Work Order 05
Work Order 05
Assistant Engineer,
CCSD-9, CPWD, Chandigarh
Bill sent to Division Office on dated
TO BE FILLED BY ACCOUNS BRANCH IN DIVISION OFFICE- Part-II
Part I checked with all condition of agreement and found in
1 order’? (Y/N)
Auditor
3
10% amount of water proofing item withheld? Y/N)
5
EOT case sanctioned or not ?
6
Status of Mile Stone.
All measurement recorded in this CMB are checked, rates of all items in this bill checked with respect to
full/part rate sanctioned. Necessary recovery made and amount with held (if any, as per agreement).
Name of work: Construction of Boundary wall, Toe wall and other miscellaneous civil work at GPRA
Colony, Sector 38 B, Chandigarh i/c Electrical work. (SH: Misc. work in basement)
Certified that this MB contains pages from 01 to and all are machine
numbered.
REVIEW NOTES
4 15.48 Taking out C.I. cover with frame from R.C.C. top slab of
manholes of varioussizes including demolishing of R.C.C.
work manually/ by mechanical meansand stacking of useful
materials near the site and disposal of
unserviceablematerials within 50 metres lead as per
direction of Engineer-in-charge.
75.00
Qty. B/F TCMB /P- 06 75.00
Total 75.00 each 690.00 51750.00
5 22.23 Providing and applying integral crystalline slurry of
hydrophilic in nature for waterproofing treatment to the
RCC structures like retaining walls of the basement, water
tanks, roof slabs, podiums, reservior, sewage & water
treatment plant, tunnels / subway and bridge deck etc.,
prepared by mixing in the ratio of 5: 2 (5 parts integral
crystalline slurry : 2 parts water) for vertical surfaces and
3 : 1 (3 parts integral crystalline slurry : 1 part water) for
horizontal surfaces and applying the same from negative
(internal) side with the help of synthetic fiber brush. The
material shall meet the requirements as specified in ACI-
212-3R-2010 i.e by reducing permeability of concrete by
more than 90% compared with control concrete as per DIN
1048 and resistant to 16 bar hydrostatic pressure on
negative side. The crystalline slurry shall be capable of self-
healing of cracks up to a width of 0.50 mm. The work shall
be carried out all complete as per specification and the
direction of the engineer-in-charge.The product
performance shall carry guarantee for 10 years against any
leakage.
5.1 22.23.1 For vertical surface two coats @ 0.70 kg per sqm per coat
240.00
Qty. B/F TCMB /P- 06 217.14
Total 217.14 sqm 470.00 102055.80
5.2 22.23.2 For horizontal surface one coat @1.10 kg per sqm. 96.00
Qty. B/F TCMB /P- 06 108.58
Total 108.58 sqm 360.00 39088.80
Total 260563.50
5354.38
Qty. B/F TCMB /P- 06 5354.38
Total 5354.38 kg 66.00 353389.08
Assistant Engineer
Contractor Chandigarh Sub-Div.-IX
CPWD, Chandigarh.
1st & Final Bill
MEASUREMENTS
Name of work:- Misc. works at newly constructed GPRA qtrs. (Type-IV & VI) at Sector-38/B, Chandigarh. (SH: Urgent water
proofing in basement, taking out and re-fixing S.S. grills, CI cover, installation of 50mm dia water meter & other misc. works etc.)
2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50 m.
15.48 Taking out C.I. cover with frame from R.C.C. top slab of manholes of varioussizes including
demolishing of R.C.C. work manually/ by mechanical meansand stacking of useful materials near the
site and disposal of unserviceablematerials within 50 metres lead as per direction of Engineer-in-charge.
size 455mm x 610mm
behind Type-VI (B1+B2) 1 1 24 24.00
between type-IV (B1 & green area towards road) 1 1 1 1.00
between type-IV & guest house 1 1 1 1.00
adjacent to Gurudwara side 1 1 1 1.00
size 610mm x 610mm
behind Type-VI (B1+B2) 1 1 2 2.00
adjacent to Gurudwara side boundary wall 1 1 2 2.00
b/w type-VI & Guest house 1 1 4 4.00
size 300mm x 300mm
behind Type-VI (B1+B2) 1 1 20 20.00
adjacenet to Gurudwara side boundary wall 1 1 5 5.00
b/w type-IV & Gust House 1 1 1 1.00
b/w type-VI & Type-IV 1 1 8 8.00
b/w type-IV tower-I & green area towards road 1 1 6 6.00
Total 75.00 each
Qty. C/F TCMB Pg-
Date of measurement:- 30.12.2024
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.
outside CPWD premises UT water pipe line 1 1 3.00 1.80 1.20 6.48
22.23.1 For vertical surface two coats @ 0.70 kg per sqm per coat
positive phase retaining wall sides
(2.15+4.95+13.10+0.88+0.60) 1 1 21.68 0.30 6.50
(2.11+3.08+14.22+13.40+3.80+0.73+15.00+5.85) 1 1 58.19 0.30 17.46
(4.10+8.55+4.90+0.33+4.02) 1 1 21.90 0.30 6.57
(15.00+15.00+13.50+1.45+13.50) 1 1 58.45 0.30 17.54
(1.65+9.30+0.55+0.55+0.84+7.25+15.00+15.00+9.12 1 1 70.23 0.30 21.07
+0.37+10.60)
(0.31+11.50+15.00+0.53+15.00+15.00+6.20+9.30+0. 1 1 79.74 0.30 23.92
30+6.60)
positive phase new brick work sides
(2.15+4.95+13.10+0.88+0.60) 1 1 21.68 0.40 8.67
(2.11+3.08+14.22+13.40+3.80+0.73+15.00+5.85) 1 1 58.19 0.40 23.28
(4.10+8.55+4.90+0.33+4.02) 1 1 21.90 0.40 8.76
(15.00+15.00+13.50+1.45+13.50) 1 1 58.45 0.40 23.38
(1.65+9.30+0.55+0.55+0.84+7.25+15.00+15.00+9.12 1 1 70.23 0.40 28.09
+0.37+10.60)
(0.31+11.50+15.00+0.53+15.00+15.00+6.20+9.30+0. 1 1 79.74 0.40 31.90
30+6.60)
TOTAL 217.14
SAY 217.14 sqm
Qty. C/F TCMB Pg-
NS-2 Providing and supplying sanitary fittings for installation 50mm dia water meter of class-B(KRANTI) or
equivalent make i/c water meter 50mm dia, GI Hexa nipple, nipple , Tee, socket, elbow, reducer, union,
brass gate wall, pipe, ferrule, plug, flange, bush, bolt, UPVC connection, rubber, fitter Grade-I & Beldar
for taking out connection from UT line to CPWD premises all complete as per the direction of the
Engineer-in-charge
front of type-IV tower-2 block 1 1 1.00 1.00
Total 1.00 each
Qty. C/F TCMB Pg-
NS-3 Providing and fixing ISI marked 85x42 mm oxidised M.S. pull bolt lock conforming to IS : 7534 with
necessary
Type VI screws bolts, nut and washers etc. complete. 1 14 8.00 112.00
Type IV 1 28 5.00 140.00
Total 252.00 each
Qty. C/F TCMB Pg-
STATEMENT OF THEORETICAL CALCULATIONS
Name of work: Misc. works at newly constructed GPRA qtrs. (Type-IV & VI) at Sector-38/B, Chandigarh. (SH:
Urgent water proofing in basement, taking out and re-fixing S.S. grills, CI cover, installation of 50mm dia water
meter & other misc. works etc.)
Period :- From………..…………………to………………………………
Name of work : Construction of Boundary wall, Toe wall and other miscellaneous civil work
at GPRA Colony, Sector 38 B, Chandigarh i/c Electrical work. (SH: Misc. work in basement)
Skilled :- ………………………………………………………………...
Semi-Skilled :-…………………………………………………………………
Unskilled :- ……………………………………………………………….
Wages :- Skilled…………….Semi-Skilled……………Un-skilled……..
Name of work : Construction of Boundary wall, Toe wall and other miscellaneous civil work at GPRA
Colony, Sector 38 B, Chandigarh i/c Electrical work. (SH: Misc. work in basement)
Agreement No.:AE/CSD-IX/W.O./2024-25/04 dated 09.12.2024
Agency: M/s A.B. Engineers & Co. DIV: Chandigarh-I
Sr No. of the Bill :- 1st & Final RA Bill Sub Div :- CSD-IX/Chandigarh
A.E. E.E
1 TCMB/Pg-
TOTAL
%AGE T/C
Assistant Engineer
CSD-IX, CPWD
Chandigarh
11.56 Providing and laying Polished Granite stone flooring in required design and
patterns, in linear as well as curvilinear portions of the building all complete as per the architectural
drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1
cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry
admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete
as specified and as directed by the Engineer-in-Charge.
11.56.1 Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or
equivalent.
MATERIAL
18 mm thick polished finish granite
stone slab 10.00 sqm + 1.50 (Add for
wastage 15%)= 11.50 sqm
7297 Granite of any colour, 18 mm thick
(slab area above 0.50 sqm) sqm 11.50 0.00 0.00
2216 Carriage of Stone blocks white &
red sand stone & kota stone slab tonne 0.67 0.00 0.00
3.9 Rate as per Item No.3.9 of
SH: MORTARS cum 0.224 0.00 0.00
0367 Portland Cement tonne 0.05 0.00 0.00
0874 Black colour dark shade pigment kilogram 4.50 0.00 0.00
11.41.A.2 Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with
water absorption less than0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade,
laid on 20 mm thick cement mortar 1:4 (1 cement:4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including
grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond
cutter only. Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and
rubber mallet for placing the tiles gently and easily
26.86.2 45x85mm
Detailsbof cost for 5.20 metre of door
frame/chowkhat size 1.00 x 2.10 metre.
( 1.00+2.10+2.10= 5.20 meter)
MATERIAL
5748 Factory made single extruded WPC (Wood metre 5.20 0.00 0.00
Polymer COMPOSITE) Solid
door/window,celestory windows & other
frames/Chowkhat of frame size 45 x 85 mm
including carriage of frame
LABOUR
For fabrication and fixing in position
0156 Carpenter (average) day 0.10 679.50 67.95
0155 Mason(average) day 0.17 679.50 115.52
0114 Beldar day 0.44 553.00 243.32
9999 Sundries includes PVC solvent cement and ss L.S 10.00 2.10 21.00
screws etc
TOTAL W 447.79
Add Water Charges A @ 1.5% 6.72
TOTAL WC=(W+A) 454.51
Add 12% GST by reversible method B=(0.1405*
@ 0.1405 63.86
(Multiplying Factor = 0.1405) WC)
TOTAL X=(WC+B) 518.37
Add C.P.O.H. C @ 15% 77.76
TOTAL Y=(X+C) 596.13
Add Labour Cess D @ 1% 5.96
Cost of Z=(Y+D) 5.20 meter 602.09
Labour Element per m 115.79
1 TMT Bars
(i) Basic rate as per DAR 46 Rs/kg
(ii) Rate as per reverse calculation 34.06 Rs/kg
ANALYSIS OF RATES FOR SECURED ADVANCE
26.86.2 45x85mm
Code No. Description Unit Quantity Rate Amount
Detailsbof cost for 5.20 metre of door
frame/chowkhat size 1.00 x 2.10 metre.
( 1.00+2.10+2.10= 5.20 meter)
MATERIAL
5748 Factory made single extruded WPC (Wood Polymer 5.20 0.00 0.00
COMPOSITE) Solid door/window,celestory
windows & other frames/Chowkhat of frame size 45 metre
x 85 mm including carriage of frame
LABOUR
For fabrication and fixing in position
0156 Carpenter (average) day 0.10 679.50 67.95
0155 Mason(average) day 0.17 679.50 115.52
0114 Beldar day 0.44 553.00 243.32
9999 Sundries includes PVC solvent cement and ss 10.00 2.10 21.00
screws etc L.S
TOTAL W 447.79
Add Water Charges A @ 1.5% 6.72
TOTAL WC=(W+A) 454.51
Add 12% GST by reversible method (Multiplying
B=(0.1405*WC) @ 0.1405 63.86
Factor = 0.1405)
TOTAL X=(WC+B) 518.37
Add C.P.O.H. C @ 15% 77.76
TOTAL Y=(X+C) 596.13
Add Labour Cess D @ 1% 5.96
Cost of Z=(Y+D) 5.20 meter 602.09
Labour Element per m 115.79
MATERIAL
18 mm thick polished finish granite
stone slab 10.00 sqm + 1.50 (Add for
wastage 15%)= 11.50 sqm
7297 Granite of any colour, 18 mm thick
(slab area above 0.50 sqm) sqm 11.50 0.00 0.00
2216 Carriage of Stone blocks white &
red sand stone & kota stone slab tonne 0.67 0.00 0.00
3.9 Rate as per Item No.3.9 of
SH: MORTARS cum 0.224 0.00 0.00
0367 Portland Cement tonne 0.05 0.00 0.00
0874 Black colour dark shade pigment 4.50 0.00 0.00
kilogram
2209 Carriage of Cement tonne 0.05 0.00 0.00
9999 Mortar for pointing in white
cement (11.22) L.S. 25.35 0.00 0.00
LABOUR :
0124 Mason (brick layer) 2nd class day 1.20 679.00 814.80
0114 Beldar day 1.00 553.00 553.00
0115 Coolie day 1.00 553.00 553.00
0139 Skilled Beldar (for floor rubbing etc.) day 2.00 625.00 1250.00
0019 Machine for cutting (hand grinding) day 2.00 250.00 500.00
9999 Sundries L.S. 208.13 2.10 437.07
TOTAL W 4107.87
Add Water Charges A @ 1.5% 61.62
75MM
Code Description Quantity Rate Amount
Unit
Detail of cost for 18.00 m (6 x 3.00 m)
MATERIAL
7622 Hubless centrifugally cast (spun) iron
pipes as per IS 15905 - 75 mm dia
(3000 mm length pipe) metre 18.54 0.00 0.00
i/c (3% wastage)
9999 Scaffolding L.S. 80.73 0.00 0.00
9977 Carriage of materials L.S. 40.38 0.00 0.00
LABOUR
0116 Fitter (grade 1) day 0.35 734.00 256.90
0100 Bandhani day 0.17 625.00 106.25
0114 Beldar day 0.70 553.00 387.10
TOTAL W 750.25
Add Water Charges A @ 1.5% 11.25
TOTAL WC=(W+A) 761.50
DSR
Sl. No:- Description Qty unit
code
1 2.8 Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means in foundation trenches or drains
(not exceeding 1.5 m in width or 10 sqm on plan), including
dressing of sides and ramming of bottoms, lift upto 1.5 m,
including getting out the excavated soil and disposal of
surplus excavated soil as directed, within a lead of 50 m.
4 15.48 Taking out C.I. cover with frame from R.C.C. top slab of
manholes of varioussizes including demolishing of R.C.C.
work manually/ by mechanical meansand stacking of useful
materials near the site and disposal of unserviceablematerials
within 50 metres lead as per direction of Engineer-in-charge.
75.00 each
5 22.23 Providing and applying integral crystalline slurry of
hydrophilic in nature for waterproofing treatment to the RCC
structures like retaining walls of the basement, water tanks,
roof slabs, podiums, reservior, sewage & water treatment
plant, tunnels / subway and bridge deck etc., prepared by
mixing in the ratio of 5: 2 (5 parts integral crystalline slurry :
2 parts water) for vertical surfaces and 3 : 1 (3 parts integral
crystalline slurry : 1 part water) for horizontal surfaces and
applying the same from negative (internal) side with the help
of synthetic fiber brush. The material shall meet the
requirements as specified in ACI-212-3R-2010 i.e by
reducing permeability of concrete by more than 90%
compared with control concrete as per DIN 1048 and
resistant to 16 bar hydrostatic pressure on negative side. The
crystalline slurry shall be capable of self-healing of cracks up
to a width of 0.50 mm. The work shall be carried out all
complete as per specification and the direction of the
engineer-in-charge.The product performance shall carry
guarantee for 10 years against any leakage.
5.1 22.23.1 For vertical surface two coats @ 0.70 kg per sqm per coat
240.00 sqm
5.2 22.23.2 For horizontal surface one coat @1.10 kg per sqm. 96.00 sqm
5354.38 kg
7 NS-2 Providing and supplying sanitary fittings for installation
50mm dia water meter of class-B(KRANTI) or equivalent
make i/c water meter 50mm dia, GI Hexa nipple, nipple ,
Tee, socket, elbow, reducer, union, brass gate wall, pipe,
ferrule, plug, flange, bush, bolt, UPVC connection, rubber,
fitter Grade-I & Beldar for taking out connection from UT
line to CPWD premises all complete as per the direction of
the Engineer-in-charge
1.00 per job
Assistant Engineeer ,
Chandigarh Sub Div-I
CPWD,Chandigarh
8/B, Chandigarh. (SH: Urgent
mm dia water meter & other misc.
Rate Amount
260.30 1581.00
196.00 1191.00
223.60 67080.00
697.40 52305.00
472.90 113496.00
362.80 34829.00
Total 270482.00
68.20 365169.00
57669.80 57670.00
199.25 50211.00
Total 473050.00
0.97 263179.00
Total 736229.00 14725
SAY 736200.00
Assistant Engineeer ,
Chandigarh Sub Div-IX
CPWD,Chandigarh