Vaishali Qty
Vaishali Qty
8 10 12 16 20
For footings (+ Lift pardi 6 m
height) 668 2765 305 471 116
0 4325
0 5919
0 8617
0 3000
0 21861
918180
TITLE BBS FOR FOOTINGS DRAWING NO
PROJECT VAISHALI, MOTERA DRAWING TITLE
DRAWING DATE
BAR BENDING SCHEDULE REVISION NO.
No. of
Sr. No. of Dia of No.of Cutting Total
Description element 8
No. bars Bar Bar Length length
s
(pu) (mm) (pu) (pu) (m) (m) (Kg)
Vaishali foundation
For Footing Jali - //toW
For A3 21 10 1 21 2.40 50.40
For A8 13 10 1 13 1.70 22.10
For A12 13 10 1 13 1.70 22.10
For A16 13 10 1 13 1.70 22.10
For A23 16 10 1 16 2.10 33.60
For A29 16 10 1 16 2.10 33.60
For C7 21 10 1 21 2.40 50.40
For B11 23 10 1 23 2.50 57.50
For B17 23 10 1 23 2.50 57.50
For C24 21 10 1 21 2.40 50.40
For D3 23 10 1 23 2.70 62.10
For D29 23 10 1 23 2.50 57.50
For F7 16 10 1 16 2.10 33.60
For E11 23 10 1 23 2.50 57.50
For E17 23 10 1 23 2.50 57.50
For F24 16 10 1 16 2.10 33.60
For G2 13 10 1 13 1.70 22.10
For G28 13 10 1 13 1.70 22.10
For H5 16 10 1 16 2.10 33.60
For H10 23 10 1 23 2.70 62.10
For I4 18 10 1 18 2.35 42.30
For I10 23 10 1 23 2.50 57.50
For K4 21 10 1 21 2.40 50.40
For K10 16 10 1 16 2.10 33.60
For J14 21 10 1 21 2.40 50.40
For J21 16 10 1 16 2.10 33.60
For N13 30 12 1 30 3.60 108.00
For L19 13 10 1 13 1.70 22.10
For L26 21 10 1 21 2.40 50.40
For O20 16 10 1 16 2.40 38.40
For O27 13 10 1 13 1.70 22.10
For R1 16 10 1 16 2.10 33.60
For P15 33 10 1 33 3.10 102.30
For P22 15 10 1 15 1.90 28.50
For Footing Jali - //toL
For A3 19 10 1 19 2.75 52.25
For A8 12 10 1 12 1.95 23.40
For A12 12 10 1 12 1.95 23.40
For A16 12 10 1 12 1.95 23.40
For A23 14 10 1 14 2.40 33.60
For A29 14 10 1 14 2.40 33.60
For C7 19 10 1 19 2.75 52.25
For B11 19 10 1 19 2.90 55.10
For B17 19 10 1 19 2.90 55.10
For C24 19 10 1 19 2.75 52.25
For D3 21 10 1 21 3.00 63.00
For D29 19 10 1 19 2.90 55.10
For F7 14 10 1 14 2.40 33.60
For E11 19 10 1 19 2.90 55.10
For E17 19 10 1 19 2.90 55.10
For F24 14 10 1 14 2.40 33.60
For G2 12 10 1 12 1.95 23.40
For G28 12 10 1 12 1.95 23.40
For H5 14 10 1 14 2.40 33.60
For H10 21 10 1 21 3.00 63.00
For I4 15 10 1 15 2.80 42.00
For I10 19 10 1 19 2.90 55.10
For K4 19 10 1 19 2.75 52.25
For K10 14 10 1 14 2.40 33.60
For J14 19 10 1 19 2.75 52.25
For J21 14 10 1 14 2.40 33.60
For N13 27 12 1 27 4.05 109.35
For L19 12 10 1 12 1.95 23.40
For L26 19 10 1 19 2.75 52.25
For O20 16 10 1 16 2.50 40.00
For O27 12 10 1 12 1.95 23.40
For R1 14 10 1 14 2.40 33.60
For P15 29 10 1 29 3.50 101.50
For P22 13 10 1 13 2.20 28.60
For M3 - M6
For Jali 26 10 1 26 5.61 145.86
47 10 1 47 3.11 146.17
6 16 1 6 5.85 35.10
8 20 1 8 5.85 46.80
4 12 1 4 5.25 21.00
Ring 88 8 1 88 2.60 228.80 90.39
For Q9-S6
For Jali 26 10 1 26 2.90 75.40
19 10 1 19 4.00 76.00
9 16 1 9 5.85 52.65
9 16 1 9 5.85 52.65
4 12 1 4 5.25 21.00
Ring 62 8 1 62 2.70 167.40 66.13
For
For H19 - 18
For jali 27 10 1 27 4.78 129.06
31 10 1 31 4.07 126.11
For B5 6 16 1 6 3.78 22.68
6 16 1 6 3.78 22.68
Ring 54 8 1 54 1.96 105.84 41.81
For B4 7 16 1 7 3.07 21.47
7 16 1 7 3.07 21.47
Ring 42 8 1 42 2.60 109.20 43.14
For B6 4 16 1 4 2.89 11.55
4 16 1 4 2.89 11.55
Ring 40 8 1 40 1.87 74.80 29.55
For B3 7 16 1 7 3.29 23.01
7 16 1 7 3.29 23.01
Ring 62 8 1 62 2.56 158.72 62.70
Top jali 34 10 1 34 2.57 87.28
27 10 1 27 3.28 88.56
For Lift pardi
3 m height
28 10 2 56 3.50 196.00
28 10 2 56 3.50 196.00
4 12 3 12 3.50 42.00
19 8 4 76 2.82 213.94 84.52
19 8 4 76 2.75 209.00 82.57
3 m height
28 10 2 56 3.50 196.00
28 10 2 56 3.50 196.00
4 12 3 12 3.50 42.00
19 8 4 76 2.82 213.94 84.52
19 8 4 76 2.75 209.00 82.57
667.91
10 12 16 20 25 Total
31.11
13.64
13.64
13.64
20.74
20.74
31.11
35.49
35.49
31.11
38.33
35.49
20.74
35.49
35.49
20.74
13.64
13.64
20.74
38.33
26.11
35.49
31.11
20.74
31.11
20.74
96.00
13.64
31.11
23.70
13.64
20.74
63.15
17.59
32.25
14.44
14.44
14.44
20.74
20.74
32.25
34.01
34.01
32.25
38.89
34.01
20.74
34.01
34.01
20.74
14.44
14.44
20.74
38.89
25.93
34.01
32.25
20.74
32.25
20.74
97.20
14.44
32.25
24.69
14.44
20.74
62.65
17.65
90.04
90.23
55.47
115.56
18.67
46.54
46.91
83.20
83.20
18.67
79.67
77.84
35.84
35.84
33.93
33.93
18.25
18.25
36.36
36.36
53.88
54.67
120.99
120.99
37.33
120.99
120.99
37.33
1,470.37
396.30
735.19
198.15
606.53
163.47
3570 0 0 0 0
Bar Bending Lengths
No. of Cutting
Bar
Mark & Location of membe
Nos.
Bar Size a b c Bar
member rs Length
No. of
bars Total
Total no Remark 2 legged
per Weight Detailed Sketch
of bars s Stirrup
membe of bars
r a
c
135°
b
ext
135°
b
link Straight L bend C bend Joggeled
135°
Link
Concrete grade
Footing cover 50 mm
Recess over
trapezoide top 100 mm
RCC TRAPEZOIDAL
Column /
Footing size
Pedestal size
No of
Sr. No. Description
footings
Width Length D d Width Depth
Total
Cutting Cutting Quantity
Dia Spacing Dia Spacing Nos Nos Quantit
Length Length per No.
y
(mm) (mm) (mm) (mm) (pu) (m) (pu) (m) (m3) (m3)
1 1.5 3
Shrinkage 50%
Footing
Footing Formwork
Reinforcement Material requirement (per No.)
Quantity
Quantity
Total Quantit Total
Quantity
Quantit y per Quantit Cement Sand Aggregate
per No.
y No. y
(m2) (m2) (Kg) (Kg) (Bags) (m3) (m3)
Steel Formwor
Cement Sand Aggregate
Density k factor
M5 1 5 10
M7.5 1 4 8
M10 1 3 6
M15 1 2 4
M20 1 1.5 3 7.905138 0.409091 0.818182
M25 1 1 2
No. of No.of Bar Cutting Total
Sr. No. Description No. of bars Dia of Bar
elements Length length
512.00
758.52
796.44
455.11
296.30
237.04
341.33
227.56
192.00
170.67
75.85
371.20
329.96
288.71
187.73
82.49
42.67
133.33
88.89
49.60
44.09
77.16
44.09
27.02
27.02
40.53
22.04
All longitudnal bars have been assumed to be equally spaced for ring cutting length calculation
Column cover will be provided to main steel; not to stirrups. Calcultions are done accordingly.
Rings Links
Nos in No of Cutting Per Total Cutting No of
a set Dia C/C Length rings length Column length Nos length links
g length calculation
done accordingly.
nks
Cutting
length
21.08 189.72
21.08 168.64
42.16 295.12
21.08 168.64
51.68 103.36
103.36 103.36
51.68 155.04
42.16 84.32
Floor to Next Floor Beam Additional
Description Floor height height depth lengths
Foundation to Basement Slab top 5000 3150 600 450
Basement slab to HP slab 3150 3000 600 0
Basement slab to HP slab 3000 3000 600 0
3000 3000 600 0
3000 0 0 0
17150 450
Maximum
Maximum welding
Clear Quarter Max bar lapping (50d) Slab top (15d) (25 Lap Lap splice cutting
length length dia (25mm dia) clearance mm dia) staggering lengths for dowels
2550 637.5 16 800 150 300 300 950 2050
2400 600 16 800 150 300 300 950 2050
2400 600 16 800 150 300 300 950 2050
2400 600 16 800 150 300 300 950 2050
0 0 16 800 150 300 300 0 0
17600
Weld splice cutting Lap splice cutting Weld splice cutting
lengths for dowels lengths lengths
750 1350 6400 7500 6200 6800 1100 600
750 1350 3950 3950 3450 3450 1100 600
750 1350 3800 3800 3300 3300
750 1350 3800 3800 3300 3300
0 0 2850 1750 2550 1950
if end bearings have brackets; then bracket length to be added in hanging length of extra top bar.
Only two legged beam stirrups can be calculated; for other types i.e. 4 legged stirrups separate calculatio
In steel reinforcement binding wire required is 8 kg per MT.
Top steel Bottom steel Extra top Extra top
bearing) lengths (Through) (Through) Stirrups (End bearing 1) (End bearing 2)
Mid 2 Nos Dia Nos Dia Dia Spacing Nos Dia Length Nos Dia Length