Forwork estimate
Forwork estimate
Formwork calculations
for columns 0.76
Total columns 78 1.52
average size 600 x 300
Dividing by 4 19.5
Total 20 set required for columns 101.76 3800
Wall plates
For Slab formwork
Deshutter
90 x 65 Indian Box (slab ing in 7
bottom) 216 220 Nos days 1165
Deshutter
100 x 75 wall plates (Beam ing in 1
sides) 132 150 Nos day 360
Cuplock
Verticle 2.5 mt 492 390 Nos 10 3900 62
Verticle 2.0 mt
Verticle 1.5 mt
U jack 360 Nos 360 240
Ledger 1.5 mt 536 400 Nos 5.2 2080 62
Ledger 1.2 mt 576 500 Nos 4.2 2100 62
Ledger 1.0 mt 40 Nos approx wt 3 0 62
Ledger 0.9 mt 40 Nos approx wt 2.5 0 62
Base jack
2310
1732.5 1162.5
138600 16.11628 93000
1087.5
525
1612.5
129000
16.125
281201
32.69779
386688 44.96372
0 88000
10.23256
120
393.6
stock
stock
241800 110 Nos 110 Nos
20 Nos 20 Nos 62.4
20 Nos 20 Nos 50.4
86400 140 Nos 140 Nos
128960 140 Nos 140 Nos
130200 80 Nos 80 Nos
0 50 Nos 50 Nos
0 75 Nos 75 Nos
40 Nos 40 Nos
Stock
73403.18 100 ft 12960
1728
727334.4 7.5
21.24
281201
65000
7.55814
4985 7 2993 4 14.55 17.425
3490 5 4085 6 9.05 8.495
2600 3 2992 4 9.44 11.329 C channel
4540 7 2845 4 5.09 10.98
4985 7 2360 3 11.88 11.895 11
2380 3 2455 3 14.18 11.51 20
4155 6 2680 3 11.51 4.01 11
1705 2 2455 3 17.425 12.825 6
4085 6 2517 3 8.495 6.45
2865 4 2455 3 7.135
2455 3 2865 4 101.62 102.054
2865 4 2820 4 333.3136 334.7371
2565 3 2670 3
4155 6 1105 1
2993 4 2935 4
2455 3 3477 5
2845 4 2935 4
56123 77 3477 5
184.1306 1107 1
1185 1
2440 3
2863 4
2120 3
1105 1
2277 3
1035 1
61260 79
200.9843
3.3 36.3
1.65 33
1.35 14.85
4.65 27.9
112.05
448.2
Rate Unit GST Total
Indian box 90 x 50 x 250 1163 Per no 18% 1372.34
Channel 100 x 50 43644 Per ton 18% 51499.92
Pine wood patta/patti 190.67 Cu.dm 18% 224.9906
Shuttering ply 8 x 4 x 12 484.38 sq.mt 18% 571.5684
Anchor nut 40 Nos 18%
Threded tie rod 60 Kg 18%
Wall plate 190.67 Cu.dm 18% 359.9849 424.7822
Measurements Reinforcement Formwork
Day 1 Line out and starter Material lifting Deshuttering of sides
Day 2 Column & Lift reinforcement Staircase
Day 3 Column & Staircase 20 column + lift + Staircase
Day 4 Staircase 20 column + Staircase
Block A slab
1: 10 Columns + Lift
Block B slab
2: 10 Columns + Staircase 84
1: 10 Columns + Lift
2: 10 Columns + Staircase
14.32172 126000
15000
280000
421000
16000
6000
22000
6.4479