0% found this document useful (0 votes)
31 views1 page

Acxpnq27 S D 231 0

Uploaded by

kumaresh tikadar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Acxpnq27 S D 231 0

Uploaded by

kumaresh tikadar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RC COLUMN SCHEDULE (L02 TO L03)
C1 2B1
A COLUMN NO. LENGTH WIDTH
UP C1, C37A, C72 300 1000

SW109
MB1
C4, C5, C8, C23, C68 400 1500
SW1 SW3 2B4 SW4 2B5 SW5 2B6 SW6 2B7 SW7 2B8 SW8 C9, C10, C11, C12, C13, C16, C17, C18, 750 650
G B C19, C20, C24, C25, C26, C27, C28,
2B2 SW2
2B3

2Bh

2B78
S-D-131A-0

2B76
S1 S1 S1 C31, C32, C33, C34, C35, C41, C42,

2Bh
2B9 2B10 250 PT 250 PT 2Bc 2B13 2B14 C43, C44, C45, C48, C49, C50, C51,
SW9 SW10 SW14
SLAB SLAB C C52, C56, C57, C58, C59, C60, C63,

SW115
SW107
SW11 SW12 SW13

2Be

2Be
2B12 C64, C65, C66, C67
2B11
250 PT C14, C15, C29, C30, C46, C47, C61, 1300 500

PTB4

PTB4

PTB1

PTB1
PTB1
250 PT N
SLAB 2Ba C62
SLAB

PTB1

PTB2
PTB1

PTB1

PTB1
250 PT 250 PT 250 PT 250 PT 250 PT 250 PT 250 PT C21, C53 AS PER PLAN

PTB1
PTB2
SLAB SLAB SLAB SLAB SLAB SLAB SLAB C36 AS PER PLAN
2Ba 2Ba 2Ba 2Ba C55 AS PER PLAN
2B15 2B17 2B18 2B19 2B22 2B25 2B26 2B27
SW15 SW16 2B16 SW17 SW18 SW19 SW20 SW21 SW22 SW23 SW24 SW25 SW26 SW27 SW28 2B28 SW29 2B29 SW30 2B30 SW31 2AB1
2AB2 C2
D NOTES:
UP UP SW32 2AB3
2B74

2B88
2B20 2B21 2B23 2B24

2AB27
C3
MB1

2Ba
SHEAR WALL SCHEDULE (L02 TO L03) 1. ALL DIMENSIONS ARE IN MM & LEVELS ARE IN METER.
599.03 m THE DIMENSIONS ARE TO BE READ AND NOT

2AB28
SW33 C4 C5 250 PT
600THK PT SW34 WALL NO. THICKNESS
2Ba SLAB SCALED/MEASURED FROM THE DRAWINGS.

2AB36
2B31 BAND SW1, SW2, SW3, SW4, SW5, SW6, SW7, SW8, SW9, 400 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, DETAILS,
UP 2AB5
SW100 2Bb

2AB26
2B87
S1 SW10, SW11, SW12, SW13, SW14, SW16, SW17, SW18, SPECIFICATIONS & SITE CONDITIONS & SHALL REPORT ANY

2Be
2180 * 2180 *
S1 C6 ERROR, OMISSION AND/OR ANOMALY TO THE ARCHITECT
C7 SW19, SW20, SW21, SW22, SW23, SW24, SW25, SW26,
2B72

S1
2Be C14
2Ba 2Ba
C15
SW35
2ABf
E SW27, SW28, SW29, SW30, SW31, SW38, SW39, SW40, BEFORE COMMENCEMENT OF WORK.
C9 C10 C11 C12 C13 C16 C17 C18 C19 C20 C8 450 PT

2ABe
SW41, SW42, SW43, SW44, SW45, SW46, SW47, SW48, 3. GRADE OF CONCRETE FOR

2AB29

2AB35
2Be SLAB 250 PT
SW105

500 *
SLAB SW49, SW50, SW51, SW52, SW53, SW54, SW55, SW56, a. BEAMS/FLOOR SLAB - M45
B 2AB4
F c. SHEAR WALL/COLUMN - M60
2Be

SW57, SW58, SW59, SW60, SW61, SW62, SW63, SW64,


A 2Ba 2Ba

2AB25
1200 * 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * S-D-231C-0 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * 1200 * SW65, SW68, SW70, SW71, SW72, SW73, SW74, SW75, 4. GRADE OF REINFORCEMENT SHALL BE Fe 500D CONFORMING

2AB17
2ABc

SW113
2Be S3

2B86
S-D-231C-0 SW76, SW77, SW78, SW79, SW80, SW81, SW82, SW83, TO IS:1786 WITH MINIMUM ELONGATION OF 14.5%.

4900 *
1170 * 1170 * 1170 * 1170 * 1170 * 1170 * 1170 * 1170 * 1170 * 1170 * C SW85, SW86, SW87, SW88, SW89, SW90, SW91, SW92, 5. ALL STRUCTURAL STEEL SHALL CONFORM TO IS-2062
SW93, SW94, SW95, SW96, SW97, SW98, SW100, 6. CLEAR COVER TO REINFORCEMENT FOR

2AB34
S-D-231C-0 450 PT
2Be

H SW101, SW102, SW103, SW104, SW105, SW106, SW107, a. WALLS/COLUMNS 40mm


2B71

SW38 SLAB
S-D-231C-0
F1 SW108, SW109, SW110, SW111, SW112, SW113, SW114, b. BEAMS/SLABS/STAIRCASE 30mm
SW115, SW116, SW117, SW118, SW120, SW124 7.POUR STRIPS SHALL BE PROVIDED FOR MAX. POUR LENGTH OF

2AB24
599.03 m C22
1050 30M IN ANY DIRECTION IN CONSULTATION WITH PT VENDOR.

4725 *
6mm C21 2Be 600THK PT SW15, SW33, SW34, SW35, SW84 300
CHEQUERED BAND 8.ALL CUTOUTS/SLEEVES SHALL BE AS/RESPECTIVE SERVICES.

SW126
PLATE 597.03 m SW66, SW67, SW121, SW122 350 9. SETTING OUT EXTERNAL STAIRS/RAMPS SHALL BE AS PER
C30 C31 C32 C33 C34 C35 C23 2B34 SW99 325 RESPECTIVE ARCH & CIVIL DRAWINGS.

SW120
C24 C25 C26 C27 C28 C29

2B85
SW104

1050 *
G NOTE: SW119 IS NOT IN USE.
10.SETTING OUT OF SUNKS & CUTOUTS SHALL BE AS PER

SW112
RESPECTIVE ARCH/SERVICE DRAWINGS.

2AB23
RC BEAM SCHEDULE (L02) LEGEND:
4725 *

2ABa

2AB33
SW39 REFER DWG 200 WIDE NO TENDON ZONE (VERTICAL DIRECTION)
L NO :
BEAM NO. BREADTH DEPTH
2B70

3680 300 3960 300 S-D-331C-0 2960 800 450 PT ACXPNQ27-S- 2B1,2B32,2B33,2B65,2B66,2B89,2Be 300 600
2AB6 300 WIDE NO TENDON ZONE (HORIZONTAL DIRECTION)

565
2B84

2B89a
225 PT SLAB F-058B-0 2B2,2B8,2B58,2B64,2Bb,2Bc 400 600
SLAB S1 PTHB1
C38 2B3,2B4,2B5,2B6,2B7,2B9,2B10,2B11,2B1 800 600 500 WIDE NO TENDON ZONE (HORIZONTAL DIRECTION)

SW125
450 210

450 160
SW40 SW41 SW42 SW43 SW44 SW45 PTHB1 SW46 PTHB1 SW47 SW48 SW49 SW50 SW51 SW52 2,2B13,2B14,2B16,2B17,2B18,2B19,2B20,
C36 2B35 C37A C37 PTHB1 H 2B21,2B23,2B24,2B25,2B26,2B27,2B28,2 INDICATES PIPE SLEEVE IN RC/PT SLAB
B38,2B39,2B40,2B41,2B42,2B43,2B45,2B
SW103

2AB16

PTB3
PTB1

PTB1

PTB1

PTB1

PTB1

PTB1

PTB3

PTB1

PTB1

PTB1

PTB1

PTB1

PTB1
225 PT 225 PT 225 PT 225 PT 225 PT 225 PT 225 PT 225 PT 225 PT 225 PT 225 PT
PTHB1 PTHB1 46,2B47,2B48,2B49,2B50,2B52,2B53,2B54 50MM SUNK
SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB
SW53 SW54 SW55 SW56 SW57 SW58 SW59 SW60 SW61 SW62 SW63 SW64 SW65 ,2B55,2B56,2B57,2B59,2B60,2B61,2B62,2

2B83
H1 B63,2B67,2B68,2B69,2B70,2B71,2B72,2B WALL/COLUMN STOPS AT FLOOR LEVEL

2AB32
79,2B80,2B81,2B82,2B83

SW118
250 PT 250 PT
SLAB SLAB
250 PT 2B15,2B36,2Bd 300 700 * INDICATES DIMENSIONS PROVIDED FOR NO-TENDON ZONE
2B69

250 PT SLAB 275 PT 2B22,2B44 1200 600 (CENTER) SHALL BE VERIFIED WITH RESPECT TO ARCH LAYOUT
SLAB SLAB

PTB3
2B30,2B34,2B73,2B74,2B84,2B85,2B86,2 400 700 FOR RACK & HAC FRAME.
B87,2B88
4675 *

2B31,2B37,2Ba 600 600

2AB15
2B82
2B35,2B90 300 650
SW111

C39 C40
SW102

6mm C41 C42 C43 C44 C45 C46 C47 C48 C49 C50 C51 C52 2B51 400 1000 FOR ALL CHARJJA & LINTEL REFER RESPECTIVE ARCH

SW124
CHEQUERED DRAWING.
1050 *

PLATE J 2B75,2B76,2B77,2B78,2Bg,2Bh 200 600


2Bf 250 700

SW117
C53 2Be CONTRACTOR SHALL COORDINATE WITH PT VENDOR FOR ANCHORS,
2Bi 200 450
D 599.03 m POUR STRIPS, STRESSING AND OTHER CONSTRUCTION DETAILS.

2ABc 2AB14
2Bj 150 600
5025 *

2AB31
S-D-231C-0 2ABc 200 THK 2Bk 200 700

2B81
SLAB AT ALL FLOORS SHALL BE FINISHED TO ENSURE FLOOR
2B68

PARDI
S1 FLATNESS FF=35 AND FLOOR LEVELNESS FL=25 AS PER ACI 117 AND
K RC COLUMN SCHEDULE (L02 TO L03)-ADMIN
ACI 302(LATEST EDITION). THIS SHALL BE VERIFIED BY THE
2Be

CONTRACTOR AT SITE WITHIN 24 TO 72 HRS OF THE CASTING OF THE

SW123
2ABc SW66 2ABa
S-D-331C-0
J1
SW110

SLAB AND PRIOR TO REMOVAL OF PROPS AND SHUTTERING.


4625 *

C54 COLUMN NO. LENGTH WIDTH


UP

2AB22
C55 450 PT

2B80
2Ba 2Ba C2, C6 300 1200
SW101

C61 C62 SLAB


C3, C37 300 1000
475 *

K
2Bf

SW67
C7, C22, C38, C39, C40, C54 700 700
C63 C64 C65 C66 C67 2ABa

2ABe
2B67

C56 C57 C58 C59 C60 2Ba CS1 200 200

2AB12
2Bd 2Ba 2Ba
S1 2ABe 597.03 m
E PD 600 600
2Be

2AB30
SW99

S1 S1 2ABe
S-D-231C-0 599.03 m 2Be

2B79
SW68 2B37 250 PT

PTB5
2Ba 250 PT 225 PT SLAB
C68 SLAB

SW116
2B36 SLAB
RC BEAM SCHEDULE (L02) ADMIN BLOCK
2B66

2Be
J
2B73

UP 2B38 2B39 2B40 2B41 2B42 2B43 2B44 2B45 2B46 2B47 2B48 2B49 2B50
SW71 SW72 SW73 SW74 SW75 SW76 SW77 SW78 SW79 SW80 SW81 SW82 2AB8 SW69 2AB9 C69 2AB10 C70 2AB11 C71 S-D-231C-0 BEAM NO. BREADTH DEPTH
SW70 SW83 2B51 2AB1,2AB2,2AB8,2AB9,2AB10,2AB11,2AB 400 700
SW84 12,2AB14,2AB15,2AB16,2AB17,2AB23,2A 0 22-Dec-2023 ISSUED FOR CONSTRUCTION (IFC)
2Ba 2Ba I 2Ba 2Ba B24,2AB25,2AB30,2AB31,2AB32,2AB33,2 REV DATE DESCRIPTION
G L
PTB2

S-D-231C-0 AB34 DRAWING STATUS


250 PT 250 PT 250 PT 250 PT 250 PT 250 PT
PTB1

PTB1

PTB1

PTB1

PTB2

2AB3,2AB5,2AB7,2AB7a,2AB26,2AB29,2A 300 700


SLAB SLAB SLAB S-D-231C-0 SLAB SLAB SLAB
B35,2AB36,2ABb ISSUED FOR CONSTRUCTION (IFC)
K
PTB1

PTB1

PTB1

2Be PTB1

250 PT
PTB4

PTB4

250 PT 250 PT 250 PT 2Ba REFER DWG NO : ACXPNQ27-S-F-058A-0


SLAB 2AB4,2AB6,2AB20,2ABc 300 600
SLAB SLAB SLAB OWNER Adani Connex
SW106

SW114

S-D-231C-0
2B52 2B53 2B54 2B55 2B56 2B57 2AB22,2AB27 300 1200
2Be

SW87 S1 SW88
SW85 SW86 SW89 SW90
M 2AB28 300 1600 11th Floor, Aravalli Adani Corporate House, Shantigram road,
2Bc 2ABa 400 600 Shantigram, Ahmedabad, Gujarat - 382 421
2B77

S1 S1
2B75

2Bh

S1 www.adaniconnex.com
2Bh

2B59 2B60 2B61 2B62 2B63 2ABd 200 700


2B58 SW92 2B64
SW93 SW94 SW95 SW96 SW97 SW98
N 2ABe 200 600
SW91 2ABf 200 450 PRINCIPAL CONSULTANT Burr Computer Environments Inc.
SW108
MB1

Burr Computer Environments Inc., 10400 Rodgers Rd.,


Houston, Texas 77070
P PT BEAM SCHEDULE (L02) www.bcei.com
C72 2B65
BEAM NO. BREADTH DEPTH
F DESIGN CONSULTANT AECOM
1 LEVEL 02 FLOOR PLAN S-D-231C-0
PTB1
PTB2
1600
1800
600
600 9th Floor, Infinity Tower- 'C', DLF Cybercity, DLF Phase 2,
Gurugram, 122002
scale 1 : 200 PTB3 2000 600
T: +91 124 4830100,
PTB4 850 600 F: 91 124 4830108
PTHB1 400 250 Web:- www.aecom.com
U.O.N PT SLAB SHALL BE 225 THK. ©AECOM Asia Company Ltd. 2023

U.O.N RC SLAB SHALL BE S1. The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the
purpose for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon
RC SLAB SCHEDULE this document. All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically
stored or transmitted in any form without the written permission of AECOM.

SLAB NO. THICKNESS PROJECT

S1 200 ACXPNQ27 - PUNE DATA CENTER


S2 225
S3 250
DRAWING TITLE
S4 175
S5 300
LEVEL 02 FLOOR PLAN

DWG NO. REV.

ACXPNQ27-S-D-231-0 0
THE DRAWING IS INTENDED TO PRINT IN COLOUR. DRAWN BY DESIGNED BY CHECKED BY APPROVED BY
RN HS VSP MJ
FOR BEAMS AROUND CUTOUTS, PARAPETS, EQUIPMENT PEDESTALS SCALE @ A1 DATE OF FIRST ISSUE PROJECT NO. AECOM PROJECT NO.
REFER TO THE RESPECTIVE PART PLANS/DRAWINGS.
As indicated 27-Oct-2023 ACXPNQ27 60716918
©2023 AECOM Corporation

You might also like