Captura de Tela 2022-04-04 À(s) 19.34.50
Captura de Tela 2022-04-04 À(s) 19.34.50
1 2 3 4
Intro Leveraging Model Predictive MPC in Calciner
Digital Control
Technologies for
process
optimization
5
Delivery
approach
Model Model
Traditional
Predictive Predictive
Operation
Stabilization Optimization
Supervised learning
Creates a model on known input Soft Sensor/
and output data to predict future
problems
Model Predictive The categories of machine
learning applications can be
Machine Control deployed in production
today
identifies deviations
MV measured value
MV set point
MPC optimizes
future trajectories
using an internal
simulation
Controlled CV measured value
Variable (CV)
CV prediction
104
REDUCES Variability
102
Process/Specification Limit
100 ACHIEVES
98
M ANAGES the process
96
Benefits within constraints
Push process
94 tow ard limits
Variability under Variability reduction Maintain quality just ACHIEVES UPLIFT operate
operator control w ith Pavilion MPC w ithin specification
92 closer to specifications and
Before During After performance limits while
TIME maintaining safety margins
Console
Handle slow or complex processing lags
Virtual Online Analyzer Controller / Optimizer
Virtual Online Analyzers replace sparse,
or infrequent, feedback from Lab or
analyzer
run-time visualization
Modeling
Supervised
MPC uses a model of the process to predict how Machine Learning
Model Predictive
Control
the process output variables will respond to
changes in the process input variables and
disturbances
LSF, AM, SM Feed recipe (%) Kiln torque Feed Total Energy
Fuel mix Separator Feed Nox Feed Quality Fuel mix
Feed rate Feed rate Heaty Duty Feed rate
O2, CO
Kiln Energy Kiln Speed
Feed rate Fan speed
Precalciner Energy Fan Speed
Kiln speed Temperature
O2, CO Oxygen Measurement
BZT Condition Clinker freelime Tertiary Air Temperature
Mill load Secondary Air Temperature
Returns/Reject Fan Speed
Back End Temperature
Pyrometer
Process Trends
Variation Example
Production Rate
Example
Kiln Speed
Single variable in & single variable out Multivariable in & multivariable out
Set up a target and control process variable to the target. Control strategy based on a holistic comprehension
No awareness of how control changes impact other PID loops. of key process variables and their interdependencies
Constraints Constraints
Only internal awareness of loops limits on setpoint and output Predict and monitor future values of constraints
104
REDUCES Variability
102
Process/Specification Limit
100
ACHIEVES Plant Stability
98
MANAGES the process
96 within constraints
Benefits
94
Push process
tow ard limits ACHIEVES UPLIFT operate
92
Variability under
operator control
Variability reduction Maintain quality just closer to specifications and
w ith Pavilion MPC w ithin specification
performance limits while
Before During After maintaining safety margins
TIME
DP
T
Manipulated Controlled
Variables (MVs) Variables (CVs) Process Filter Fan
Process variables you can variables that need to be Blaine
adjust that affect the CVs maintained at a target or
(typically PID set-points) within a set range
Combined
H2O F
T
T
Recycle
Disturbance RPM Stucco
Variables (DVs)
Measured process variables F
Gas Fan
CV MV DV P
P
Vib
kW
Potential benefits:
Potential benefits:
Increases throughput: 2% - 3%
Fuel consumption recurion:1% 2%
Power consumption reduction: 1% - 3%
Deviation free lime: -50%
Reducing NOx emissions by 20%
Reducing CO2 emissions by 5% - 10%
Process Challenges
MPC delivers
Maximize the productivity,
Reduce energy cost
variability within the products Increase throughput
Reduce fineness variability
Energy consumption
Reduced maintenance costs
Lack of reliable measurements
of some key variables
Bill of Material:
- One (1) Solution Builder (optional)
- One (1) Console (Required)
- Run time based on #-of-MVs required (required)
Pavilion8® Toolset
1 2 3
4
Mine to Market Visibility
3rd party applications AR Solutions
Controlled based AI
Operational Model Predictive
Efficiency Control
Modern
technologies
improve
performance of
process,
equipment, and
people
Persona Interviews
1 2 3 4 5 6 7
Plan
Design
FDS
Step testing
Develop
Deploy
Close
Audit Period
Customer Resources