0% found this document useful (0 votes)
55 views3 pages

Ongoing Projects

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views3 pages

Ongoing Projects

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

LIST OF MAJOR ONGOING WORKS

Sr. Project Cost Employer For whom project is under


Name of Work Completion Completion Period
No. (Rs. In Crore) implementation

Up-gradation of Shyampur to Sabalgarh Road section of NH-552Ext. From km. 111.800 to


1 166.850 to Two Lane with Paved Shoulder configuration in the State of Madhya Pradesh on 557.18 24 Months
Hybrid Annuity Mode (HAM).

Rehabilitation & Upgradation of Indore-Ujjain Road (SH-59) from 4-Lane to 6-Lane with
2 Paved Shoulders (Design Length – 46.475 Km) in the state of Madhya Pradesh on Hybrid 623.95 24 Months
Annuity (HAM) Mode.

Development Operation and Maintenance of Ropeway from Nature Park (Mohal) to


3 273.84 24 Months
Bijli Mahadev Temple in District Kullu in Himachal Pradesh on HAM.

Construction of Limited Height Sub-ways in lieu of level crossings in Chittaurgarh- Udaipur


4 40.41 18 Months
section in connection with elimination of existing Level Crossing Gates. (Total 09 Nos.)

Construction of Limited Height Sub-ways in lieu of level crossings in Ajmer-


5 Chittaurgarh section in connection with elimination of existing Level Crossing Gates. (Total 05 23.50 18 Months
Nos.)
Sr. Project Cost Employer For whom project is under
Name of Work Completion Completion Period
No. (Rs. In Crore) implementation

Construction of 2 lane Road Over Bridge in lieu of LC No.C-72 at km: 107/7-8 near Degana
station yard is having single clear span of 1 x 36.0m Composite Steel Girder in railway
6 portion, 14 x 18.75m PSC girder viaduct with pile foundation RE wall about 360.0m and 29.62 18 Months
pedestrian subway (RUB) of 4.50 x 2.50 m precast RCC box and approach roads and other
ancillary works for construction of ROB and RUB as a complete job work.

Widening to 2 lane with paved shoulder from Km.0.00 to 102.310 (Design Chainage) of NH-
7 548B i.e., Murrum (Maharashtra border) – IB circle (Bijapur) Section in the S tate 545.00 24 Months
Karnataka on EPC mode

Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border


8 (Greenfield) section of NH-31 Package-I from Hridaipur (km 0.000) to Shahapur (km 621.00 24 Months
42.500) on EPC Mode in the state of Uttar Pradesh.

Construction of Four Lane Highway from Gazipur - Ballia - UP/Bihar State Border
9 (Greenfield) section of NH-31: Package II [from Shahapur (km 42.500) to Pindari (km 585.91 24 Months
78.150)] on EPC Mode in the state of Uttar Pradesh

Widening to 2 lane with paved shoulder from km 103.225 (Pattadakal) to km 133.00 (Shirur
10 cross) (Design Chainage Km 104.800 to 130.880) of NH-367 in the State of Karnataka on EPC 159.00 18 Months
Mode Project (JobNo.NH-367-KNT-2021-22-934)
Sr. Project Cost Employer For whom project is under
Name of Work Completion Completion Period
No. (Rs. In Crore) implementation

Four laning of Ratnagiri Kolhapur section of NH-166 Package I from km 0.000 to km


11 19.769 and km 31. 000 to 67.140 in Maharashtra to be executed on Hybrid Annuity 930.00 24 Months
Mode under NH (O)