0% found this document useful (0 votes)
18 views5 pages

062 3003 134

Uploaded by

Wei Xian Lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views5 pages

062 3003 134

Uploaded by

Wei Xian Lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Contents

Foreword

Contents

1 Safety Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

2 Transporting the Crawler--mounted Crane . . . . . . . . . . . . . . . . . 3


2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 Dimensions and Transport Weights of the Main Components . . . 5
2.3 Dimensions and Transport Weights of the Boom System . . . . . . . 7

3 Assembling and Dismantling the Crane . . . . . . . . . . . . . . . . . . . 3


3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.1.1 Bolt Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.1.2 Hydraulic Cylinders -- Protection of the Piston Rods . . . . . . . . . . . 7
3.1.3 Assembly Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.2 Assembling the Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.3 Assembling the Superstructure on the Chassis . . . . . . . . . . . . . . . . 15
3.3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
3.3.2 Assembly Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
3.4 Swinging the Crane Operator’s Cab into Operating Position
and Tilting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
3.4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
3.4.2 Swinging the Crane Operator’s Cab into the Operating Position . 23
3.4.3 Tilting the Crane Operator’s Cab . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
3.5 Raising the A--Frame and Placing the A--Frame in the Assembly
Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
3.6 Assembling the Track Frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.6.2 Assembling the Left--Hand Track Frame . . . . . . . . . . . . . . . . . . . . . 31
3.6.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3.6.2.2 Assembling the Track Limit Stops . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3.6.2.3 Assembly Procedure for the Left--Hand Track Frame . . . . . . . . . . 33
3.6.3 Assembling the Right--Hand Track Frame . . . . . . . . . . . . . . . . . . . . 37
3.6.3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
3.6.3.2 Assembling the Track Stops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
3.6.3.3 Assembly Procedure for the Right--Hand Track Frame . . . . . . . . . 39
3.6.4 Connecting the Hydraulic Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
3.7 Assembling the Central Ballast on the Chassis . . . . . . . . . . . . . . . . 47
3.7.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
3.7.2 Assembly Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
3.8 Assembling the Counterweight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
3.8.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
3.8.2 Mounting Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
3.9 Dismantling the Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
3.9.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
3.10 Dismantling the Counterweight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

062--3003--134 1
Contents

3.11 Dismantling the Central Ballast on the Chassis . . . . . . . . . . . . . . . . 59


3.12 Dismantling the Track Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
3.12.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
3.12.2 Dismantling the Hydraulic Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
3.12.3 Assembling the Chain Stops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
3.12.4 Supporting the Crane on Outriggers . . . . . . . . . . . . . . . . . . . . . . . . . 65
3.12.5 Dismantling the Right--Hand Track Frame . . . . . . . . . . . . . . . . . . . . 67
3.12.5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
3.12.5.2 Dismantling the Right--Hand Track Frame . . . . . . . . . . . . . . . . . . . . 69
3.12.6 Dismantling the Left--Hand Track Frame . . . . . . . . . . . . . . . . . . . . . 73
3.12.6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
3.12.7 Dismantling the Left--Hand Track Frame . . . . . . . . . . . . . . . . . . . . . 75
3.13 Folding the A--Frame into the Transport Position . . . . . . . . . . . . . . 79
3.14 Tilting and Swinging the Cab into the Transport Position . . . . . . . . 81
3.14.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
3.14.2 Tilting the Crane Operator’s Cab . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
3.14.3 Swinging the Crane Operator’s Cab into the Transport
Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
3.15 Dismantling the Superstructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
3.15.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
3.15.2 Lifting Off the Superstructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85

4 Assembling the Main Boom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3


4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4.2 Assembling and Fitting the Main Boom SH . . . . . . . . . . . . . . . . . . . 5
4.2.1 Assembling Main Boom Combinations SH . . . . . . . . . . . . . . . . . . . . 7
4.2.2 Fitting Main Boom Combination SH . . . . . . . . . . . . . . . . . . . . . . . . . 29
4.2.3 Assembling the Main Boom Stay Bars with the
Combination SH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
4.2.4 Fitting the Runner on the Connecting Head . . . . . . . . . . . . . . . . . . . 39
4.2.5 Dismantling the Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
4.3 Assembling and Fitting the Main Boom SH / LH,
Heavy Basic Length of the Main Boom 58.5 m . . . . . . . . . . . . . . . . 45
4.3.1 Assembling the Main Boom Combinations SH / LH,
Heavy Basic Length of the Main Boom 58.5 m . . . . . . . . . . . . . . . . 47
4.3.2 Fitting the Main Boom Combinations SH / LH . . . . . . . . . . . . . . . . . 67
4.3.3 Assembling the Main Boom Stay Bars for the
Combination SH / LH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
4.3.4 Fitting the Runner on the Main Boom SH/LH . . . . . . . . . . . . . . . . . . 77
4.3.5 Dismantling the Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81

5 Assembling the Main Boom and Fly Jib . . . . . . . . . . . . . . . . . . . 3


5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
5.2 Assembling and Fitting Fly Jib Combination SW . . . . . . . . . . . . . . . 5
5.2.1 Assembling Main Boom Combination SH for Variant SW . . . . . . . 7
5.2.2 Assembling Fly Jib Combinations for Variant SW . . . . . . . . . . . . . . 21
5.2.3 Fitting Main Boom and Fly Jib SW . . . . . . . . . . . . . . . . . . . . . . . . . . 43
5.2.4 Fitting the Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
5.2.5 Assembling Stay Bars HA and HI and Bracing Rods WU for the
Combination SW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77

062--3003--134 2
Contents

6 Assembling and Dismantling the Superlift . . . . . . . . . . . . . . . . . 3


6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
6.1.1 Bolt Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
6.1.2 Hydraulic Cylinders -- Protecting the Piston Rods . . . . . . . . . . . . . . 7
6.1.3 Assembly Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
6.2 Assembling and Fitting the Superlift Mast . . . . . . . . . . . . . . . . . . . . 11
6.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
6.3 Assembling the Superlift Mast (SL Mast) . . . . . . . . . . . . . . . . . . . . . 15
6.3.1 Superlift Mast with Counterweight Frame
(SL counterweight radius 11 m) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
6.3.2 Superlift Mast with Counterweight Frame
(SL counterweight radius 13 m) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
6.3.3 Superlift Mast with Counterweight Frame
(SL counterweight radius 15 m) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

7 Assembling the Main Boom with Superlift . . . . . . . . . . . . . . . . . 3


7.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
7.2 Assembling and Fitting the SSL Superlift Combination . . . . . . . . . 5
7.2.1 Assembling the SSL Main Boom Combinations . . . . . . . . . . . . . . . 7
7.2.2 Fitting the SSL Main Boom Combination . . . . . . . . . . . . . . . . . . . . . 25
7.2.3 Assembling the HA Stay Bars on the SSL Combination . . . . . . . . 33
7.2.4 Fitting the Runner on the Connecting Head . . . . . . . . . . . . . . . . . . . 35
7.2.5 Dismantling the Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
7.3 Assembling and Fitting the SSL / LSL Main Boom . . . . . . . . . . . . . 41
7.3.1 Assembling the SSL / LSL Main Boom Combinations . . . . . . . . . . 43
7.3.2 Fitting the SSL/LSL Main Boom Combination . . . . . . . . . . . . . . . . . 73
7.3.3 Assembling the HA Stay Bars for Combination SSL/LSL . . . . . . . 81
7.3.4 Fitting the Runner in the Top Section . . . . . . . . . . . . . . . . . . . . . . . . 83
7.3.5 Dismantling the Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87

8 Assembling the Main Boom and Fly Jib with Superlift . . . . . . 3


8.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
8.2 Assembling and Fitting the Boom Combination SWSL . . . . . . . . . 5
8.2.1 Assembling the Main Boom Combination for the Variant SWSL . 7
8.2.2 Assembling the Fly Jib Combination for the Variant SWSL . . . . . . 43
8.2.3 Fitting the Main Boom and Fly Jib Combination SWSL . . . . . . . . . 65
8.2.4 Fitting the Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
8.2.5 Assembling the Stay Bars HA and HI and the Bracing Rods WU
for the Combination SWSL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99

9 Reeving the Ropes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3


9.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
9.2 Reeving the Derricking Ropes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
9.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
9.2.2 Table for Reeving the Derricking Ropes . . . . . . . . . . . . . . . . . . . . . . 5
9.3 Reeving the Luffing Ropes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
9.3.1 Reeving the Luffing Rope W1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
9.3.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
9.3.1.2 Table for Reeving the Luffing Rope W1 . . . . . . . . . . . . . . . . . . . . . . 7
9.3.2 Reeving the Luffing Rope W2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

062--3003--134 3
Contents

9.3.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
9.3.2.2 Table for reeving the luffing rope W2 . . . . . . . . . . . . . . . . . . . . . . . . . 9
9.4 Reeving the Hoist Ropes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
9.4.1 Reeving the Hoist Ropes -- Combination SH and SSL . . . . . . . . . . 11
9.4.2 Reeving the Hoist Ropes --
Combination SH / LH and SSL / LSL . . . . . . . . . . . . . . . . . . . . . . . . 23
9.4.3 Reeving the Hoist Rope --
Combination SW and SWSL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

10 Erecting and Lowering the Boom System . . . . . . . . . . . . . . . . . 3


10.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
10.2 Erecting Boom Variant SH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
10.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
10.2.2 Erecting the boom variant SH, with runner, with WU rods on
the intermediate sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
10.2.2.1 Boom variant SH, with runner, with WU rods, without Auxiliary
crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
10.2.2.2 Boom Variant SH, with Runner, with WU Rods, with Auxiliary
Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
10.2.3 Erecting the Boom Variant SH, without Runner, with WU Rods
on the Intermediate Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
10.2.3.1 Boom Variant SH, without Runner, with WU Rods, without
Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
10.2.3.2 Boom Variant SH, without Runner, with WU Rods, with
Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
10.2.4 Erecting the Boom Variant SH, without Runner, without WU
Rods on the Intermediate Sections . . . . . . . . . . . . . . . . . . . . . . . . . . 17
10.2.4.1 Boom Variant SH, without Runner, without WU Rods, without
Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
10.2.4.2 Boom Variant SH, without Runner, without WU Rods, with
Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
10.3 Erecting the Boom Variant SH / LH . . . . . . . . . . . . . . . . . . . . . . . . . . 21
10.3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
10.3.2 Erecting the Boom Variant SH / LH, with Runner, with WU
Rods on the Intermediate Sections . . . . . . . . . . . . . . . . . . . . . . . . . . 23
10.3.2.1 Boom Variant SH / LH, with Runner, with WU Rods, without
Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
10.3.2.2 Boom Variant SH / LH, with Runner, with WU Rods, with
Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
10.3.3 Erecting the Boom Variant SH / LH, without Runner, without
WU Rods on the Intermediate Sections . . . . . . . . . . . . . . . . . . . . . . 27
10.3.3.1 Boom Variant SH / LH, without Runner, without WU Rods,
without Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
10.3.3.2 Boom Variant SH / LH, without Runner, without WU Rods, with
Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
10.4 Erecting the Boom Variant SW without Roller Set on the
Main Boom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
10.4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
10.4.2 Erecting the Boom Variant SW, without Roller Set on the
Main Boom, with Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
10.4.2.1 Boom Variant SW, without Roller Set on the Main Boom,
with Runner, without Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . 33
10.4.2.2 Boom Variant SW, without Roller Set on the Main Boom,
with Runner, with an Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . 41

062--3003--134 4
Contents

10.4.3 Erecting the Boom Variant SW, without Roller Set on the
Main Boom, without Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
10.4.3.1 Boom Variant SW, without Roller Set on the Main Boom,
without Runner, without Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . 51
10.4.3.2 Boom Variant SW, without Roller Set on the Main Boom,
without Runner, with an Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . 59
10.5 Erecting the Boom Variant SW with Roller Set on the
Main Boom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
10.5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
10.5.2 Erecting the Boom Variant SW, with Roller Set on the Main
Boom, with Runner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
10.5.2.1 Erecting Boom Variant SW, with Roller Set on the Main Boom,
with Runner, without Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . 71
10.5.2.2 Erecting Boom Variant SW, with Roller Set on the Main Boom,
with Runner, with an Auxiliary Crane . . . . . . . . . . . . . . . . . . . . . . . . . 75
10.5.3 -- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
10.6 Erecting Boom Variant SSL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
10.6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
10.6.2 Erecting Procedure Boom Variant SSL, with Runner,
with WU Rods Fitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
10.7 Erecting Boom Variant SSL / LSL . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
10.7.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
10.7.2 Erecting Procedure Boom Variant SSL / LSL, with Runner,
with WU Rods Fitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
10.8 Erecting Boom Variant SWSL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
10.8.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
10.8.2 Erecting Procedure Boom Variant SWSL, without
Roller Set on the Main Boom, with Runner . . . . . . . . . . . . . . . . . . . 93