0% found this document useful (0 votes)
26 views25 pages

Joe Hobbs - Qatar Process Safety Symposium - JBOG

Uploaded by

Hafed Abdulhadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views25 pages

Joe Hobbs - Qatar Process Safety Symposium - JBOG

Uploaded by

Hafed Abdulhadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

Jetty Boil-off Gas Recovery Project

Qatar Process Safety Symposium


March 13, 2012

W. Joe Hobbs JBOG Head of SHES


Agenda
• Safety Moment
• SHE&S Status
• JBOG Overview
• 12 Golden Rules
• Weekly Safety Huddles
• Safety Stand downs
• SHE Communications
• Safety Leadership Team meetings
• SHE Management System
• Process Safety
• Environmental – Beach Clean-Up / Plantation Drive / Recycling
• Pre Screening / Physical Exams / Training
• Global Village Camp
• Safety Days
• 5 Million Safe Hours
• Questions

JBOG PROJECT 2
March 13, 2012
INNOVATION IN GLOBAL ENERGY
Safety Moment – Dropped Objects
Spanner dropped from the scaffolder
near to the workers on ground

JBOG PROJECT 3
March 13, 2012
INNOVATION IN GLOBAL ENERGY
Safety Moment- Dropped Objects

What to do?
• Don’t carry tools or materials up a
• All gaps in handrail, holes or
ladder, instead use containers, or
openings must be securely
buckets lifted by a line.
covered or fenced off.
• Don’t stick tools in your pockets because
when you bend over or reach, they may
fall out.
• Attach lashes to tools to prevent them
from falling to the ground if dropped.
• Use tool baskets to store tools at height

• Keep tools and materials in use away


from the edges of platforms, ladders,
railings and sills.
• Never throw or sweep materials, tools
from above.

• Do not cross barriers, even to take


a quick shortcut.
• Pay attention to what is going on
around you, particularly when somebody
working on above.

JBOG PROJECT 4
March 13, 2012
INNOVATION IN GLOBAL ENERGY
Safety Statistics – Project to Date

• Total Project Safe Hours: 5,281,719


• TRIR: 0.16
• FAC’s: 22
• MTC’s: 1
• Recordable Occupational Illnesses: 2
• RWC’s: 1
• LTI’s: 0
• SHE Violations: 26
• Near Misses: 18
• Vehicular Accidents: 20
• Reportable Environmental Releases to the MoE: 0

JBOG PROJECT 5
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Overall View

JBOG PROJECT 6
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – 12 Golden Rules
1. Work with valid work permit
2. Conduct gas tests when required
3. Verify isolation before work begins
4. Obtain authorization before entering a confined Space
5. Obtain authorization before overriding or disabling
safety critical equipment
6. Protect against falls when working at height
7. Do not walk under suspended load
8. Do not smoke outside designated smoking areas
9. No alcohol or drugs while working or driving
10. While driving do not use your cell phone or speed
11. Wear your seat belt
12. Follow prescribed journey management plan.
JBOG PROJECT 7
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – 12 Golden Rules

JBOG PROJECT 8
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Weekly Safety Huddles
Every Sunday all JBOG contractors carry
out weekly Safety Huddles which serve
as a direct message from the Project
Contractors’ Leadership to the work
force.

During the huddles the following


information is normally delivered to
attention of the personnel:
• Achievements – updates in progress
• Incidents, Unsafe acts, Lessons
Learnt
• Changes in Standards, Safety System
of Work
• Award ceremonies – Project
incentive program
At the end of the safety huddles the
workers are given a chance to ask
questions, to bring forward their
concerns/initiatives.

JBOG PROJECT 9
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Safety Stand Downs

 JBOG conducting safety


stand-downs when we feel a
re-focus is required on safety

 JBOG Leadership Team


participates in these stand-
downs with Contractors’
senior management

 Leadership Team members


talking and interacting with
workers.

 The safety huddles helping to


demonstrate JBOG’s
management commitment to
Safety and to IIF.

JBOG PROJECT 10
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – SHE Communications

JBOG PROJECT 11
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – SHE Communications

JBOG PROJECT 12
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Safety Leadership Team Meetings
• Monthly meeting with
Senior Management
and contractor Project
Managers
• Quarterly meetings
include Senior
Management and
contractor Directors/
CEOs

JBOG PROJECT 13
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Safety, Health & Environmental Management System
Key program Elements:
• Management Leadership &
Commitment
• Management Walks
• Employee Involvement
• Worksite Analysis
• Hazard Prevention & Control
• Method Statements, JSA’s
• Risk Assessments / Risky
Work
• Safety and Health Training

JBOG PROJECT 14
March 13, 2012
INNOVATION IN GLOBAL ENERGY
Safety, Health & Environmental Management System
• Worksite Analysis
– Identifying Hazards
– SHE Representatives on site (1:50 workers)
– Accident Investigations
• Hazard Prevention & Control
– Deficiencies Identified in Weekly Walk
Down/SOC’s
– Safety and Health Training
• Training (e.g. Safety Orientation, Confined
Space, Work at Height etc.)
• Employee Incident Injury Free (IIF) Training
• Emergency Drills
• Employee Involvement
– Pre-Job Briefings –STA’s (Safety Task
Analyses)
– Weekly Toolbox Meeting
– Weekly Safety Walk
– Hazard Identification
• Safety Observation Cards (SOC’s)

JBOG PROJECT 15
March 13, 2012
INNOVATION IN GLOBAL ENERGY
Process Safety

• HAZIDS
• HAZOPS
• Risk Register
• Model Reviews
• QRA
• Diligent close out of findings
and actions

JBOG PROJECT 16
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Environmental
Environment Communication: Control of environmental
JBOG Project Team and Its contractors Aspects and Impact:
are committed to provide Environment JBOG Project Team and Its
related information to the work force and contractors are committed to ensure
issue monthly Environment bulletin there is no impact to the land, Water
or Air during our day to day
construction Activities by
implementing JBOG Construction
Environment Management Plan

JBOG PROJECT 17
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Environmental
Beach Clean up at RLIC Leaving
Turtle nesting areas: Environment
JBOG Project Team and contractors are
helping RLIC environmental team in
footprint at RLIC
keeping Turtle nesting ground clean by Conservation Area:
conducting beach clean up activities JBOG Project Team and
contractors are working with
RLIC environment team in
improving RLIC conservation
area . This area is habitat for
several species such as ORYX,
Ostrich, Antelopes etc. JBOG
team is providing Rest shelters ,
Feeding trays and Water troughs
for animals living in this area

JBOG team is also conducting


Plantation in this area on 8th
March 2012 and will plant NEEM
Wood trees for beatification of this
area.
Recycling-
Shoe racks for camp
residents and fire
extinguisher boxes

JBOG PROJECT 18
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Pre Screening / Physical Exams / Training
Training Passport:
JBOG Project provides training passport to all
project personnel for capturing their IIF and SHES
trainings.

Training facility:
JBOG Project have excellent training facility which
include Training rooms , Practical training set up for
working at height etc.
JBOG project requires each personnel joining the
project to go for mandatory trainings such as Basic
Safety Orientation and Incident injury free orientation.
Medical examination and pre screening is prerequisite
before personnel receive JBOG Access Badge.

JBOG PROJECT 19
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Pre Screening / Physical Exams / Training
Practical training: Banks man training:
JBOG Project provides Working at Height JBOG Project contractor team conducting practical banks man training
training which is prerequisite before any one
access scaffolding or work platform.

Skill training:
JBOG Project contractor team conducting practical
skill training on Power tools at site

JBOG PROJECT 20
March 13, 2012
INNOVATION IN GLOBAL ENERGY
Global Village Camp

• Well-being of camp residents


• Clean, well kept facilities
• Good food
• Sports
• Leisure Activities

JBOG PROJECT 21
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Safety Day
 The Goal of Safety Day is to promote safety and well being of our workers

 Safety Days are celebrating to reinforce our IIF programs with a single Goal as the
JBOG slogan says – EVERY BODY GOES HOME SAFE.

 JBOG is committed to IIF –


to our workers welfare and
well-being

 We are celebrating two


Safety Days in every year.

 Our first Safety Day was


celebrated on 30th June
2011.

 Next Safety Day is


scheduled on 15th March
2012.

JBOG PROJECT 22
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – Safety Day

 Ours is “A Leadership
Journey” towards SUCCESS
and IIF

 We Value our IIF Slogan –


“EVERYBODY GOES HOME
SAFE” day-in and day-out.

 We mean it and we are


confident that it is achievable

 We adopt any program which


enables a better
communication between the
JBOG Leadership Team and
our work force

JBOG PROJECT 23
March 13, 2012
INNOVATION IN GLOBAL ENERGY
JBOG – 5 Million Safe Man-Hours

JBOG PROJECT 24
March 13, 2012
INNOVATION IN GLOBAL ENERGY
Questions