0% found this document useful (0 votes)
25 views2 pages

Unpriced BOQ For - LasoCurdin - School

Bill of quantity lascurdin

Uploaded by

Saciid Laafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views2 pages

Unpriced BOQ For - LasoCurdin - School

Bill of quantity lascurdin

Uploaded by

Saciid Laafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

BILL OF QUANTITIES FOR CONSTRUCTION OF 1 NEW SCHOOLS (CONSISTING OF: 3 CLASSROOMS WITH

OFFICE, STORE, 2 TWIN LATRINES, WATER STORAGE AND FENCE) IN LASOCURDIN, SOOL, PUNTLAND.
I'o
Unit Cost Total Amount
Item Description Unit Qty US$ US$
I) CONSTRUCTION OF 3 CLASSROOMS WITH OFFICE & STORE
A) FOUNDATION, EXCAVATION & CONSTRUCTION
1
Clear the site from debris, and loose materials,
backfill and level the existing garbage pit and set out
for the excavation, clearing of soft sand from school,
including all remaning construction materials,
excavated soil from latrines pits, level the yard and
prepare the site for handover. M2 1,600.00 $ 0.50 $ 800.00
2 Excavation of foundation strip trench 50cm deep M3 24.140 $ 10.00 $ 241.40
3 Lay at the bottom of excavated trenches 50mm of
blinding lean concrete (1:4:8) (120.7x0.4x0.05)m M3 2.4140 $ 10.00 $ 24.14
4
Provision and construction of foundation stone wall.
all joints between stones should be filled with
cement/sand mortar with 1:4 ratio. Minimum height
of the foundation wall from the Ground level is 40
cm. (120.7x0.40x0.85)m. M3 41.0380 $ 63.00 $ 2,585.39
5
Construction of 4 veranda steps with stone wall
including plastering and 2.2 M wide slope for
wheelchairs 6m long with handrail-GI made using
1.5inch GI ClassB pipe as approved by SCI. all joints
between stones should be filled with cement/sand
mortar with 1:4 ratio. Plastering mortar should be 1:3
cement/sand ratio lump sum 1.00 $ 1,000.00 $ 1,000.00
6
Provide 10mm thick, 60cm wide of blinding lean
concrete (1:4:8) plinth protection around the
perimeter of classrooms. Level the ground and
provide necessary compaction before concreting
(48.5x0.1x0.06)m M3 0.29 $ 450.00 $ 130.95
B) FLOOR CONSTRUCTION

Provide and lay a 450mm thick hard coare and


stone. Top 70mm should be stone and aggregate to
1 fill up well levelled and compacted (203.15x0.450). M3 91.41750 $ 25.00 $ 2,285.44

Construction of 40 cm thick and 20cm wide R.C


continues roof lintels 1:2:3 ratio with 4 nos 12mm
ray-bars and 6mm dia staffs c/c 40cm. Including
Roof lintel with same diamensions and reinforced
2 with bars over verandah. M3 9.6560 $ 450.00 $ 4,345.20
FLOOR SLAB 150mm THICK C25 CONCRETE
WITH T8@200mm MESH REINFORCEMENT
3 ON DAMP PROOF MEMBRANE.(203.15x0.15). M3 30.4725 $ 200.00 $ 6,094.50
C) WALL CONSTRUCTION $ -

Construction of 20 cm R.C continues lintels 1:2:3


ratio with 4 nos 12mm ray-bars and 6mm dia staffs
1 c/c 40cm. This includes concrete window overhungs M3 6.6595 $ 300.00 $ 1,997.85
Construction of 15 cm R.C continues lintels 1:2:3
ratio with 4 nos 12mm ray-bars and 6mm dia staffs
2 c/c 40cm. This beam is under windows. M3 2.8740 $ 300.00 $ 862.20

Construction of 40 cm thick and 20cm wide R.C


continues roof lintels 1:2:3 ratio with 4 nos 12mm
ray-bars and 6mm dia staffs c/c 40cm over the
verandah while 20cmx20cm top lintel beam to be
provided over the block walls with 6mm bars to hold
3 the roof trusses. M3 5.96 $ 300.00 $ 1,788.00
Construction of 20 cm thick block walls, with
4 cement/sand mortar 1:4 ratio. M2 242.15 $ 21.00 $ 5,085.15
Provision and fixing of R.C columns 1:2:3 with 4 nos
12mm ray-bars and 6mm dia staffs c/c 40cm
veranda posts and within block walls. size of each
5 column 32X(0.2mx0.2mx3.2m) M3 4.1 $ 300.00
D) ROOF CONSTRUCTION
1
Roofing with pre-painted iron corrugated sheets # 30
gauge, with timber roof trusses c/c 1.4m. All the roof
trusses should be anchored with 6 mm dia. bars in
the concrete roof lintel. Roof purlins at gable ends
should be anchored with 6 mm dia. bars, flat metal
sheet should be anchored where trusses and purlins
meet. king post is 2.2m high M2 286.88 $ 25.00 $ 7,171.97
2 Fixing 6mm laminated ceiling board completed with
50x50cm ceiling joists c/c 60 cm for all classrooms
and the varenda and all roof eaves. M2 233.8 $ 15.00 $ 3,506.70
3 Fascia board 20cm (57.72) M2 11.5 $ 20.00 $ 230.88
E) PLASTERING & PAINTING $ -
1 External foundation stone walls plastering 20mm
thick mortar 2(coats), Morter with 1:3 cement/sand
ratio M2 29.1 $ 15.00 $ 436.95
2 Internal and external block walls plastering 20mm
thick mortar 2(coats), Mortar with 1:3 cement/sand
ratio including verandah columns M2 595.1 $ 8.00 $ 4,760.96
3 Provide and apply to all external and internal walls
white washing 2(coats) M2 624.2 $ 2.50 $ 1,560.62
4 2 coats of internal and external walls emulsion
painting. M2 624.2 $ 3.00 $ 1,872.75
5 Two coat of gloss paint on fascia board M2 11.5 $ 20.00 $ 230.88
F) DOORS & WINDOWS $ -
1

Supply and install 2 leaf doors (2.1 x1.2) m. Doors


should be made 1.2mm steel sheet with 25x25
hallow box tubes for all the classrooms complete with
locks, hinges and painting. Door lock-Orlando made
in italy Safety rim dead lock - 6 turns -Original N0 5.0 $ 220.00 $ 1,100.00
2

Supply and install 2 leafs steel windows, each leaf


should be divided into 2 sections vertically which can
be openable with external security bars, (1.2 x1.2) m.
windows should be 1.2mm still sheet with 25x25
hallow box tubes including locks, hinges and painting N0 19.0 $ 160.00 $ 3,040.00
G) BLACKBOARD $ -
Provision and fixing of Blackboards made of one
complete 9mm plywood size (1.2 x 2.4) with
1 (25x50)mm wooden frames and chalk holders N0 3.0 $ 300.00 $ 900.00
H) VISIBILITY $ -

Supply and install visibility billboards of the size


1 (120x120) with 2.5x5 hallow box tubes frame and 2
inch GI pipe posts with 40x40 concrete footing. The
project and logos of the donor and the implementer
should be painted on the billboard as per the design N0 1.0 $ 150.00 $ 150.00
I) ELECTRIFICATION $ -
Provide complete electrification fourteen 8 watt
1 lights, four 3-pin sockets, switches and all necessary
installation sundries. Saudi type wires must be used
as approved by an engineer L/sum 1.0 $ 500.00 $ 500.00
SUB-TOTAL (I)-CONSTRUCTION OF 3
CLASSROOMS WITH OFFICE, STORE $ 52,701.93
II) CONSTRUCTION OF TWIN LATRINES $ -
Item Description Unit Qty
I FOUNDATION EXCAVATION & CONSTRUCTION $ -
1 Excavate latrine pit 1.5m x2m x3m deep M3 9.00 $ 35.00 $ 315.00
2 Excavate foundation for pit slab 80cm deep (pit
lining) M3 2.752 $ 35.00 $ 96.32
3 Excavate foundation for stone wall foundation
0.3m deep M3 2.088 $ 35.00 $ 73.08
4 Lay at the bottom of excavated trenches 50mm
of blinding lean concrete (1:4:8) M3 0.348 $ 150.00 $ 52.20
5 Construction of 40cm thick stone masonry
foundation walls supporting pit slab (80cm deep)
using 1:6 c/s mortar. M3 2.75 $ 70.00 $ 192.64
6 Provision and construction of foundation stone
wall. all joints between stones should be filled
with cement/sand mortar with 1:6 ratio.
Minimum height of the foundation wall from the
Ground level is 20 cm. total foundation hight is
45cm from the blind concrete. as approved by
an Engineer.
M3 3.13 $ 70.00 $ 219.24
II CONCRETE WORKS $ -
1 Ground beam- Providing and laying 15 cm thick
cement concrete mix ratio (1:2:4) including
formwork, Provide 3 nos of bars of Y 10mm
steel reinforcments with y6mm links at 30cm c/c
as directed by an Engineer. M3 1.04 $ 200.00 $ 208.80
Middle precast RCC over doors- Providing and
laying 10 cm thick cement concrete mix ratio
(1:2:4) including formwork, Provide 3 nos of
bars of Y 10mm steel reinforcments with y6mm
links at 30cm c/c as directed by an Engineer.
The size of the precast 2x(20cmx10cmx150cm)
2 M3 0.06 $ 450.00 $ 27.00
Top ring beam- Providing and laying of 15 cm
thick cement concrete mix ratio (1:2:4) including
formwork, Provide 4 nos of bars of Y 10mm
steel reinforcments with y6mm links at 30cm c/c
3 as directed by an Engineer. M3 0.293 $ 450.00 $ 131.85
4 Construction of (2.3mx2.8mx0.2m thick) R.CC
cover slab- concrete mix ratio (1:2:3) with 20mm
thick maximum aggregate size including
formwork. Provide Y12mm steel @200mmc/c
both ways, provided with a (500 x 500mm)
cleaning manhole or desludge. Including
flushing the parts of foundation wall above the
ground level.
M3 1.288 $ 450.00 $ 579.60
III FLOOR CONSTRUCTION $ -
Provide and lay a 350mm thick stone fill up well
compacted and levelled as approved by an 1.852
1 Engineer. M3
$ 70.00 $ 129.61
5 cm thick plain cement concrete flooring of ratio
1:3:6, floor slab should slope towards door as 0.420
2 approved by an Engineer. M3 $ 150.00 $ 63.00
Construction of door steps with stone masonry
including concrete screed. Provide minimum 2
steps, the width of the steps should be 1.4 M
wide. All joints between stones should be filled
with cement/sand mortar with 1:3 ratio as
approved by an Engineer.
3 L.M. 1.00 $ 78.00 $ 78.00
Construct 2 foot rests- 40cmx60cm, using
blocks, the cost plastering and the 6inch delivery
pipe, connected well to the septic tank as
approved by SCI engineer
4 No 2.00 $ 250.00 $ 500.00
Construct 2 hand washing Basins (HWB)
(35cmx45cmx80cm high) No.s 2, using blocks
complete with, plastering, whitewashing,
painting, trap and drain pipes (2 inch) connected
5 to the septic tank.as approved by an Engineer No 2.00 $ 400.00 $ 800.00
Provision and installation of 3 inch PVC vent
pipe(3m high from the pit slab with flyscreen)
vent pipe should be at least 20 cm below the pit
slab, and fixed firmly on the adjecent wall
6 L.M. 1.00 $ 450.00 $ 450.00
IV BLOCK WALLING $ -
1 Construction of 20 cm thick hollow concrete
block walls with cement/sand mortar 1:4 ratio as
approved by an Engineer. M2 34.30 $ 21.00 $ 720.30
2 Construct N.os 2, size 50cmx50cm RCC
ventlation grills completed with paintings as
approved by an engineer No 2.00 $ 350.00 $ 700.00
V ROOFING WORKS $ -
1 Supply and fix roofing using prepainted iron
corrugated sheets # 30 gauge with timber roof
rafters c/c 1.4m. All the roof trusses should be
anchored with 6 mm dia. bars in the concrete
top beam. Flat metal sheet should be anchored
where trusses and purlins meet. There should
be an overlap of minimum 10cm between the
two overlapping CGI sheets as approved by an
Engineer.
M2 7.8463 $ 30.00 $ 235.39
2 Provide and fix 15cmx2.5cm timber fascia board
under all eaves and paint and approved by an
Engineer. L.M. 1.00 $ 50.00 $ 50.00
VI DOORS $ -
1 Supply and install 1 leaf doors (2 x0.8) m for
latrines. Door should be made of 1.0mm steel
sheet with 25x25 hallow box frame completed
with locks, hinges and painting. Door lock-
orginal Safety rim dead lock -Original as
approved by an Engineer
No 2.00 $ 200.00 $ 400.00
VII PLASTERING & PAINTING WORKS $ -
1 Plastering external and internal walls with 1:3
c/s mortar as approved by an Engineer. M2 73.36 $ 8.00 $ 586.88
2 Whitewash external and internal walls. 2 coats
as approved by an Engineer. M2 73.36 $ 4.00 $ 293.44
3 Paint external and internal walls. 2 coats as
approved by an Engineer. M2 73.36 $ 5.00 $ 366.80
Total for construction of 1 Twin Latrines Unit
$ -
Total for construction of 2 Twin Latrines Unit Twin 2
Latrine $ 7,269.14
III) CONSTRUCTION OF WATER STORAGE
TANK $ -
1 Excavate for columns supporting the slab (1m
deepx0.5mx0.5m) M3 1.0 $ 25.00 $ 25.00
2 Column Footings (0.5mx0.5mx0.5m)- Providing
and laying of cement concrete mix ratio (1:2:4)
including formwork, Provide Y 10mm steel
reinforcments double mesh in footings with
10cm c/c spacing and 4 No Y10mm column
starter bars with y6mm links at 30cm c/c at the
starter bars as directed by an Engineer.
M3 0.50 250 $ 125.00
3 Square Columns- Providing and laying of 20cm
x 20 cm x 3.5m high cement concrete columns
with mix ratio (1:2:4) including formwork,
Provide 4 nos of bars of Y 10mm steel
reinforcments with y6mm links at 30cm c/c.
Provide 31 columns spaced at a maximum of
4.8m C/C as directed by an Engineer.
M3 0.56 400 $ 224.00
4 Construction of R.C. top ring beam (40 x 20) cm
1:2:3 ratio with 4 nos 10mm ray-bars and 20cm c/c
staffs. M3 0.88 $ 350.00 $ 308.00
5 Construction of (3mx2.5mx0.2m thick) R.CC
slab- concrete mix ratio (1:2:3) with 20mm thick
maximum aggregate size including formwork.
Provide Y12mm steel @200mmc/c both ways.
M3 1.50 350 $ 525.00
6 Plastering columns and beams with 1:3 c/s
mortar as approved by an Engineer. M2 16.80 8 $ 134.40
7 Whitewash external and internal walls. 2 coats
as approved by an Engineer. M 2
16.80 4 $ 67.20
8
Provide and install plastic tank capacity of 6000 Litters
or 6 cubic meters including transportaiton and
installation cost. Suspend the tank with concrete ring L.S 1.00 $ 500.00
as approved by SCI engineer.
$ 500.00
9
Fill the newly installed fiberglass tank with 6000 litters L.S 1.00 $ 700.00
of drinkable water as approved by SCI engineer
$ 700.00
10
provide portable steel stairs made from 1.5inch GI.
all joints between stones should be filled with
cement/sand mortar with 1:4 ratio. Plastering mortar
should be 1:3 cement/sand ratio and Provide tiling
on top of the stairs L.Sum 1 $ 100.00 $ 100.00
SUB-TOTAL (III) FOR CONSTRUCTION OF
WATER STORAGE $ -
IV) CONSTRUCTION OF FENCE $ 2,708.60
Total Amount
# Description Unit Qty US$
1 Excavation of foundation strip trench 50cm deep and
40cm wide M3 30.08 $ 10.00 $ 300.80
2 Lay at the bottom of excavated trenches 50mm of
blinding lean concrete (1:4:8) M3 3.01 $ 10.00 $ 30.08
3

Provision and construction of foundation stone wall.


all joints between stones should be filled with
cement/sand mortar with 1:4 ratio. Minimum height
of the foundation wall from the Ground level is 30
cm. additional construction due a sloped ground M3 47.12 $ 63.00 $ 2,968.56
4
Construction of enterance gate ramp with stone wall
including plastering and sloped well. all joints
between stones should be filled with cement/sand
mortar with 1:4 ratio. Plastering mortar should be 1:3
cement/sand ratio and provide ceramic tiles broken
on top of the entrance ramp N0 1.00 $ 300.00 $ 300.00
5 Construction of R.C. Foundation ring beam (40 x 20)
cm 1:2:3 ratio with 4 nos 12mm ray-bars and 20cm
c/c staffs. M3 12.03 $ 350.00 $ 4,211.20
6
Construction of 10 cm thick and 25cm wide R.C
continues lintels 1:2:3 ratio with 4 nos 12mm ray-
bars and 6mm dia staffs c/c 40cm as approved by
SCI engineer M3 3.70 $ 150.00 $ 554.25
7 Construction of 20 cm thick block walls and 2m high,
with cement/sand mortar 1:4 ratio. M2 295.60 $ 21.00 $ 6,207.60
8 External and internal foundation stone walls and
ground beam plastering 20mm thick mortar 2(coats),
Morter with 1:3 cement/sand ratio M2 159.0 $ 7.00 $ 1,113.00
9 Internal and external block walls plastering 20mm
thick mortar 2(coats), Mortar with 1:3 cement/sand
ratio including verandah columns M2 654.7 $ 8.00 $ 5,237.76
10 Provide and apply to all external and internal walls white
washing 2(coats) M2 813.7 $ 2.50 $ 2,034.30
11
2 coats of internal and external walls emulsion painting. M 2
813.7 $ 2.50 $ 2,034.30
12 Excavate for columns supporting the main gate
(1mx1mx1m) M3 2.0 $ 25.00 $ 50.00
13 Column Footings (0.95mx0.95x0.5)- Providing
and laying of cement concrete mix ratio (1:2:4)
including formwork, Provide Y 10mm steel
reinforcments double mesh in footings with
10cm c/c spacing and 4 No Y10mm column
starter bars with y6mm links at 30cm c/c at the
starter bars as directed by an Engineer.
M3 0.90 250 $ 225.63
14 Square Columns- Providing and laying of 40cm
x 40 cm x 3.3 cement concrete columns with
mix ratio (1:2:4) including formwork, Provide 4
nos of bars of Y 10mm steel reinforcments with
y6mm links at 30cm c/c. the top 30cm should be
a well decorated column heads including
plastering and painting as directed by an
Engineer.
M3 1.21 400 $ 482.40
15 Square Columns- Providing and laying of 20cm
x 20 cm x 2.1 high cement concrete columns
with mix ratio (1:2:4) including formwork,
Provide 4 nos of bars of Y 10mm steel
reinforcments with y6mm links at 30cm c/c.
Provide 31 columns spaced at a maximum of
4.8m C/C as directed by an Engineer.
M3 2.60 400 $ 1,041.60
16 Provide 6inch diameter hole/outlets for rain
water along the foundation wall and install 6inch
PVC pipes as approved by an engineer L.Sum 1.00 $ 500.00 $ 500.00
17 Supply and install 2 leaf doors (3.0 x3 high) m
for the main gate. Doors should be made 1.2mm
steel sheet with 25x25 hallow box tubes
complete with locks, hinges and painting.
No 1.00 200 $ 200.00
18
Plant 7 trees (Dhamas trees) provide the trees and
excavate 40cm x 40cm x 50cm wide pit and fill it with
firtile soil and construct 40cm high block wall
surrounding the tree (2m long x 20cm wide x 40cm No 7.00 $ 25.00
high) with internal and external plaster, whitewash
and paint as per the drawing and as approved by SCI
engineer
$ 175.00
SUB-TOTAL (IV) FOR CONSTRUCTION OF $ 27,666.48
FENCE

TOTAL FOR CONSTRUCTION 1 NEW SCHOOL (3 CLASSROOMS WITH OFFICE, STORE, 2


TWIN LATRINES, WATER STORAGE, FENCE) (I+II+III+IV) IN LASOCURDIN, SOOL, PUNTLAND. $ 90,346.15