0% found this document useful (0 votes)
25 views2 pages

Nalco - Invoice 280 - Wingu

Uploaded by

tx
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views2 pages

Nalco - Invoice 280 - Wingu

Uploaded by

tx
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INVOICE

CUSTOMER: INVOICE NO:


WINGU
280/Cons/Nal/2023
ADDRESS: DATE:
Djibouti, Africa November- 1-2023
TERMS OF
PROJECT NAME / CODE: MODE OF PAYMENT: CURRENCY:
PAYMENT:

Land Cable Installation for Wingu


Ref. to Contract Bank Transfer/cheque DJF
Submarine Cable Optic

N° Description QTY Unit Unit Price HT total HT


1,1 Mobilisation/site monitiring / Démobillisation - LS 1 204 545,45 -
1,2 As built document /survey work - LS 454 545,45 -
1,3 Insurance - LS 350 000,00 -

2 Headwall (2000x500x500mm)
2,1 Lean concrete and Polyane sheet 1,00 Ls 30 000,00 30 000,00

Headwall Concrete ( Readymix concrete with SRC 35


grade and reinforcement Fe415 grade ) with 4x150mm
2,2 (Min Inner Dia) Sleeves and 50mm concrete steel cover 1,00 Ls 154 545,45 154 545,45
2,3 Installation on site LS 27 272,73 -
Excavation between Headwall and Beach manhole ( On
2,4 sea side ) with a excavator m 13 636,36 -
Reincorced concrete surrounding the pipe (0,7x0,5x25 m)
2,5
between the beach manhole and the headwall
6,50 m3 154 545,45 1 004 545,45
Sub-Total 2 1 189 090,91
3,0 Beach Manhole (3500x2500x2500mm)
3,1 Lean concrete ( Concrete with SRC 15 grade ) 1,00 m3 54 545,45 54 545,45
3,2 Polyane sheet 12,00 m2 909,09 10 909,09
Concrete slab fondation ( Readymix concrete with SRC
3,3 35 grade and reinforcement Fe415 grade ) - m3 145 454,55 -
Concrete Wall ( Readymix concrete with SRC 35 grade
3,4 and reinforcement Fe415 grade ) 3,00 m3 154 545,45 463 636,36
Concrete Slab cover ( Readymix concrete with SRC 35
3,5 grade and reinforcement Fe415 grade ) 2,19 m3 154 545,45 338 068,18
3,6 Equipment :
3,6,1 2 Layers of Bituminous Paint 24,00 m2 7 272,73 174 545,45
3,6,2 Heavy Duty K2C Manhole Cover 1800 x 900 - Unit 318 181,82 -
3,6,3 Installation of pipe reservation PVC - Unit 2 727,27 -
3,6,4 Lifting hook - Unit 21 363,64 -
3,6,5 Ladder 1,00 Ls 68 181,82 68 181,82
3,7 Excavation 137,21 m3 9 090,91 1 247 400,00
3,8 water pump 1,00 LS 263 636,36 263 636,36
3,9 Installation on site with a 25T crane 2,00 days 227 272,73 454 545,45
sub -Total 3,0 3 075 468,18

NALCO CONSTRUCTION
NCAGE: SVQ81
D.U.N.S. 850 545 258 Page 1 de 2
INVOICE
CUSTOMER: INVOICE NO:
WINGU
280/Cons/Nal/2023
ADDRESS: DATE:
Djibouti, Africa November- 1-2023
TERMS OF
PROJECT NAME / CODE: MODE OF PAYMENT: CURRENCY:
PAYMENT:

Land Cable Installation for Wingu


Ref. to Contract Bank Transfer/cheque DJF
Submarine Cable Optic

N° Description QTY Unit Unit Price HT total HT


4,0 90 Degree Turning Manhole ( 2400x1400x1700mm)
4,1 Lean concrete ( Concrete with SRC 15 grade ) 0,50 m3 54 545,45 27 490,91
4,2 Polyane sheet 5,04 m2 909,09 4 581,82
Concrete slab fondation ( Readymix concrete with SRC
4,3 35 grade and reinforcement Fe415 grade ) - m3 145 454,55 -
Concrete Wall ( Readymix concrete with SRC 35 grade
4,4 and reinforcement Fe415 grade ) - m3 154 545,45 -
Concrete Slab cover ( Readymix concrete with SRC 35
4,5 grade and reinforcement Fe415 grade ) - m3 154 545,45 -
4,6 Equipment : - -
4,6,1 2 Layers of Bituminous Paint - m2 7 272,73 -
4,6,2 Heavy Duty K2C Manhole Cover 1800 x 900 - Unit 318 181,82 -
4,6,3 Installation of pipe reservation PVC - Unit 2 727,27 -
4,6,4 Lifting hook - Unit 21 363,64 -
4,7 Excavation 10,80 m3 9 090,91 98 181,82
4,8 Installation on site with a 16T crane 2,00 days 45 454,55 90 909,09
Sub-TOTAL 4,0 221 163,64
sub-Total 4,0 X2 442 327,27
5,0 Excavation and Pipe installation
Manual Excavation ( With 50 cm and deep 100 cm), filling
5,1 with sand and soil excavated 50,00 m 7 727,27 386 363,64
Cutting asalph road, cement road and concrete sidewalk
5,2 - m 909,09 -
5,3 Repair of Asaph cut during excavation 150,00 m 4 090,91 613 636,36
5,4 Warning tape 20,00 m 272,73 5 454,55
5,5 Pipe PVC 100 200,00 m 3 181,82 636 363,64
5,6 Pipe PVC 48 mm 100,00 m 1 818,18 181 818,18
Sub -Total 5,0 1 823 636,36 DJF
TOTAL Without VAT 6 530 522,73 DJF
BANK DETAILS Advance payment 25% 1 632 630,68 DJF
Bank Name EXIM BANQUE DJIBOUTI SA Retention 5% 326 526,14 DJF
Address 13 PLACE LA GARDE
VAT 10% 457 136,59 DJF
Po Box 4455,DJIBOUTI
City DJIBOUTI Total VAT incl. 5 028 502,50 DJF
Country DJIBOUTI
Account No. 10006593
Currency DJF
Swift code: EXTNDJJDXXX Mahad OMAR

Project Engineer

NALCO CONSTRUCTION
NCAGE: SVQ81
D.U.N.S. 850 545 258 Page 2 de 2

You might also like