0% found this document useful (0 votes)
36 views2 pages

G-QRF Ms. Mahanth Motors at Shivamogga

Uploaded by

Sai Gnanadeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

G-QRF Ms. Mahanth Motors at Shivamogga

Uploaded by

Sai Gnanadeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Customer & Project Details

Company Name M/s. SR Associates (Mahanth motors)

Building Location Shivamoga, Karnataka, India.


Building Purpose
Building Phase NA

Part A: Building Parameters/Specifications

a. Building Parameters: -

Sl Description Parameters
1 Building Geometry Double slope clear span & lean to
2 No of Modules 1 No.
3 Width As per client drawing
4 Length As per client drawing
Along A & F – 7.33 m (E.C) & Along grid G continuous slope
5 Eave clear height at sides
Along grid 1’ – 6.446 m (top of rafter at lean to lower side)
6 Eave clear height at ridge 1:10 slope
7 Interior Columns Nil
8 Spacing of interior main column Nil, clear span
9 Bay Spacing As per client drawing
10 Bracing - Roof & Side Wall As per design
11 End Wall type Non-expandable
12 Roof Sheeting 0.5 mm 150 GSM AL-ZN, Bare galvalume
13 Poly Carbonate Lighting Nil
Front End Wall

Side Wall Cladding Back End Wall


14 As per client drawing
(Brick wall not in our scope)
Left Side Wall

Right Side Wall


15 Flashings (Std Off-White Color) Water gutter, down spouts, trims& ridges
No of Mezzanines 1 No.
Mezzanine size As per design
Mezzanine clear heights 3.0 m (Beam bottom)
16 Mezzanine Part
(Grid D to F @ 7-11) Mezzanine live load 250 Kg/Sq. m
0.8 mm thick decking sheets with 125
Floor type mm thick concrete.
Staircase with MS handrails Nil
17 Canopy Part No of Canopies Nil
18 Framed openings No. of openings Nil
19 Crane Part No. of Cranes Nil

Page 1 of 2
b. Additional Notes

1 Cage Ladder for roof maintenance - 1 No.


2 Along grid 1 B-F, stub columns to be considered.
3 Ridge line to be considered as per client drawing.
4 At grid 9A - 5.579 m R.C.C column & rest above steel column to be considered. (refer client drawing)
Main building & lean-to junction along grid F – full height open & along grid 1 – full height open up to lean
5
to & rest wall cladding to be considered.
6 Nil

Page 2 of 2