0% found this document useful (0 votes)
5 views6 pages

Contract 17NC0073

N/A

Uploaded by

Niel Romero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
5 views6 pages

Contract 17NC0073

N/A

Uploaded by

Niel Romero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 6
Department of Public Works and Highways Contract ID: 17NCO073 Contract Name: Construction of One(1) Storey-Two (2) Clssrooms Schoo! Building Under CY 2017 Basic Educational Facilities Fund(BEFF)Bsich 4@ Manat Elementary School, ‘Trento, Agusan del Sur Location of the Contract: Trento, Agusan del Sur CONTRACT AGREEMENT. KNOW ALL MEN BY THESE PRESENTS: This CONTRACT AGREEMENT, made this_2D™4 guy op NOME 3019 by and beeen MAIR CONST. & GEN. MDSE. ‘The GOVERNMENT OF THE REPUBLIC OF THE P\IILIPPINES through the Department of Public Works ‘and Highways (DPWH) represented herein by MARCEL INO M. OPERARIO, duly authorize fortis purpose, ‘with main office address at DPWH Agusan del Sur 2 Distt Engineering Office, Kaos, Agusan del Sur, hereinafter refered as the “PROCURING ENTITY"; de MAIR CONSTRUCTION & GEN. MDSE., 9 sing!» proprictorshp\partershiplorporation/ join: venture ‘orgized and cxstng under and by virtue of laws ofthe Republic ofthe Philippines, with main offic sess at ‘Bayugan City, represented herein by LAN P. CABUNTOCAN, duly authorized for this purpose, hereinafer referred to asthe "CONTRACTOR: n Francisco, WITNESSETH: |\ WHEREAS, the PROCURING ENTITY is desirous thatthe CONTRACTOR exc the Werks under Co ‘\\No. 17NCO073~ Construction of One({1) Storey-Two (2) Classrooms Schoo! Building Under CY 2017 Basic \ cao Fats Fn (EF) batch at Manat lene, Sco, Tewo, Aan dl Sutera called «hk Works,” and the PROCURING ENTITY has accepted the Caleuated Bid ofthe CONTRACTOR fo the cxelon sa colton te Worst th aed iid shown in te bon ew dred om he illofQaites or al Conse pio To Min Si Handel Fiy Five Thana ce Hue 5 fexy BD res Yavin (rngntt50 1) sot ID eg Trem Description ‘Quantity | vat | Unit Cost iar ral Nunber @ o [PART A.1 OTHER GENERAL REQUIREMEN BS Projet bilbouwSignboard [2.00 | vai =a Tose 3.7 |Occupatioal Safty and 1.00 Toads] 15,468.60 15,468.60 {cai Prora BS_|MobizatonDenobitzaim | 100 is TFT) FERED 7 TOTAL COST FOR PARTA | Pip A2LOD [PART A. EARTHWORKS . AOI(1) Removal of Obsrastion Toy 73080 Tae uss [STRUCTURE EXCAVATION 803( 0) [Strctre Excavation =m TT g [EMBANKMENT 5 30404) [Gravel Fi [—axs oom [1a SETEOT TOTAL COST FOR PARTA Phy 75.17.08 | DewresrRst2ni6 Page Lot Contract 1D: 17NCOO73 Contract Name: Construction of One(1) Storey-Two (2) Classrooms School Building Under CY 2017 Basic Educational Facilities Fund(BEFF)Ba‘ch 4@ Manat Elementary School, ‘Trento, Agusan del Sur Location of the Contract: Trento, Agusan del Sur 3 z é Trem [escripion Gunny | Tat | Unt Gost] Tora Amount Se ea Number 2) @) ae OEE PART B. PLAIN & REINFORCED CONCRETE WORKS ge & REINFORCED CONCRETE WORK: 22 2 900(T}ez [Structural Conerete-Fooing &] 3005 Jou Sacer] TaaSHRTT 8 : slab on Fil fe=3000 psi g [28 das 2 HOLT |Suuctural Conese Footng | 710 | am esos] 6308 6 = Hie Beam (fe=3000 psi @ 28 ays) 4 700 Tes |Seuctarl Coneret=-Conwns | RST] cm BaD e Ge=3000 pi 28 days) $= PGoninae Stractrat Conerete- Beans | 735} vam 703 S153 237 Gide fe=3000 pi @ 28 oes dave) \ age ‘Sub-Total 281,287.30 =< [REINFORCING STEEL ¥ 902(Da2 Reifrcing Sted (Dem] TORTS | as Ta] as Rae Grade 0 \ FORMS & FALSEWORKS : \ [ 9034) [Fors and Framework [00 is 3115.14 FTERMITE CONTROL WORKS \ 1000(1) ier 6308.71 TOTAL COSTFOR PARTE: B63.996.41 <2 \ lemme 25 — \ \eanpentry JOINERY WORKS 23 ~ Yooscratfceiing-¢. Simm Fiber Cemen) 1836] via Dio] ww SaAT 22 [S_* [Boardon Metal Frame BEE loaf Boar 9m Aba] 3850 | as 130691] SRE ~eee |Cement Board aa TOO) [Carpentry & Joinery Works] 200 [at oar 19AsSaS 5% Blackboard 6 SUB-TOTAL TGR [HARDWARES TOOI@a [Finishing Hardware Lackset [400 a Tae] oe TooW2}e [Finishing Hardware-Knobs | 400] a 3405.85] 3.61396 1004 [Finihing Hardware Hinges | 1600]

You might also like