0% found this document useful (0 votes)
181 views250 pages

Upper Paunglaung HPP - 4-V-4 UPL Completion Report (Vol-IV) (8.3.2016)

Uploaded by

unmwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
181 views250 pages

Upper Paunglaung HPP - 4-V-4 UPL Completion Report (Vol-IV) (8.3.2016)

Uploaded by

unmwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 250

ြပည်ေထာင်

ထ စုသမ္မတြမန်မာနိ
ာ ုင်ငံေတာ်ာ်အစိုးရ
လျှပ်စစ်စွစွမ်းအား၀န်န် ကီးဌာန

ေရအားလျှ
လျှပ်စစ်အေက
ကာင်အထည်
ထ ေဖာ်ေရးဦးစီ
ရ းဌာနန

အထ
ထက်ေပါါင်းေလာာင်းေရအအားလျှပ်ပ်စစ်စီမံကိ
ကန်း
လုပ်ငန်
င းြပီးစီးေက
း ြ ာင်င်းအစီရင်ငခံစာ

အတွဲ (၄)
ဒီ ုင်း ပုံစံများ
ဒဇိ ာ ( Designn Drawing
gs)

၂၂၀၁၆ ခုနှစ်၊ လ( ) ရက
က်
-1-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


0 ၁ တည်ေနရာ ြပပုံ
၂ ေပါင်းေလာင်း ြမစ်၏ ေရအားအရင်းအမ ြ စ်များ
၃ တမံနှင့် ဆက်စပ် ေရအားလျှပ်စစ် အေဆာက်အအုံများ တည်ေနရာ ြပပုံ
၄ ပင်မတမံ ြဖတ်ပိုင်းပုံ
၅ ပင်မတမံ RCC ကွန်ကရစ် သွန်းေလာင်းခဲ့သည့် အစီအစဉ်
၆ စီမံကိန်းအတွင်း လုံြခုံေရး ေဆာင်ရွက်ထားရှိမှု

1 General
1 General Arrangement Project Layout Plan
2 General Arrangement Elevation Views Upstream & Downstream Views
3 General Layout Cross Section At Spillway Axis Section At STA. 425.50
General Layout Cross Section at Power Intake Axis No.1 Section At STA. 326.75
4
General Layout Cross Section At Power Intake Axis No.2 Section At STA. 346.75
5

2 Main Dam
1 General Arrangement Dam Layout Plan View
2 General Arrangement Drainage Galleries 296 Layout, Sections And Details
3 General Arrangement Drainage Galleries 321 Layout, Sections And Details
4 General Arrangement Drainage Galleries 350 Layout, Sections And Details
5 General Arrangement Abutment Gallery - Left Bank Layout & Longitudinal Profile
General Arrangement Abutment Gallery - Right Bank Layout & Longitudinal Profile
6
7 Dam Layout Typical Sections Sections & Details
8 General Arrangement Dam Crest - Left Bank Plans And Section
9 General Arrangement Dam Crest - Right Bank Plans And Section
10 Main Dam Foundation Treatment Sections
11 Main Dam Grouting And Drainage Curtain Layouts, Section & Details
12 Main Dam Instrumentation General Layout Sections
13 Main Dam Instrumentation Plumbline PL9 Plan, Sections & Detail
14 Main Dam Instrumentation Plumbline PL13 Plan, Sections & Detail
15 Main Dam Instrumentation Plumbline PL17 Plan, Sections & Detail
16 Main Dam Instrumentation Plumbline PL20 Plan, Sections & Detail
17 Main Dam Instrumentation Details Details & Sections
18 Main Dam Instrumentation Block 9 And 25 Plan & Sections
19 Main Dam Instrumentation Downstream Standpipe Piezometer Layout
20 Main Dam Instrumentation Geodetic Survey Plan View
Main Dam Instrumentation Geodetic Survey Downstream View, Sections & Details
21
Main Dam Stage 2A & 2B Access Gallery Portal, 321 LB Detail, Sections And
22 View
-2-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


Main Dam Stage 2B & 3 Abutment Gallery LB (309.30 - 321.30) Profile And
23 Sections
24 Main Dam Stage 3 Detail Arrangement Plan, Section And Detail
Main Dam Stage 3 Abutment Gallery LB (EL 321.00-336.60) Profile And Sections
25
26 Main Dam Access To Access Gallery 321 LB Plan And Sections
27 Main Dam Stage 4 Access Gallery Portal, 296 RB Plan, Sections And View
28 Main Dam Stage 5 Joint Drain Pipe Plan And Section
Main Dam Stage 5 Abutment Gallery RB EL 296.10 To 304.50 Profile And Section
29
Main DamStage 5 Abutment Gallery RB EL 304.50 To 321.00 Profile And Section
30
Main Dam Stage 5 Abutment Gallery RB EL 296.10 To 321.00 Profile With Steel
31 Form Arrangement, Section And Detail
32 Main Dam Stage 5 Drainage Holes Arrangement Plans
33 Main Dam Stage 6 & 7 Detail Arrangement Plan, Section And Detail
34 Main Dam Stage 6 & 7 Access Gallery Portal, 350 LB Plan, Sections And View
Main Dam Stage 6 & 7 Abutment Gallery LB (EL 336.60-349.80) Profile And
35 Sections
36 Main Dam Stage 6 & 7 Joint Drain Pipes Plans At EL 349.80 And Sections
37 Main Dam Stage 6 & 7 Drainage Holes Arrangement Plans
38 Main Dam Stage 6 & 7 Drainage Holes Arrangement Plan And Section
39 Main Dam Stage 9 Access Gallery Portal, 350 RB Plan, Sections And View
40 Main Dam Stage 9 Precast Arrangement, Gallery 321 RB Plan At EL 322.30
41 Main Dam Stage 9 Joint Drain Pipe Plan And Section
42 Main Dam Stage 9 Drainage Holes Arrangement Plans
43 Main Dam Stage 8 Detail Arrangement Plan, Section And Detail
44 Main Dam Stage 8 Precast Arrangement, Gallery 350 LB Plan At EL 351.60
Main Dam Stage 8 Abutment Gallery LB (EL 349.80-367.20) Profile And Sections
45
Main Dam Stage 10 Abutment Gallery RB (EL 349.80-377.70) Profile With Steel
46 Form Arrangement, Section And Detail
47 Main Dam Stage 10 Precast Arrangement, Gallery 350 RB Plan At EL 351.60
Main Dam Stage 10 Abutment Gallery RB EL 362.10 To 378.30 Profile And
48 Sections
Main Dam Access Gallery Left Bank, 350.00 Handrails Plan, Views, Details And
49 Quantity

3 Spillway
Spillway Bridge General Arrangement Plan View, D/S View, Typ. Cross Sections
1 And Details
2 Spillway Dam Crest Crest Layout - Blocks 16 To 19 Plan View And Detail
3 Spillway Dam Crest Crest Layout - Block 16 To 19 Sections And View
Spillway Formwork - Blocks 16 & 19 EL.361.00 To 378.15 - Ogee Crest &
4 Abutment Plan View, Section And Detail
-3-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


Spillway Formwork - Blocks 16 & 19 EL.361.00 To 378.15 - Ogee Crest &
5 Abutment Sections
Spillway Formwork - Blocks 17 & 18 EL.361.00 To 378.15 - Ogee Crest & Pier Plan
6 View, View 1-1 And Sections
Spillway Formwork - Blocks 17 & 18 EL.361.00 To 378.15 - Ogee Crest & Pier
7 Sections And Detail
Spillway Formwork - Blocks 16 To 19 Spillway Bridge And Crest Plan View And
8 Sections
Spillway Formwork - Blocks 16 To 19 Spillway Bridge And Crest Typical Precast
9 Pillar Details, Detail A And Section
Spillway Formwork Spillway Bridge And Crest Typical Cross Sections And Details
10

4 Bottom Outlet
1 Bottom Outlet General Arrangement Plan View And Longitudinal Section
2 Bottom Outlet Formwork Bottom Outlet Channel Section And Views
3 Bottom Outlet Formwork D/S Deflectors Plan And Sections
4 Bottom Outlet Formwork Access Portal Plan And Sections

5 Power Intakes
1 Power Intakes General Arrangement Section 1-1 & 2-2
2 Power Intakes General Arrangement Section And Plan View
3 Power Intakes General Arrangement Section E-E
4 Power Intakes General Arrangement Section F-F
5 Power Intake Unit 1 Inlet Formwork Horizontal Section A-A At EL 337.60
6 Power Intake Unit 1 Inlet Formwork Horizontal Section B-B At EL 340.0
7 Power Intake Unit 1 Inlet Formwork Longitudinal Section D-D
Power Intake Unit 1 Gate Shaft EL 369.00 To 378.00 Formwork Section 1-1 And 2-2
8
Power Intake Unit 1 Gate Shaft EL 369.00 To 378.00 Formwork Section 1-1 And 2-2
9
10 Power Intake Unit 2 Inlet Formwork Horizontal Section A-A At EL 337.60
11 Power Intake Unit 2 Inlet Formwork Horizontal Section B-B At EL 340.0
12 Power Intake Unit 2 Inlet Formwork Longitudinal Section D-D
Power Intake Equipment Room, EL 371.30 To 378.00 Formwork View A-A And
13 Horizontal Section B-B
Power Intake Equipment Room, EL 371.30 To 378.00 Formwork Sections C-C, D-D
14 And E-E
15 Power Intakes Maintenance Gate Handrails Plan, Sections, Details And Quantity
Power Intakes Unit 1 And 2 Platform At EL.378.00 Handrails Plan, Sections, Details
16 And Quantity
17 Power Intakes Stair Case Opening Roofing Plan, Sections And Quantity
18 Power Intakes EL.372.75 To EL.378.00 Steel Ladder Plan, Sections And Details
Power Intakes Water Level Transmitter & Trench Covers Plan, Sections And Details
19
-4-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


20 Power Intakes Slab Opening @ EL.378.00 Cover Plan, Sections And Details

6 Penstocks
1 Penstocks General Arrangement Plan At EL 340.0
2 Penstocks General Arrangement Penstock No. 1 Cross Section STA. 326.75
3 Penstocks General Arrangement Penstock No. 2 Cross Section STA. 346.75
4 Penstocks General Arrangement Sections, View And Details
5 Penstocks Upper CVC Encasement Plan At EL 343.80 And Section
6 Penstocks Upper CVC Encasement Plan At EL 340.00 And Section
Penstocks Access To Penstock Flow Measurement Gallery Handrails And Steps
7 Layout, Views And Sections
Penstocks Upper Encasement At Unit 1 - Part "A" Formwork - EL.336.60 To
8 EL.343.80 View, Sections And Details
Penstocks Upper Encasement At Unit 2 - Part "A" Formwork - EL.336.60 To
9 EL.343.80 View, Sections And Details
Penstocks Upper Encasement At Unit 2 - Part "B" Formwork - EL.336.60 To
10 EL.343.80 Views And Sections

7 Power House
1 Powerhouse General Arrangement Floor 1, EL. 275.40 Plan View
2 Powerhouse General Arrangement Floor 2, EL. 280.50 Plan View
3 Powerhouse General Arrangement Floor 3, EL. 285.00 Plan View
4 Powerhouse General Arrangement Cross Section 6-6 Section
5 Powerhouse General Arrangement Longitudinal Section A-A Section
6 Powerhouse General Arrangement Section D - D
7 Powerhouse General Arrangement Section C - C
8 Powerhouse General Arrangement Cross Section 8-8 Section
9 Powerhouse General Arrangement Cross Section 7-7 Section
Powerhouse Unloading / Assembly Bays Above EL 290.90 Formwork, Longitudinal
10 Section D1 - D1
Powerhouse Unloading / Assembly Bays Above EL 290.90 Formwork, Longitudinal
11 Section D2 - D2
Powerhouse Unloading / Assembly Bays Floor 4, EL 290.90 And Superstructure
12 Formwork, Longitudinal Section D3 - D3
Powerhouse Unloading / Assembly Bays Above EL 290.90 Formwork, Longitudinal
13 Section F - F
Powerhouse Machine Bay / Unit 1 Floor 1, Section At EL 273.60 Formwork,
14 Upstream Plan View
Powerhouse Machine Bay / Unit 1 Floor 1, Section At EL 278.40 Formwork,
15 Upstream Plan View
Powerhouse Machine Bay / Unit 1 Floor 1, EL 275.40 Formwork, Downstream Plan
16 View And Sections
Powerhouse Machine Bay / Unit 1 Floor 1, EL 275.40 Formwork, Section 1-1 And
17 Detail
-5-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


Powerhouse Machine Bay / Unit 1 Floor 1, EL 275.40 Formwork, Section 2-2 And
18 1d-1d
Powerhouse Machine Bay / Unit 1 Floor 1, EL 275.40 / EL. 273.60 Formwork,
19 Sections A-A, E-E, 2a-2a And Detail
Powerhouse Machine Bay / Unit 1 Floor 1, EL 275.40 Formwork, Sections D-D, F-F
20 And 3-3
Powerhouse Machine Bay / Unit 2 Floor 1, Section At EL 278.40 Formwork,
21 Upstream Plan View
Powerhouse Machine Bay / Unit 2 Floor 1, EL 275.40 Formwork, Downstream Plan
22 View And Sections
Powerhouse Machine Bay / Unit 2 Floor 1, EL 275.40 Formwork, Section 3-3 And
23 Detail
Powerhouse Machine Bay / Unit 2 Floor 1, EL 275.40 Formwork, Section 4-4 And
24 A3-A3
Powerhouse Machine Bay / Unit 2 Floor 1, EL 275.40 Formwork, Section D-D & F-F
25
Powerhouse Machine Bay / Unit 1 Floor 2, EL 280.50 Formwork, Upstream Plan
26 View
Powerhouse Machine Bay / Unit 1 Floor 2, EL 280.50 Formwork, Downstream Plan
27 View And Sections
Powerhouse Machine Bay / Unit 1 Floor 2, EL 280.50 Formwork, Section 1-1 And 1a-
28 1a
29 Powerhouse Machine Bay / Unit 1 Floor 2, EL 280.50 Formwork, Section 2-2
Powerhouse Machine Bay / Unit 1 Floor 2, EL 280.50 Formwork, Section A-A, A1-
30 A1 And 1c-1c
Powerhouse Machine Bay / Unit 1 Floor 2, EL 280.50 Formwork, Sections D-D And
31 F-F
Powerhouse Machine Bay / Unit 2 Floor 2, EL 280.50 Formwork, Upstream Plan
32 View And Sections
33 Powerhouse Machine Bay / Unit 2 Floor 2, EL 280.50 Formwork, Section 4-4
Powerhouse Machine Bay / Unit 2 Floor 2, EL 280.50 Formwork, Section A-A And
34 A1-A1
Powerhouse Unloading / Assembly Bays Floor 2, EL 280.50 Formwork, Upstream
35 Plan View
Powerhouse Unloading / Assembly Bays Floor 2, EL 280.50 Formwork, Downstream
36 Plan View And Sections
Powerhouse Unloading / Assembly Bays Floor 2, EL 280.50 Formwork, Section 5-5
37
Powerhouse Unloading / Assembly Bays Floor 2, EL 280.50 Formwork, Section 5A-
38 5A
Powerhouse Unloading / Assembly Bays Floor 2, EL 280.50 Formwork, Section A-A
39 And E-E
Powerhouse Unloading / Assembly Bays Floor 2, EL 280.50 Formwork, Section D-D
40 And F-F
-6-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


Powerhouse Machine Bay / Unit 1 Floor 3, EL 285.00 Formwork, Upstream Plan
41 View And Sections
Powerhouse Machine Bay / Unit 1 Floor 3, EL 285.00 Formwork, Downstream Plan
42 View And Sections
Powerhouse Machine Bay / Unit 1 Floor 3, EL 285.00 Formwork, Section 1-1 And 1a-
43 1a
Powerhouse Machine Bay / Unit 1 Floor 3, EL 285.00 Formwork, Section 2-2 And
44 1b-1b
Powerhouse Machine Bay / Unit 1 Floor 3, EL 285.00 Formwork, Section D-D And
45 F-F
Powerhouse Machine Bay / Unit 2 Floor 3, EL 285.00 Formwork, Section 3-3 And II-
46 II
Powerhouse Machine Bay / Unit 2 Floor 3, EL 285.00 Formwork, Section A-A And
47 E-E
Powerhouse Unloading / Assembly Bays Floor 3, EL 285.00 Formwork, Upstream
48 Plan View
Powerhouse Unloading / Assembly Bays Floor 3, EL 285.00 Formwork, Downstream
49 Plan View And Sections
Powerhouse Unloading / Assembly Bays Floor 3, EL 285.00 Formwork, Sections 5-5
50 And A1-A1
Powerhouse Unloading / Assembly Bays Floor 3, EL 285.00 Formwork, Section 5A-
51 5A
Powerhouse Unloading / Assembly Bays Floor 3, EL 285.00 Formwork, Section 6-6
52
Powerhouse Unloading / Assembly Bays Floor 3, EL 285.00 Formwork, Sections A-
53 A And E-E
Powerhouse Unloading / Assembly Bays Floor 3, EL 285.00 Formwork, Sections D-
54 D And F-F
Powerhouse Machine Bay / Unit 1 Floor 4 And Supper Structure Formwork,
55 Downstream Plan View And Sections
Powerhouse Machine Bay / Unit 1 Floor 4 And Supper Structure Formwork, Section
56 1-1
Powerhouse Machine Bay / Unit 1 Floor 4 And Supper Structure Formwork, Section
57 2-2
Powerhouse Machine Bay / Unit 1 Floor 4 And Supper Structure Formwork, Sections
58
Powerhouse Machine Bay / Unit 1 Floor 4 And Supper Structure Formwork, Section
59 G-G
Powerhouse Machine Bay / Unit 1 Floor 4 And Supper Structure Formwork, Section
60 F-F
Powerhouse Machine Bay / Unit 2 Floor 4 And Supper Structure Formwork,
61 Upstream Plan View
Powerhouse Machine Bay / Unit 2 Floor 4 And Supper Structure Formwork,
62 Downstream Plan View And Sections
-7-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


Powerhouse Machine Bay / Unit 2 Floor 4 And Supper Structure Formwork, Section
63 3-3
Powerhouse Machine Bay / Unit 2 Floor 4 And Supper Structure Formwork, Section
64 4-4 (Upstream Part)
Powerhouse Machine Bay / Unit 2 Floor 4 And Supper Structure Formwork, Sections
65 E-E, 4-4 (Downstream Part) & 4a-4a
Powerhouse Machine Bay / Unit 2 Floor 4 And Supper Structure Formwork, Section
66 F-F
Powerhouse Unloading / Assembly Bays Floor 4, EL 290.90 And Super Structure
67 Formwork, Upstream Plan View
Powerhouse Unloading / Assembly Bays Floor 4, EL 290.90 And Superstructure
68 Formwork, Downstream Plan View
Powerhouse Unloading / Assembly Bays Floor 4, EL 290.90 And Superstructure
69 Formwork, Section 5-5
Powerhouse Unloading / Assembly Bays Floor 4, EL 290.90 And Superstructure
70 Formwork, Upstream Section 5A-5A
Powerhouse Unloading / Assembly Bays Above EL 290.90 Formwork, Cross Section
71 5B-5B
Powerhouse Unloading / Assembly Bays Floor 4, EL 290.90 And Superstructure
72 Formwork, Upstream Section A-A
Powerhouse Unloading / Assembly Bays Floor 5&6, EL 295.20/299.40 Formwork,
73 Downstream Plan View
Powerhouse Unloading / Assembly Bays Floor 7, EL 303.60 & Roof At EL 306.85
74 Formwork, Downstream Plan View

8 Tailrace
Tailrace Channel General Arrangement Layout Plan View And Section 02
1 21.03.2015

9 Associated Building
Associated Building 33KV Switchgear Building General Layout Plans And Sections
1
Associated Building Diesel Generator Building General Layout Plans, Views And
2 Sections
Associated Building Transformer Oil Building General Layout Plans, Views And
3 Section
4 Associated Building Cable Trench General Layout Plans, Views And Sections
5 Associated Buildings Doors
Associated Building 33KV Switchgear Building Formwork Plans, Sections And
6 Detail
Associated Building Diesel Generator Building Formwork Drawing Plans And
7 Sections
Associated Building Transformer Oil Building Formwork Drawing Plans And
8 Sections
9 Associated Building Cable Trench Formwork Sections
-8-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks

10 Miscellaneous Civil Works


1 Miscellaneous Civil Works Watertank General Layout Sections
2 Miscellaneous Civil Works General Arrangement Water Pipe Layout Plan View
Miscellaneous Civil Works General Arrangement Water Pipe Layout Longitudinal
3 Section And Sections
Miscellaneous Civil Works General Arrangement Water Pipe Layout Sections And
4 Detail
Miscellaneous Civil Works General Arrangement Water Pipes From Powerhouse To
5 Dam Steps Sections
Miscellaneous Civil Works General Arrangement Water Pipes From Dam Steps To
6 Bottom Outlet View And Section
Miscellaneous Civil Works General Arrangement Water Pipes From Separation Wall
7 To Powerhouse Section
Miscellaneous Civil Works General Arrangement Water Pipes From Separation Wall
8 To Powerhouse Longitudinal Section
Miscellaneous Civil Works Cable Routing Between Switchyard And Powerhouse
9 Plan View
Miscellaneous Civil Works General Arrangement - Cable Routing Between
10 Powerhouse And Power Intake Layout
Miscellaneous Civil Works General Arrangement - Cable Routing From Powerhouse
11 To Switchyard Layout
Miscellaneous Civil Works General Arrangement - Cable Routing From Powerhouse
12 To Switchyard Sections And Details
13 Miscellaneous Civil Works Watertank Formwork Sections And Detail
14 Miscellaneous Civil Works Watertank Formwork Section And Details
Miscellaneous Civil Works Formwork Cable Pipes From Powerhouse To Power
15 Intake Details And Sections
Miscellaneous Civil Works Access Road To Powerhouse Side Drains Plan View,
16 Section And Typical Details

11 Access Road
Access Road General Arrangement Acc. Road To Powerhouse-RD 0.00 To RD
1 187.12 Plan View And Section
Access Road General Arrangement From separation Wall To Powerhouse Plan View
2 And Section
Access Road General Arrangement From separation Wall To Powerhouse Sections
3

12 Switchyard
1 Switchyard General Arrangement Layout
2 Switchyard General Layout Foundations Plan View
Switchyard General Layout Drainage Trenches Plan View And Typical Cross
3 Sections
-9-
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


Switchyard General Layout Cable Trenches Plan View And Typical Cross Sections
4
5 Switchyard General Arrangment Earthing System Layout And Sections
6 Switchyard Road Contraction Joints Layout Plan View
7 Switchyard Slab Contraction Joint Layout Plan View And Section
Switchyard Foundation Type 1 (T1) Layout And Formwork Plan View And Section
8
Switchyard Foundation Type 2 (T2) Layout And Formwork Plan View And Section
9
Switchyard Foundation Type 3 (T3) Layout And Formwork Plan View And Section
10
KV Switchyard Foundation Type 4 And 5 (T4 & T5) Layout And Formwork Plan
11 View And Section
12 Switchyard Security Fence Metal Work Plan View, Sections And Details

13 Geology and Hydrology


1 Geology and Hydrology Main Dam Geological Mapping - Blocks 1 And 2 Layout
Geology and Hydrology Main Dam Geological Mapping - Blocks 3, And 4 Layout
2
3 Geology and Hydrology Main Dam Geological Mapping - Blocks 5 And 6 Layout
4 Geology and Hydrology Main Dam Geological Mapping - Blocks 7 And 8 Layout
Geology and Hydrology Main Dam Geological Mapping - Blocks 9 And 10 Layout
5
Geology and Hydrology Main Dam Geological Mapping - Blocks 11 And 12 Layout
6
Geology and Hydrology Main Dam Geological Mapping - Blocks 13, 14A And 14B
7 Layout
Geology and Hydrology Main Dam Geological Mapping - Blocks 15 And 16 Layout
8
Geology and Hydrology Main Dam Geological Mapping - Blocks 17 And 18 Layout
9
Geology and Hydrology Main Dam Geological Mapping - Blocks 19 And 20 Layout
10
Geology and Hydrology Main Dam Geological Mapping - Blocks 21 And 22 Layout
11
12 Geology and Hydrology Main Dam Geological Mapping - Block 23 Layout
Geology and Hydrology Main Dam Geological Mapping - Blocks 24 And 25 Layout
13
Geology and Hydrology Main Dam Geological Mapping - Blocks 26 And 27 Layout
14
15 Geology and Hydrology Main Dam Geological Mapping - Blocks 1 To 27 Layout
16 Geology and Hydrology Main Dam Geological Mapping Sections
Geology and Hydrology Main Dam Geological Mapping - Offset 130.00 & 230.00
17 Sections
- 10 -
အမှတ် (၁) တည်ေဆာက်ေရး
အထက်ေပါင်းေလာင်း ေရအားလျှပစ် စ်စမီ က
ံ ိနး်

Sr.No. Lists of Drawing Remarks


Geology and Hydrology Main Dam Geological Mapping - Sta. 218.00, 349.60 And
18 425.50 Sections
19 Geology and Hydrology Main Dam Geological Mapping - Boreholes Layout
Geology and Hydrology Main Dam Geological Mapping - Boreholes No.1 To 12
20 Sections
Geology and Hydrology Main Dam Geological Mapping - Boreholes No.13 To 33
21 Sections
Geology and Hydrology Main Dam Geological Mapping - Additional Boreholes
22 Sections
အထက်ေပါင်းေလာင်း ေရအားလျှပ်စစ်စီမံကိန်း
တည်ေနရာပြ ပုံ

အလယ်ေပါင်းေလာင်း
(၁၀၀ မဂ္ဂါဝပ်)

wnfae&m

ေပါင်းေလာင်း
(၂၈၀ မဂ္ဂါဝပ်)

ပျဉ်းမနားမ
ြ ို့
26 rdkif အထက်ေပါင်းေလာင်း
နန်ချို (၁၄၀ မဂ္ဂါဝပ်)
(၄၀ မဂ္ဂါဝပ်)

ေနပ
ြ ည်ေတာ် ပျဥ်းမနားမ
ြ ို့၏ အေရှ့ဘက် (၂၆) မိုင်ခန့်အကွာ ေပါင်းေလာင်းြမစ် ေပါ်တွင် တည်ရှိပါသည်။
ေပါင်းေလာင်းြမစ်၏ ေရအားအရင်းအမ
ြ စ်များ

အထက်ေပါင်းေလာင်းစီမံကိန်း (၁၄၀ မဂ္ဂါဝပ်)

နန်ချုိ စီမက
ံ နိ း် (၄၀ မဂ္ဂါဝပ်)
တပ်ဆင်စက်အင်အား
တည် ဆာက် ပီး - ( ၄၆၀) မဂ္ဂါဝပ်
တည် ဆာက်ဆဲ - (၁၀၀) မဂ္ဂါဝပ်
ေပါင်းေလာင်းစီမံကိန်း (၂၈၀ မဂ္ဂါဝပ်) စစ ပါင်း - (၅၆၀) မဂ္ဂါဝပ်
တမံ နှင့် ေရအားလျှပ်စစ်အေဆာက်အအုံများ တည်ေနရာပ
ြ ပုံ

ေရယူအေဆာက်အအုံ
ေရထုတ်ေပါက်
ေရပိလ
ု ဲွှ
ပင်မတမံ

ဖိအားမ
ြ င်သ
့ မံ ဏိပက
ုိ လ
် ငုိ း်

ဓာတ်အားေပးစက်ရံု

ေရလွှဥဲ မင်လဏ
ုိ ်

ဆွစ်ယာဒ်
U/S D/S
EL‐378 m
FTL-370 m
wrHtjrifh 322 ay
wrHtjrifh 322 ay wrHtvsm; 1690 ay
MOL-352 m
RCC uG e f u &pf 315100 usif;
340 m
RCC
U/S Coffer Dam
EL – 304 m
79 ay

EL‐280 m
ပင်မတမံ RCC ကွန်ကရစ်သွန်းေလာင်းခဲ့သည့် အစီအစဥ်

8B-2 8B-1 10B

8A 10A
6B
6A 9B,7
9C-2
3A 3B 9A
9C-1
2B.1 2B.2 5B-1 5B-2

2A 5A
1 4

RCC Volume Start Finish


Stage No. EL
(m3) Date Date
Stage- 1 285.60 295.80 33,051 27.1.2011 10.2.2011
Stage- 2 A 295.80 307.80 59,406 31.3.2011 21.4.2011
Stage- 2 B1 307.80 321.00 47,255 29.5.2011 26.6.2011
Stage- 2 B2 307.80 321.00 49,275 10.7.2011 2.8.2011
Stage- 3 B 321.00 336.60 55,203 9.11.2011 28.11.2011
Stage- 3 A 321.00 336.60 54,210 9.12.2011 28.12.2011
Stage- 4 281.40 295.80 71,202 19.1.2012 11.2.2012
Stage- 6 A 336.60 343.80 30,864 1.3.2012 13.3.2012
Stage- 5 A 295.80 313.2 112,740 3.5.2012 3.6.2012
Stage- 5 B-1 313.20 321.00 31,911 20.7.2012 6.8.2012
Stage - 9 A 321.00 336.60 49,855 16.10.2012 7.11.2012
Stage - 9 B,7 336.60 349.80 37,866 7.11.2012 23.11.2012
Stage - 6 B 343.80 349.80 31,479 14.12.2012 25.12.2012
Stage - 8 A 349.80 362.70 72,188 25.1.2013 22.2.2013
Stage - 8 B-1 362.70 377.70 21,132 10.3.2013 31.3.2013
Stage - 8 B-2 362.70 377.70 27,033 28.4.2013 21.5.2013
Stage - 5 B-2 313.20 321.30 21,747 15.6.2013 24.6.2013
Stage - 9 C-1 321.30 336.00 43,520 10.7.2013 31.7.2013
Stage - 9 C-2 336.00 350.10 41,856 3.10.2013 23.10.2013
Stage - 10 A 350.10 362.70 30,732 6.11.2013 26.11.2013
Stage - 10 B 362.70 377.70 27,780 8.12.2013 29.12.2013
Sub Total 950,305 27.1.2011 29.12.2013
အထက် ပါင်း လာင်း ရအားလ ပ်စစ်စီမကိန်း
စီမကိန်းဧရိယာအတွင်း လြခု ရး ဆာင်ရွက်ထားရှိမ
ပင်မဂိတ် လြခု ရး
တပ်မ တာ် မှ (၂)ဦး
ဌာနမှ (၂)ဦး

...
စက်မဝင်း

ရတခမရ(၆၀၆) စရး (၁)စိတ်

ကရ
ဲ းိ

ရတခမရ(၆၀၆) ခွရ
ဲ း(၁)စိတ်

ပင်မတမ လြခု ရး
ရဲတပ်ဖဲွ ့မှ (၂)ဦး

စက်ရ လြခု ရး
ရဲတပ်ဖွဲ ့မှ (၂)ဦး

ြမန်မာနိင်င ရဲတပ်ဖဲွ ့ ဓာတ်အား ပး


ဆွစ်ယာဒ် စက်ရ
အရာရှ(ိ ၂)ဦး၊
အြခားအဆင့် (၂)ဦး၊ ဌာနမှ (၂) ဦး

ပင်မတမ လြခု ရး
ရဲတပ်ဖဲွ ့မှ (၂)ဦး