0% found this document useful (0 votes)
40 views3 pages

ratol price

Uploaded by

2023426982
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views3 pages

ratol price

Uploaded by

2023426982
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 27.11.2024

Work Item Unit Overall Average (RM)


DRAINAGE WORKs m Location Range (RM) Average (RM) RM 572.10
Precast reinforced concrete pipe culvert including
C 572.10 - 572.10 572.10
jointing.
Class Y
Single
900mm diameter
DRAINAGE WORKs m Location Range (RM) Average (RM) RM 821.10
Precast reinforced concrete pipe culvert including
C 821.10 - 821.10 821.10
jointing.
Class Y
Single
1200mm diameter
DRAINAGE WORKs m Location Range (RM) Average (RM) RM 1159.41
Precast reinforced concrete pipe culvert including
B 800.00 - 800.00 800.00
jointing.
Class Z C 1100.00 - 3000.00 2050.00
Single D 712.00 - 869.57 787.64
1500mm diameter
F 1000.00 - 1000.00 1000.00
DRAINAGE WORKs m Location Range (RM) Average (RM) RM 525.00
NEW PRECAST BOX CULVERT FOR SIZE
E 525.00 - 525.00 525.00
Precast Box Culvert
Box culvert and flat lid including joint.
900mm x 900mm size box culvert
DRAINAGE WORKs m Location Range (RM) Average (RM) RM 776.20
NEW PRECAST BOX CULVERT FOR SIZE
A 700.00 - 860.00 777.40
Precast Box Culvert
Box culvert and flat lid including joint. E 700.00 - 850.00 775.00
1200mm x 1200mm size box culvert
DRAINAGE WORKs m Location Range (RM) Average (RM) RM 950.00
NEW PRECAST BOX CULVERT FOR SIZE
E 950.00 - 950.00 950.00
Precast Box Culvert
Box culvert and flat lid including joint.
1500mm x 1500mm size box culvert
DRAINAGE WORKs m Location Range (RM) Average (RM) RM 2000.00

1/3
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 27.11.2024

Work Item Unit Overall Average (RM)


NEW PRECAST BOX CULVERT FOR SIZE Precast E 2000.00 - 2000.00 2000.00
Box Culvert
Box culvert and flat lid including joint.
3000mm x 3000mm size box culvert

2/3
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 27.11.2024

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: [email protected]