Stirrups: L = 880 mm
25 +30 = 55 pcs
Use 9m RSB:
9
=10.23 ≈ 10
0.88
55 6 pcs – 9m
=5.5 ≈ 6 pcs
10
TOTAL
Grid B-C/2 Continuous bars: 16 mm ∅
(B1) (B2) 4 pcs –5.5 m
EQV = 4 pcs – 7.5 m RSB
XCS = 4 pcs – 2 m
2 Cut bars:
1 pc – 1.4 m
1 pc – 2.7 m
1 pc – 1.5 m
EQV = 1 pc – 6m RSB
Stirrups: L = 880 mm
30 + 7 = 37 pcs
Use 9m RSB:
9
=10.23 ≈ 10
0.88
3 pcs – 9 m
30
=3 pcs
10
3 Cut bars:
1 pc – 1.2 m
1 pc – 2.1 m
1 pc –2.4 m (use XCS)
1 pc – 2.4 m
1 pc – 2.8 m
1 pc – 1.5 m
EQV = 1 pc – 10.5m RSB
XCS = 1 pc – 2.6 m 1 pc – 10.5 m
Stirrups: L = 880 mm
24 + 30 = 55 pcs
Use 9m RSB:
50 5 pcs – 9 m
=5 pcs
10
TOTAL
Grid A-D/4 Continuous bars: 16 mm ∅
(B1) 4 pcs – 11.2 m
EQV = 4 pcs – 12 m RSB 4 pcs – 12 m
Cut bars:
4 1 pc – 2.8 m
1 pc – 1.5 m
1 pc – 2.4 m (use XCS from “3”)
1 pc – 1.2 m
1 pc – 1.7 m
1 pc – 1.9 m (use XCS from”2”)
1 pc – 2.0 m
EQV = 1 pc – 6m RSB 1 pc – 6 m
Stirrups: L = 880 mm
24 + 26 + 21 = 71 pcs
Use 9m RSB:
70 7 pcs – 9m
=7 pcs
10
Use 6m RSB for the remaining 1
stirrup:
1 pc – 6m 1 pc – 6 m
TOTAL
COMPUTATION SHEET
5 Cut bars:
1 pc – 1.2 m
1 pc – 2.1 m (use XCS from”3”)
1 pc – 1.8 m (use XCS from “2”)
1 pc – 1.7 m
1 pc – 1.0 m
EQV = 1 pc – 6m RSB 1 pc – 6m
XCS = 1 pc – 3.9 m
Stirrups: L = 880 mm
25 + 22 = 47 pcs
Use 9m RSB:
40
=4 pcs 4 pcs – 9 m
10
Use 7.5m RSB for the remaining 7
stirrups:
7.5
=8.52 ≈ 8 pcs
0.88
1 pc – 7.5 m
EQV = 1 pc – 7.5m
TOTAL
Grid A-B/5 Continuous bars: 16 mm ∅
(B1) 4 pcs – 4.9 m
EQV = 4 pcs – 7.5 m RSB 4 pcs – 7.5 m
XCS = 4 pcs – 2.6 m
6 Cut bars:
1 pc – 0.8 m
1 pc – 1.2 m (use XCS from”3”)
1 pc – 1.5 m
1 pc – 1.6 m
1 pc – 1.0 m
EQV = 1 pc – 6m RSB
Stirrups: L = 880 mm
18 + 20 = 38 pcs
Use 9m and 7.5m RSB:
30 3 pcs – 9m
=3 pcs−9 m
10
8 1 pc – 7.5
=1 pc – 7.5
8
TOTAL
COMPUTATION SHEET
7 Cut bars:
4 pcs – 0.7 m (use XCS from”1”)
2 pcs – 1.0 m (use XCS from”3”)
Web bars:
2 – 0.9 m
EQV = 1 pc – 10.5 m RSB 1 pc – 10.5 m
XCS = 4 pc – 6. 7 m
Stirrups: L = 1008 mm
16 pcs
Use 9m RSB:
9
=8.33 ≈ 8 pcs
1.08
16
=2 pcs−9 m 2 pcs – 9 m
8
8 Cut bars:
4 pcs – 2.0 m (use XCS)
2 pcs – 3.5 m
EQV = 1 pc – 7.5 m RSB 1 pc – 7.5 m
Web bars:
2 – 6.5 m (use XCS from “7”)
EQV = 1 pc – 7.5 m 1 pc – 7.5 m
Stirrups: L = 1080 mm
36 pcs
Use 7.5m RSB:
36 6 pcs – 7.5 m
=6 pcs−7.5 m
6
TOTAL
COMPUTATION SHEET
9 Cut bars:
1 pc – 1.3 m
1 pc – 2.1 m (use XCS from”3”)
1 pc – 1.9 m
3 pcs – 1.8 m
1 pc – 1.1 m
EQV = 1 pc – 12m RSB 1 pc – 12 m
XCS = 1 pc –2.3 m
Stirrups: L = 880 mm
25 + 22 + 22 = 69 pcs
Use 9m RSB:
69
=6.9 ≈ 7 pcs
10
EQV = 7 pcs – 9 m 7 pcs – 9 m
TOTAL
Grid B/1-4 Continuous bars: 16 mm ∅
(B1) 4 pcs – 7.2 m
EQV = 4 pcs – 7.5 m RSB 4 pcs – 7.5 m
Cut bars:
10 1 pc – 1.5 m
1 pc – 2.2 m
2 pcs – 1.9 m
1 pc – 1.1 m
EQV = 1 pc – 9m RSB 1 pc – 9 m
XCS = 1 pc –m
Stirrups: L = 880 mm
26 + 18 = 44 pcs
Use 6m RSB:
40 4 pcs – 9 m
=4 pcs−9 m
10
Use 6m RSB for the remaining 4
stirrups:
EQV = 1 pc – 6 m 1 pc – 6 m
TOTAL
COMPUTATION SHEET
Stirrups: L = 880 mm
11 12 pcs
Use 12m RSB:
12
=13.64 ≈ 13 pcs
0.88
Use 6m RSB for the remaining 4
stirrups:
EQV = 1 pc – 6 m 1 pc – 12 m
TOTAL
Grid B-C/4-6 Continuous bars: 16 mm ∅
(B1) 4 pcs – 5.5 m
EQV = 4 pcs – 6 m RSB 4–6m
Cut bars:
12 1 pc – 0.8 m (use XCS from “5”)
1 pc – 1.3 m
1 pc – 1.7 m
1 pc – 1.8 m
1 pc – 1.1 m
EQV = 1 pc – 6m RSB 1 pc – 6 m
XCS = 1 pc – 1.4 m
Stirrups: L = 880 mm
18 + 22 = 40 pcs
Use 9m RSB:
40 4 pcs – 9 m
=4 pcs−9 m
10
TOTAL
Grid C/1-6 Continuous bars: 16 mm ∅
(B1) 2 pcs – 9 m
2 pcs – 10.5 m
2 pcs – 4 m
2 pcs – 2.5 m (use XCS from “5”)
13 EQV = 3 pcs – 9 m RSB
2 pcs – 10. 5 m RSB
3 pcs – 9 m
2 pcs – 10. 5 m
TOTAL
COMPUTATION SHEET
Stirrups: L = 880 mm
15 + 20 + 20 + 33 = 88 pcs
Use 9m and 7.5m RSB:
80 8 pcs – 9 m
=8 pcs−9 m
10
8 1 pc – 7.5 m
=1 pc−7.5 m
8
TOTAL
Grid C/2-4 Continuous bars: 16 mm ∅
(B2) 4 pcs – 5.5 m
EQV = 2 pcs – 12 m RSB 2 pcs – 12 m
Stirrups: L = 880 mm
14 34 pcs
Use 9m RSB:
30
=3 pcs−9 m 3 pcs – 9 m
10
TOTAL
Grid D/4-6 Continuous bars: 16 mm ∅
(B1) 4 pcs – 5.5 m
EQV = 2 pcs – 12 m RSB 2 pcs – 12 m
XCS = 2 – 1.0 m
15 Cut bars:
1 pc – 0.8 m (use XCS)
1 pc – 1.3 m
1 pc – 1.1 m (use XCS from “6”)
1 pc – 1.7 m
1 pc – 1.8 m
TOTAL
COMPUTATION SHEET
TOTAL
TOTAL FOR 6.00 m 4 pcs − 10 pcs
SECOND
FLOOR
7.50 m 10 pcs 1 pc 13 pcs
BEAM 9.00 m 60 pcs − 14 pcs
10.50 m − 1 pc 11 pcs
12.00 m 1 pc − 25 pcs
TOTAL
ROOF Continuous bars: 12 mm ∅
BEAMS: 4 pcs – 3.7 m
EQV = 2 pcs – 7.5 m RSB 2 pcs – 7.5 m
GridA-B/1
(RB) Stirrups: L = 680 mm
25 pcs
Use 6m and 12m RSB:
6
1 0.68
=8.82 ≈ 8 pcs
12
=17.65 ≈ 17 pcs
0.68
8
=1 pc−6 m 1 pc – 6 m
8
17 1 pc – 12 m
=1 pc−12 m
17
TOTAL
Grid B/C-1 Continuous bars: 12 mm ∅
(RB) 4 pcs – 5.3 m
EQV = 4 pcs – 6 m RSB
4 pcs – 6 m
Stirrups: L = 680 mm
2 33 pcs
Use 12 m RSB:
33
=1.94 ≈ 2
17
EQV = 2 pcs – 12 m 2 pcs – 12 m
TOTAL
COMPUTATION SHEET
Stirrups: L = 680 mm
3 30 + 6 = 36 pcs
Use 9m RSB:
36
=2.77 ≈ 3 pc s
13
EQV = 3 pcs – 9 m 3 pcs – 9 m
TOTAL
Grid A/B-3 Continuous bars: 12 mm ∅
(RB) 4 pcs – 3.6 m
EQV = 2 pcs – 7.5 m RSB 2 pcs – 7.5 m
Stirrups: L = 680 mm
4 24 pcs
Use 9m RSB:
24 2 pcs – 9 m
=1.85 ≈ 2 pcs−9 m
13
TOTAL
GridA/D-4 Continuous bars: 12 mm ∅
(RB) 4 pcs – 8.7 m
EQV = 4 pcs – 9 m RSB 4 pcs – 9 m
Stirrups: L = 680 mm
5 31 + 24 + 3 = 58 pcs
Use 10.5m RSB:
58
=3.87 ≈ 4 pc s
15
EQV = 4 pcs – 10.5 m 4 pcs – 10.5 m
TOTAL
GridC/D-4 Continuous bars: 12 mm ∅
(B1) 4 pcs – 2.6 m
EQV = 1 pc – 10.5 m RSB 1 pc – 10.5 m
Cut bars:
6 2 pcs – 0.9 m
1 pc – 1.3 m 1 pc – 6 m
EQV = 1 pc – 6 m
XCS = 2.9 m
Stirrups: L = 880 mm
18 pcs
Use 7.5m and 9m RSB:
10 1 pc – 9 m
=1 pc−9 m
10
8 1 pc – 7.5 m
=1 pc−7.5 m
8
TOTAL
COMPUTATION SHEET
Stirrups: L = 680 mm
7 30 + 6 = 36 pcs
Use 9m RSB:
36 3 pcs – 9 m
=2.77 ≈ 3 pcs−9 m
13
TOTAL
Grid A-B/5-6 Continuous bars: 12 mm ∅
(RB) 4 pcs – 4.8 m
EQV = 4 pcs – 9 m RSB 4 pcs – 9 m
XCS = 4 – 4.2 m
8 Stirrups: L = 680 mm
18 + 20 = 38 pcs
Use 9m RSB:
38 3 pcs – 9 m
=2.92 ≈3 pcs−9 m
13
TOTAL
Grid B-D/6 Continuous bars: 16 mm ∅
(B3) 4 pcs – 6.4 m
EQV = 4 pcs – 7.5 m RSB 4 pcs – 7.5 m
Cut bars:
9 4 pcs – 1.9 m
2 pcs – 3.5 m
EQV = 1 pc – 12 m 1 pc – 12 m
1 pc – 6 m 1 pc – 6 m
XCS = 2.5 m
Web bars:
2 pcs – 6.3 m
EQV = 2 pcs – 7.5 m 2 pcs – 7.5 m
Stirrups: L = 1080 mm
36 pcs
Use 7.5m RSB:
36 6 pcs – 7.5 m
=6 pcs−7.5 m
6
TOTAL
COMPUTATION SHEET
Stirrups: L = 680 mm
10 25 + 22 + 22 = 69 pcs
Use 12m RSB:
69
=4 pcs 4 pcs – 12 m
17
TOTAL
Grid B/1-6 Continuous bars: 12 mm ∅
(RB) 4 pcs – 10.3 m
EQV = 4 pcs – 10.5 m RSB 4 pcs – 10.5 m
Stirrups: L = 680 mm
11 6 + 26 + 23 + 22 = 77 pcs
Use 9m RSB:
77 6 pcs – 9 m
=5.9 ≈ 6 pc s
13
TOTAL
GridB-C/4-5 Continuous bars: 12 mm ∅
(RB) 4 pcs – 2.4 m
EQV = 1 pc – 10.5 m RSB 1 pc – 10.5 m
Stirrups: L = 680 mm
12 18 pcs
Use 7.5m RSB:
18
=1.6 ≈ 2 pc s 2 pcs – 7.5 m
11
TOTAL
Grid B-C/5-6 Continuous bars: 16 mm ∅
(B2) 4 pcs – 3.3 m
EQV = 2 pcs – 7.5 m RSB 2 pcs – 7.5 m
Stirrups: L = 880 mm
13 9 + 18 = 27 pcs
Use 9m RSB:
20 2 pcs – 9 m
=2 pcs
10
Use 7.5m RSB for the remaining 7
stirrups:
EQV = 1 pc – 7.5 m 1 pc – 7.5 m
TOTAL
COMPUTATION SHEET
Stirrups: L = 680 mm
18 pcs
14 Use 7.5m RSB:
18
=1.6 ≈ 2 pcs 2 pcs – 7.5 m
11
TOTAL
Grid C/1-5 Continuous bars: 12 mm ∅
(RB) 4 pcs – 10.5 m
EQV = 4 pcs – 10.5 m RSB 4 pcs – 10.5 m
Stirrups: L = 680 mm
15 6 + 25 + 33 = 64 pcs
Use 12m RSB:
64
=3.76 ≈ 4 pcs 4 pcs – 12 m
17
TOTAL
Grid B-C/4-5 Continuous bars: 16 mm ∅
(B2) 4 pcs – 5.4 m
EQV = 4 pcs – 6 m RSB 4 pcs – 6 m
Stirrups: L = 880 mm
16 33 pcs
Use 10.5 m RSB:
33 3 pcs – 10.5 m
=3 pc s
11
TOTAL
TOTAL FOR 6.00 m 1 pc 12 pcs 6 pcs
ROOF
BEAM
7.50 m 12 pcs 6 pcs 6 pcs
9.00 m 20 pcs 8 pcs −
10.50 m 7 pcs 13 pcs 1 pc
12.00 m 11 pcs − 1 pc
TOTAL
FOOTING Hook = 12(16) = 192 mm
TIE BEAMS: Total hook = 2(192) = 384 mm
For line A:
L of main bar = 8200 + 12(16)(2)
= 8584 mm
Use 9m bar :
1 pc main bar (8584 mm)
TOTAL:
COMPUTATION SHEET
For line B:
L of main bar = 384 + 4125 = 4509
≈ 4500 mm
Use 9m:
2 pcs main bar (4500 mm) 2 pcs – 9 m
Stirrups:
3 pcs
Stirrups:
25 pcs
TOTAL
For line D:
L of main bar = 10500 + 384 = 10884 mm
Use 12 m:
1 pc main bar (10884 mm)
For line E:
L of main bar = 4500 + 384 = 4884 mm
Use 10.5m:
2 pcs main bars (4884 mm)
Stirrups:
19 + 21 = 40 pcs
TOTAL
COMPUTATION SHEET
Stirrups:
37 pcs
For line 1:
L of main bar = 9900 + 384 = 10284 mm
Use 10.5m:
1 pc main bar (10284 mm)
Stirrups:
29 + 23 + 23 = 75 pcs
TOTAL
For line 2:
L of main bar = 2100 + 384 = 2484 mm
Use 10.5m:
4 pcs main bars (2484 mm)
Stirrups:
19 pcs
For line 3:
L of main bar = 690 +384 = 7285 mm
Use 7.5m:
1 pc main bar (7285 mm)
Stirrups:
29 + 23 = 52 pcs
For line 4:
L of main bar = 5050 + 384 = 5434 mm
Use 6m:
1 pc main bar (5434 mm)
Main bars = 4 pcs – 6 m 4 pcs – 6 m
Stirrups:
19 + 23 = 42 pcs
TOTAL
COMPUTATION SHEET
Stirrups:
17 + 21 + 19 = 57 pcs
For line 6:
L of main bar = 5050 + 384 = 5434 mm
Use 6m:
1 pc main bar (5434 mm)
Stirrups:
19 + 23 = 42 pcs
TOTAL
For total Assume concrete cover = 50 mm
stirrups: 1 stirrup = (300)(2) + (80)(2) + 100 = 860
mm ≈ 857 mm
If we use 6m length:
6
=7 pcs of stirrups
0.857
Total # of stirrups = 574 pcs
574 82 pcs – 6 m
Total # of 6m RSB = =82 pcs−6 m
7
TOTAL
TOTAL FOR 6.00 m 82 pcs − 11 pcs
FOOTING
TIE BEAM:
7.50 m − − 12 pcs
9.00 m − − 6 pcs
10.50 m − − 7 pcs
12.00 m − − 5 pcs
TOTAL
BELGA, JELOMEE D.
SANTILLANA, RAPHAEL JOSEF D.
SUMMARY:
∅ 10 mm
x pc
6.00 m 87 321.55 kgs
s
x pc
7.50 m 22 101.64 kgs
s
x pc
9.00 m 80 443.52 kgs
s
x pc
10.50 m 7 45.28 kgs
s
x pc
12.00 m 12 88.70 kgs
s
∅ 12 mm
x pc
6.00 m 12 63.94 kgs
s
x pc
7.50 m 7 46.63 kgs
s
x pc
9.00 m 8 63.94 kgs
s
x pc
10.50 m 14 130.55 kgs
s
x pc
12.00 m – –
s
∅ 16 mm
x pc
6.00 m 27 255.64 kgs
s
x pc
7.50 m 31 366.89 kgs
s
x pc
9.00 m 20 284.04 kgs
s
x pc
10.50 m 19 314.81 kgs
s
x pc
12.00 m 31 587.02 kgs
s
TOTAL WEIGHT: 3114.14 kgs