100% found this document useful (1 vote)
50 views3 pages

STE 2,4,6 Marks IMP

Uploaded by

saqibzuber813
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
50 views3 pages

STE 2,4,6 Marks IMP

Uploaded by

saqibzuber813
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Software Testing 2 Marks IMP Solution

1. Define static and dynamic testing.


2. Enlist objectives of software testing.
3. Define defect, provide its classification and meaning, state any two root causes of
defects, list four attributes of a defect, and mention four defect reporting
guidelines.
4. State any four advantages and the need for using automated testing tools.
5. Define bug, error, fault and failure
6. Define verification and validation with respect to software testing. Compare
verification and validation (any two points).
7. Enlist any four testing tools
8. Enlist any four skills for software tester
9. State any four needs to prepare a test plan
10. Define test plan with two advantages.
11. State any two differences between manual and automated testing.
Software Testing 4 Marks IMP Solution
1. Describe Boundary value analysis with suitable example
2. Differentiate between drivers and stubs (any four points) and describe their
concepts with suitable examples.
3. State the contents of ‘Test Summary Reports’ used in test reporting
4. State any eight limitations of manual testing
5. Enlist factors considered for selecting a testing tool for test automation
6. Differentiate between alpha and beta testing (any four points)
7. Explain test management, including Test Infrastructure Management, Test People
Management, and factors to consider when selecting testing tools for automation.
8. Explain the testing approaches used during client-server testing and web application
testing.
9. Differentiate between Quality Assurance and Quality Control
10. Draw defect prevention process cycle. State working of each phase. Describe
detect management process with neat diagram.
11. State the Entry and Exit criteria’s for the software testing
12. Describe the types of integration testing with neat diagrams, including the top-
down approach and bi-directional integration testing. State their advantages and
disadvantages.
13. Describe the “Test Infrastructure” components with Diagram
14. Differentiate between white box testing and black box testing (any four points).
15. Prepare a defect report after executing test cases for a login form or an email login
field.
16. Describe graphical user interface (GUI) testing and its important traits
17. Describe test deliverables in detail and explain their importance in test planning.
18. Describe the process of performance testing, including load testing and stress
testing, with suitable examples.
19. State the advantages and disadvantages of using testing tools and explain any four
benefits of test automation.
20. Write the test cases of Notepad applications (any eight test case) (Window based)
21. Differentiate between static and dynamic testing tools. (any four points).
22. Describe the regression testing. State entry and exit criteria for regression testing.
State when the Regression testing shall be done.

Page 2 of 3
Software Testing 6 Marks IMP Solution
1. Design test cases for online railway reservation applications
2. Design test cases for login forms of e-commerce and social media websites (e.g.,
Amazon, Flipkart, Facebook), focusing on GUI testing.
3. Elaborate on the concept of software metrics and measurement, including the need
for software measurement. Describe base metrics and calculated metrics with
suitable examples. Additionally, explain three types of metrics commonly used in
software development.
4. Design test cases for hostel admission form of your institute.
5. Prepare a test plan with test cases for applications like Notepad’s edit function and
MS Excel’s ‘Save As’ option.
6. Draw a diagram for the defect life cycle and provide an example of a defect
template.
7. Design test cases and prepare defect reports for different applications like ATM
withdrawal systems and online shopping websites (e.g., Flipkart).
8. Explain client-server testing with suitable diagram.

Page 3 of 3

You might also like