0% found this document useful (0 votes)
16 views3 pages

DAS well site Pre-job check list

Uploaded by

onec0094
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views3 pages

DAS well site Pre-job check list

Uploaded by

onec0094
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

GWDC18/QHSE/WT/R31-2011 Revision: 0/A Page 1 of 3

DAS Well Site Pre-Job Check List


Project: Halfaya Well: HF0663-WS0663 Rig: BHDC-98
From 2064.5-2090.5mMD To 2096.0-2102.5mMD
Test Interval From 2124.0-2147.0mMD To 2172.0-2174.0mMD
From 2176.0-2182.0mMD To
Test Type: ESP Test

Check List Yes / No Comments


HSE JOB
Have personnel wear with PPE properly? □ □
Are personnel in good Health condition? □ □
Employee carried with H2S monitor and did function test? □ □
Respiratory equipment placed at right points and in useable status? □ □
Escape Respirators placed at right points & enough for each employee? □ □
Fire extinguishers placed at for right points & in good condition? □ □
First Aid for Emergency placed at visible position of First aid station r? □ □
Placed safety signs at right place? □ □
Enclosure work area with safety ropes? □ □
Tested emergency tel. number before work? □ □
Confirmed 2 places for assembly points? □ □
All escape routes for the well site be clear? □ □
Placed wind direction at right and visible position? □ □
Point out I First aid station? □ □
Completed emergency drilling at work side? □ □
Are testing equipments & electric equipments grounded properly? □ □
Are power box covered and marked? □ □
Are there any leaking containers? □ □
Point out waste collection station? □ □
Are air hose in good condition? □ □
Pneumatic airlines are securely connected with crows feet, whip checks and □ □
retaining pins?
All production lines fixed with slings? □ □
Brass hammer be used at well site all time? □ □
Kept flare lit at all times? □ □
Any EX-lighter installed at work area? □ □
Hold a safety meeting at work site? □ □
QUALITY JOB
Meet customer representative upon arrival on the rig? □ □
Checked equipment to ensure everything is on location? □ □
Prepared and organised work site to ensure safe and efficient working □ □
GWDC18/QHSE/WT/R31-2011 Revision: 0/A Page 2 of 3

conditions?
Obtain necessary information for tool calculations? □ □
Record the serial numbers of each tool and list in job record? □ □
Have you opened the needle valve of data head? □ □
Have you took some consideration the circumstance of weather? □ □
Covered the transducer if need? □ □
Have you switched on the power of computer and ups? □ □
Does the interface box work properly? □ □
Does the software work properly? □ □
Have you setup a logging file of this well? □ □
Have you setup enough data channel of the testing well? □ □
Have you setup the right unit according to the requirement of supervisor? □ □
Have you setup the proper logging rate in the begging of well testing? □ □
Have you prepared to setup the proper logging rate during the smooth time
□ □
of well testing?
Does the logging rate meet the requirement of supervisor? □ □
Have you opened the profile of Data scan (DS)? □ □
Have you opened the monitor trends of this well? □ □
Have you added the right channel in the trends? □ □
Have you setup clear unit and tag for every line in the trend? □ □
Have you prepared the colour printer in case of printing? □ □
Have you inspected all pressure sensors in good condition and in useful-life? □ □
Have you inspected DP sensors in good condition and in useful-life? □ □
Have you inspected all temperature in good condition and in useful-life? □ □
Have you calculated inputted flow meter k factor? □ □
PAPER WORK
Recorded safety meeting content? □ □
Recorded emergency drilling at work site? □ □
Recorded the results all of Measuring Instruments Inspection? □ □
Recorded the APR Well Site Pre-Job Check List? □ □
Recorded the Meeting Record? □ □
TRAINING
Employee trained the contents of well QHSE plan? □ □
Employee trained safety emergency plan? □ □
Employee trained JSA contents? □ □
Employee trained use method of safety facility and H2S monitor? □ □
Employee trained customer HSE well site policy? □ □
Employee trained well test procedure? □ □
Employee trained personal responsibility of HSE & quality control? □ □
Employee trained contents of well site meeting? □ □
ENGINEER COMMENTS:
GWDC18/QHSE/WT/R31-2011 Revision: 0/A Page 3 of 3

SIGNED: DATE:

You might also like