WHEELCHAIR LIFT: BASIC LIFT
INSTALLATION, OPERATION, AND
MAINTENANCE
XYZTech Machinery Co., Ltd.
Website: www.xyzlift.com
Tel: +86-13853121232
Email:
[email protected] Right reserved, any doubts please feel free to contact us. Always here for you.
Specification
Model XYZVPL-2.2
Loading capacity 250kg
Platform inner size 1330(L) x 900(W)mm
Max. lift height 2.2m
Installation size 1450(L) x 2000(W)mm
Tower height H 3.3m
Normal speed 60mm/s
Access type Straight through access
Motor 240v, 50hz, single phase; 2.2kw
Right reserved, any doubts please feel free to contact us. Always here for you.
Preparing to Install
1. Final Site Inspection: Verify the surface of the lift will mount to is smooth and level. Verify
that there is enough space for the lift’s footprint. Include space for the folding access ramp,
allowing 1450(L) x 2000(W)mm.
2. Tools needed, Following pictures for reference.
- 18mm drill,
- Electric hammer,
- Measuring Tape.
Materials and tools, spare parts together with the LIFT PACKAGE.
Right reserved, any doubts please feel free to contact us. Always here for you.
Pre-Installation Checks
1. Add hydraulic oil: Open the back cover on the lift and add 3.5L hydraulic oil 32#.
2.Connect the post controller as marked numbers 1-1, 2-2.
3.Plug electrical cord. Testing all controllers, manual down. Run the lift up and down for 2
complete cycles.
- Controller on the platform (KEY ON)
- Post controller (KEY ON)
- Remote controller (KEY OFF)
Right reserved, any doubts please feel free to contact us. Always here for you.
Installation Steps
Step 1 Wall installation
Install the tripod fixed plate onto wall (as user’s actual use site) by expansion screws
Step 2 Ground installation
Make holes on ground by electric hammer (use 18mm drill) across the hole of lift.
Tighten and fixed as follows:
Right reserved, any doubts please feel free to contact us. Always here for you.
Step 3 Ramp installation
Step 4 Post controller installation
Fixed the post on the ground by small expansion screws. One on ground floor, another is on
second floor.
Right reserved, any doubts please feel free to contact us. Always here for you.
Maintenance
The recommended maintenance schedule is provided below.
Right reserved, any doubts please feel free to contact us. Always here for you.