0% found this document useful (0 votes)
23 views5 pages

335007683 Foundations PDF

Uploaded by

ksbabu31234
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views5 pages

335007683 Foundations PDF

Uploaded by

ksbabu31234
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

FOUNDATION FOR TEMPORARY SUPPORT 33-TS-01

1.1 Design data


Pedestal Size = b = 750.0 mm
h = 750.0 mm
Safe net bearing capacity = qsnet = 100.0 kN/m2 Design Basis

Fdn.depth below grade level = Df = 0.55 m


Factor for bearing capacity (1.25 for WL, 'or' 1.00) = 1.00
Safe gross bearing capacity (incl. factor for WL Case) q = 110 kN/m2
Grade of reinforcement = fy = 460.0 N/mm2
Design strength of concrete = fcu = 30.0 N/mm2
Depth of foundation slab = D = 550.0 mm
Clear cover = c = 75.0 mm
Unit weight of soil = γ = 18.0 kN/m3
Elastic modulus of concrete = Ec = 2.80E+04 N/mm2
Elastic modulus of reinforcement = Es = 2.00E+05 N/mm2
Design allowable crack width = w = 0.15 mm

1.2 Foundation GA FX
(X)
h 0

FZ
b
L = 0.75 (Z) 0.55

B = 0.75
1.3 Check for bearing pressure
Base area & size of footing
Design service load = P1 = 13.47 kN NODE-7, LC 102

Design service moment(Mx) = MX1 = 0.00 kN.m


Design service moment (Mz) = MZ1 = 0.00 kN.m
Maximum horizontal force (Fz) = FZ = 0.23 kN
Maximum horizontal force (Fx) = FX = 1.27 kN
Lever arm for Hor.load (from fdn base) = Hq = 0.55 m
Self weight of footing = w1 = 7.73 kN
Self weight of pedestal = w2 = 0.00 kN
Self weight of earth on footing = w3 = 0.00 kN
Total vertical load on the foundation = P = 21.20 kN
Area of base required = (A)req. = P / qs
= 0.19 m2

33-TS-01&2
Length of footing = L = 0.75 m
Width of footing = B = 0.75 m
Area footing provided = A = 0.56 m2
> (A)req. OK
Bearing Pressure(Serviceability)
Additional moment about X due to F Z =MX2 = F Z * Hq = 0.1 kN.m
Additional moment about Z due to F X =MZ2 = FX* Hq = 0.7 kN.m
Total moment about X on foundation = Mx = 0.13 kN.m
Total moment about Z on foundation = Mz = 0.70 kN.m
Eccentricity due to moment Mx = ez = 0.01 m <B/6 OKAY
Eccentricity due to moment Mz = ex = 0.03 m <L/6 OKAY
2
Base pressure due to axial force (P/A) = p1 = 37.7 kN/m
Base pressure due to moment (Mx) = p2 = 1.8 kN/m2
Base pressure due to moment (Mz) = p3 = 9.9 kN/m2
Maximum base pressure = pmax = 49.4 kN/m2
< 109.9 kN/m2 OK
Minimum base pressure = pmin = 26.0 kN/m2
> 0 kN/m2 OK
1.4 Calculation for design moment
Load factor for ultimate design, LF = 1.6
Bearing pressure for Design (Ultimate state)
Design maximum bearing pressure = LF. pmax = 79.1 kN/m2
Pressure due to wt. Of soil,base slab = = -22.0 kN/m2
Net upward design pressure = = 57.1 kN/m2

57.09 kN/m2

Conservativly assuming maximum bearing pressure on both the sides


Moment along L (M)L = B*[((L-b)/2)2/2]*qmax
= 0.0 kN.m
Moment along B (M)B = L*[((B-h)/2)2/2]*qmax.
= 0.0 kN.m

33-TS-01&2
1.5 Calculation for reinforcement.
1.5.1 For moment along ' L ' :-
Effective depth = d = 457.0 mm
The ratio = k = (M)L / bd2fcu
= 0.000
Lever arm = z = d (0.5+(0.25 - k/0.9) 0.5) 3.4.4.4
= 457 mm Part 1
Lever arm = (z) Max. = 0.95d
= 434 mm
Therefore the design "z" value = z = 434 mm
Reinforcement required = As = (M)L / 0.95 f y z
= 0 mm2
= (As)Min. = 0.13%
= 165 mm2
(As)Pro. in 0.75 m wide base = 679 mm2
6 T 12 > 165 mm2 OK
1.5.2 For moment along ' B ' :-
Effective depth = d = 457.0 mm
The ratio = k = (M)B / bd2fcu
= 0.000
Lever arm z = d (0.5+(0.25 - k/0.9) 0.5)
= 457 mm
Lever arm (z) Max. = 0.95d
= 434 mm
Therefore the design "z" value = 434 mm
Reinforcement required = As = (M)B / 0.95 f y z
= 0 mm2
= (As)Min. = 0.13%
= 536 mm2
(As)Pro. in 0.75 m wide base = 679 mm2
6 T 12 > 536 mm2 OK
1.5.3 Punching shear check at column face
Column Perimeter = Sp = 2a+2b
= 3000
Factored column load, P = LF(P1+W 2) = 21.552 kN
Shear stress = Vc = P / (Sp * d)
= 0.02 N/mm2
< 4.38 N/mm2 OK
1.5.4 Punching shear check at 1.5d from the column face.
The steel ratio = 100As / bd = 0.20 %
The ratio = 400/d = 0.88
The design value of 400/d = 1.00
Ultimate shear capacity = vc = 0.39 N./mm2
Critical perimeter = P = Column perimeter + (12d)
= (2b+2h) + (12d)
= 8484 mm

33-TS-01&2
Area with in the perimeter = A' = (b+3d)*(h+3d)
= 4.50 m2
Average earth pressure = 57.1 kN/m2
Punching shear force = V = Earth pressure x (A - A')
= -224.7 kN
Punching shear stress = v = V / (Perimeter x d)
= -0.06 N/mm2
< 0.39 N/mm2 OK
1.5.5 One-way shear check at 1.0 d from the column face
The footing cantilever length = (B-h)/2 = 0m
Effective shear length (Dist of critical section from footing edge) = -0.46 m
Shear force at critical section = V = -19.6 kN
Shear stress = v = V/bd
= -0.06 N/mm2
< 0.39 N/mm2 OK
1.6 Crack width calculation
Steel ratio provided = ρ = (As)Prov. / bd
0.0020
Modular ratio = αe = Es / (Ec/2)
2.00E+05
1.40E+04
= 14.29
αe * ρ = 0.028
0.5
x /d = αe*ρ {[1+ (2 /αe*ρ)] - 1}
= 0.211
Depth of neutral axis = x = 96.5 mm
Lever arm = Z = d - X/3
= 424.8 mm
Concrete compressive stress = fcb = 2Ms / Z b x
= 0.00 N/mm2
Tensile stress on steel = fs = Ms / Z As
= 0.0 N/mm2
Check stress levels:-
Allowable comp. stress in concrete = fcb' = 0.45 fcu
= 13.5 N/mm2
> fcb
Allowable tensile stress in steel = f s' = 0.8 fy
2
= 368.0 N/mm
> fs
(D-x) * fs
Elastic strain at surface = E1 =
(d-x) * Es
= 0.00E+00

33-TS-01&2
Stiffening effect of concrete (For bt * (D - x) * (a' - x)
bending only) = 3*Es * As * (d - x)
= 1.05E-03
Em = E1- Stiffening effect of concrete
= -1.051E-03
Acr = [(Spacing/2) 2+(c+ Dia./2) 2]0.5 - Dia /2
= 92.4 mm
3 * Acr * Em
Crack width
= 1+2[(Acr-Cmin.) / (D-x)]
= 0.00 mm
< 0.15 mm OK

1.7 STABILITY CHECK


1.7.1 For Sliding
Resultant Horizontal force = Htotal = 1.29 kN

Total vertical force = Ptotal = 21.20 kN


Frictional resistance = µPtotal = 8.48 kN (m=0.4)

Factor of safety against sliding = 6.57


> 1.50 OK
1.7.2 For Overturning
For Moment Mx:
Overturning moment = MX = 0.1 kN.m
Restoring moment at base = MR=P.B/2 = 8.0 kN.m
Factor of safety against overturning = 62.86
> 1.50 OK
For Moment Mz:
Overturning moment = MZ = 0.7 kN.m
Restoring moment at base = MR=P.L/2 = 8.0 kN.m
Factor of safety against overturning = 11.38
> 1.50 OK
1.7.3 For Uplift
Since there is no uplift force acting on the foundation, check for uplift not required.

Note : Since this foundation is connected to the Grade slab at all sides Sliding check is not performed.