0% found this document useful (0 votes)
29 views102 pages

MCQ Practice One Word Answers Expenditure

Sample of CBT MCQ question

Uploaded by

Ram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views102 pages

MCQ Practice One Word Answers Expenditure

Sample of CBT MCQ question

Uploaded by

Ram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 102

Topic: Expenditure

ers
ns w
rd A
o M
eW
o
Ra
On ara
sw 0
g e 1 6
Na 24 3 2
4 9
9
Question - 1
Works - Corrigendum to the Tender
Notice – Minimum _____ days
notice
Answer – 1
15 Days
Question - 2
Works - Quotations – At least ___ well
experienced Contractors / Agencies
(Need not be in Approved List)
Answer - 2

3
Question - 3
Works - NIQ stands for ___________
(Hint: Quotations)
Answer - 3

Notice Inviting
Quotation
Question - 4
Works - Quotations – Minimum
Notice period of at least ______
Days from the date of NIQ (Notice
Inviting Quotation)
Answer - 4

7 Days
Question - 5
Works - Quotations – Powers of
SG/JAG/SS(Independent charge) –
Maximum limit with the Finance
concurrence is ______ Lakhs
Answer - 5

5 Lakhs
Question - 6
Quotations – Powers of
SG/JAG/SS(Independent charge) –
Maximum limit with out the Finance
concurrence is ______ Lakhs (for
Safe running of Trains only)
Answer - 6

Rs. 2 Lakhs
Question - 7
LOA stands for _________
Answer - 7

Letter Of Award /
Acceptance
Question - 8
TAA stands for _____________
Answer - 8

Tender Acceptance
Authority
Question - 9
Direct Acceptance of Tenders:
Minimum Notice period is _____
days
Answer - 9

21 Days
Question - 10
IREPS stands for ___________
Answer - 10

Indian Railways
Electronic Procurement
System
Question - 11
Two packet system applicable –
Works More than _______ Crore
Answer - 11
Rs. 10 Crore
Question – 12
EOI stands for _______________
Answer - 12

Expression Of Interest
Question - 13
AMC stands for _________
Answer - 13

Annual Maintenance
Contract
Question - 14
OEM stands for ___________
Answer - 14

Original Equipment
Manufacturer
Question - 15
PQB stands for ____________
Answer - 15

Pre Qualification Bidding


Question - 16
NIT stands for ____________
Answer - 16

Notice of Inviting Tender


Question - 17
Works – Major Tenders – Minimum
Notice Period is _____ days
Answer - 17

30 Days
Question - 18
Works - Minimum Notice Period (30
days) can be reduced up to _____days
in case of works with approval of SAG
& without finance concurrence up to
the value of Rs. 1 Crore through IREPS
Answer - 18

21 Days
Question - 19
Works - Minimum Notice Period (30
days) can be further reduced up to
_____days in case of works with
approval of SAG & with finance
concurrence up to the value of Rs. 2
Crore through IREPS
Answer - 19

14 Days
Question - 20
Works - NIT to be uploaded on
______ and published in ______
Answer - 20

IREPS & Newspapers


Question - 21
Works - Approved list of Contractors
should not be less than _____
names
Answer - 21

10 Names
Question - 22
Works – Limited / Spl Limited
Tenders – Minimum Notice Period is
______ days
Answer - 22

14 days
Question - 23
Works – Special Limited Tenders: the
number of Agencies shall not be less
than ____ names and preferably ____
names.

(approval list is not required)


Answer - 23

4 Names & 6 Names


Question - 24
GCC stands for ____________
Answer - 24

General Conditions of
Contract
Question - 25
The Latest edition of GCC for works
is _______ ( Month & Year)
Answer - 25

2022 April
Question - 26
The Latest edition of GCC for
Services is _______ ( Month &
Year)
Answer - 26

2018 January
Question - 27
Works - New Name of EMD – Earnest
Money Deposit is __________
Answer - 27

Bid Security
Question - 28
Works - The EMD / Bid security %
____ up to the Tender value of Rs. 1
Crore and _____ Beyond Rs. 1
Crore
Answer -28

2 % & 0.5 %
Question - 29
Works – Maximum EMD/Bid Security
to be collected is _____
Answer - 29

Rs. 1 Crore
Question - 30
Works – EMD/Bid Security rounded
off the nearest ______
Answer - 30

Rs. 100
Question - 31
Bank Guarantee Bond (as Bid
Security) validity period is beyond
_____ days of Bid validity period
Answer - 31

90 days
Question - 32
The Original Bank Guarantee should be
delivered in person to the official
nominated as indicated in the Tender
document _____ days before the
closing date for submission of Bids
Answer - 32

1 Working day
Question - 33
Works: Pre bid conference is
required for the Tenders valuing
_____ Crore or more
Answer - 33

Rs. 50 Crore
Question - 34
MII policy stands for
_______________
Answer - 34

Make In India policy


Question - 35
DPIIT stands for __________
Answer - 35

Dept for Promotion of


Industry & Internal
Trade
Question - 36
Works: Technical Eligibility &
Financial Eligibility required for
Tenders valuing ______ and above
Answer - 36

Rs. 50 Lakh
Question - 37
Expenditure on New Service / New
Instrument of Service incurred from
___________ ( Hint: Fund)
Answer - 37
Contingency Fund of India

(Part 2 of Government
Accounts)
Question - 38
Works: Technical Eligibility – Tenderers
must have completed similar works as
prescribed in the last _____ years
ending the last day of the month
previous to the one in which Tender is
invited.
Answer - 38

7 Years
Question - 39
Works: Technical Eligibility
- Successfully completed the

3 similar works - ___ % of the advertised value of Tender

2 similar works - ___ % of the advertised value of Tender

1 similar work - ___ % of the advertised value of Tender


Answer - 39

30%, 40% & 60%


Question - 40
Works: Subletting of work costing up
to _____ Lakh, no previous work
experience of sub contractor shall
be asked for by the Railways
Answer - 40

Rs. 50 Lakh
Question - 41
ITC stands for _________ (Hint: GST)
Answer - 41

Input Tax Credit


Question - 42
RCM stands for ___________ (Hint:
GST)
Answer - 42

Reverse Charge
Mechanism
Question - 43
Works: Tender Validity period for
Single Packet Tenders & Two packet
Tenders is _____ days & _____ days
respectively.
Answer - 43

60 Days & 90 Days


Question - 44
Works: In case, the notarised affidavit is found to be
forged / false during the process of Tenders or after
awarding the contract, the action by the
administration is

1. Forfeiture of Bid security / SD / PG

2. Banning of the business for a period of ____ years


Answer - 44

2 years
Question - 45
SD – Security Deposit shall be ____
% of the Contract value.
Answer - 45

5%
Question - 46
SD – Security Deposit shall be
recovered at the rate of ____ % of
the Bill amount till the full SD is
recovered
Answer - 46

6%
Question - 47
PVC stands for ____________
Answer - 47

Price Variation Clause


Question - 48
PVC shall be applicable for Works
Tenders whose advertised value
above ____ Crore and having a
completion period of _____ and
above
Answer - 48

Rs. 2 Crores
Question - 49
Internal check is one of the functions
of ______ Dept
Answer - 49

Accounts Dept
Question – 50
The Latest GFR issued in the year
____
Answer - 50

2017