TECHNICAL SERVICES DEPARTMENT
PROJECT ENGINEERING
Sub HSE (M)
Approval Page
Project Title: Installation of steam sparger in CN melt tank 40-2022
Date: 28-04-2022 MOC Type: Non-TA Job
MOC No. #: NP-2021-124 Asset Tag: 40-2022
Project Engineer: Hasnain Raza (_ ="? Asset Description: CN Melt Tank
Plant: NP Revision No: Revo
Peer (If Applicable): Hafiz ave > Moc Category: Reliabjity
Sub HSE () Approval trough Mesting = = :
- ‘Sub HSE (M) Chairman
Engineering Functional Review: 5
mre
Operational/Mechanical/Safety Review:
____Department “Comments / Remarks
Operation
UM/SH/AE : |
Field Maintenance alt 6% BAIR, |
UMY/SH/AE
Inspection
UM/AE
HSE
UM/AE
Process
UM/SH/AE
Gwvil
A — a _|
UM/SH/AE ‘ Ne
F&I
in —
UM/AE _ N
on ay A:
eS
Approved By: Chairman Sub HSE E (M)TECHNICAL SERVICES DEPARTMENT
PROJECT ENGINEERING
‘Sub HSE (M)
Problem Description & Proposed Solution
Job Scope & Responsibilities
Project Title: Installation of steam sparger in CN melt tank 40-2022
Date: 28-04-2022 Non-TA Job
MOC No. #: NNP-2021-124 40-2022
Project Engineer: Hasnain Raza Asset Description: CN Melt Tank
Plant: NP Revision No: Rev.0
Peer (if Applicable): Hafiz Ayaz MOC Category: Reliability
Problem Description & Proposed Solutio:
The phosphate solution formed during dissolution of rock with nitric acid is further cooled in crystallizers and
separated in rotary vacuum filter drums. The Calcium nitrate Ca(NO3)2.4 aq.crystals separated in filter drum
and washed with nitric acid are continuously discharged to CN melt tanks 40-2022/23, where these crystals
are melted with the help of steam. The resulting CN melt is sent to the CN conversion section of CAN plant by
means of CN melt pumps 40-7710/17/90. The level is controlled in 40-2022 by level controller LICAH 40-414.
Ammonia is also added in CN melt to control free acid in CN melt tank. The CN melt tank (40-2022), contains
SL steam coils while the CN melt tank (40-2023) contains steam spargers to heat the CN solution. It is difficult
to maintain CN melt tank (40-2022) temperature through steam coils and frequent coil leakages also occurred
due to reliability issue.
To deal with the above scenario it is proposed to install 4 nos. of steam spargers in CN melt tank (40-2022) as
Per spargers of CN melt tank (40-2023). Drawing of steam spargers of CN tank (40-2023) is attached. This
‘modification will help to make CN melt temperature up to desirable limit and avoid any abnormality.
In view of above, following recommendation is purposed installation of steam header of ide tank
and four branch spargers of 3" size inside CN melt tank (40-2022). The material of spargers
JOB SCOPE & RESPONSIBILITIES:
Sr.No. | _ Activity __|__ Responsibility Remarks |
1 | Field execution of spargers installation FM East |
2 | Update PSI related documents Process/Project I
In case of any support/clarity required let us know. All interfaces are requested to kindly review and share
your feedback.
MANAGER OFFICE
Uy may 2002
RECEIVED | DISPATCHEDTECHNICAL SERVICES DEPARTMENT
PROJECT ENGINEERING
Sub HSE (M)
Document Transmittal
Project Title: Installation of steam sparger in CN melt tank 40-2022
Date: 28-04-2022 MOC Type: Non-TA Job
MOC No. # NP-2021-124 40-2022
Project Engineer: Hasnain Raza CN Melt Tank
Plant: NP Rev.0
Peer (If Applicable}: Hafiz Avaz MOC Category: Reliability
We herewith transmit the following documents in this package:
1 - ‘Sub HSE (M) Approval document
> Problem Description & Proposed Solution —
_ Job Scope & Responsibilities
3] : Document Transmittal
4 - Sub HSE(M) Norms & ITP
5 NP-PIP-O97 Mechanical Drawing
6 | WPS-NP-10-05-22-01 Welding Procedure
| 7 PE/NP/21-124 Respective Approved Sub HSE (P) Package
l
ISSUED BY: PTE-TSD
PREPARED BY:
Cr
Hasnain Raza
PROJECT ENGINEER
APPROVED BY:
UM PROJECT ENGINEERINGTECHNICAL SERVICES DEPARTMENT
PROJECT ENGINEERING
‘Sub HSE (M)
‘Sub HSE Mechanical Norms & ITP
Project Title: Installation of steam sparger in CN melt tank 40-2022
Date: 28-04-2022 MOC Type: Non-TA Job
MOC No. #: NP-2021-124 Asset Tag: 40-2022
Project Engineer: Hasnain Raza ‘Asset Description: CN Melt Tank
Plant: NP Revision No: Rev.0
Peer (If Applicable): Hafiz Ayaz MOC Category: Reliability
KEY COMPONENTS OF SUB HSE MECHANICAI
Is the documentation (including Minutes of meeting)
for design package complete from the previous Sub PE/NP/21-124
HSEs (Process, E & | and Civil)
2, | Does the proposed change comply with applicable | NA
standards? (Write Standard No.)
| 3, Are specification sheets complete and consistent NA
with flow plan and heat and material balance?
Has a Design Specification been included in the
4 : NA
layout drawing? _
's the capability of pipe rack, being used for holding
5. | the new installations, evaluated and found NA
adequate?
6.__| Will the maintenance procedures require change? NA
7, 1s the loading on existing equipment calculated and NA
found satisfactory?
8.__| Have welding procedures prepared? Yes WPS-NP-10-05-22-01
Are there training requirements for maintenance
Le NA
staff?
10. Does new/modified equipment/piping create No
| "_| hindrance in existing lighting?
1. Have change in inspection requirements been NA
identified and plan updated?
12. | Is Quality Testing Plan (QTP) required for this NA
ane PREPARED BY REVIEWED BY | _REVIEWEDGY | APPROVED BY
teroiecrencinesny | _acarncincensin | esrecronencontens | om /sh pac)
Se) CP |The [AEFmodification?
13. | Have the insulation requirements identified? NA
14, | Equipment spacing criteria as per standard been used nn z
for this modification?
Is there provision for use / access of lifting
15. | equipment? (Crane mobile / overhead, Forklift Truck No
etc.)
1g, | DO types of fittings, valves etc, as specified by = ‘|
relevant Sub-HSE Process are compliant.
A. Pipe works Yes
8. Plant layout No.
a7, |-_& Mat. of construction __ NA. _
. D. Corrosion / erosion NA
E. Plant equipment NA
|__F._ Vessel registration NA _
G. Pipe line registration NA
A. Portable Equipment NA
B._Lifting Equipment NA
18. C._Lighting NA
D. Roads NA
E._ Drains - NA
F. Electrical Supplies NA.
A. Maintenance No.
B._Inspection Yes __
ao C._ Scaffolding Yes
D._Excavations No
E. Breaking No
F._ Entry to Confined Spaces _ Yes
G. Special Equipment No.
Has a layout drawing been included with the location
20. | of miscellaneous nozzles for vents, drains, level NA
instruments, ete. a
Will the fabrication be done in field? Does area
=e 5 i, Yes
permit field welding?
2 Are Tie-in point locations identified by consensus of Yes
Process and Operations Units? )
23, | Have static electricity concerns in equipment (fiers nn
or tanks etc.) been addressed? _
24. | Has line slope provided as per P & ID? NA _
ae PREPARED BY REVIEWED BY REVIEWED BY ‘APPROVED BY
(provecrenancen) | _aseatnaneensan | ewsoecnon vance | (uM/sw pRovecn
‘Name ZINSA FZ MiZW
Date
eet | Gd | cate
LeHave changes to documentation / drawings been |
25. | identified and marked on existing drawings / NA
documents?
26. | Are any new drawings prepared? Yes NP-PIP-O97
‘Where condensable vapors are injected into cool
27. | liquids, has the possibility of "steam hammer" been | NA
I considered for Mechanical design?
| Has secondary egress from elevated platforms been
2B. . NA
provided?
| ‘Are adequate drains, catch basins, and sewers being
29. 5 NA |
| provided as Per Sub-HSE Process package?
[|__ 30. | Miscellaneous (Others) NA j
No. ITP Activity Reference ‘Acceptance Verifying | Activity
Document Criteria Document By
1__| Procured material inspection ASMEN/ASTM | ASMEN/ ASTM | Original MTCS | FM Insp. |
2 _| Welding Procedure ASME "ASME FM.
3_| Welder Operators Qualification Certificates | ‘ASME DX Certificates FM & Insp.
4_| NDT procedures _ ASMEV ‘ASME V PFL Procedures | Insp.
| Visual inspection _ Report Insp
6_[ DPT Testing I Report insp
7_[ Uttasonie Testing = Report Insp.
| Radiography Testing ial Report Insp.
9 | PWHT Procedure ASME 31.3 ASME 313 PFU Procedures | FM
10” | PwHr ASMES13 ASMESL3 FMB lp.
11_| Hydrostatic Testing Procedure ‘ASME 31.3 ASME 31.3 PFU Procedures | FM
12 | Hydrostatic Testing ‘ASME 31.3 ASME 31.3 [FMB tnsp.
aa PREPARED BY REVIEWED BY REVIEWED BY ‘APPROVED BY
terovecrenawneen) | iamcarycyeensay | ewsrtcronenaiieen | (u/s PROIECH
ae
oyBILL OF MATERIAL
1
a conronenroescrnon arama | Oy
oe : —):
a | s+ | os [re nes 5, Be. ASME B36 jane reo |
are
ay a ae Foon] we
«| = [care 2sonteneim TH pec] zee |8
mo
es |x [acs [ene con, we, acme mes, [ne Ge we
we | | mos [eno cw, oe, ame me Jnige Ge ziee| 04 EA
r |.
(re
ELEVATION VIEW ELEVATION VIEW
Towas0s.soum Towan0s EAST |.
N o
a
len E
Iso VIEW
vin ouY SLL (APPROVED FOR
Consreucron
ae
a 7 a 7a foe TTA
= PLAN VIEW 1 [a | SSUED FOR EVEN -1si0e | rasnane ZES-aN 8 /APR/ 2d —
desl [srgl Rev] DESCRIP WON ‘Drawn | CHEK | APPRD | DATE
e020 :
ee ee te VEY PAKARAB FERTILIZERS LIMITED, MULTAN. | ,
eee caine PROJECT ENGINEERING SECTION
ores:
Nites tence uNLESS Stemware NoreD ast ance [PPP esa PLANT we r
clea er pat er eee nto exeas mE
2 Eater eer ety Sut ney hear Sane con [S507 Saou ¥EysTauLaTion oF STEAM
é Fan woo/oor ne Toe Je Pen MELD MONTE PRA 1 @ [POON gun] SPARGER IN CN MELT TANK
5 THE GSA BLES ATER ATMERES BPE SUPPORT SUNDA Tae Soran] | en eT tm pe a 40-2022
uct eae or
~ REFERENCE ORANG oF | 1 [woc-ne-21-12 NP-PIP-097 IRlo|PAKARAB FERTILIZERS LTD
MULTAN PAKISTAN
Project
| e of Issue; 10-05-22
|__Engineering | ——_WPS-NP--10-05-22-01 | Prepared By DR
| JOB: erm :HR_
Description/ Specification! WPS for Installation of sparger in CN melt tank 40-2022
Class
| Base Metal
Weld To
Thickness
| Joint Description
JOINT PREPARATION:
WELDING PROCEDURE SPECIFICATION ]
Preheating NA
First Pass:
Weld Process
Filler Wire
Size (diameter)
| Inter Pass temperature:
| Filling and Capping:
Weld Process
Filler Metal
Size (diameter)
Gas Backing
Dye Check
| RT
PWHT
| Remarks:
1. Proper grooves through grinders should be prepared
2. Weld joints should be shielded from air blast/wind during and after welding.
3. Surface to be welded should be properly cleaned from paint, oil, grease, dus, dirt, rust etc
4. For Sanicro® 28, heat-input of <1.0 kiimm and inter pass temperature of <150°C (300°F) are
Fecommended. A siring bead welding technique should be used,
Project Engr.: Hasnain Raza___—_ Inspection Engineer: Faroog Zafar) peers ron Moco
SUB HSE PROCESS
‘Sub-HSE(P) No, PEINP/21- 12.4 Dated: 25-08-2021
‘Any Addendum to this Specification?” YES .” No 4
Title: “Installatic
of sparger in CN melt tank (40-2022)"
Prepared by: Ahmad Masood (p-se
Peer Review by
Functional by:
Sub HSE (P) Approval through: Circulation ©] Meeting
Signature
REVIEWS AND APPROVAL:
UM Process:
wun fb
UM/SH Production (Concerned):
Shift Engineer:
Instrument Engineer:
Project Engineer:
FM Engineer
Environment Engineer
i
Con.
CHAIRMAN SUB -HSE(P)‘TECHNICAL SERVICES DEPARTMENT ate: 25% Aug 2024
s Spec # : PE/NP/21-
Pakarab Fertilizers Limited
PROCESS PACKAGE
“Installation of sparger in CN melt tank (40-
2022)“
‘PROCESS ENGINEERINGPakarab Fertilizers Limited. ____PEMpr2i-
Background & Reasons for Change
The phosphate solution formed during dissolution of rack with nitric acid is further cooled in
crystallizers and separated in rotary vacuum filter drums. The Calcium nitrate Ca(NOs):.4 aq.
crystals separated in filter drum and washed with nitric acid are continuously discharged to
CN melt tanks 40-2022 / 23, where these crystals are melted with the help of steam. By
means of SL steam the temperature in these tanks is maintained at about 60 °C by TIC-
40108 / 10. The resulting CN melt is sent to the CN conversion section of CAN plant by
means of CN melt pumps 40-1110/11/90. The level is controlled in 40-2022 by level
controller LICAH 40-414. Ammonia is also added in CN melt to control free acid in CN melt
tank.
The CN melt tank (40-2022) contains SL steam coils while the CN melt tank (40-2023)
contains steam spargers to heat the CN solution. tis difficult to maintain CN melt tank (40-
2022) temperature through steam coils and frequent coil leakages also occurred due to
reliability issue.
Technical Evaluation
To deal with the above scenario it is proposed to install 4 nos. of steam spargers in CN melt
tank (40-2022) as per spargers of CN melt tank (40-2023). Drawing of steam spargers of CN
tank (40-2023) is attached.
This modification will help to make CN melt temperature upto desirable limit and avoid any
abnormality.
In view of above, following recommendation is purposed.
© Installation of steam header of 5” size inside tank and four branch spargers of 3” size
inside CN melt tank (40-2022)
The material of spargers will be SS316L.
Process EngineeringPakarab Fertilizers Limited. PE/NP/21-
Recommendation
‘* Project Engr. will conduct Sub-HSE (M) for installation of 4 nos. of steam sparger of
3” size and main header of 5” size.
‘* FM will execute this modification as per MOC.
List of Attachments
© CNmelt tank Datasheet
© PBID (D-13922-0)
© Sparger drawing of CN melt tank (40-2023)
© Sub HSE (P) Norms
Process EngineeringBED os. seszres
Ss} siafieds |
aBewep asempieyon ‘Zz SaQ Sa, nay} uooalut Bunesedo
PaAlasqo sownNjoN “| Wea}s TS JORG 44
SOA sa, sj100 weels 1S u6isaq
| suefieds
ON SOA nuyy uoyoal Buneiedo
WEAIS TS 198. €202 - Ob
(sbuu 814)
a oN S100 weajs 1S ubiseq |
(s6uu o1#)
oN Se sll0o Wea}s 1S Bunevedo
2202 - Ov
‘aBewep yuanboy oN oN (sBuu g)#) ubisaq
0} aNp panowias a1am S105 sjjoo weays 1S
ue,
syewey soyeyby hice Buneey Aydosojtud veH N 9
aoe re
|lOD sa JoBseds yuel OW NO Sw, waaoPPL '
SUB- HSE PROCESS NORMS
Process Spec No: PE/ NP /21- Date: 25-08-2021
Title: “Installation of sparger in CN melt tank (40-2022)”
KEY COMPONENTS OF SUB HSE PROCESS:
1. WHAT IS THE NEED FOR MODIFICATION / ADDITION?
Removal of Hazards. 7
Process Technology Change}
Operational Improvement...
Enhancement of Product Quai.
Production Enhancement.
Equipment Revival.
Others.
Remarks:
any abnormality.
Oo
oO
Ergonomics.
Procedural Change...
This modification will help to make CN melt temperature up to desirable li
ooo | oo
2. WHICH STANDARDS DOES THE PROPOSED CHANGE COMPLY?
Plant Design standards. OSHA
Equipment Vendor's standards.[-]_ NFPA...
ASME. . ANSI =
NEQS.
British Standards...
Not Applicable.
Remarks: The purposed change comply the standards provided by UHDE.
000006
3. IS THE IMPACT OF MODIFICATION ON UTILITIES EVALUATED AND.
FOUND SAFE?
POWER... Cooling Water .......... oO
.-O Effluent. Ol
sen] Plant Air. a
Demin. Water ... 2G
Remarks: N/A
4. WHICH OF THE PROCESS CONDITIONS ARE BEING PROPOSED AND HOW
DO THEY MATCH UP WITH THE EXISTING CONDITIONS?
‘Temperature. oO Composition. ... oO Reactions. a
Pressure... oO Inventory. o Services. oO
oure | foccerronsrn | troremnony | gumeceane” | Retrence |
Name Aimed Masood | Mahmood Parr }| Salman Salem om
Date | 2506-2001 75082024 sernierasien
esignisign fem awd” [snpOFIEL
Flow.
OO Chemicals.......49
Level... +O Ignition Sources]
Effluents, O Others.....0
Remarks: N/A
5. HAVE TRAIN
Operations Staff
Remarks: N/A.
NEEDS IDENTIFIED AND RESPONSIBILITY ASSIGNED?
Maintenance Staff.................0]
6. HAS THE LOCATIONS IDENTIFIED FOR PROPOSAL?
Valves Control valves.
Ditins “B vens.. 8
Bleeds. Sample points oO
NRVs, QO TieIn. =
Remarks: Tie-in points for installation of sparger is marked in attached P&ID
7. WHAT SAFETY CONTINGENCIES HAS BEEN EVALUATED? DO THEY
COVER ALL POSSIBLE CONTINGENCIES THAT COULD OCCUR?
Site Utility Failure .. 1 — Mis-operation of Valves.........[]
Fire ... Temperature Excursion og
Runaway... : Pressure Excursion, Oo
Malfunction of Control Valves....{] Potential upset conditions.......
Operator Error ia
Remarks: N/A
8, HOW WILL THE MODIFICATION / ADDITION AFFECT THE DESIGN OF THE
PLANT? WILL IT BE IN SAFE DESIGN RANGES (VES / N@-/ NA)
Design pressure.......[] Pipe Works...........] Corrosion / Erosion.)
Design Temp......... Plant Layout........0) — Interlocks..........£
Mat-of Construction. ] Instrumentation... El. Shutdown system...)
Relief Vents........... Loads on StructuresE] Plant Equipment's.
Measuring / Metering Devices. “Recorders...
SCDS....0000
Remarks: Steam header of 5” size will be installed inside CN melt tank (40-2022) along with two
branch spargers of 3” size.
WHICH OPERATIONAL METHODS / PROCEDURES ARE TO BE CHANGED
OR DEVELOPED?
Commissioning.........1 ‘Abnormal Operation. Q
Startup... “Oo Emergencies... Q
Normal Operation......5 Preparation for Maintenance...)
Shut down oo Opportunities for Error...)
Not Applicable. Oo
Bone PREPARED BY REVIEWED BY ‘APPROVED BY Reference
(PROCESS ENGINEER) (SH OPERATION) {uM PROCESS)
‘Salman Saleem ‘OSHA
Name ‘Ahmad Masood Mehmood Paresh | Sema worn vn
Date 25-08-2024 >, [2508-2001] _ (25-08; soe
[DesigniSign.| E-11 * Toune XO ole aan
KSOPFL :
Remarks: N/A
10. WHICH OF THE OTHER EQUIPMENT / PLANT IS AFFECTED BY THE
MODIFICATION / ADDITION?
Portable Equipment.......] Railway... Upstream .
Lifting Equipment......... Drains. ---[J Downstream.
Lighting. Oo Electrical ‘Supplies. O Vents..
Roads. o Line slope... Other Plants.
Support Structure oO
Remarks: NA
11. CONSIDERING THE ABOVE CHANGES AND EFFECTS WHAT HAZARDS CAN
RESULT?
Broken Parts... a Pipe Leaks. Fl
Moving Parts. Vessels leaks.
Released Energy. A other Emissions. 8
Falls... a Hot Surfaces.........
Flames. a
Noise... O Chemicals...
Remarks: NA
12. TO WHAT EXTENT IS THE ENVIRONMENT AFFECTED BY MODIFICATION /
ADDITION?
-O
Working Conditions...) Emissions / Effluents..
Plant Environment Beyond Plant Boundary...........]
Remarks: This modification will help to make CN melt temperature up to desirable limit and avoid
any abnormality
13. DOES ANY PROCESS REQUIRE CHANGE?
Alarm & Trip Testing... Electrical Classification.........1
Pipeline Registration Vessel Registration. A
Relief Stream Registration. Emergency Clearance.
Remarks: N/A
14, WILL ANY EXISTING SAFETY EQUIPMENT BE INADEQUATE WHEN THE
MODIFICATION / ADDITION ARE COMPLETED?
Clothing, : oO Fire Fighting,
Eye Protection... a Means of Escape. 4
Ear Protection........scesseeeeef] Fire Detection... A
Breathing Apparatus. oO Fire Protection. o
Lighting. 8 Showers. o
Remarks: N/A
PREPARED BY REVIEWED BY
Route | maceernonern | tevorenaron1 tawrpnocessy | _ Reference
Name "Anmad Masood Tianna ParachPo] Sarnan Sacer OSHA
Date 25-08-2021 yn 25-08-2021 iC | seres80 180
[Design/Sign.| E-1 ‘SH NP UM.15. WHERE WILL THE DETAILS OF THE MOFIFICATION / ADDITION BE
RECORDED?
Changes to P & I Diagrams............g§ Changes to P F Diagrams........5)
Changes to Elect. Line Diagrams.....[] Notices. oO
‘Changes to Mech. Drawings, MB......Training...... a)
New Drawings... see} Changes to Design Manual... 5]
Changes to Operating Instructions... . Material & Energy Balance...)
Other es sssisccsnssseeerseesssssseeseesees ld
Remarks: This modification will be updated in P&ID and CN tank mechanical datasheet.
16. DOES THE MOFIFICATION AFFECT HAZARDS AREA
CLASSIFICATION? YES /NOV
If YES
~Area is Classified as Zone Qo
Specification Electrical Equipment is adequate for zone classified CI
-Hazard area classification list and layout needs update. o
Remarks: N/A
17. HAZOP / WHAT IF CONDUCTED AND CHECKLIST ATTACHED..N/A
18. HAVE ALL THE CONCERNED PERSONNEL REVIEWED THE PACKAGE...
: ee oe yes .
19. ARE FURTHER HAZARD STUDIES REQUIRED?...NO.
PREPARED BY REVIEWED BY ‘APPROVED BY Refer
ROUTE | wrocessencnveem (snoperarion 4 (um process) vent
Name ‘Ahmad Masood Mahmood Paracha 7 Selman Saleem ‘OSHA
29.0FR.1910.1190)
Date 25-08-2021 y] , [208-2021 Ay ee
besignign- [Ea wa? Tein va {ow@
pekereh
SUB HSE (P) Checklist
subject: Installation of steam sparger in CN melt tank (40-2022)
Np/2ti34
‘srt [Description ‘Yes/No/NA ‘Remarks
1_| Reference number of Sub SOC (P) given. Yes
[Piping specication mentoned. Yes
3 HAZOP hari heck int stacked wo 4
4 Hlon Veloce rn eis 7 =
[Sem press angs are within af ini ¥ a
| Material speciation mentioned ves ee minced wing
[7 Types of valves specified 7 [NA a
[btn vale cations or proper dang wa
5 [Werle ocatons fo proper venting wa -
707 [Line slope eaureret or seit raining Wa |
11_ | Data sheets provided. NA] 7 7
Frstrument angela un Scar
12 | mentioned. _ _ NA _ |
| Petbanached 7
Ti [ Line sie/speccatonrenloned on FID ves 4
15 [ Chea he possiblity of inermixng of two seams| NA |
[Taken cae of NEGS values wa
4 [ Can he system be safely commited anne? | NA
hat Pt are reared fr commissoning and 6 ;
18 | operate the system (if applicable) Abad ee creat |
To" | What procedure tbe oad / developed mm
20" No's ef role reared. ny sare oles? wi
21 | Manholehand hole provi Wk
[Reference given for the andar) ed Yes | Ae per URDE pectin
23 [nteok requirements a
24 [eS screen diction requirement wa |
25 [ Any instrurent loop medication wa
36 Any sequence mosifieston ta |
37 Issiaton for Personnel Protection my
‘28 | Minimum Chemical Exposure to end user. NA a
3 [Pressure gauges nal =
30_ [Temperate gages insted
31 [How meters equred
32_| Transmitters required. |
'33_| Recorders required. -
'34_| Can the system be commissioned / decon safely a a
35-[ Ghnge’s efecto product quay
. Pron Tapas wi
Fe ee Yes | maintain tne tank tmp up
~ 7 —_— _ = to desirable limit
37 Brine ae : ™
33 Vet ote lcstone Wh
+39_| Plant Startup/Shut down effect. No. - =
“40 _| Training of Operations people. Yes =
‘41_| Functional Review carried out with UM Ops Yes_ |
42_| Checked possibility of micup of tag numbers NA 7
[T4a_[ Check drain / bleed for safe depressurization. NA _ i
Page otNall, TECHNICAL SERVICES DEPARTMENT 7 PAGE 1 of 1
PROCESS ENGINEERING UNIT
MINUTES OF MEETING
Installation of Stack Analyzer at Dissolving Section
Recovery of vacuum pumps seal water by installation of pH meter
SUBJECT: 3. Provision of urea recycle line and installation of urea standby pump along with level indication &
drain plate
Installation of sample point on reactor discharge line to settling tank seal pot
5._ Installation of sparger in CN melt tank (40-2022)
HELD ON: | 25/08/2021 | ISSUED ON: | 27/08/2021 | LOCATION: SKYPE MEETING
REFNO: | TSD/PE/NP PREPARED BY: Ahmad Masood
PARTICIPANTS: PARTICIPANTS
Hyder Ali (HA) Prod. Manager East Shadab Anjum (SA) Sr. Process Engr.
‘Salman Saleem (MSS) UM Process Hasnain Raza (HR) Project Engr.
Mahmood Paracha(MP) SH NP. ‘Sana Zulfiqar (SZ Env. Engr.
Nadeem Shahid (NS) Safety Engr. ‘Ahmad Masood (AM) Process Engr.
Khawaja Hassan Mansur —_Environment Engr. ‘Shahan All (SA) FM Engr.
Ghulam Rasool (GR) Day Engr. NP
[Sub-HSE (P) of NP plant was conducted and the marked actions are as follows.
oad
Etre aT
DATE
* Installation of Stack Analyzer at Dissolving Section
MOC for installation of stack analyzer at Dissolving Section carried out. + Info. -
2, _| lt wasadvised to provide tapping point of 1” at 135F for proper measurement Process | 3108-202
of exhaust gases. (Completed)
‘© Recovery of vacuum pumps seal water by installation of pH meter
For recovery of raw water from seal water tank it is proposed to install pH
1. | analyzer connecting upstream & downstream of seal water tank with alarm of | info. -
Pump (40-1120) at low pH. Forum agreed to execute this modification.
‘+ Provision of urea recycle tine and installation of urea standby pump along with level indication & drain |.
plote
To ensure continuous dosing of urea solution into reactors it is proposed to
1. | provide pump recycle line, standby urea pump, level indication and drain plate | - info. -
on urea preparation tank,
The subject modification will be executed in Phase-I and new urea overhead
Process | 30-06-2022
tank will be evaluated in Phase-tqnRL, | TECHNICAL SERVICES DEPARTMENT —
So I PROCESS ENGINEERING UNIT
MINUTES OF MEETING
> Installation of sample point on reactor discharge line to settling tank seal POt
1_| Forealection of sample in between reactor and setting tanks sample pointof | ise,
2° with plug valve is proposed to install at 114F.
‘* Installation of sparger in CN melt tank (40-2022)
“The existing coils in CN melt tank (40-2022) is not reliable and couldn't fulfill to
1. _ | maintain the temperature up to desired limit. So, itis proposed to install steam | Info. -
spargers as per other CN tank (40-2023)
Removal of coils a lengthy job 50 itis decided to keep the coil for time being &
install two nos. of steam sparger to meet the requirement of desired | FM ATA-2022
temperature till it’s removal and further two spargers will be added.
a
(ee =e —
er