Ravi Shankar Asthana
S/O Late Shri. R.P. ASTHANA
DATE OF BIRTH: 27.09.1971
ADDRESS S-496, Sanskriti Enclave
ELDECO, Uddyan-II
LUCKNOW (U.P.) 226025
Contact No.: 9466500995
6398598772
E-mail
[email protected] [email protected] QUALIFICATION: Degree in electrical engineering from
Delhi Institute of Engineering Studies
after Diploma in Electrical Engineering
completed from UPBTE (LUCKNOW)
Completed MBA with specialization in Project
Management from ISBM (Indore).
EXPERIENCE : Twenty-Seven years (approx.)
Presently associated with M/s L&T Limited since November’17, was constructed 765KV D/C Tamnar-
Dharamjaygarh Transmission Line for M/S Sterlite Ltd up September’18 as Project head.
Successfully completed 765kv S/C Ghatampur-Hapur Transmission Line in Uttar Pradesh for M/s
Ghatampur Transmission Limited as Project Head with zero harm and win ROSPA Silver Award
as well as Safety rolling Trophy also for the Project.
Nature of job
Project Planning & monitoring, setting targets – preparation of project schedules, cost estimation
and Cash Flow projection, provides technical inputs for methodologies of construction,
Execution of Project, ensure Profitability, Man & Material management, responsibility to ensure
optimal utilization of resources, attending review meetings, follow-up, and collection of payment
in time from client.
Worked with M/s Punj Lloyd Limited as Deputy General Manager from Dec’15 to October’17, was
looking after execution of 220kV & 132kV Transmission Line and Sub-station Projects of voltage level
of 220kv/132kv/33kv/11kv at different locations in Madhya Pradesh under Madhya Pradesh Power
Transmission Corporation Limited.
Nature of job
Project Planning & monitoring, setting targets – preparation of project schedules, cost estimation
and Cash Flow projection, provides technical inputs for methodologies of construction,
Execution of Project, ensure Profitability, Man & Material management, responsibility to ensure
optimal utilization of resources, attending review meetings, follow-up, and collection of payment
in time from client.
Worked with M/s GAMMON India Limited as Sr. Manager (Project) from Dec’2012, to
Nov’2015 executed 765kV S/C Meerut - Moga Transmission Line and 765 KV D/C Raipur-
Wardha Transmission Line under Power Grid Corporation of India Limited.
Nature of job
Project Planning & monitoring, setting targets – preparation of project schedules, cost estimation
and Cash Flow projection, Provides technical inputs for methodologies of construction &
Preparation of Progress Reports.
Man & Material management, responsibility to ensure optimal utilization of resources via
coordination and mobilization of resources sharing among various teams working at site,
allocation of tasks within teams, based on skills profile.
Handling material management for site and coordination with store personals to estimates
quantities & placing requirement of materials for construction.
Co-ordination with the client & designers and attending review meetings
Preparation bills for payments and collection of payment in time from client.
Checking & verification of sub-contractor’s bill after joint inspection.
Manage statutory clearances, right of Way (ROW) issues & resolve routine problems.
Ensure timely completion of work within the budget maintaining quality and implementation of
Environment, Health & safety measure.
Worked with M/s LANCO Infratech Limited as Sr. Manager Project from April’2010 to Nov’2012
and looking after execution of 400 KV D/C Transmission Line at Bilaspur (CG)
Nature of job
Project Planning & monitoring, preparation of project schedules & Progress Reports.
Man & Material management, responsibility to ensure optimal utilization of resources via
coordination and mobilization of resources sharing among various teams working at site,
allocation of tasks within teams, based on skills profile.
Handling material management for site and coordination with store personals to estimates
quantities & placing requirement of materials for construction.
Co-ordination with the client & designers and attending review meetings
Preparation bills for payments and collection of payment in time from client.
Checking & verification of sub-contractor’s bill after joint inspection.
Manage statutory clearances, right of Way (ROW) issues & resolve routine problems.
Ensure timely completion of work within the budget maintaining quality and implementation of
Environment, Health & safety measure.
Worked with Transmission & Distribution division of M/S ASTER Teleservices Pvt. Limited
Hyderabad from September’2008 to March’ 2010 as Project Manager
Nature of job
Project Planning, Project Monitoring, Man & Material Management, and Co-ordination with working
agencies & Clint for Execution of 400 KV Transmission Line under Power Grid Corporation of India
Limited.
Worked with M/S Subhash Projects & Marketing Limited, from May’ 2006 to August’ 2008 as
Manager Projects at their different Project sites.
Nature of job
Project Planning, Project Monitoring, Man & Material Management, and Co-ordination with
working agencies, consultant & Clint. Executions of Projects related to Transmission Line,
APDRP Project & Sub-Station projects up to 220 kV.
Worked as Chief (Electrical & Automation), with M/s. Siazar Metaliks Pvt Ltd. From 26th March 2004
to 31st March 2006 on contract basis.
Nature of job
Detail Engineering, Equipment selection, Estimation and Costing, Ordering, Project planning &
Monitoring for 64M3 Blast Furnace. Finalization & Co-ordination with working agencies for
Installation testing and commissioning of electrical equipments related to following systems;
Equipments related to 33KV Transmission line & 33KV Substation, 2000KVA- 33/0.415 KV
Transformer, 2X500 KVA Gen. Sets., Auto Synchronizing Panel, Power Distribution System,
Motors up to 200KW, 30KW AC Drive, PLC Panel, Power, Control, Compensating and
Communication cable laying and Termination. Installation, testing and commissioning of
Process related instruments like Temperature, Pressure and flow measurement and control.
Instrumentation and Automation job for 64M3 Blast Furnace. Equipments related to illumination
system of office building and plant area.
Worked with M/S ARJEE CONSULTANCY SERVICE DURG (CG) as Electrical Engineer
from April 2001 to March 2004
Nature Of job
Detailed engineering of electrical, instrumentation and automation system for 64 M3 Blast
Furnaces including Power, control, Compensating and communication cable length and core
calculation P.L.C size calculation, estimation of cable length, cable trays, No of I/Os in PLC as
per the client’s requirement, power & control cable scheduling. Site visits for clarification and
solve electrical and automation related problem during execution of projects.
Worked as Jr. Electrical Engineer with M/s Malvika Steel Limited. An Integrated steel plant
situated at Industrial Area Jagdishpur Sultanpur (U.P.) from October’1994 to March’2001.
Nature of job:
Associated in Erection, Testing & Commissioning of 2X50MVA Transformer 220 KV Sub-
Station, 220KV DC Transmission Line, Power distribution system for raw material handling and
following Equipment’s: -
Equipments related to Wagon tippler, Stacker cum re-claimer, Conveyors drive, and diesel-
electric locomotive. Transformers up to 1.6 MVA 6.6 KV/.44KV oil filled and dry type,
Induction Motors (squirrel cage, slip ring). Dc Motors up to 6.6 KV with their starters as direct
on line, star/delta and AC B fed, Switch gears and Switch board voltage rating, .44 K.V. and 6.6
K.V. sf6 breakers ABB make, Air circuit Breakers L&T make, Battery Bank and their charger,
A.C & DC drives used for speed control of Motors, Programmable logic controller., Capacitor
banks used for power factors correction purpose, Centralizes air Conditioning Plant,
Maintenance of E O T cairns, Radio frequency dryer, shrink wrapping machine, Instruments use
for controlling and indication purpose like level controller, Temperature controller, humidity
controller, photocells, Thermostats etc.
Estimation, planning & supervision of scheduled Maintenance of all electrical equipments for
raw Material handling system.
Worked with a centralized maintenance team for whole plant in shift also provide service for
smooth operation from electrical side for hamper less production and better productivity.
I had been worked as a J.E. (Elect.) with project Department of M/s.M.V.V.V.V.NOIDA from
26th Nov.1992 to 15th July 1993.
Nature of job:
Operation & Maintenance of Power Sub-Station used for their own town ship purpose, D.G. sets,
transmission line, Power transformer, distribution substation Distribution Lines, Air
Conditioning plant, Wiring and Household Equipments.
Training:
One-year Apprenticeship training at N.T.P.C. Rihand from 16/07/1993 to 15/07/1994, covering
operation & maintenance of electrical equipments used in a 2X500 MW Power Plant.
Twenty-nine weeks Training on Erection Testing & Commissioning operation & Maintenance of
All electrical equipment used is an integrated steel plant at N.P.T.I. Durgapur (W.B)
Attended seminar on Low Voltage switchgear training at L & T switchgear Training Center
Lucknow
Undergone training on operation and maintenance of medium voltage (6.6 K.V.) Switchgear at
A.B.B Nasik
Operation & Maintenance of Electrical System of Diesel Electric Locomotive at B.H.E.L.
(Jhansi)
Attended seminar on Integrated Management System (EMS/OHSAS) awareness program
Working Experience of MS PROJECT, ERP (Entrepreneur Resource Planning) & SAP
software
Date: 20
11.04.2022
RAVI SHANKAR ASTHANA