Power and Data Connection Provision To Retail PODS and Carpet Replacements Central Processor (CP) Seating Areas in Terminal A

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views2 pages

Power and Data Connection Provision To Retail PODS and Carpet Replacements Central Processor (CP) Seating Areas in Terminal A

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MTB- TGC-ANL-ELE-

Document No:
ITP-0014

Revision 00

PROJECT NAME: Power and Data Connection Provision to Retail PODS and
Carpet Replacements Central Processor (CP) Seating Areas in Terminal A Page Page 1 of 2
Rebus Projects Managements LLC
INSPECTION & TEST PLAN
Installation of Wiring Devices & Accessories

Inspection and Acceptance


Test /Inspection Criteria and Report
No. Activity Description Reference Documents Frequency Main
Requirements Subcontractor Engineer Reference No.
Contractor

 Compliance with
requirements of relevant
Material Approval of Wiring  As per Abu Dhabi International Prior to start to work
1. project Specification H H H MAR Approval
Airport Specification, Section on site
Devices  Material Approval Request
262726
 ADCD Regulation
 Compliance with the project
 As per ADIA Specification,
specifications Section 262726
Approval of Electrical Shop Drawing
2.  Manufacturer  As per ADIA Specification, H H H
System Shop Drawings Section 013300 Prior to start to work Approvals
Recommendation  Approved for Construction on site
 ADCD Regulation Drawing

 Make / Brand Material


 Model & Type  As per ADIA Specification,
Wiring Devices delivered to Inspection
3.  Material Inspection Request Section 262726 H H H
site  Approved Method Statement  Material Approval Request For each lot Request Forms.
Storage and Handling  Supplier Delivery Note (MIR)
Section
Work Inspection
Request forms &
Mock Up Installation for  As per ADIA Specification,
4.  Approved Shopdrawing Section 262726 Clause 3 Mock Up Installation H H H Check List.
Wiring devices
 Approved Method Statement
 WIR
 ELE-FM-0007

Legend: S- Surveillance Inspection W- Witness Inspection Point H- Mandatory Hold Point for Inspection R - Record Review
MTB- TGC-ANL-ELE-
Document No:
ITP-0014

Revision 00

PROJECT NAME: Power and Data Connection Provision to Retail PODS and
Carpet Replacements Central Processor (CP) Seating Areas in Terminal A Page Page 2 of 2
Rebus Projects Managements LLC
INSPECTION & TEST PLAN
Installation of Wiring Devices & Accessories

Inspection and Acceptance


Test /Inspection Criteria and Report
No. Activity Description Reference Documents Frequency Main
Requirements Subcontractor Engineer Reference No.
Contractor

Work Inspection
Request forms &
 As per ADIA Specification,
Check all Installations of
5.  Approved Shop Drawing Section 262726 Clause 3 H H S Check List.
Wiring Devices
 Approved Method Statement Every Installation
 WIR
 FM-0007

Legend: S- Surveillance Inspection W- Witness Inspection Point H- Mandatory Hold Point for Inspection R - Record Review