TECHNICAL SPECIFICATION
Concrete Works
Pekerjaan Belon
的;
9
叭刊
乞
This document is to be considered confidential, and sl1all not be reproduced in wl1ole or in part by any means without the prior written consent of APP Global Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
Project No. P-Kw2M
Page
1
2 o f 18
ConcreteWo『ks Issued Date Jan 14, 2019
Revision Summary
Description of Revision
Date Revision Prepared Checked Approved
(function affected, modified sections)
M.HERLINGG AYUNG K/
Jan 14, 2019 1 Issued for Approval HOMBARASW
A/ IRMAN S ROY UK
i part by any means without the prior written consent of APP Glooal Projects Group
This document is to be considered confidential, and shall not be reproduced in whole or n
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
Cf).
Project No P-Kw2M
PINDO DELI KARAWANG Document No P-Kw2M-100-1 O-SPC-0006
Table O f Contents
SCOPE
REFERENCE DOC_UMENT
MATERIAL
3.1 CEMENT
3.2 COARSE AGGREGATE/ AGGREGAT KASAR
3.3 FINE AGGREGATE
3.4 ADMIXTURES
3.5 WATER
而 s document is to be considered confidential, and shall not be reproduced in whole or in part by any means without the prior written consent of APP Glot:>al Projects G「oup
Form: Kw2M-100-01-STD_Engineenng_Standard Nov 16, 2015
Project No. P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
1 SCOPE
This specification covers minimum 「equirement of produce concrete, production, quality control,
placing, curing and testing of concrete which is to be used for plain, reinforced or prestressed
concrete work in COMPANY concession areas. The specification however does not deal with
special types of concrete. The work shall conform to the grades, lines and dimensions shown on the
drawings.
Spesiftkasi 1ili mencakup persyaratan minimum pembuatan beton, produksi, kontrol kua!tras,
penempatan, cunilg dan pengLJJ,店n beton yang akan digunakan untuk peketjaan beton biasa,
perkuatan atau prategang动area konsesi PERUSAHAAN Namun spes1nkasinya t心'ak
berhubungan dengan知1:S beton khusus. Peketjaan harus sesuai dengan kelas, gan:S, dan dimensi
yang吮'tin_,丿ukkan pada gambar.
Nonetheless certain equipment and/or works may present particular problems. In such a case the
COMPANY reserves the right to modify general specifications or supplement them with particular
specifications.
Meskipun dem庙n, peralatan dan / atau pekerjaan tertentu dapat meminbu/kan masa/ah tertentu.
Dalam kasus seperti itu PERUSAHAAN berhak untuk memodiftkasi spes.历'kasi umum atau
melengkapi nya dengan spes1.茄asi tertentu.
2 REFERENCE DOCUMENT
The 「eference documents listed below form an integral part of this General Specification. Unless
otherwise stipulated, the applicable version of these documents, including relevant appendices and
supplements, is the latest revision published at the EFFECTIVE DATE of the CONTRACT.
Dokumen referensi yang tercantum动bawah 1'ni merupakan bag.砌 y a n g / .心'ak terp1:Sahkan dart
Spes1.茄as/ Umum 1'nl Kecua/J" ditentukan la加,versi yang berlaku da月dokumen勺 'okum en in�
termasuk lamp/ran dan suplemen yang relevan, ada/ah rev.心'i terbaru yang动'!erbf[kan pada
TANG GAL EFEKTIF dari KONTRAK
When local national standards, regulations and codes exist, all design, engineering, materials and
construction shall conform to their latest requirements, which complete or modify the p 「esent
specifications.
Ketika standar nasional setempat, peraturan dan kode setempat ada, semua desa加,teknik, ba/Jan
dan konstruksi /Jarus memenu/Ji dengan persyaratan terbarunya, yang tela/J砸ng,勉tJi atau
d1mod1.茄asida刀spes1.茄asiyang ada.
In case of lack of mandatory local national standards, international code and standards will be
applied.
Dalam ha/ kurangnya standar nasional /oka/ maka w�丿1/bk, ode dan standar intemasional d!terapkan
In case of lack of international norms and standards, national code and standards listed he 「eafte「
will be applied
Dalam ha/ kurangnya norma dan standar intemasional, maka kode dan standar nas1on台 I yang
tercantum se!anjutnya akan d!lerapkan
This document is to be considered confidential, and shall not be reproduced in whole or in part by any means without the prior written consent of APP Glot::>al Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
它
Project No. P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
In all cases the system adopted shall be coherent, i.e. the various texts shall present no
incompatibility. Any dispute shall be 「esolved by basing works on the most stringent text for the
CONTRACTOR and at his expense.
Dalam semua kasus, s1:Stem yang diadopsi harus koheren, ya!lu berbagai teks yang t,心'ak
menya;lkan ket厄'akcocokan. Set1ap perselisihan /Jarus动selesaikan dengan mendasarkan
peker;aan kepada teks yang paling ketat untuk KONTRAKTOR dan alas b店�asendid
The list of specifications and code quoted is not exhaustive: the CONTRACTOR shall respect the
secondary standards and 「egulations, which cover the works described in the present specification.
Danar spes.庥-asi dan kode yang dik.玑ip t.厄'ak lengkap: maka KONTRAKTOR harus menghorma/1
standar dan peraturan sekunder, yang mencakup peke!J"aan yang咂/askan dalam spes庥函ini.
Certain specifications and code may be indicated with an issue date. This is for information only. It
must be understood that the most recent issue shall be used.
Spes1.陈asi dan kode tertentu dapat劭n噬asikan dengan tangga/ penerbitan dan lni hanya untuk
勿formasi. maka harus dipahami bahwa isu terbaru harus动gunakan.
Organizations whose standards are referenced herein and related work in other sections are as
follows:
Organisasi yang standamya dlrujuk动bawah inf dan segala peke!Jaan yang terka1t di. bag.砌 / 砌
adalah sebagai berikut:
Reference Title
INDONESIAN CODE
SNI - 2847 - 2013 Persyaratan Beton Struktural untuk Bangunan Gedu ng
PBl-1971 Peraturan Beton Bertulang Indonesia
SNl-15-2049-2004 Semen Portland
AMERICAN CONCRETE INSTITUTE - ACI
ACl-318-2011 Building Code Requirements for Reinforced Concrete
Recommended Practice for Evaluation of Strength Test
ACI 214
Results of Concrete.
Recommended Practice for Measuring, Mixing,
ACI 304R
Transportinq, and Placing Concrete.
Manual of standard practice for detailing reinforced
ACI 315
concrete structures.
Recommended practice for selecting proportions for
ACI 613
concrete.
AMERICAN SOCIETY OF TESTING MATERIAL -ASTM
Test for Flow of Portland Cement Concrete by use o f the
ASTM C 124
Flow Table.
ASTM C 143 Test for Slump of Portland Cement Concrete
Test for Ball Penetration in Fresh Portland Cement
ASTM C 360
Concrete.
This document is to be considered confidential. and shall not be reproduced in whole or in part by any means without the prior written consent of APP Glot?al Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
勺 ,
ProJect No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
3 MATERIAL
The basic materials required to produce concrete shall conform to the following in conjunction with
the refe 「ence standards mentioned in section 2.0
Bahan dasar yang dtperlukan untuk produksi beton harus sesuai dengan ha/ bertkut bersamaan
dengan standar referensiyang dtsebutkan dalam bag.励 2 . 0
3.1 CEMENT
a. The cement used shall be ordinary Portland cement (Type I) unless di 「ected otherwise,
conforming to the standards referred to in section 2.
Semen yang dtgunakan adalah semen Portland b1asa kecualt·dtarahkan sebaltknya, sesuai
dengan standaryang disebutkan da/am bagian 2
b. The minimum strength of cement tested under standard conditions referred to in the standards
shall be as under:
Kekua/an m们imum semen yang dillji dalam kondisi standar sebagatinana dtinaksud dalam
standar adalah sebagaibertkut:
This document isto be considered confidential, and shall not be reproduced in whole or in part by any means without the prior written consent of A P P Global Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
它
ProJect No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
c. The initial setting time for the cement shall not be less than 30 minutes and the final setting time
shall not be more than 8 hours.
Waktu pengaturan awal untuk semen harus tidak kurang de动30 menit dan waktu pengaturan
akh1r tidak bole/7 Jebi/7 da月8/am
d. The cement shall have a specific surface not less than 2700 cm2 / gm.
Semen harus mem劝*ipermukaan spes.历* t1dak kurang dad 2700 cm2 / gm
g. The cement bags shall be stored on sleepers with enough room to circulate ai 「aro und it and
shall not be stacked more than 6 bags high.
Kantung semen harus恋师'f)an pada bantalan dengan ruang yang cukup untuk mengalirkan
udara幼sekitarnya dan t,心'ak boleh dltumpuk /ebih dari 6 kantung.
h. The bags showing signs of warehouse set shall be separated from the other bags and shall be
used only after a consent is obtained from the COMPANY.
Kantung-kantung yang bertanda gudang动retapkan dan harus dlp1:Sahkan d.动kantung-kantung
/动danakan动gunakan hanya setelah persetUJuan吻eroleh d.动PERUSAHAAN
i. Bags showing signs of permanent set shall be separated from all othe 「 bags. A report shall be
prepared on the number of such bags and shall be made available to the COMPANY.
Kantung yang menunJukkan tanda set permanen harus dlpisahkan d.动 k a n t u n g /ainnya.
Laporan h a r u s 恋 砌 k a n tentang丿um/ah kantung tersebut dan harus d1:Se西kan untuk
PERUSAHAAN
j. When the cement is procured by the CONTRACTOR, the CONTRACTOR shall obtain a
certificate from the manufacturer stating the batch number, the date of manufacture, the
chemical composition and the results of tests to satisfy clauses "b", "c", and "d". In the event
that the CONTRACTOR fails to provide such certificate, the CONTRACTOR shall not be
allowed to use the said cement and shall not be paid for i t
Ke!Jka semen d1be/J'oleh KONTRAKTOR, KONTRAKTOR harus mempero/eh se月'fikat d.叩
pabnkan yang menyatakan nomor batch, tanggal pembuatan, kompos1:Si k,叨la dan has!/
pengUJian untuk memenuhi k / a u s a ' 织 ' c ' : d a n ' ' d ' ' . Dalam ha/ KONTRAKTOR gaga/
This document is to be considered confidential, and shall not be reproduced in whole or in part by any means without the prior written consent of A P P Global Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
守.
Project No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
k. The cement shall be used within 30 days of its date of manufacture shown on the
manufacturer's certificate.
Semen harus digunakan dalam waktu 30 hari dari tanggal pembuatannya yang dllu17Ji.Jkkan
pada serf.历'katpabrikan.
a. The coarse aggregate, either crushed rock or any other approved material, shall be clean,
angular, well graded free from organics, or any other undesirable material.
Agregat kasar; ba1k batu yang d1nancurkan atau bahan la1il yang d!setUJu�harus bers欣
bersudut, 动切1/ai bebas d.动bahan organik, atau bahan /a1il yang tidak dt.历'!Jlilkan.
b. The coarse aggregate shall be dense (specific gravity between 2.5 to 2.6), hard and shall have
a crushing strength of minimum 200 MPa.
Agregat kasar harus padat (berat丿enis antara 2, 5 hingga 2, 6), keras dan harus memi/Jki
kekuatan penghancuran m加加um200MPa
c. The coarse aggregate shall have a stable chemical composition and shall be free from lime or
any other substance that will deteriorate on reacting with alkali or alkaline envi 「onment present
in concrete.
,a
Agregat kasar harus mem份(f{i kompos1si k,叨 yang stab1l dan harus bebas dad kapur atau zat
/alil yang akan memburuk saat bereaksi dengan /Jilgkungan alk.动 a t a u a l i 庙 y a n g ada dalam
beton.
d. The coarse aggregate shall have a attrition value of 3.0 as determined by Los Angeles test.
Agregat kasar harus memi/1.如n砌gesekan 3. Osebaga1inana动tentukan oleh UJl Los Anqeles.
e. The agg 「egate shall absorb moisture not more than 2% of its dry weight after soaking in water
for 24 hours.
Agregat harus menyerap ke/embaban t1dak lebih d.动 2 % d.动beratke加'gnya setelah d1rendam
dalam air selama 24;am.
This document is to be considered confidential, and shall not be reproduced in whole or in part by any means without the prior written consent of APP Gloti,al Projects Group
Form. Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
于.
Project No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
25.4 1 100
19.0 ¾ 35-70 90-100 100
12.7 ½ 90-100
9.52 3/8 10-30 20-55 40-70
4.76 3/16 0-5 0-10 0-15
2.40 No. 7 0-5 0-5
g. The coarse aggregate shall be sto 「ed in the place designated for the purpose
Agregat kasar harus disimpan di tempat yang dtlentukan untuk tujuan tersebut.
a. The fine aggregate shall be either sand or finely crushed rock. If the finely crushed rock is used
the approval shall be obtained in writing before using the same. The fine aggregate shall be
clean, free from organics, clay or any other undesirable matter. The fine aggregate shall be well
graded.
Agregat /Ja!lJs /Jarlls berllpa pasir atalJ batlJ yang dt.加ancllrkan /Jallls. Jika batu yang
劭ancllrkan sampai /Ja/lJs dtgllnakan, persetlJjuan /Jarlls dtperole/J secara tertlllis sebellJm
menggllnakan yang sama. Agregat /Ja/lJs /Jarlls berstn, bebas dad ba/Jan organik, tana/J liat
atalJ benda lain yang t1dak dtlnginkan. Agregat /Ja/lJs /Jarlls dt'n庙i dengan baik.
c. The fine aggregate shall be free from salts and shall be of stable chemical composition.
Agregat hallJs /Jarlls bebas dari garam dan harlls da厅kompos1si kimia yang stab11.
e. The fine aggregate shall be sto 「ed in the place designated for that purpose
Agregat ha/us harus动�impan d i tempat yang d!lun.,丿i.lk untuk IUJi.lan 1/u
3 .4 ADMIXTURES
.
Project No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
b. The admixture shall be used in the dosages recommended by the manufacturer and / or
COMPANY.
Admixture harus dtgunakan dalam dosis yang direkomendastkan oleh pabnk dan I atau
PERUSAHAAN
c. When the use of admixtu 「e is needed the admixtures shall be recommended by the
COMPANY. In case the concrete is supplied by the CONTRACTOR, the CONTRACTOR and
the COMPANY shall agree to an allowable percentage of wastage fo 「 admixture. Any use of
admixture in excess of the quantity recommended by the COMPANY and the agreed
percentage of wastage shall be back charged to the CONTRACTOR.
Ketika penggunaan admixture diperlukan, admixture tersebut harus ditentukan oleh
PERUSAHAAN Dalam ha/ beton dipasok oleh KONTRAKTOR, KONTRAKTOR dan
PERUSAHAAN harus menyetlljui persentase pemborosan yang d1.切'17kan. Setiap penggunaan
a d i 呻 硒 / e b 1 n da盯砌'/ah yang direkomendas1kan oleh PERUSAHAAN dan persentase
pemborosan yang动sepakati akan噬emba旅an d1bebankan kepada KONTRAKTOR
3.5 WATER
a. Water for mixing, curing and other designated applications related with concrete production and
curing shall be free from dissolved salts, dissolved or undissolved impurities, organic matter,
acid or alkali or any other undesirable substance. The pH of water shall be between 6 and 8.
At"r untuk pencampuran, c叨 ng dan apltkasi khusus latilnya yang terkait dengan produ.知 d a n
pengawetan beton harus bebas da厅garam terlarut, pengotor ter/arut atau t1dak /arut, bahan
organik, asam atau a/k.动 a t a u zat lati7 yang t1dak dt.勿吵kan. P H air harus antara 6 dan 8
a. The cone 「ete shall be produced using the constituents mentioned in section 3. The following
maximum size coarse aggregate shall be used fo 「all grades.
Belon harus d!produksi dengan menggunakan konsl!ruen yang动:.Sebutkan da/am b召qian 3.
Agregat kasar ukuran maks加um bedkut harus d!gunakan untuk semua grade.
b. The concrete shall be prepa 「ed as per the mix design. The mix design itself shall be b乏 sed on
one of the reference standards and the trial mixes. The COMPANY shall ensure the co 「rect
P「oportions of the trial mixes and shall supervise the testing of the trial mix cub�s. After
satisfactory results are obtained, the trial mix shall be registered as an approved mix design and
a number shall be designated to identify it. Any change in aggregate size / grading shall requi 「e
This document is to be considered confidential, and shall not be「eproduced in whole or in part by any means without the prior written consent of A P P Glob;i;3I Pro」ects Group
Form: Kw2M-I00-01-STD_Engineering_Standard Nov 16, 2015
-
Project No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
a new mix design. Trial mix shall be submit for age in days in 3,7,14,21,28, each of the age shall
be in 4 sample (2 concrete Lab/internal lab and 2 independent lab/Recommend by Company)
Belon harus d1.造'f)kan sesuai desain campuran. Desain campuran 1tu sendi竹harus didasarkan
pada salah satu standar referensi dan campuran uji coba. PERUSAHAAN harus memast1kan
proporsi yang benar dari campuran LJJI coba dan harus mengawasi penglljian benda UJI kubus
campuran. Sele/ah hasil yang动加'ginkan吻eroleh, campuran LJJIcoba harus动daftarkan sebaga1
desain campuran yang动'selLJJi.li dan nomor harus动tun,丿i.lk untuk meng.心'enlt.版asinya. Set1ap
perubahan dalam ukuran / kelas agregat maka d!butuhkan desa1n campuran baru. Campuran ujl
coba harus动幼初kan untuk us店dalam hari dalam 3, 7, 14,21,28, masing-masing us启harus
dalam 4 sampe/ (2 Lab beton//nternal Lab dan 2 lab independent/Ditentukan o/eh Perusahaan丿
c. The maximum water cement ratio and minimum cement content for any grade of concrete shall
follow as per table below except for lean concrete (K-100 To K-150).
Rasia semen air maks加um untuk se/1ap tingkat be/on 17arus mengikuti seperti label d i bawa/7
kecua/i untuk lean concrete (K-100 To K-150).
However the COMPANY decision shall be based on the cement content of the design mix. and
the cube test (Trial Mix)
Namun dem畛n, keputusan PERUSAHAAN harus d1dasarkan pada kandungan semen d.动
campuran desain. dan tes kubus (Tn刮肋ix). Untuk semua kelas yang /ainnya, kadar semen
m们imum harus d i utuskan dan disaksikan o/eh PERUSAHAAN.
This document isto be considered confidential, and shall not be reproduced in whole or in part by any means without the pnor written consent of APP Glo :al Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
�
Project No. P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
d. All the concrete produced shall be based on the dry weights of materials. Mechanical mixing with
approved equipment only shall be used. In case the materials have any absorbed moisture,
necessary adjustment shall be made to the water cement ratio so as to counter the effect of such
excess moisture.
Semua be/on y a n g 吻 r o d u k s i harus berdasarkan pada berat bahan kering. Pencampuran
mekanis dengan peralatan yang动selllJ"ui hanya harus digunakan. Dalam ha/ bahan memt.加
ke/embaban yang dt"serap, penyesua砌yang d!perlukan harus动1/akukan terhadap rasio semen
air untuk melawan efek d.动kelebihan air tersebut.
e. Sand when used as fine agg 「egate shall be regularly tested for bulking. The weight of sand shall
then be adjusted in the mix design to allow for the percentage of moisture thus found out
m
Past"r bi/a digunakan sebagai agregat ha/us harus 切Vsecara berkala untukJumlah besar. Bera!
pas1r kemudian harus幼sesuaikan dalam desain campuran untuk memungki历kan persentase
kelembaban yang动temukan.
f. standard test cylinder (size : 15 cm x 30 cm) shall be cast and dated as pe 「the following :
Cy!tilder uji standar (ukuran: 15 cm x 30 cm丿harus动cetak dan dt"be斤tanggal sesuai yang
berikut
The test cubes shall be cured under water. At the 7th day- three test cubes shall be tested as per
procedures listed in the reference standards mentioned in section 2
Three more cubes from the same batch shall be cured upto the 28th day of casting and shall be
tested as per above .
Kubus UJi'harus dicuring di bawah air. Pada hari ke 7, tiga batu UJi'harus ditJJi'sesuai prosedur
yang tercantum dalam standar referensiyang disebutkan dalam bagt'an 2
Tt'ga kubus lagi d.动kelompokyang sama harus diJ'aga sampai hari ke 28 pengecoran dan harus
ditJJi'seperti d i alas.
守
Project No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
At least 2 cubes shall pass the c 「iteria at the 7 day test and all the cubes ( 3 numbers) shall
pass the above criteria at the 28th day test. The failure of mo 「e than 5% of the total cubes,
casted till date, to meet the criteria at any particular time shall automatically require a new mix
design, with the approval of the COMPANY.
Set,心'aknya 2 kubus harus /ulus kritena pada tes 7 hari dan semua kubus (3 sample,丿harus/u/us
knte庞动alas pada tes ha刀ke-28. Kegagalan /ebih dari 5% d.动 t o t a l kubus, dicor sampai
tangga/, untuk memenuhi kntena pada waktu tertentu akan secara otomatis memerlukan desa勿
campuran baru, dengan persetu;uan dari PERUSAHAAN
h. The results of testing of cubes shall be sent weekly to the COMPANY and shall be approved. A
separate record on the production of concrete in the format specified by the COMPANY also
shall be submitted to the COMPANY. If the concrete cubes fail to show the required strength as
per section 4 point "g" of this specification, the matter shall be immediately brought to the notice
of the COMPANY. If the conc 「ete cubes have failed to achieve the 7 day strength (i.e. 0.7 x
characte 「istic strength) then the COMPANY shall adopt measures like curing the structure where
such concrete was used for a longer period.
Has!l pengLJJ,店n kubus akan d1.励 m
se/Jap m加'ggu ke PERUSAHAAN dan harus d1set.归
Catatan terp1sah tentang produksi beton dalam format yang ditentukan a/eh PERUSAHAAN_丿iJga
harus diserahkan kepada PERUSAHAAN J1ka kubus beton gaga/ menunjukkan kekuatan yang
diperlukan sesuaipada section 4 po1il''g" dari spesifikasi 1il�masalah tersebut segera di心awake
pembentahuan PERUSAHAAN舷a kubus beton gaga/ mencapai kekuatan 7 hari (mis. 0, 7 x
kekuatan karaktenstik) maka PERUSAHAAN harus mengamb1l /Jildakan seperti cunilq strukt.切
beton yang sudah匆unakan untuk penode yang leb1h lama
In case the test cubes fail to show the 「equired s甘ength as per section 4 point "g" (b), then the
matter shall be referred to the design office and the mix design shall be critically analp:ed and
the necessary changes made to achieve the required strength
Dalam ha/ batu u;'i gaga/ menun_,丿ilkkan kekuatan yang c/J'perlukan sesu.刮section 4 p a i n ' 矿(纵
.
maka masalah tersebut harus动劭ilk ke kantor de函 1i l dan de函 in campuran harus动analis.心
secara knt1s dan perubahan yang diperlukan harus动'buat untuk mencapai kekuatan yang动
butuhkan.
If the concrete which has failed to show the required strength after 28 days has been supplied by
the Contractor and if the design office requires rectification of the structure where such concrete
has been used then the CONTRACTOR shall carry out the complete 「ectification at his oVvn cost
J1ka beton gaga/ menun_,丿ilkkan kekuatan yang diperlukan setelah 28 hari c/J'pasok a/eh Kontraktor
dan ;ika desa1il mensyaratkan perba1kan struktur动mana beton tersebut digunak.岔n maka
KONTRAKTOR akan melakukan perba1kan /engkap dengan biaya sendiri.
This document is to be considered confidential, and shall not be reproduced in whole or in part by any means without the prior written consent of APP Glot;;,al Projects Group
Form. Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
多 ·
Project No P-Kw2M
PINDO DELI KARAWANG Document No P-Kw2M-100-1 O-SPC-0006
i. The concrete shall have the following slump for all grades.
Belon harus mem份ki slump benkut untuk semua ntlai.
5 PLACING OF CONCRETE
a. The concrete shall be placed in the places shown on the drawing as per the dimensions, slopes
and elevations marked on the drawing. Correct concrete grade as per the drawing shall be
used. The CONTRACTOR shall be responsible for any request for inappropriate grade of
concrete. The batch so refused shall be back charged to the CONTRACTOR, in case the
concrete supply is by the COMPANY.
Belon /Jarus吮'empatkan di tempat-tempat yang动lunjukkan pada gambar sesua; 动mensi,
k砌 iringan dan ket1ilgg.砌 y a n g dl[andaipada gambar. Ke/as be/on yang benar sesuai gambar
/Jarus动igunakan. KONTRAKTOR akan bertanggung丿awab alas segala permintaan un/l/k mutu
be/on yang t1dak sesuai Kumpulan yang d!rolak akan动*emba/1kan ke KONTRAKTOR, 丿�ka
pasokan betonnya adala/J ole/J PERUSAHAAN
b. The CONTRACTOR shall obtain written approval from the COMPANY before placing the
concrete in the designated location. The approval shall be in the standard format provided by
the COMPANY.
KONTRAKTOR harus mendapatkan persetujuan tert.幼1s dari PERUSAHAAN sebe/um
menempatkan beton dt. /okasi yang dttentukan. Perse/LJJ'uan harus dalam format standar yang
disediakan oleh PERUSAHAAN
c. The form work shall be thoroughly cleaned and wetted with water, to the satisfaction of the
COMPANY, before placing concrete (Refer to P-JktGPG-100-10-SPC-0004 technical
Specification for Form Wo 「k and False Work).
Bekisting /Jarus d1bersi/Jkan secara menye/uru/J dan dibasa/Ji dengan air, untuk keoutu/Jan
PERUSAHAAN, sebe/um menuangkan beton (U/Jat P-Jk!GPG-100-10-SPC-0004 Sp0s1.茄as1
tekms untuk Peke!Jaan Bek心ting dan Peke!]aan Peranca/J,丿
d. The concrete shall be transported only in approved vehicles like mixers, buggies etc. The
drums of the truck mixers shall be washed clean after every 8.0 hours.
Be ton harus diangkut pada kendaraan yang telah dl'se!UJui seperti mixer, kereta di/. Drum mixer
truk harus d1cuci bersih setelah set1'ap 8, O丿am.
e. The concrete shall be placed in the fo 「m work or at any othe 「 designated location -vvithout
segregation. The maximum free fall allowed for concrete shall be 2.5 meters. At any sign of
segregation the conc 「eting shall be stopped and the height of free fall shall be adjustec:1. If this
fails to correct the problem the concrete mix shall be redesigned
Belon harus ditempatkan da/am bekisting atau di /okasi lain yang动tunjuk tanpa pe皿�ahan
Jarak maksimum Jatuh bebas yang d1,庄inkan untuk beton adalah 2, 5 meter. Pada setiap tanda
This document is to be considered confidential, and shall not be reproduced in whole or in part by any means without the prior w百tten consent of APP Gloeoal Projects Group
Form·Kw2M-100-01-STD_Eng,neering_Standard Nov 16, 2015
仔
Project No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
pem1sahan, pengecoran harus dihent1kan dan ket1ilgg1an丿'atuh bebas harus dises盛 tkan. J1ka
gaga/ memperbaiki masa/ah, campuran beton harus d� 砖satil ulang
f. The concrete shall be thoroughly compacted using approved vibrators. The compaction shall be
deemed to be complete at the first sign of slurry on the surface of concrete. Vibration shall not
be used fo 「pushing the concrete from one place to another. No reinforcement shall be either
removed or disturbed for placing and / or vibrating concrete.
Belon harus吻adatkan dengan seksama menggunakan vibrator yang disetlljui Pemadatan
harus d1anggap selesai pada tanda bubur pertama d i permukaan beton. Getaran t,厄'ak bo/eh
d!gunakan untuk mendorong beton dari satu tempat ke tempat lain. Tidak ada tu/angan bes/
yang boleh di/epas atau diganggu saat menempatkan dan / atau menggetarkan beton
g. After placing of concrete all concrete surfaces shall be troweled smooth with a metal trowel o「
finished as specified in drawing / directed by the COMPANY.
Sele/ah menempatkan beton, semua permukaan beton harus dtk1k1s ha/us dengan sekop
logam atau selesai sebaga加ana ditentukan da/am gambar/ diarahkan oleh PERUSAHAAN
h. When the concrete pour is stopped for one hour or more, the surface from which the fresh
concrete shall be poured later, shall be roughened to the satisfaction of the COMPANY. Such a
surface shall be free from all loose aggregates, all the laitance and dust shall be removed f 「om
the surface. The surface shall be wetted with 1 : 3 cement : water mixture and then only the
fresh pour shall be started.
Ket1ka penuangan beton动1/Jent1kan selama satu ;am atau leb1n, permukaan dari mana beton
segar akan动tuangkan kemud1an, harus dikasarkan sesuai kebutuhan PERUSAHAAN.
Permukaan seperti ltu harus bebas da刀semua agregat lepas, semua laltance dan debu harus
动1/Ji/angkan da厅permukaan. Permukaan harus动vasahi dengan semen 1: 3: campuran air dan
kemudian Penuangan beton segar akan segera d1inula1
i. All temporary platforms, walkways, stays etc. shall be removed before placing concrete at the
location where such platforms, walkways, stay are erected.
Semua platform sementara, 丿'Blur pe_丿'Blan kak�tempat t1nggal di/. Harus动Vepaskan sebelum
menempatkan beton动/okasi d i mana platform, 庞/urpe_丿'Blan kak�tempat t1nggal dA动切(J(an
j. ·No attempt shall be made to 「ecompact the concrete once the initial set has taken place
乃dak ada upaya yang dapat di/akukan untuk memadatkan ulang beton sete/ah s e t awal telah
ter;adi.
k. When the cone 「ete has to be placed under water, dry mix shall be used. Tremie pipe shall be
used for placing the concrete in place
Ket1ka beton harus d1tempatkan c11·bawa/7 air; campuran kenng harus dlgunakan. Pipa tremie
harus d1gunakan untuk menempatkan beton pada tempatnya.
6 CURING CONCRETE
而s document isto be conside「ed confidential. and shall not be reproduced in whole or in part by any means without the prior written consent of A P P Global Projects Group
Form. Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
Project No P-Kw2M
PINDO DELI KARAWANG Document No P-Kw2M-100-1 O-SPC-0006
b. When curing is done with water, the concrete shall be cured for a minimum pe 「iod of seven
days.
Ket1ka Cl/.加'9 di/akukan dengan air, beton harus盆吵'9 untuk pedode m加加um ltJJuh han
c. The curing shall not start until after at least 8 hours have passed since placing the concrete
Cunilg tidak akan m响sampai setelah setidaknya sete/ah 8丿am se;ak beton dttempatkan.
d. When curing is to be done by curing compounds only approved compounds shall be used. The
silica based curing compounds shall not be used where water proofing compounds have to be
used later. The application the curing compounds shall be uniform over the entire exposed
surface of concrete.
Ke/1'/<a curing harus dtlakukan dengan curing kompon, maka hanya kompon yang le/ah d1set0切
yang dapat digunakan. Cunilg kompon berbasts s脏a tidak bo/eh digunakan di mana kompon
anti air harus digunakan nant1ilya. Aplt'kasi curing kompon harus seragam di selu.吵
permukaan be/on.
a. The concrete shall be deemed as wet till at least 48 hours after placing and the CONTRACTOR
shall take care to avoid heavy loads on this concrete du 「ing this period.
Seton akan dianggap sebagai basah sampai set1daknya 48丿am setelah penempatan dan
KONTRAKTOR harus berhat1�hati untuk meng,川ndari beban berat pada beton 1. 闭selama
pertodeini
b. When the form work is removed, if the COMPANY notices any defect on the surface of
concrete, then the CONTRACTOR at his own expense, shall rectify the defective concrete
surface by using 1 : 3 cement : sand mortar. In case the concrete shows honeycombing, the
CONTRACTOR shall bring this to the notice of the COMPANY, who will then decide whether
the conc 「ete has to be completely 「emoved or only repaired. The surfaces which require only
repairs shall be freed of loose aggregates and mortar shall be applied to the said surface and
the surface smoothened. The mortar applied thus shall be cu 「ed as per section 6. Such repairs
shall be to the CONTRACTOR own expense. If the repairs are not carried out within 24 hours of
striking the forms an amount equal to 5% of the progress payment under the concrete item shall
be held towards the rectification till such time that the rectification is done.
Ke/Jka bek,心ting叩砌'gkan, jlka PERUSAHAAN me/Jnat adanya cacat pada permukaan be/on,
maka KONTRAKTOR alas b1aya sen砌harus memperba1ki permukaan be/on yang rusak
dengan menggunakan semen 1: 3: mortar pasir. Da/am ha/ be/on kedapatan saranq lebah,
KONTRAKTOR harus membenlahukan ha/加kepada PERUSAHAAN, yang kemudt.初 a k a n
memutuskan apakah be/on tersebut harus d1n1/angkan seluruhnya a/au hanya diperba皿
Permukaan yang hanya membutuhkan perbaikan harus动vebaskan dad agregat longgar dan
mortar harus d!terapkan pada permukaan tersebut dan permukaan d1naluskan. Dengan
dem加�n mortar yang digunakan harus dicunngkan sesuai bagian 6. Perba1kan semacam 1/u
harus d1bebankan kepada KONTRAKTOR sendiri. J1ka perbaikan t,心'ak dilakukan da/am waktu
24 ;am se;ak pemogokan formu/Jr; 丿i.Jmlah yang sama dengan 5% dadpembayaran ke;刀 危vi.Jan
berdasarkan k1,劝nan be/on akan劭'akukan terhadap perba1kan sampai saat pe:rbaikan
d1/akukan
This document isto be considered confidential, and shall not be reproduced in whole or in part by any means without the pno「written consent of APP Glot,al Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
它
Project No. P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
c. The nails, she-bolts etc. jutting out of the concrete surface after the removal of form work shall
be cut by making a 15 mm recess into the concrete and then cutting the said objects well below
the surface in question.
Paku, baut-baut, di/. Vang menon;ol keluar d.动permukaan beton sete/ah pem历dahan bentuk
harus dipotong dengan membuat ceruk 15 mm ke dalam beton dan kemudt'an memotong
benda-benda tersebut丿即加iibawah permukaan yang dimaksud
The recess shall then be filled with 1 : 3 cement : sand mortar and the surface smoothened.
The COMPANY shall with hold the progress payment of 5% of the concrete item towards the
rectification of such repairs till such a time that the rectification is done.
Reses kem{J,西 n akan动的dengan semen 1: 3: mortar pas1r dan permukaan动1/Ja/uskan.
PERUSAHAAN akan menanggLJhkan progess pembayaran 5% d.动beton sampai perba1kan
sedc砌 'lk/.初励'{Jga selesai
If the concrete requires to be removed due to CONTRACTOR fault, the CONTRACTOR shall
be back charged for the concrete if the concrete is supplied by the COMPANY.
邓 a beton peril/劭i/angkan karena kesalahan KONTRAKTOR, maka KONTRAKTOR akan
dikenakan biaya llnlllk beton ;ika beton dipasok oleh PERUSAHAAN
d. In case the reinforcement is left open for facilitating future extension, all such reinforcement
shall be either embedded in non-structural grade concrete o「shall be painted with cement
slurry to prevent corrosion.
Dalam ha/ tu/angan dib店rkan terbuka untuk memfasi/Jtasi perpan,丿angan di. masa depan, semua
tu/angan tersebut harus tertanam dalam beton mutu non-struktura/ atau harus动bat dengan
bubur semen untuk mencegah korosi
e. The slu 「ry ridges formed on the surface of form finished concrete due to the joints in form work
not being watertight shall be rubbed smooth by the CONTRACTOR, at no extra expense to the
COMPANY.
砌 t a n bubur yang terbentuk pada permukaan beton karena sambungan dalam pekerjaan yang
呻 k kedap air harus digosok dengan ha/us oleh KONTRAKTOR, tanpa b店,ya tambahan
kepada PERUSAHAAN
f. In case of slabs, the COMPANY shall inspect the slab_ 24 hours after casting and advise the
CONTRACTOR about the 「ectification of slopes if required. Such rectification shall be carried
out by roughening the concrete surface and using 1: 2 : 4 cement : sand : coarse aggregate
concrete. The maximum size of coarse aggregate used for such rectification shall be 1Orrnm.
Dalam ha/ slab, PERUSAHAAN harus memenksa slab 24 jam sete/ah pengecor.岔n dan
membe厅tahu KONTRAKTOR tentang perba1kan lerengjlka diper/ukan. Perba1kan semacam 1tu
harus动1/akukan dengan mengasaran permukaan beton dan menggunakan semen -/: 2: 4
pasir: beton agregat kasar. Ukuran maksimum agregat kasar yang digunakan untuk pe,baikan
tersebut harus 10 mm.
8 METHOD OF MEASUREMENT
This document is to be considered confidential, and shall not be reproduced in whole or in part by any means without the prior written consent of APP Glo�,al Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015
Project No P-Kw2M
PINDO DELI KARAWANG Document No. P-Kw2M-100-1 O-SPC-0006
b. Columns shall be measured from top of the footing / slab to the bottom of the next slab or
beam, the beams shall be measured on the clear spans. For the beams below slabs, the web
depths shall be considered for volume calculations. In case of beams not under slabs the entire
depth shall be taken in to account. The slabs shall be measured for area and thickness.
Ko/om harus幼ukurd.动 a/asp庞kan / slab ke bagian bawah slab a/au balok benkutnya, balok
harus动'ukur pada bentang yang尤las. Untuk balok d i bawah slab, kedalaman web harus
dipert,加bangkan untuk perhtlungan volume. Dalam hal ba/ok yang t.厄'ak berada动bawah slab,
seluruh kedalaman harus diperhitungkan. Lembaran harus d1ukur untuk luas dan ketebalan.
3
c. The openings, cut outs shall be deducted from the measurement if they a「e in excess of 0.1 m
in volume.
Bukaan, cutout harus d1kurangkan d.动pengukuran质a volumenya leb1n dari O, 1 m3.
d. When the concrete is supplied by the COMPANY, the minimum wastage allowed shall be
ag 「eed jointly by COMPANY and CONTRACTOR. Any wastage in excess of the agreed
wastage shall be back charged to the Contractor along with the concrete volume measured.
Ke/1ka beton dipasok oleh PERUSAHAAN, pemborosan m勿/mum yang di!.动 * a n harus
disetu;:切bersama oleh PERUSAHAAN dan KONTRAKTOR Set1ap pemborosan yang meleb彻
pemborosan yang动sepakati harus噬emba欣an ke Kontraktor bersama dengan volume beton
yang动ukur.
e. Any 「ectification involving chipping concrete for no fault of CONTRACTOR, shall be based on
the man-hour 「ates only.
Setiap perba1kan yang mel1batkan be/on terkelupas tanpa kesalahan KONTRAKTOR, hanya
akan叩'asarkan pada tarif. am ke!J'a sa,庞..
9 UNIT OF MEASUREMENT
10 PAYMENT
The unit price paid for concrete shall be full compensation for furnishing all labour, materials, tools,
equipment and incidentals for completion of work involved in concrete as shown on drawing and as
specified and directed by the COMPANY.
Harga satuan yang dtbayar untuk beton adalah kompensasi penuh untuk melengkapi semua tenaga
ker;a, bahan, peralatan, peralatan dan b1aya tak terduga untuk penyelesaian pekerjaafl yang terlibat
dalam beton seperti yang ditun,丿ukkan pada gambar dan sebagaimana动tentukan d a n dtarahkan
o/eh PERUSAHAAN.
9:,.
This document is to be considered confidential, and shall not be reproduced in whole or in part by any means without the prior written consent of p..PP Global Projects Group
Form: Kw2M-100-01-STD_Engineering_Standard Nov 16, 2015