LOI Frisian Flag Indonesia Project+Experience List

Uploaded by

Selly Antini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views74 pages

LOI Frisian Flag Indonesia Project+Experience List

Uploaded by

Selly Antini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 74

P?

"WEJAVA KARY& {Persere} Tbk"


r INDUSTRI e INFRASTRUKTUR & GEDUNG oENERGI & INDUSTRIAL PLANT. REALTI & PROPERTI r INVESTASI

Jatan D.l. Panjaitan Kav.9-10, Jakarta 13340 lndonesia, PO Box 4174IJKTJ, Phone :62-21 - 8508640, Faksimili : 62-2'l-22085126

No. sE.01 .01/u.DPSR.00006/2021 March24,2021


Attachment 1

BESA ENGINEERING
ln Jakarta

For the attention:


Mr. Nana Gunawan

Subject: Letter of lnterest to participate in Tender Frieian Flag


lndonesia Project

Dear Sir,

Regarding information for Frisian Flag lndonesia Project

Hereby we PT Wijaya Karya (Persero) Tbk. are lnterested for following the tender process
for this project.

To improve communications with us, hereby we submit the following data:

Applicant Company Name PT Wijaya Karya (Persero) Tbk


Representative Person Erik Agus Sandi Tarigan
E-mail Address [email protected]
Phone Number +62 81321915069

For your information, we have previous work experience in EPGC lndustrial Plant Project

Should you have any further information that you may requested, we will gladly fumish you
upon your request.

Your kind attention and consideration would be highly appreciated

Yours faithfully,
PT Wijaya Karya (Persero) Tbk.

_ - PTWJAYAlqRIAlP.ersero) Tbk
Erik Agus Sandi Tahigan
Business Development Manager
EXPERIENCE LIST
DEPARTMENT OF EPCC

PT. WIJAYA KARYA (PERSERO) Tbk


VISION

• TO BE ONE OF THE BEST


INTEGRATED EPC AND INVESTMENT
COMPANY COMPANY IN SOUTH EAST ASIA

INTRODUCTION MISSION

• PROVIDING EXCELLENT AND INTEGRATED PRODUCTS


AND SERVICE IN EPC AND INVESTMENT FOR
INFRASTRUCTURE, BUILDING, ENERGY, INDUSTRIAL
PLANT, INDUSTRY AND REALTY & PROPERTY

• SATISFYING THE EXPECTATIONS OF KEY


STAKEHOLDERS

• IMPLEMENTING BUSINESS ETHICS TO PROMOTE


SUSTAINABILITY OF GOOD CORPORATE
GOVERNANCE

• STRATEGIC OVERSEAS EXPANSION

• IMPLEMENTING ‘BEST PRACTICE’ INTEGRATED


MANAGEMENT SYSTEM
Content
01 Business Segments &
Renewable Energy Profile

02 Power Plant Project


Experience

03 Oil and Gas Project


Experience

Industrial Plant Project


04 Experience
1. BUSINESS SEGMENTS

• Coal Fired Steam Power Plant • Renewable Power Plant


• Combined Cycled Power Plant • Geo-thermal Power Plant

POWER
PLANT
• Gas Engine Power Plant • Solar Power Plant
• Sub station • Energy Storage Plant
• Transmission Line

• Pipeline (Onshore & Offshore) • LNG (Gas Technology)


OIL AND
URE

• Tank Terminal • Refinery

GAS
• Gas Processing Facility • Rig & Jacket
• Engineering Services

• Alumina Plant • Sugar Plant


• Bulk Material Handling System • Steel Plant
INDUSTRIAL

• Ferronickel Plant • Copper Smelter Plant


PLANT

• Cement Plant • Engineering Services


• Oleo Chemical (CPO Plant) • Sulphuric Acid
• NPK Granulation Plant • Phosphoric Acid
• Ammonia Plant
• Engineering Services
HYBRID WIKA SWH – WIKA HEAT PUMP
Hotel Balcony Balik Papan

HYBRID SWH – LPG Water Heater


Hotel Santika Raya, Kuta, Bali
NAWA-CITA PROJECT By ESDM-EBTKE Indonesia Republic
Compact Solar Home System For Papua & West Papua Provincy
Solar Street
Reservoar Tower, Water Capacity 3 x 5 m3 Light
PV Module : 28 x 100WP
Elevation +154 metres

Power Cable

Gravitation Pipe
Distribution

Pipe Distribution

Reservoar with PV
Broncaptering Pump inside
6 Unit Hydran @ 3m3 pipe distribution, length total 625 m
Elevation +135 metres
Elevation between +145 m to +148 metres
Solar Pumping System Gua Plawan Gunung Kidul DIY CSR Sinergi WIKA Mandiri – MCK PATS Tenaga Surya

PATS Bener Meriah Aceh PATS Air Gambut Filtration – Barito Kuala PATS – Nusaniwe Ambon
PV Centralized Wind Hybrid System Bantul Jogjakarta : PV 20 KWp, Wind 2KW
PV Centralized System – KEPULAUAN RIAU (RIAU ISLANDS)

Solar PV Centralized
PV Roof Top System – Jasamarga Toll Gate 30 KWp

Solar PV Centralized Roof Top Design


PV Roof Top System – P3 GL (BANDUNG 50 KWp & CIREBON 20 KWp)

Solar PV Centralized Roof Top Design


PV Roof Top System – TERMINAL 3 SUKARNO HATTA INTERNATIONAL AIRPORT 240 KWp
PV Roof Top System – BNI SERPONG 75 KWp
PV Centralized System – Riau I & Riau II

LOCATION : DESA MENGKAIT & DESA IMPOL, ANAMBAS, RIAU ISLAND


PV Centralized System –Kalimantan I & Kalimantan II

LOCATION : DESA LONG APARI, MAHAKAM HULU, EAST KALIMANTAN , 30 KWP


PV Centralized System –Kalimantan I & Kalimantan II

LOCATION : DESA LONG PANANEH, KALTIM, 30 KWP


Pf. WUAYA KAAYA 111••�roJ fbk•

...

POWER PLANT & ENERG¥


� . . -
4 5
6 7
8 9
Th
th e Co
ec m
om pa
pa ny'
ny s s OI
's tra
en te LA
th gic ND
us a GA
ias ct
m io n SP

S
an o f RO
dp b
ro usin JEC

A
fes e TE
s io s s d XP

G
na ive ER
l a rs
cc ific I EN

D
om a
pli onti CE
sh

N
i
me n th
nt e o

A N
in il
fac & g

L S IO
ing as

I
th and
ed p
yn ow

O VI
am er
ics pla
of nt

I
bu ind
sin us

D
es try
s. s ho
ws
“The Company's strategic action of
business diversification in the oil & gas
and power plant industry”
3. Oil And Gas Experience

TUBAN AROMATIC PLANT (OWNER : PT. TRANS PACIFIC PETROCHEMICAL INDOTAMA)


• Scope Of Work = Storage: Storage Tank 45 unit various capacity from 3.000 KL to 60.000 KL, Spherical Tank 3
unit cap 3.000 KL, Power Generation, Fuel System, Water Treatment, Air Treatment, Waste Treatment, Flare,
Civil Building Work
• Project Duration = Feb 2004 - Aug 2006
BALONGAN – CIKAMPEK PIPELINE
3. Oil And Gas Experience
Owner
PT. PERTAMINA (PERSERO)

Project Duration Jul 2008 - Aug 2009


Scope of Work
Preparation, Engineering § Length of Pipe 125 km
Procurement & Construction for § Pipe Dia. 16”
Mechanical, Piping, Electrical, § Road Crossing,
Instrument, Civil & HSE, § Inspection & Testing
Pre-commissioning & § Flushing & Pigging
Commissioning § Installation of Pig
§ Launcher/Receiver Crude Oil
§ Commissioning & Start-up
3. Oil And Gas Experience

TANJUNG SEKONG LPG TERMINAL

Owner PT. Pertamina (Persero)


Project Duration Dec 2009 - Feb 2012
Scope of Work Design, Fabrication, Inspection, Testing,
Installation/Construction, Start-Up,
Commissioning, Mechanical Performance
of
§ All
LPGSupplied Equipments.
Tank Relocation: 10 x 9000 MT
§ New LPG Tank: 4 x 2500 MT
§§ 25.000
FacilityDWT JettyLPG Tank: 3500 – 25000
Storage
§ DWT
741 m(Cargo
Subsea1800 – 10000 MT)
Pipeline
§§ 4Marine
Units ofLoading
2.500 MT Arm for 2 Jetty
Spherical Tank
Back Loading LPG to 3500 DWT Tanker
§§ Terminal Facility (pump, pipe, truck
(Cargo 1800 MT)
§ loading)
Skid Tank Facility (Filling Shed) @ 2
§ Supporting
units Facility (water & power
§ connecting
Relocationfacility)
of 40 MT Weight Bridge &
§ Telecommunication
60 MT Weight Bridge Installation
§§ Instrumentation
New 60 MT Weight (automation
Bridge system,
Piping,
§ EWS, Pump, Compressor
detection system) Installation
§ E&I Facility, TAS include backup system,
Protection System
3. Oil And Gas Experience

SOEKARNO HATTA INTERNATIONAL AIRPORT FUEL SUPPLY


FACILITY

Owner PT. Pertamina (Persero)

Project Duration Dec 2009 – Mar 2013

Scope of Work Material Supply, Detail Engineering, Fabrication,


Site Erection, Heat Treatment, Install, Testing,
Comissioning, and Start-Up of:

Scope of work;
§ 3 Avtur Tank @ 12.000 KL
§ Mechanical & piping (Tank, Pump,
Valve & MOV, Hydrant Pump,Tank
Gauging, Fire Fighting)
§ Civil (Utility & Supprting Facility)
§ Electrical (Installation of Water
Facility)
§ Instrumentation (Automation
System, ESD, Detection System)
§ Test & Commissioning
3. Oil And Gas Experience
3. Oil And Gas
Experience
TANK RESTORATION OF RU V CILACAP
Owner Pertamina
Project Duration Apr 2012 – Mar 2013
Scope of Work Design, Fabrication, Inspection, Testing,
Installation/Construction, Start-Up,
Commissioning, Mechanical
Performance of all supplied equipments.

§ 4 HOMC Tank @ 86.000 barrel


§ Mechanical & Piping Dia. 24”and
MOV Dia. 20”
(Tank, Pump, Valve, & MOV, Hydrant
Pump, Tank Gauging, Fire Fighting)
§ Civil (Utility & Supporting Facility)
§ Electrical and Water Facility
§ Instrumentation (Automation
System, ESD, detection system
§ Testing & Commissioning
3. Oil And Gas Experience
TANJUNG PRIOK LPG TERMINAL & REPLACEMENT PROJECT
Owner Pertamina
Project Duration Apr 2011 – Dec 2013

Scope of Work Engineering, Procurement,


Construction and Commissioning :

§ LPG Tank Relocation: 10 x 9000


MT
§ New LPG Tank: 4 x 2500 MT
§ Facility Storage LPG Tank: 3500 –
25000 DWT (Cargo 1800 – 10000
MT)
§ Marine Loading Arm for 2 Jetty
§ Back Loading LPG to 3500 DWT
Tanker (Cargo 1800 MT)
§ Skid Tank Facility (Filling Shed) @
2 units
§ Relocation of 40 MT Weight
Bridge & 60 MT Weight Bridge
§ New 60 MT Weight Bridge
§ Piping, Pump, Compressor
Installation
§ E&I Facility, TAS include backup
system, Protection System
3. Oil And Gas Experience

MAKASAR LPG TERMINAL


Owner Bosowa Duta Energasindo

Project Duration Dec 2011 – Aug 2013


Scope of Work Storage:
§ LPG Spherical Tank: 4 x 2.500 MT
§ Automatic Tank Gauge
Receiving:
§ Liquid Line: 10”Pipe
§ Vapour Line: 4”Pipe
§ Ship Metering
§ Odrant Injection System
Distribution:
§ LPG Pump: 6 x 70 M3/Hr
§ Truck Loading Arm & Metering
Package
§ Filling Shed
Facility:
§ Office, Clinic, etc
3. Oil And Gas Experience
PANGKALAN BRANDAN – RANTAU
PANJANG GAS COMPRESOR STATION

Owner Pertamina Gas


Project Duration Jul 2013 - Dec 2014
Scope of Work Design, Fabrication, Inspection,
Testing,
Installation/Construction, Start-
Up, Commissioning, Mechanical
Performance of All Supplied
Equipments.
§ Civil Works
§ Mechanical and Piping
§ Compressor, Scrubber, Slug
Catcher installation
§ Pre-Commissioning and
Commisssioning
§ Pipe 24" API 5L PSL 2 X-5
(Total Length = 236,000 meter)
3. Oil And Gas Experience

Owner Conoco Philips Indonesia


Project Duration Jan 2013 – Mar 2014
Scope of Work Material Supply, Detail
Engineering, Fabrication, Site
Erection, Heat Treatment, Install,
Testing, Comissioning, and Start-
Up of :

§ 2 (Two) x 11.700 m3
Condensate Storage Tank
§ 1 (One) x 2.000 m3 Firewater
Tank,
§ 1 (One) Lot Foam Tank Package
(Including Hydrant & Fire Monitor
as Required) and Control Valves
§ Site Installation of 3 (Three)
Shipping Pumps
SUBAN CONDENSATE STORAGE TANK PROJECT
§ 2 (Two) Fire Water pumps,
§ 1 (one) Uninterruptible Power
Supply (UPS)
§ 1 (one) Lot Safety Instrumented
System (SIS) Panel
3. Oil And Gas Experience

Owner Pertamina

Project Duration Sept 2014 – Mar 2017

Scope of Work Design, Fabrication, Inspection, Testing,


Installation/Construction, Start-Up,
Commissioning, Mechanical Performance of
all supplied equipments.

§ 2 Storage Tank @ 50.000 KL


§ 2 Storage Tank @ 25.000 KL
§ Facility Jetty cap 17.500 – 50.000 DWT
§ Mechanical & Piping Dia. 24”and
MOV Dia. 20”
(Tank, Pump, Valve, & MOV, Hydrant
Pump, Tank Gauging, Fire Fighting)
§ Civil (Utility & Supporting Facility)
§ Electrical and Water Facility
§ Instrumentation (Automation System, ESD,
detection system
§ Testing & Commissioning
3. Oil And Gas Experience

Owner Pertamina
Project Duration Sep 2014 – Mar 2017
Scope of Work Design, Fabrication, Inspection, Testing,
Installation/Construction, Start-Up, Commissioning,
Mechanical Performance of all supplied equipments.
§ 3 HOMC Tank @ 50.000 KL
§ 1 Premium Tank @ 50.000 KL
§ Mechanical & Piping Dia. 24”and MOV Dia. 20”
(Tank, Pump, Valve, & MOV, Hydrant Pump, Tank
Gauging, Fire Fighting)
§ Civil (Utility & Supporting Facility)
§ Electrical and Water Facility
§ Instrumentation (Automation System,
ESD, detection system, Testing & Commissioning
3. Oil And Gas Experience

NORTH DURI DEVELOPMENT 13

Owner Chevron Pacific Indonesia


Project Duration Jul 2012 - Feb 2017
Scope of Work Infrastructure
§ Roads & support facility
§ Well pads consist of:
-358 Oil Producing Wells
-145 Steam Injection Well
-36 Temperature Observation
Wells
On-Plot Facilities
§ Automatic Well Test Units,
Overflow & OWS System, Waste
Gas, Casing Vapor Collection,
Utilities
Telecommunication
Commissioning and Start-up
Assistance.
3. Oil And Gas Experience

TANGGUH FIELD NEW CONDENSATE & DIESEL TANK

Owner British Petroleum


Project Duration Jun 2013 - Jun 2017
Scope of Work Civil / Earthwork: Tree Cutting, Excavation 300.000 m3,
Tanks Foundation, Road, Drainage and Tank Yard
Mechanical :
• 1 Unit Condensate Tank Dia. 40m, height.
18m, Cap. 20.000 m3
• 1 Unit Diesel Tank Dia. 18m, height.
10.8m, Cap.2.000 m3

Modern Portfolio • 9 Unit Pumps For Transfer, Loading and


Unloading system and Fire Fighting
Designed System
Piping,Electrical, Instrument and Control,
Telecommunication
3. Oil And Gas Experience

KUALANAMU INTERNATIONAL AIRPORT FUEL SUPPLY FACILITY


Owner PT. Pertamina (Persero)
Project Duration Oct 2009 – Mar 2013

Scope of Work Design, Fabrication, Inspection, Testing, Installation/Construction,


Start-Up and Commissioning. Mechanical Performance All Equipment
Supply EPC
§ 5 Avtur Tank @ 3.000 KL,
§ Mechanical & Piping (Tank, Pump, Valve & MOV, Hydrant) Pump,
Tank Gauging, Fire Fighting)
§ Civil (Utility & Supporting Facility
§ Electrical (Installation of Water Facility)
§ Instrumentation (Automation System, ESD, Detection System)
§ Testing & Commissioning
3. Oil And Gas Experience
PROYEK
PEMBANGUNAN
DPPU KERTAJATI
JAWA BARAT

Project Duration 06 Nov 2017 - Ongoing (97%)


Owner PT Pertamina (Persero) Direktorat
Pemasran

Scope of Work AREA 1 – SATELLITE OFFICE


AREA 2 – DPPU
AREA 3 – PIPELINE DPPU TO VC 2
AREA 4 – ROAD ACCES
OPERATIONAL
3. Oil and Gas Experience
SCOPE OF WORK :
Jetty Work
§ Trestle 1.2 Km from Plant to Jetty 1 and Jetty 2
§ Upgrading Jetty 1 from 25.000 to 65.000 DWT
§ New Jetty 2 25.000 DWT
§ New Jetty 3 25.000 DWT

Tank
§ Propane Tank 44.000 MT = 1 unit
§ Butane Tank 44.000 MT = 1 unit
§ Fuel Tank 50 m3 = 1 unit
§ Water Tank 500 m3 = 1 unit

Equipment
Others
§ Propane Tank 44.000 MT = 1 unit
§ Piping = 151.000 Dia.inch
§ Butane Tank 44.000 MT = 1 unit
§ Metering = 8 Package
§ Fuel Tank 50 m3 = 1 unit
§ Fire and Gas System
§ Water Tank 500 m3 = 1 unit
§ Telecommunication System
§ Vessel/Drum = 11 unit
§ Automation System
§ Utility Package = 3 Unit (IA,N2, PA)
§ Etc.
§ Heat Exchanger = 10 Unit
§ Line Mixer = 1 unit
§ Enclosed Ground Flare = 1 unit
§ BOG Compressor = 6 unit
§ LPG Pump = 28 unit
§ Fire and Utility Pump = 11 unit
§ Gas Blower = 10 unit
§ Marine Loading Arm = 7 unit
Owner Pertamina EP

3. Oil And Gas Experience Project Duration


Scope of Work
Apr 2014 – Jul 2017

Gas Processing Facility Capacity : 65 MMSCFD

Flowlines: All area Matindok and Maleoraja


CPP Matindok: Header Manifold, Well Test Unit,
Unit Separasi, Unit Booster Compressor, AGRU (Acid
Gas Removal Unit), SRU (Sulfur Recovery Unit), DHU
(Dehydration Unit), DCU (Dew-point Control Unit),
Unit Condensate Handling and Unit Produced
Water Handling, utility system
Trunkline: Pipe for Treated Gas from CPP Matindok
to Tie in point-2 (TIP-2) in area CPP Senoro.
Metering facility Station di TIP-2 Receiving Facility
of Condensate PEP in Senoro area
3. Oil And Gas Experience

Owner Pertamina EP
Project Duration Apr 2014 – Jul 2017
Scope of Work
Gas Processing Facility Capacity : 65 MMSCFD

Flowlines: All area Matindok and Maleoraja


CPP Matindok: Header Manifold, Well Test Unit,
Unit Separasi, Unit Booster Compressor, AGRU (Acid
Gas Removal Unit), SRU (Sulfur Recovery Unit), DHU
(Dehydration Unit), DCU (Dew-point Control Unit),
Unit Condensate Handling and Unit Produced
Water Handling, utility system
Trunkline: Pipe for Treated Gas from CPP Matindok
to Tie in point-2 (TIP-2) in area CPP Senoro.
Metering facility Station di TIP-2 Receiving Facility
of Condensate PEP in Senoro area
p T I
I Tl p
4. Industrial Plant Experience

PROJECT NAME PEMBANGUNAN PABRIK KELAPA SAWIT DI RIAU


OWNER PT Dian Anggara Persada
Project Duration Apr 2005 - May 2006
Scope of Work Design and Engineering PKS cap. 30 Ton TBS/Jam
Procurement (Material & Equipment) Construction and Installation
Earth Works, Civil Works, M & E Works, Start-Up & Commissioning,
Performance Test, Maintenance

1. Reception Station 10. Engine Room


2. Sterilizer Station 11. Raw Water Treatment Plant
3. Threshing Station 12. Boiler Water Treatment Plant
4. Pressing Station 13. Effluent Treatment Plant
5. Clarification Station 14. Mill Piping Works
6. Palm Oil Storage Tank 15. Fire Fighting System
7. Depericarping Station 16. Electrical Works
8. Kernel Recovery Station 17. Building & Civil Works
9. Boiler House
4. INDUSTRIAL PLANT
EXPERIENCE
4. Industrial Plant Experience
SOCIAL MEDIA

35%
Your Text Here
You can simply impress your audience and add a unique zing and
appeal to your Reports and Presentations with our Templates. Easy
to change colors, photos and Text.
4. Industrial Plant Experience
PROJECT NAME NEW CEMENT MILL P9.P10 CIREBON

OWNER Indocement Tunggal Prakarsa

Project Duration 2009 - 2010

Scope of Work Construction of Cement Mill Building


1.Erection Install for All Cement Mill
Equipment
2.System cap. 90 TPH
a.Bag Filter c/w chimney for dusting
System
b.Main Motor , Reducer and Mill Barrel
c.Cement Transport ( Apron Feeder, Air
Slide, Bucket and Chain Elevator and
Separator Unit)
1.Dryer and Dosing System
4. Industrial
Plant
Experience
4. Industrial Plant Experience
4. Industrial Plant Experience
DESIGN AND BUILD (TURNKEY) 2.500 MT PER DAY PALM OIL
PROJECT NAME
REFINERAY PULAU LAUT

OWNER SIMEDARBY
Project Duration Jan 2012 – Jun 2013
Scope of Work Jetty Work
§ Jetty for 1 X 40.000 DWT
§ Barge berth for 3 X 5.000 DWT

Tank
§ Tank 1.200 KL = 3 Unit
§ Tank 3.000 KL = 30 Unit
§ Tank 5.000 KL = 3 Unit
§ Small Tank 500KL – 20KL = 5 Unit
4. Industrial Plant Experience

Simple Portfolio
Presentation
Get a modern PowerPoint

You can simply impress your audience


and add a unique zing and appeal to
your Presentations.
4. Industrial Plant Experience
4. Industrial Plant
Experience
4. Industrial Plant Experience
Project Name Proyek Pembangunan Pabrik Feronikel
Halmahera Timur (P3FH)
Lokasi Proyek Tanjung Buli, Halmahera Timur, Maluku Utara
Pelaksana PT. Wijaya Karya (Persero) Tbk.
Pemilik ANTAM
Pekerjaan
Waktu 28 Bulan
Pelaksanaan

Scope of Work
Equipment and Material for 1. System 1 – Ore Preparation
the System 2. System 2 – Electric Smelting Furnace
3. System 3 - Refinery
4. System 4 – Utility Supply
Material Handling 1. Belt Conveyor
2. Pneumatic Conveyor
Building and Civil Work 1. System 1 : Raw Ore Storage Building, Ore Drying,
Ore Sizing, Conditioned Ore, etc.
2. System 2 : ESF Building
3. System 3 : Product Storage Building
4. System 4 : Main Substation Building, EGR Building,
etc.
4. INDUSTRIAL PLANT EXPERIENCE
4. Industrial Plant
Experience
SCOPE OF WORK :
Engineering, Hazop/hazid study, survey,
PROJECT INFORMATION SUMMARY : procurement, construction, commisioning &
start up
Value : IDR 551.194.508.000,- Tank
Duration : 19 Months ( October 2016 - May 2018 ) § Tank 1.000 KL = 2 Unit (PFAD Tank)
Location : Sei Mangkei Economic Zone, North Sumatera § Tank 2.000 KL = 5 Unit (2 RBDPO & 3 RBDPS
Technology Provider : LIPICO Technologies Singapore Tank)
§ Tank 5.000 KL = 10 Unit (6 CPO & 4 Olein
Tank)
Road & Drainage
Packaging Machine and Building
Refining & Fractionation Plant
Utility Equipment Supply
Civil Works & Buildings
Electrical & Instrumentation
4. Industrial Plant Experience
HEAD OFFICE : WIKA TOWER,
Jl. D.I. Panjaitan Kav. 10, Jakarta 13340 Phone : 021-8192808,
8508640, 8508650
Fax : 021-8191235, 8198040
http://www.wika.co.id; email : [email protected]

Disclaimer :
This material is for Information only, and we are not soliciting any action based upon it. This report is not to be construed as an offer to sell or the solicitation of an offer to buy any security in any jurisdiction where such an offer or
solicitation would be illegal. The Information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurate or complete, and it should not be relied upon as such. Opinion expressed is our
current opinion as of the date appearing on this material only, and subject to change without notice. It is intended for the use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in
any form, by any means, or redistributed to others without written permission of PT Wijaya Karya (Persero) Tbk.
@Copyright 2019