0% found this document useful (0 votes)
15 views

HIDSB01

Uploaded by

Ernesto Kaneko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

HIDSB01

Uploaded by

Ernesto Kaneko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

HIDSB and HIDSBMT Installation Guide

HIDSB and HIDSBMT Installation Guide 1


Hardy Process Solutions
10075 Mesa Rim Road
San Diego, CA 92121

Copyright © 2021 Hardy Process Solutions


All Rights Reserved

Notice of Rights
No part of this manual may be reproduced, copied, translated or transmitted, in any form or by any
means, without the prior written permission of Hardy Process Solutions, Inc.

Notice of Liability
Information provided in this manual is intended to be accurate and reliable. However, Hardy Process
Solutions, Inc. assumes no responsibility for its use, nor for any infringement of rights of third parties
which may result from its use. THIS DOCUMENT IS PROVIDED “AS IS” AND ANY EXPRESS OR
IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF
MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO
EVENT SHALL HARDY PROCESS SOLUTIONS, INC. BE LIABLE FOR ANY DIRECT, INDIRECT,
INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT
LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA,
OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF
LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE
OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS DOCUMENT, EVEN IF
ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

Trademarks
All trademarks and registered trademarks are the property of their respective owners.

HIDSB and HIDSBMT Installation Guide Rev. A


August 6, 2021

HIDSB and HIDSBMT Installation Guide 2


CONTENTS

Contents ................................................................................................................... 3

Introduction .............................................................................................................. 4
Additional References ....................................................................................................... 4
Load Cell Specifications .................................................................................................... 5

1 HIDSBMT Installation Instructions ...................................................................... 6


1.1 Overview ..................................................................................................................... 6
1.2 Installation Hints .......................................................................................................... 6
1.3 HIDSBMT Orientation.................................................................................................. 6
1.4 HIDSBMT General Mounting Principles ...................................................................... 7
1.5 HIDSBMT Allowable Movement .................................................................................. 8
1.6 Assembly Procedure ................................................................................................... 9
1.7 HIDSBMT and HIDSB Typical Application ................................................................ 11

2 HIDSBMT Construction and Features ............................................................... 12

HIDSB and HIDSBMT Installation Guide 3


INTRODUCTION

Double-ended Shear beams are medium- and high-capacity workhorses that are very
rugged, stable, and able to handle side loads well. The HIDSBMT mount is recommended
for the center-loaded Load Cell model HIDSB. ꞏ
In applications where substantial thermal expansion/contraction is expected, or room is not
available to raise a vessel significantly for load cell replacement, the HIDSB mount is highly
recommended in this type of application. Using a double-ended, center-loaded module is an
excellent choice to handle vessel movement and limited space requirements.
The mount uses a round-load cell that allows the top-loading pivot to correct minor alignment
problems. The weigh module can also accommodate substantial movement in the direction
perpendicular to the longitudinal axis of the load cell.
The load cell in the mount is supported on hardened circular pivots (RC-46/48). Screws
secure it to the base. The top chair is held captive by removable pins on the top and bottom
of the load cell. This allows the load cell replacement without raising the vessel by merely
taking the load off of the weigh module.
This document contains important guidelines for applying load to a center-loaded, double-
ended shear beam load cell and for orienting the mount for use with model HIDSB.

Additional References
For information about dimensions, model numbers, and schematic drawings, refer to the
following webpages:
 Mount: https://www.hardysolutions.com/tenants/hardy/documents/Load_Cell_Mount_HIDSBMT.pdf
 Cell: https://www.hardysolutions.com/tenants/hardy/documents/Load_Sensor_HIDSB01-02.pdf

HIDSB and HIDSBMT Installation Guide 4


How to Use This Guide

Load Cell Specifications


The HIDSB Double Ended Shear Beam Load Cells come in two varieties: HIDSB01
versions are Stainless Steel and HIDSB02 versions are Nickel Plated Alloy Steel.

SPECIFICATIONS HIDSB01 HIDSB02

Capacities 5K, 10K, 20K, 40K, 50K, 60K, 5K, 10K, 20K, 40K, 50K, 60K, 100K,
100K, 150K, 200K 150K, 200K

Rated Output (ES) 3.0 mv/v ± 0.10% 3.0 mv/v ± 0.10%

Zero Balance <±1.0 % Rated Output <±1.0 % R.O.

Hysteresis < 0.02% Full Scale < 0.02% Full Scale

Non Linearity < 0.03% Full Scale < 0.03% Full Scale

Combined Error <±0.02% R.O. <±0.02% R.O.

Input Resistance 700±7 ohm 700±7 ohm

Output Resistance 703 ± 4 ohm 703 ± 4 ohm

Excitation 10VDC ‐ Maximum 15VDC 10VDC ‐ Maximum 15VDC

Safe Load Limit 150% Emax 150% Emax

Sensor Material Stainless Steel 17‐4PH Nickel Plated Alloy Steel

Temperature ‐ 0 ‐ 150 deg. F 0 ‐ 150 deg. F


Compensated Range

Temperature ‐ < 0.0011% FS O/deg. F < 0.0011% FSO/deg. F


Effect on Zero

Sealing Potted Potted

Approvals CE, IP67, RoHS, REACH CE, IP67, RoHS, REACH

Warranty Two years Two years

HIDSB and HIDSBMT Installation Guide 5


1 HIDSBMT INSTALLATION INSTRUCTIONS

1.1 Overview
The HIDSBMT mount is designed for use with the HIDSB Nickel Chrome plated alloy steel
or HIDSB stainless shear beams. Together these two products compose the mount weighing
assembly.

1.2 Installation Hints


 The mounting surfaces for the BASE (4) and LOADING PLATE (12) must be level, and the
distance between them must be within 1/32'' of the nominal height (7). If the BASE is
mounted on concrete, grouting is an accepted method for leveling.
 All welding on and around the installation should be done before installing LOAD CELLS
(2).
 Proper drainage is a must and should be provided so that the weighing assembly is not
standing in water.
 If weighing vessels and surrounding equipment are frequently steam cleaned, a protective
shroud for the weighing assembly is recommended.

1.3 HIDSBMT Orientation


The best mounting/installation for several vessel types is shown in Figure 1-4, where a line
of the vessel is at right angles to the longitudinal axis of the load cell. These
recommendations are particularly important when significant thermal expansion/contraction
is expected.
The HIDSB should be oriented with the load cell's longitudinal axis in line with the expected
movement.
Figure 1-1 shows the recommended placement and orientation for double-ended beam
typical installations.

HIDSB and HIDSBMT Installation Guide 6


Chapter 1 – HIDSBMT Mount Installation Instructions

Figure 1-1. Recommended Placement and Orientation (Double-Ended Beam Installations)

1.4 HIDSBMT General Mounting Principles


 The load cell should be horizontal in both directions.
 The load should be applied vertically through the cell's center.
 The load should be introduced without producing a twisting effect around the center.
 The load must not move along the cell.

HIDSB and HIDSBMT Installation Guide 7


Chapter 1 – HIDSBMT Mount Installation Instructions

1.5 HIDSBMT Allowable Movement


Figure 1-2 shows the HIDSBMT allowable movement.

Figure 1-2. HIDSBMT Allowable Movement

Table 1-1. Specifications

Movement Degrees

Axial movement (left image in Figure 1-2) ±0.5 degrees

Radial movement (right image in Figure 1-2) ±0.5 degrees

HIDSB and HIDSBMT Installation Guide 8


Chapter 1 – HIDSBMT Mount Installation Instructions

1.6 Assembly Procedure


The HIDSBMT weighing module has six major parts (see Figure 1-3):
 The BASE (4) is attached to the mounting surface that supports the entire assembly.
 The LOAD CELL (2) and SUPPORT PINS (3) are bolted to the BASE (4).
 The LOADING BRACKET (1) is held captive by the RETAINING PIN (9).
The type of installation will dictate how you locate, attach, and assemble the parts for the
mount weigh module assembly. Some judgement must be exercised depending on
application.
In a typical installation:
1. Locate the BASE (4) and LOADING BRACKET (1), and bolt them to the mounting
surface and weighing vessel, respectively.
2. Insert the LOAD CELL (2) through the large hole in the side of the LOADING BRACKET
(1).
3. Pass the MOUNTING BOLTS (10) through the ends of the LOAD CELL (2) and
SUPPORT PINS (3), and threaded into the BASE (4) and hand tightened. The center line
of the SUPPORT PINS (3) must be perpendicular to the center line of the LOAD CELL
(2).
4. If properly positioned, the BEARING PIN (11) and RETAINING PIN (9) will easily slide
into the LOADING BRACKET (1). Neither should be forced into position. Use COTTER
PINS (7) to hold both PINS captive.
5. For multi-cell applications, install the other mount weighing assemblies in the same way.
6. Make the final height adjustments by inserting spacers between the top of the LOADING
BRACKET (1) and the weighing vessel.
7. Torque the MOUNTING BOLTS (10) to 20 foot-pounds.
Figure 1-3 shows the HIDSBMT outline drawing and parts identification.

HIDSB and HIDSBMT Installation Guide 9


Chapter 1 – HIDSBMT Mount Installation Instructions

12
1
11
7 2 10

9
3
8
4

5 6

Figure 1-3. HIDSBMT Outline Drawing and Parts Identification

Number Description

1 Loading bracket
2 Load cell (model HIDSB)
3 Support pins (2 plcs)
4 Base
5 Thru holes in subplate to clear mounting plate “S” Dia. 2 pl
6 Subplate recommended
1 in. up 60 Klbs
11/2 in. up to 150 Klbs
2 in. up to 250 Klbs.
7 Nominal height dimension
8 Cotter pins (2 plcs)
9 Retaining pin
10 Mounting Bolt (2 plcs)
11 Bearing pin
12 Loading plate

HIDSB and HIDSBMT Installation Guide 10


Chapter 1 – HIDSBMT Mount Installation Instructions

1.7 HIDSBMT and HIDSB Typical Application


Figure 1-4 shows a typical application for the HIDSBMT and HIDSB.

Figure 1-4. HIDSBMT and HIDSB Typical Application

HIDSB and HIDSBMT Installation Guide 11


2 HIDSBMT CONSTRUCTION AND FEATURES

Each end of the load cell is screwed to a base through a hardened cylindrical spacer, which
is cross-drilled to allow the screw to pass through.
The chair assembly has a clearance through which the load cell passes. A hardened load
pin is inserted horizontally at the top of the clearance hole, which transmits the load to the
cell. Another pin sits in an angular groove at the center of the cell.
This arrangement allows the chair to move in practically all directions, as shown in Figure
1-2, while providing checking in all directions.
To remove the load cell, raise the vessel only enough to relieve the load from the cell.
The HIDSB design locks the tank or hopper to the weigh module, obviating the need for
check rods in most applications.
 Safe overload: 150%
 Ultimate Overload: 300%
 Safe side load: 50%
 Weighing system accuracy: ±.02%
(Overall System accuracy is dependent on the quality of the installation.)
 Meets UBC 94 Seismic Zone 1-4 Requirements

HIDSB and HIDSBMT Installation Guide 12


Hardy Process Solutions
10075 Mesa Rim Road
San Diego, CA 92121
[email protected]
http://www.hardysolutions.com

Hardy Process Solutions Document Number: 0400-DESB-2 Rev. A

HIDSB and HIDSBMT Installation Guide 13