0% found this document useful (0 votes)
28 views17 pages

6 Cuttinglist

Uploaded by

Gilbert Timog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views17 pages

6 Cuttinglist

Uploaded by

Gilbert Timog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 17

COMPUTATION SHEET

Project: Two-storey residential house Page: 1


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
SECOND Continuous bars: 16 mm ∅
FLOOR 4 pcs – 8.3 m
BEAMS: EQV = 4 pcs – 10.5 m RSB
XCS = 4 pcs – 2.2 m 4 pcs – 10.5m
Grid A-C/1
(B1) Cut bars:
1 pc – 1.2 m
1 pc – 1.5 m
1 pc – 2.1 m
1 1 pc – 2.2 m
1 pc – 2.8 m 1 pc – 6m
EQV = 1 pc – 6m RSB
XCS = 1 pc – 3.2 m

Stirrups: L = 880 mm
25 +30 = 55 pcs

Use 9m RSB:
9
=10.23 ≈ 10
0.88

55 6 pcs – 9m
=5.5 ≈ 6 pcs
10

TOTAL
Grid B-C/2 Continuous bars: 16 mm ∅
(B1) (B2) 4 pcs –5.5 m
EQV = 4 pcs – 7.5 m RSB
XCS = 4 pcs – 2 m

2 Cut bars:
1 pc – 1.4 m
1 pc – 2.7 m
1 pc – 1.5 m
EQV = 1 pc – 6m RSB

Stirrups: L = 880 mm
30 + 7 = 37 pcs

Use 9m RSB:
9
=10.23 ≈ 10
0.88
3 pcs – 9 m
30
=3 pcs
10

Use 7.5m RSB:


7.5
=8.52 ≈ 8
0.88
1 pc – 7.5 m
1 pc−7.5 m
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 2


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid A-C/3 Continuous bars: 16 mm ∅
(B1) 4 pcs – 8.4 m
EQV = 4 pcs – 10.5 m RSB
XCS = 4 pcs – 2.1 m

3 Cut bars:
1 pc – 1.2 m
1 pc – 2.1 m
1 pc –2.4 m (use XCS)
1 pc – 2.4 m
1 pc – 2.8 m
1 pc – 1.5 m
EQV = 1 pc – 10.5m RSB
XCS = 1 pc – 2.6 m 1 pc – 10.5 m

Stirrups: L = 880 mm
24 + 30 = 55 pcs

Use 9m RSB:
50 5 pcs – 9 m
=5 pcs
10

Use 6m RSB for the remaining 4


stirrups:
6
=6.81 ≈ 6 1 pc – 6 m
0.88
1 pcs – 6m RSB

TOTAL
Grid A-D/4 Continuous bars: 16 mm ∅
(B1) 4 pcs – 11.2 m
EQV = 4 pcs – 12 m RSB 4 pcs – 12 m

Cut bars:
4 1 pc – 2.8 m
1 pc – 1.5 m
1 pc – 2.4 m (use XCS from “3”)
1 pc – 1.2 m
1 pc – 1.7 m
1 pc – 1.9 m (use XCS from”2”)
1 pc – 2.0 m
EQV = 1 pc – 6m RSB 1 pc – 6 m

Stirrups: L = 880 mm
24 + 26 + 21 = 71 pcs
Use 9m RSB:
70 7 pcs – 9m
=7 pcs
10
Use 6m RSB for the remaining 1
stirrup:
1 pc – 6m 1 pc – 6 m
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 3


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid B-D/5 Continuous bars: 16 mm ∅
(B1) 4 pcs – 6.5 m
EQV = 4 pcs – 9 m RSB 4 pcs – 9 m
XCS = 4 pcs – 2.5 m

5 Cut bars:
1 pc – 1.2 m
1 pc – 2.1 m (use XCS from”3”)
1 pc – 1.8 m (use XCS from “2”)
1 pc – 1.7 m
1 pc – 1.0 m
EQV = 1 pc – 6m RSB 1 pc – 6m
XCS = 1 pc – 3.9 m

Stirrups: L = 880 mm
25 + 22 = 47 pcs
Use 9m RSB:
40
=4 pcs 4 pcs – 9 m
10
Use 7.5m RSB for the remaining 7
stirrups:
7.5
=8.52 ≈ 8 pcs
0.88
1 pc – 7.5 m
EQV = 1 pc – 7.5m

TOTAL
Grid A-B/5 Continuous bars: 16 mm ∅
(B1) 4 pcs – 4.9 m
EQV = 4 pcs – 7.5 m RSB 4 pcs – 7.5 m
XCS = 4 pcs – 2.6 m

6 Cut bars:
1 pc – 0.8 m
1 pc – 1.2 m (use XCS from”3”)
1 pc – 1.5 m
1 pc – 1.6 m
1 pc – 1.0 m
EQV = 1 pc – 6m RSB

Stirrups: L = 880 mm
18 + 20 = 38 pcs
Use 9m and 7.5m RSB:
30 3 pcs – 9m
=3 pcs−9 m
10
8 1 pc – 7.5
=1 pc – 7.5
8
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 4


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid B/5-6 Continuous bars: 16 mm ∅
(B3) 4 pcs – 2 m
EQV = 4 pcs – 9 m RSB 1 pc – 9 m
XCS = 1 pc – 1 m

7 Cut bars:
4 pcs – 0.7 m (use XCS from”1”)
2 pcs – 1.0 m (use XCS from”3”)

Web bars:
2 – 0.9 m
EQV = 1 pc – 10.5 m RSB 1 pc – 10.5 m
XCS = 4 pc – 6. 7 m

Stirrups: L = 1008 mm
16 pcs
Use 9m RSB:
9
=8.33 ≈ 8 pcs
1.08
16
=2 pcs−9 m 2 pcs – 9 m
8

Grid B-D/6 Continuous bars: 16 mm ∅


(B3) 4 pcs – 6.6 m
EQV = 4 pcs – 9 m RSB 4 pcs – 9 m
XCS = 4 pcs – 2.4 m

8 Cut bars:
4 pcs – 2.0 m (use XCS)
2 pcs – 3.5 m
EQV = 1 pc – 7.5 m RSB 1 pc – 7.5 m

Web bars:
2 – 6.5 m (use XCS from “7”)
EQV = 1 pc – 7.5 m 1 pc – 7.5 m

Stirrups: L = 1080 mm
36 pcs
Use 7.5m RSB:
36 6 pcs – 7.5 m
=6 pcs−7.5 m
6
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 5


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid A/1-5 Continuous bars: 16 mm ∅
(B1) 4 pcs – 9.9 m
EQV = 4 pcs – 12 m RSB 4 pcs – 12 m
XCS = 4 pcs – 2.1 m

9 Cut bars:
1 pc – 1.3 m
1 pc – 2.1 m (use XCS from”3”)
1 pc – 1.9 m
3 pcs – 1.8 m
1 pc – 1.1 m
EQV = 1 pc – 12m RSB 1 pc – 12 m
XCS = 1 pc –2.3 m

Stirrups: L = 880 mm
25 + 22 + 22 = 69 pcs
Use 9m RSB:
69
=6.9 ≈ 7 pcs
10
EQV = 7 pcs – 9 m 7 pcs – 9 m

TOTAL
Grid B/1-4 Continuous bars: 16 mm ∅
(B1) 4 pcs – 7.2 m
EQV = 4 pcs – 7.5 m RSB 4 pcs – 7.5 m

Cut bars:
10 1 pc – 1.5 m
1 pc – 2.2 m
2 pcs – 1.9 m
1 pc – 1.1 m
EQV = 1 pc – 9m RSB 1 pc – 9 m
XCS = 1 pc –m

Stirrups: L = 880 mm
26 + 18 = 44 pcs
Use 6m RSB:
40 4 pcs – 9 m
=4 pcs−9 m
10
Use 6m RSB for the remaining 4
stirrups:
EQV = 1 pc – 6 m 1 pc – 6 m
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 6


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid B/5-6 Continuous bars: 16 mm ∅
(B1) 6 pcs – 1.5 m
EQV = 1 pc – 9 m RSB 1 pc – 9 m

Stirrups: L = 880 mm
11 12 pcs
Use 12m RSB:
12
=13.64 ≈ 13 pcs
0.88
Use 6m RSB for the remaining 4
stirrups:
EQV = 1 pc – 6 m 1 pc – 12 m

TOTAL
Grid B-C/4-6 Continuous bars: 16 mm ∅
(B1) 4 pcs – 5.5 m
EQV = 4 pcs – 6 m RSB 4–6m

Cut bars:
12 1 pc – 0.8 m (use XCS from “5”)
1 pc – 1.3 m
1 pc – 1.7 m
1 pc – 1.8 m
1 pc – 1.1 m
EQV = 1 pc – 6m RSB 1 pc – 6 m
XCS = 1 pc – 1.4 m

Stirrups: L = 880 mm
18 + 22 = 40 pcs
Use 9m RSB:
40 4 pcs – 9 m
=4 pcs−9 m
10

TOTAL
Grid C/1-6 Continuous bars: 16 mm ∅
(B1) 2 pcs – 9 m
2 pcs – 10.5 m
2 pcs – 4 m
2 pcs – 2.5 m (use XCS from “5”)
13 EQV = 3 pcs – 9 m RSB
2 pcs – 10. 5 m RSB
3 pcs – 9 m
2 pcs – 10. 5 m
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 7


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Cut bars:
1 pc – 1.0 m
1 pc – 0.9 m
1 pc – 1.3m
1 pc – 1.6 m
1 pc – 1.7 m
1 pc – 1.5 m
1 pc – 2.3 m (use XCS from “5”)
1 pc – 3.1 m
1 pc – 1.6 m
EQV = 1 pc – 12 m 1 pc – 12 m
XCS = 1 pc – 2. 5 m

Stirrups: L = 880 mm
15 + 20 + 20 + 33 = 88 pcs
Use 9m and 7.5m RSB:
80 8 pcs – 9 m
=8 pcs−9 m
10
8 1 pc – 7.5 m
=1 pc−7.5 m
8

TOTAL
Grid C/2-4 Continuous bars: 16 mm ∅
(B2) 4 pcs – 5.5 m
EQV = 2 pcs – 12 m RSB 2 pcs – 12 m

Stirrups: L = 880 mm
14 34 pcs
Use 9m RSB:
30
=3 pcs−9 m 3 pcs – 9 m
10

Use 6m RSB for the remaining 4


stirrups:
EQV = 1 pc – 6 m 1 pc – 6 m

TOTAL
Grid D/4-6 Continuous bars: 16 mm ∅
(B1) 4 pcs – 5.5 m
EQV = 2 pcs – 12 m RSB 2 pcs – 12 m
XCS = 2 – 1.0 m

15 Cut bars:
1 pc – 0.8 m (use XCS)
1 pc – 1.3 m
1 pc – 1.1 m (use XCS from “6”)
1 pc – 1.7 m
1 pc – 1.8 m
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 8


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Stirrups: L = 880 mm
18 + 22 = 40 pcs
Use 9m RSB:
40
=4 pcs−9 m 4 pcs – 9 m
10

TOTAL
TOTAL FOR 6.00 m 4 pcs − 10 pcs
SECOND
FLOOR
7.50 m 10 pcs 1 pc 13 pcs
BEAM 9.00 m 60 pcs − 14 pcs
10.50 m − 1 pc 11 pcs
12.00 m 1 pc − 25 pcs

TOTAL
ROOF Continuous bars: 12 mm ∅
BEAMS: 4 pcs – 3.7 m
EQV = 2 pcs – 7.5 m RSB 2 pcs – 7.5 m
GridA-B/1
(RB) Stirrups: L = 680 mm
25 pcs
Use 6m and 12m RSB:
6
1 0.68
=8.82 ≈ 8 pcs
12
=17.65 ≈ 17 pcs
0.68
8
=1 pc−6 m 1 pc – 6 m
8
17 1 pc – 12 m
=1 pc−12 m
17

TOTAL
Grid B/C-1 Continuous bars: 12 mm ∅
(RB) 4 pcs – 5.3 m
EQV = 4 pcs – 6 m RSB
4 pcs – 6 m
Stirrups: L = 680 mm
2 33 pcs
Use 12 m RSB:
33
=1.94 ≈ 2
17
EQV = 2 pcs – 12 m 2 pcs – 12 m
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 9


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid B-C/2 Continuous bars: 12 mm ∅
(RB) 4 pcs – 5.3 m
EQV = 4 pcs – 6 m RSB 4 pcs – 6 m

Stirrups: L = 680 mm
3 30 + 6 = 36 pcs
Use 9m RSB:
36
=2.77 ≈ 3 pc s
13
EQV = 3 pcs – 9 m 3 pcs – 9 m

TOTAL
Grid A/B-3 Continuous bars: 12 mm ∅
(RB) 4 pcs – 3.6 m
EQV = 2 pcs – 7.5 m RSB 2 pcs – 7.5 m

Stirrups: L = 680 mm
4 24 pcs
Use 9m RSB:
24 2 pcs – 9 m
=1.85 ≈ 2 pcs−9 m
13
TOTAL
GridA/D-4 Continuous bars: 12 mm ∅
(RB) 4 pcs – 8.7 m
EQV = 4 pcs – 9 m RSB 4 pcs – 9 m

Stirrups: L = 680 mm
5 31 + 24 + 3 = 58 pcs
Use 10.5m RSB:
58
=3.87 ≈ 4 pc s
15
EQV = 4 pcs – 10.5 m 4 pcs – 10.5 m

TOTAL
GridC/D-4 Continuous bars: 12 mm ∅
(B1) 4 pcs – 2.6 m
EQV = 1 pc – 10.5 m RSB 1 pc – 10.5 m

Cut bars:
6 2 pcs – 0.9 m
1 pc – 1.3 m 1 pc – 6 m
EQV = 1 pc – 6 m
XCS = 2.9 m

Stirrups: L = 880 mm
18 pcs
Use 7.5m and 9m RSB:
10 1 pc – 9 m
=1 pc−9 m
10
8 1 pc – 7.5 m
=1 pc−7.5 m
8
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 10


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid B/C-5 Continuous bars: 12 mm ∅
(RB) 4 pcs – 5.3 m
EQV = 4 pcs – 6 m RSB 4 pcs – 6 m

Stirrups: L = 680 mm
7 30 + 6 = 36 pcs
Use 9m RSB:
36 3 pcs – 9 m
=2.77 ≈ 3 pcs−9 m
13

TOTAL
Grid A-B/5-6 Continuous bars: 12 mm ∅
(RB) 4 pcs – 4.8 m
EQV = 4 pcs – 9 m RSB 4 pcs – 9 m
XCS = 4 – 4.2 m

8 Stirrups: L = 680 mm
18 + 20 = 38 pcs
Use 9m RSB:
38 3 pcs – 9 m
=2.92 ≈3 pcs−9 m
13

TOTAL
Grid B-D/6 Continuous bars: 16 mm ∅
(B3) 4 pcs – 6.4 m
EQV = 4 pcs – 7.5 m RSB 4 pcs – 7.5 m

Cut bars:
9 4 pcs – 1.9 m
2 pcs – 3.5 m
EQV = 1 pc – 12 m 1 pc – 12 m
1 pc – 6 m 1 pc – 6 m
XCS = 2.5 m

Web bars:
2 pcs – 6.3 m
EQV = 2 pcs – 7.5 m 2 pcs – 7.5 m

Stirrups: L = 1080 mm
36 pcs
Use 7.5m RSB:
36 6 pcs – 7.5 m
=6 pcs−7.5 m
6
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 11


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid A/1-5 Continuous bars: 12 mm ∅
(RB) 4 pcs – 9.8 m
EQV = 4 pcs – 10.5 m RSB 4 pcs – 10.5 m

Stirrups: L = 680 mm
10 25 + 22 + 22 = 69 pcs
Use 12m RSB:
69
=4 pcs 4 pcs – 12 m
17

TOTAL
Grid B/1-6 Continuous bars: 12 mm ∅
(RB) 4 pcs – 10.3 m
EQV = 4 pcs – 10.5 m RSB 4 pcs – 10.5 m

Stirrups: L = 680 mm
11 6 + 26 + 23 + 22 = 77 pcs
Use 9m RSB:
77 6 pcs – 9 m
=5.9 ≈ 6 pc s
13
TOTAL
GridB-C/4-5 Continuous bars: 12 mm ∅
(RB) 4 pcs – 2.4 m
EQV = 1 pc – 10.5 m RSB 1 pc – 10.5 m

Stirrups: L = 680 mm
12 18 pcs
Use 7.5m RSB:
18
=1.6 ≈ 2 pc s 2 pcs – 7.5 m
11

TOTAL
Grid B-C/5-6 Continuous bars: 16 mm ∅
(B2) 4 pcs – 3.3 m
EQV = 2 pcs – 7.5 m RSB 2 pcs – 7.5 m

Stirrups: L = 880 mm
13 9 + 18 = 27 pcs
Use 9m RSB:
20 2 pcs – 9 m
=2 pcs
10
Use 7.5m RSB for the remaining 7
stirrups:
EQV = 1 pc – 7.5 m 1 pc – 7.5 m

TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 12


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Grid B-C/4-5 Continuous bars: 12 mm ∅
(RB) 4 pcs – 2.4 m (use XCS from “8”)

Stirrups: L = 680 mm
18 pcs
14 Use 7.5m RSB:
18
=1.6 ≈ 2 pcs 2 pcs – 7.5 m
11

TOTAL
Grid C/1-5 Continuous bars: 12 mm ∅
(RB) 4 pcs – 10.5 m
EQV = 4 pcs – 10.5 m RSB 4 pcs – 10.5 m

Stirrups: L = 680 mm
15 6 + 25 + 33 = 64 pcs
Use 12m RSB:
64
=3.76 ≈ 4 pcs 4 pcs – 12 m
17

TOTAL
Grid B-C/4-5 Continuous bars: 16 mm ∅
(B2) 4 pcs – 5.4 m
EQV = 4 pcs – 6 m RSB 4 pcs – 6 m

Stirrups: L = 880 mm
16 33 pcs
Use 10.5 m RSB:
33 3 pcs – 10.5 m
=3 pc s
11
TOTAL
TOTAL FOR 6.00 m 1 pc 12 pcs 6 pcs
ROOF
BEAM
7.50 m 12 pcs 6 pcs 6 pcs
9.00 m 20 pcs 8 pcs −
10.50 m 7 pcs 13 pcs 1 pc
12.00 m 11 pcs − 1 pc

TOTAL
FOOTING Hook = 12(16) = 192 mm
TIE BEAMS: Total hook = 2(192) = 384 mm
For line A:
L of main bar = 8200 + 12(16)(2)
= 8584 mm
Use 9m bar :
1 pc main bar (8584 mm)

Main bars = 4 pcs – 9m 4 pcs – 9m

TOTAL:
COMPUTATION SHEET

Project: Two-storey residential house Page: 13


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
Stirrups:
27 + 33 = 60 pcs

For line B:
L of main bar = 384 + 4125 = 4509
≈ 4500 mm
Use 9m:
2 pcs main bar (4500 mm) 2 pcs – 9 m

Main bars = 2 pcs – 9 m

Stirrups:
3 pcs

For line C: 3 pcs – 12 m


L of main bar = 384 + 3500 = 3884 mm 1 pc – 6 m
Use 12m: 3 pcs main bar and
6 m: 1 pc main bar (3884 mm)

Main bars = 1 pc – 12m


1 pc – 6 m

Stirrups:
25 pcs
TOTAL
For line D:
L of main bar = 10500 + 384 = 10884 mm
Use 12 m:
1 pc main bar (10884 mm)

Main bars = 4 pcs – 12 m


4 pcs – 12 m
Stirrups:
31 + 25 + 21 = 77 pcs

For line E:
L of main bar = 4500 + 384 = 4884 mm
Use 10.5m:
2 pcs main bars (4884 mm)

Main bars = 2 pcs – 10.5 m 2 pcs – 10.5 m

Stirrups:
19 + 21 = 40 pcs
TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 14


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
For line G:
L of main bar = 6225 + 384 = 6609 mm
Use 7.5m:
1 pc main bar (6609 mm)

Main bars = 4 pcs – 7.5 m 4 pcs – 7.5 m

Stirrups:
37 pcs

For line 1:
L of main bar = 9900 + 384 = 10284 mm
Use 10.5m:
1 pc main bar (10284 mm)

Main bars = 4 pcs – 10.5 m 4 pcs – 10.5 m

Stirrups:
29 + 23 + 23 = 75 pcs
TOTAL
For line 2:
L of main bar = 2100 + 384 = 2484 mm
Use 10.5m:
4 pcs main bars (2484 mm)

Main bars = 1 pc – 10.5 m 1 pc – 10.5 m

Stirrups:
19 pcs

For line 3:
L of main bar = 690 +384 = 7285 mm
Use 7.5m:
1 pc main bar (7285 mm)

Main bars = 4 pcs – 7.5 m 4 pcs – 7.5 m

Stirrups:
29 + 23 = 52 pcs

For line 4:
L of main bar = 5050 + 384 = 5434 mm
Use 6m:
1 pc main bar (5434 mm)
Main bars = 4 pcs – 6 m 4 pcs – 6 m

Stirrups:
19 + 23 = 42 pcs

TOTAL
COMPUTATION SHEET

Project: Two-storey residential house Page: 15


Owners: ______________________________________
Location: _______________________________________ Date: _________

ITEMS TO MATERIALS AND ESTIMATED


BE CALCULATIONS QUANTITIES
ESTIMATED 10 mm ∅ 12 mm ∅ 16 mm ∅
For line 5:
L of main bar = 6750 + 384 = 7134 mm
Use 7.5m:
1 pc main bar (7134 mm)

Main bars = 4 pcs – 7.5 m 4 pcs – 7.5 m

Stirrups:
17 + 21 + 19 = 57 pcs

For line 6:
L of main bar = 5050 + 384 = 5434 mm
Use 6m:
1 pc main bar (5434 mm)

Main bars = 4 pcs – 6 m 4 pcs – 6 m

Stirrups:
19 + 23 = 42 pcs

TOTAL
For total Assume concrete cover = 50 mm
stirrups: 1 stirrup = (300)(2) + (80)(2) + 100 = 860
mm ≈ 857 mm

If we use 6m length:
6
=7 pcs of stirrups
0.857
Total # of stirrups = 574 pcs

574 82 pcs – 6 m
Total # of 6m RSB = =82 pcs−6 m
7
TOTAL
TOTAL FOR 6.00 m 82 pcs − 11 pcs
FOOTING
TIE BEAM:
7.50 m − − 12 pcs
9.00 m − − 6 pcs
10.50 m − − 7 pcs
12.00 m − − 5 pcs
TOTAL
BELGA, JELOMEE D.
SANTILLANA, RAPHAEL JOSEF D.

SUMMARY:

BAR DESCRIPTION QUANTITY WEIGHT

∅ 10 mm
x pc
6.00 m 87 321.55 kgs
s
x pc
7.50 m 22 101.64 kgs
s
x pc
9.00 m 80 443.52 kgs
s
x pc
10.50 m 7 45.28 kgs
s
x pc
12.00 m 12 88.70 kgs
s

∅ 12 mm
x pc
6.00 m 12 63.94 kgs
s
x pc
7.50 m 7 46.63 kgs
s
x pc
9.00 m 8 63.94 kgs
s
x pc
10.50 m 14 130.55 kgs
s
x pc
12.00 m – –
s

∅ 16 mm
x pc
6.00 m 27 255.64 kgs
s
x pc
7.50 m 31 366.89 kgs
s
x pc
9.00 m 20 284.04 kgs
s
x pc
10.50 m 19 314.81 kgs
s
x pc
12.00 m 31 587.02 kgs
s
TOTAL WEIGHT: 3114.14 kgs