0% found this document useful (0 votes)
14 views1 page

UT 2 IMP Que. Bank

Uploaded by

samarthn001
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

UT 2 IMP Que. Bank

Uploaded by

samarthn001
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1. What are the different types of test reports? Write the contents of it.

2. What are limitations of manual testing?

3. What is Software Metrics? Describe the types of metrics (product, process and project metrics)

4. Write the steps to prepare a test plan.

5. State the need of automated testing tools.

6. Describe the contents of ‘test summary report’ used in test reporting.

7. Draw a diagram for Defect life cycle.

8. Explain Defect management process with suitable diagram.

9. Define defect and causes of defect in brief.

10. Draw defect prevention process cycle, state working of each phase.

11. Explain defect classification in detail.

12. Explain different techniques for finding defects.

13. What are different attributes of defect, describe them with suitable example.

14. Why its important to report a defect, give reason with example.

15. How one can prepare a good defect report, which parameters should have followed in it, explain
with example.

16. State the need of automated testing tool.

17. Explain need to staff training and resource requirement in test planning.

18. Differentiate between static and dynamic testing tool

19. Explain people management in test planning.

20. Describe different types of attributes of a test plan.

21. Define Test infrastructure management

22. Explain the elements of Test infrastructure management TCDB, DR & SCM of it along with
diagram.

23. Describe test case specification and list its parameters.

24. Enlist steps for fundamental test process.

25. Explain need of test deliverables and test plan for test planning..

26. Enlist and explain different type of test deliverables.

27. Explain Defect management process in detail with suitable diagram.

28. Define Metrics and Measurements and explain the need of software measurement.

29. Explain internal and external standards.

30. Describe the different factors/ criteria for selecting testing tools.

You might also like