2.2.6.4 Risk Assessment-Wg
2.2.6.4 Risk Assessment-Wg
CCP
RISK Overall risk
Machine Calibration Machine CHECK Manufacturing when CCP was out of MONITORING & Review &
SECTION IDENTIFICATION RISK CATEGORY REASON OF RISK Severity Likelihood Risk Level HOW TO CONTROL PPE CCP Accept/Reject Limit Acceptable = YES Remarks
used requird Condition POINT Paramiter Tolerance RESPENSIBILIT monitoring
AREA Not Acceptable =NO
Y
why- if they used hazard chemical in dying stage.
If found 100%
why- if should not meet AZO standard.
If lab test was fail by third party requirement QA manager take
Why- if not meet others standrad,color fastness, color fastness we should test by 3 the party with color fastness, Merchandiser Chemical test
CHEMICIAL HAZARD MEDIUM LOW MEDIUM we will lab- test before cutting the fabric. by 3th party YES YES Good N/A yes yes then we make a CAP follow as filup than it the test report by YES
to rubbing, fabric weight Etc. color fastness to rubbing, fabric weight etc. manager report is corrected
per our factory SOP. will be accept marched.
why- after wearing the garments it can cause severe human
Otherwise Will be reject.
disease
PHYSICAL HAZARD N/A
why - if fabric construction not match with approved standerd. 1)We will Fabric inspection of 10 % rolls of every shipment.( 4 If found 100%
we have fabric inspection qc he check & make a
STORE FABRIC why-if fabric width uneven. point system). 2) Shrinkage test 10 % for cotton & Nylon 100%
reports before production as 4 point
We received fabric from supplier. requirement
Merchandiser QA manager review Mill & shrinkage is
QUALITY HAZARD Why- if inspection is fail as per 4 point system. MEDIUM MEDIUM HIGH for Spandex rolls of every dye lot shipped.3)Shade check 100% YES YES Good N/A yes yes if remain fabric inspection is fail filup than it YES
system,shrinkage test,shade check & make the manager the report every lot. corrected
why-if found shrinkage variation is more then the garments rolls for all wash goods and if non wash 100% rolls of every then we follow our factory SOP. will be accept
report,
tolerance. suppler dye lot shipped. Otherwise Will be reject.
If found 100%
why- if they used hazard chemical in dying stage.
we should test with gmts by 3 the party with color If thread inspection is fail then we requirement QA manager take
why- if should not meet AZO standard. Merchandiser Chemical test report
CHEMICIAL HAZARD MEDIUM LOW MEDIUM we will full lab- test before ship the goods. by 3th party YES YES Good YES yes fastness, color fastness to rubbing, fabric weight yes make a CAP follow as per our filup than it the test report by YES
Why- if not meet others standrad,color fastness, Etc. manager is corrected
Etc. factory SOP. will be accept marched.
why- after wearing the garments it can cause human disease
Otherwise Will be reject.
If found 100%
why-if it will be sharpness . 1) we will check 100% zipper before attached. 2) during the we are following AQL 1.5 zipper check & 100% If accessories inspection is fail requirement Trims inspection
Quality Officer will QA manager review
PHYSICAL HAZARD why-if it will Insecure. MEDIUM MEDIUM HIGH zipper attach we will train the operator if found in secure zipper N/A N/A N/A N/A yes zipper are passed metal detection machine before yes then we make a CAP follow as filup than it YES and metal detector
monitoring hourly the report every day
why- after wearing the garments it can cause human disease then don't attach it should return to supervisor. attach for metal free. . per our factory SOP. will be accept report is corrected
Otherwise Will be reject.
STORE Zipper
why-if zipper inspection is fail . 1) we will check 100% zipper before attached. 2) during the If found 100%
why-if zipper not pass the metal detection machine. zipper attach we will train the operator if found in secure zipper we are following AQL 1.5 zipper inspection & 100% If accessories inspection is fail requirement Trims inspection
Quality Officer will QA manager review
QUALITY HAZARD why- if found color shading. MEDIUM LOW HIGH then don't attach it should return to supervisor.3) Before N/A N/A N/A N/A yes zipper are passed through metal detection machine yes then we make a CAP follow as filup than it YES and metal detector
monitoring hourly the report every day
Why - if tape reject. attached the Zipper we check ferus free throuh metal detection before attach the gmts . per our factory SOP. will be accept report is corrected
why - if measurement not match with approved trims card. machine. Otherwise Will be reject.
1) we will check mold before attached. 2) during the 1) we will check mold beforeattached & we make QA manager review
why-if it will be sharpness .
BTN the mock up. document the pull
why-if it will not attc properly. We wil follow our factory SOP & If found 100% requirement fill up than it
PHYSICAL HAZARD MEDIUM MEDIUM HIGH attach we will train the operator . YES YES Good YES yes 2) during the BTN attach we will train the operator . Mechanic INCH test & operator Yes
Why - if it is not match with Rivet supplier instructio for calibration. will be accept Otherwise Will be reject
3) after attached the BTN & Rivet we check by pull test machine 3) after attached the BTN & Rivet we check by pull training report check
& BTN.Why- after warning it was harmful.
as per factory SOP. test machine as per SOP every day
QA MANAGER &
1. Store molds in clean, dry conditions to prevent microbial SAFETY OFFICER
Iwhy- in damp storage conditions, molds may harbor microbial Ensuring the mold meets dimensional accuracy If found 100% requirement fill up than it
BIOLOGICAL HAZARD MEDIUM MEDIUM HIGH growth. YES YES Good YES yes gate location and size. Mechanic INCH REVIEW THE Yes pinch setting report
growth that could pose health risks. requirements. will be accept Otherwise Will be reject
2. Periodically disinfect molds and surrounding storage areas. PINCH SETTING
REPORT
MOULDS,
STORE DIES,
MACHNERY Why- If it will be not machine setup 1) we will check data sheet QA manager review
We change the machine
Why-If -if it will not attc properly. 1) we will check data sheet 2) during the heat seal document the pull
immediately & take If found 100% requirement fill up than it
QUALITY HAZARD Why - if it is not match with data sheet exm: time pressure & MEDIUM LOW HIGH 2) during the heat seal attach we will train the operator . YES YES Good YES yes attach we will train the operator . Mechanic INCH test & operator YES
necessaryaction as per factory will be accept Otherwise Will be reject .
temperature 3) after attached the heat seal we check by wash test . 3) after attached the heat seal we check by wash training report check
SOP
why- If will not pinch setyting test . every day
If found 100%
why-efect lungs. chemical test report
LUBRICATIN If LUBRICATING test is fail then requirement Machanic INCH
why-irretation 1) we will test OIL before use.2) secondary containmain need and operator PPE
STORE PHYSICAL HAZARD MEDIUM MEDIUM HIGH N/A N/A N/A YES yes We are following factory SOP . yes we will follow as per our factory filup than it Machanic INCH review the report YES
S & OIL Why -Skin desase . to use properly.3) we use PPE before handaling. training report is
SOP will be accept every day
Why -HBS ag+. corrected
Otherwise Will be reject.
BIOLOGICAL HAZARD N/A
QUALITY HAZARD
REGULATORY HAZARD N/A
BEHAVIOR HAZARD N/A
DURABILITY HAZARD N/A
why- if they used hazard chemical in printing stage. Check before starting production According to Data sheet. Machanic INCH
Daily maintainance
CHEMICIAL HAZARD Why- if not meet color standard. MEDIUM MEDIUM HIGH Pressure- 3-4 kg , Time: 12-16 , Temperature: 115 -130 degree YES YES Good YES yes Inspection with keeping record yes Machanic INCH review the report YES
record
Why- if color is bleeding. celcius. every day
Internal audit team will check machine calibration Machanic INCH
Daily maintainance
PHYSICAL HAZARD Why- If Machine not Calibrated MEDIUM MEDIUM HIGH We should calibrate m/c at every 6 month by third party YES YES Good YES yes frequently & Yearly calibration will conducted by 3rd yes Should be proper maintainance If Pressure- 3-4 kg , Time: 12-16 , Machanic INCH review the report YES
record
party. and set the machine as per data Temperature: 115 -130 degree celcius. every day
sheet then m/c should be run Then accept, if not then reject
BIOLOGICAL HAZARD
REGULATORY HAZARD
BEHAVIOR HAZARD
DURABILITY HAZARD
If found 100%
1) we will follow sharp tool policy in factory. 2)
why-if it will be missing or uncountable . 1) we will follow sharp tool policy in factory. 2) sharp tool If sharp tool control is out of requirement complaince Sharp toos record &
sharp tool keeped area should be secure with log & QA manager review
PHYSICAL HAZARD why-if sharp tools issue area is insecure. MEDIUM MEDIUM HIGH keeped area should be secure with log & issue & replace & N/A N/A N/A N/A yes yes Tolerance then we make a CAP filup than it manager will YES inventory record
issue & replace & balance report should be keep the report every day
why- after wearing the garments it can cause human disease balance report should be keep properly. follow as per our factory SOP will be accept monitoring hourly corrected
properly.
Otherwise Will be reject.
SEWING sharp tools
BIOLOGICAL HAZARD N/A
QUALITY HAZARD N/A
REGULATORY HAZARD N/A
BEHAVIOR HAZARD N/A
DURABILITY HAZARD N/A
If found 100%
why-if price not match with po sheet.
1) we will check Waist Tag as per AQL 1.5 before attached. 2) If accessories inspection is fail requirement quality in charge
why-if language is mistake. Why- if later is we have trims inspection qc she check & make a QA manager review
REGULATORY HAZARD MEDIUM LOW MEDIUM during the attaching we check finishing line also as per AQL N/A N/A N/A N/A yes yes then we make a CAP follow as filup than it will monitoring YES
missing. reports before production. the report every day
1.5 hourly basis. per our factory SOP. will be accept hourly
why -if bar cord number not match with po sheet.
Otherwise Will be reject.
If found 100%
why- if they used hazard chemical in printing stage. we have trims inspection qc she check & make a If accessories inspection is fail requirement QA manager take
merchandiser
CHEMICIAL HAZARD Why- if not meet color standard. MEDIUM LOW MEDIUM we should check before use . N/A N/A N/A N/A yes reports before production.& packing stage we has yes then we make a CAP follow as filup than it the test report by YES
manager
why- if color is bleeding. a qc she check hourly basis. per our factory SOP. will be accept marched.
Otherwise Will be reject.
why-if carton dimention not right (not match with PO sheet). We received carton from supplier If found 100%
1) we will check ctn as per AQL 1.5 & po wise
why-if language is mistake. Why- if later is 1) we will check ctn as per AQL 1.5 before start ctn. 2) during see the test report .if remain test requirement quality in charge
before start the production. 2) during the ctn QA manager review
QUALITY HAZARD missing. MEDIUM LOW HIGH the ctn audit will check & make a report as per factory SOP.3) N/A N/A N/A N/A yes yes report is pass then we received filup than it will monitoring YES
audit will check & make a report as per factory the report every day
why- if remain damage. we ensure bursting strength within standard . carton, if remain fail then we will be accept hourly
SOP.
why- if found ply layer strength is not proper. return to supplier & make a CAP. Otherwise Will be reject.
why-if not mention country of origin. We received carton from supplier If found 100%
why-if language is mistake. Why- if later is 1) we will check ctn as per AQL 1.5 & po wise see the test report .if remain test requirement quality in charge
PACKING CARTON REGULATORY HAZARD missing. MEDIUM LOW MEDIUM
1) we will check ctn as per AQL 1.5 before start ctn. 2) during
N/A N/A N/A N/A yes before start the production. 2) during the ctn yes report is pass then we received filup than it will monitoring
QA manager review
YES
the ctn audit will check & make a report. the report every day
why- if not have ctn dimension. audit will check & make a report. carton, if remain fail then we will be accept hourly
why- if weight Colum is missing. return to supplier & make a CAP. Otherwise Will be reject.
1) we will check ctn as per AQL 1.5 & po wise We received carton from supplier If found 100%
why-if bursting strength standard not meet.
before start the production. 2) during the ctn see the test report .if remain test requirement quality in charge
why-if board GSM standard not meet. we will check ctn layer before start bulk production. & we will QA manager review
DURABILITY HAZARD MEDIUM LOW MEDIUM N/A N/A N/A N/A audit will check ctn layer as per standard & make a yes report is pass then we received filup than it will monitoring YES
why- if ctn board layer are un- sufficient follow BST & ECT test report. the report every day
report. 3)during the CTN audit should follow BST & the carton, if remain fail then we will be accept hourly
why-if edgewise crush resistance standard not meet.
ECT test report. return to supplier & make a CAP. Otherwise Will be reject.
100 % do re-screen process do. Follow approved packing trim card and
Provide necessary education how educate all packers and ;set up proper
QA manager / QA
PACKING Packing QUALITY HAZARD
Why- If packing accuracy inaspection fail.
MEDIUM LOW HIGH Conduct the packing accuracy inspection N/A N/A N/A N/A yes
Ensure shipping mark, carton dimension, carton to avoid relevent errors. Fuctional layout before start the packing Packing
AUDITOR REVIEW NO
Packing report
weight, standard, packing sequence ration etc. well layout set up. MANAGER /PSO corrected
REPORT Every day
Ensure to maintain packing Do 100% packing accuracy check
guideline
Do measure Carton weight before send
to carton warehouse
If found 100%
Non-Compliant Labeling: requirement QA manager / QA
Packing Packing report
REGULATORY HAZARD Incorrect or missing labels may result in fines or rejected MEDIUM LOW HIGH Conduct the packing accuracy inspection N/A N/A N/A N/A yes ensure sku check 100% goods need to re check filup than it AUDITOR REVIEW NO
MANAGER /PSO corrected
shipments. will be accept REPORT Every day
Otherwise Will be reject.