439 0.0145 -0.1195
2080 0.3313 0.2649 -0.1427
2100 0.1167 0.4090 -0.0753
2120 0.1584 0.3615 0.0290
2140 0.3254 0.1424 0.1217
EXT06-RRU 2.500 340.000 2000 0.0399 0.3147 -0.0269
2020 0.2603 0.1660 -0.1041
2040 0.3102 0.1129 -0.1207
2060 0.1693 0.3539 -0.0583
2080 0.0959 0.4309 0.0180
2100 0.3162 0.2830 0.0968
2120 0.3670 0.0042 0.1134
2140 0.2261 0.2376 0.0498
EXT07-RRU 2.500 200.000 2000 0.2685 0.2096 -0.0700
2020 0.3345 0.0392 -0.0559
2040 0.1942 0.2745 0.0024
2060 0.0819 0.3560 0.0610
2080 0.3431 0.2540 0.0615
2100 0.4097 0.0048 0.0486
2120 0.2692 0.2312 -0.0103
2140 0.0076 0.3122 -0.0698
EXT08-RRU 2.500 90.000 2000 0.3140 0.1367 0.1453
2020 0.0998 0.2818 0.0796
2040 0.1764 0.2346 -0.0253
2060 0.3439 0.0145 -0.1195
2080 0.3313 0.2649 -0.1427
2100 0.1167 0.4090 -0.0753
2120 0.1584 0.3615 0.0290
2140 0.3254 0.1424 0.1217
EXT09-FLT 2.000 90.000 2000 0.0173 0.0112 0.0023
2020 0.0025 0.0175 -0.0076
2040 0.0143 0.0187 -0.0124
2060 0.0226 0.0123 -0.0103
2080 0.0194 0.0008 -0.0061
2100 0.0045 0.0057 0.0044
2120 0.0125 0.0068 0.0091
2140 0.0207 0.0001 0.0066
EXT10-FLT 2.000 340.000 2000 0.0046 0.0201 0.0023
2020 0.0156 0.0083 -0.0076

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 3 of 3
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:49 AM
SITE : PT CMI

2040 0.0225 0.0071 -0.0124


2060 0.0193 0.0171 -0.0103
2080 0.0074 0.0180 -0.0061
2100 0.0038 0.0062 0.0044
2120 0.0106 0.0095 0.0091
2140 0.0072 0.0194 0.0066
EXT11-FLT 2.000 200.000 2000 0.0126 0.0111 -0.0171
2020 0.0240 0.0000 -0.0185
2040 0.0267 0.0068 -0.0100
2060 0.0218 0.0054 0.0009
2080 0.0126 0.0060 0.0049
2100 0.0001 0.0166 0.0070
2120 0.0022 0.0239 -0.0013
2140 0.0040 0.0230 -0.0127
EXT12-FLT 2.000 90.000 2000 0.0173 0.0112 0.0023
2020 0.0025 0.0175 -0.0076
2040 0.0143 0.0187 -0.0124
2060 0.0226 0.0123 -0.0103
2080 0.0194 0.0008 -0.0061
2100 0.0045 0.0057 0.0044
2120 0.0125 0.0068 0.0091
2140 0.0207 0.0001 0.0066

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.rpt


Page 1 of 2
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:49 AM
SITE : PT CMI

I N P U T / A N A L Y S I S R E P O R T

Job: POLE 6M
Title: PROJECT : UNIVERSITAS SURABAYA-POLE 6M
SITE : PT CMI
Type: Space frame
Date: 28-JUN-24
Time: 09:38:16
Nodes ............................. 35
Members ........................... 40
Spring supports ................... 0
Sections .......................... 6
Materials ......................... 1
Primary load cases ................ 9
Combination load cases ............ 25
Analysis: Non-linear elastic
Update node coordinates ........... Y
Small displacement theory ......... Y
Include axial force effects ....... Y
Include flexural shortening ....... N
Convergence criterion: Residual
Convergence tolerance ......... 5.000E-04
NODE TABLE NOT PRINTED
MEMBER TABLE NOT PRINTED
SECTION PROPERTY TABLE NOT PRINTED
MATERIAL TABLE NOT PRINTED

N O D E D I S P L A C E M E N T S
CASE 2000: MAX DL + WIND AT 0.0 TO X NOICE
Node X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn
m m m rad rad rad
4 -0.0174 0.0005 0.0000 -0.00028 -0.00660 0.00051

N O D E D I S P L A C E M E N T S
CASE 2020: MAX DL + WIND AT 45.0 TO X NOICE
Node X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn
m m m rad rad rad
4 -0.0119 -0.0118 0.0000 0.00415 -0.00444 -0.00016

N O D E D I S P L A C E M E N T S
CASE 2040: MAX DL + WIND AT 90.0 TO X NOICE
Node X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn
m m m rad rad rad
4 0.0015 -0.0165 0.0000 0.00592 0.00068 -0.00050

N O D E D I S P L A C E M E N T S
CASE 2060: MAX DL + WIND AT 135.0 TO X NOICE
Node X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn
m m m rad rad rad
4 0.0153 -0.0108 -0.0001 0.00395 0.00584 -0.00040

N O D E D I S P L A C E M E N T S
CASE 2080: MAX DL + WIND AT 180.0 TO X NOICE
Node X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn
m m m rad rad rad
4 0.0219 0.0022 -0.0003 -0.00068 0.00827 -0.00014

N O D E D I S P L A C E M E N T S
CASE 2100: MAX DL + WIND AT 225.0 TO X NOICE
Node X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn
m m m rad rad rad
4 0.0165 0.0145 -0.0003 -0.00511 0.00611 0.00056

N O D E D I S P L A C E M E N T S
CASE 2120: MAX DL + WIND AT 270.0 TO X NOICE
Node X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn
m m m rad rad rad
4 0.0030 0.0192 -0.0002 -0.00689 0.00099 0.00090

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.p1


Page 2 of 2
Job: POLE 6M 28 Jun 2024
PROJECT : UNIVERSITAS SURABAYA-POLE 6M 9:49 AM
SITE : PT CMI

N O D E D I S P L A C E M E N T S
CASE 2140: MAX DL + WIND AT 315.0 TO X NOICE
Node X-Disp Y-Disp Z-Disp X-Rotn Y-Rotn Z-Rotn
m m m rad rad rad
4 -0.0107 0.0135 -0.0001 -0.00492 -0.00416 0.00077

MStower [V6.20.1.11] F:\KERJAAN\2024\POLE\CMI\1. UNIVERSITAS SURABAYA\MST POLE 6M\POLE 6M.p1