TFIQ Protocol
TFIQ Protocol
DOC-TFIQ-Report-001 Revision: A
Title: Tooling and Fixtures Installation Qualification (TFIQ) Report - Ring Bending Page 1 of 6
1. General Information
2. Measurement Instruments
Is a measurement instrument required to complete verification of the equipment? Yes No
LAST
INSTRUMENT CALIBRATION INSTRUMENT CALIBRATION CALIBRATION
MEASUREMENT INSTRUMENT REQUIRED CALIBRATION
ASSET ID # RANGE RESOLUTION TOLERANCE DUE DATE
DATE
Mylar Template [Asset ID] N/A N/A N/A N/A N/A
Report No. DOC-TFIQ-Report-001 Revision: A
Title: Tooling and Fixtures Installation Qualification (TFIQ) Report - Ring Bending Page 2 of 6
3. General Requirements
INITIALS /
DESCRIPTION ACCEPTANCE CRITERIA RESULTS PASS/FAIL
DATE
CAD Model / Drawing If required, CAD model CAD Model / Drawing required?
or drawing represents Yes No
equipment and is CAD Model / Drawing #: [Enter]
released or concurrently Revision: [Enter]
approved with TFIQ. If
Pass [Initials/Date]
equipment is managed
by a supplier, the
supplier drawing is
attached to TFIQ.
INITIALS /
DESCRIPTION ACCEPTANCE CRITERIA RESULTS PASS/FAIL
DATE
Preventative Assessed per the PM Required? Yes No
Maintenance applicable site PM Number: [Enter]
Assessment preventive maintenance
Pass [Initials/Date]
procedure.
If PM is required, PM
number is listed.
Cleaning If cleaning is required, Cleaning Required?
Requirements the routine cleaning Yes No
requirements are If “Yes”, identify the procedure where the
defined. cleaning requirements are defined:
Pass [Initials/Date]
If equipment is managed DOC#1
by a supplier, the
cleaning procedure is
attached to TFIQ.
Storage Determine if a storage Storage Container Required?
Requirements container is required to Yes No
prevent damage to the
form/fit/function of the
Pass [Initials/Date]
equipment or to provide
identification.
Are there any dimensional and/or functional requirements for the equipment that are considered critical to form, fit, or function
of the associated device to be evaluated in this section? Yes No
INITIALS /
DESCRIPTION EXPECTED RESULTS ACTUAL RESULTS PASS/FAIL
DATE
Ring bending The ring must be bent Meets Pass [Initials/Date]
without gaps between
plates.
Are there any dimensional requirements for the parts produced from the equipment that require a first article inspection?
Yes No
Assessed per First Article Inspection Procedure: Not applicable because inspections are performed during each process using
the Mylar template.
Dimensional requirements for the equipment that are considered critical to form, fit, or function of the associated device are
verified in Section 4 of this TFIQ.
7. Conclusion
The equipment meets all requirements and acceptance criteria and is suitable for its intended use. This equipment is approved and
released for use in the next validation activity and/or production as defined in the process validation procedure.
8. Approvals
<This signature page is only to be used for documenting external approvals or for business units that do not utilize the Ignite PLM
system. For all other instances, delete this signature page and approve the document electronically in Ignite.>
Approved by:
9. Revision History
REV SHORT DESCRIPTION
A Initial release