0% found this document useful (0 votes)
63 views21 pages

Engineering Solutions Brochure

Uploaded by

ahmedhsn.tp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views21 pages

Engineering Solutions Brochure

Uploaded by

ahmedhsn.tp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

COM PA N Y

BROCHURE
2 02 5

Process
Power
Pi ping
TRIPLE-P ENGINEERING

TRIPLE-P
ENGINEERING SOLUTION

‫شركة تربل بي للحلول الهندسية‬


TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Welcome
01 Index.
Welcome
Triple-P Engineering CEO Massage. 01
Massage Introduction Our Company
02
From CEO.
Triple-P Engineering History, Mission, Vision & Values

QHSE Compliance
Quality, Health, Safety & Environment. 03
As we start a new year, I am thrilled to welcome you to the
2025 profile of Triple P Engineering Solutions LLC.
Market & Business
Triple-P Engineering core market & services 04
Capabilities
05
Our company were Founded by a dedicated team of expert
engineers with commitment to deliver innovative solutions
our diverse capabilities that empower us to deliver exceptional
tailored to our clients’ needs.
solutions tailored to meet client needs.

06
As we look ahead to 2025, we remain true to our core
values of integrity, safety, and quality. Clients & Partners
our esteemed clients and partners who drive our success
We will continue to use advanced technologies and through collaborative efforts.

07
innovative practices to enhance our services.
Projects Highlights
Our goal in 2025, is not only to meet our clients’ evolving our key project highlights across diverse initiatives.
needs but also to make a positive impact on the industries
we serve. Together, we will tackle the challenges ahead
and embrace the opportunities of the future.

Eng. Mohamed Abdelmoneim


CEO. & Co-founder
2 3
02
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Introduction
Our Company
We offer a wide range of
Solutions & Services to a broad
spectrum of industries.

2012
Our company emerged as a provider of engineering services,
across a wide range of industries. With a primary focus on oil
and gas (both onshore and offshore), petrochemicals, and industrial projects.

2014 We expanded our scope and began offering comprehensive


services encompassing engineering, procurement,
construction, and project management EPC (Turnkey projects) / EPCM.

2022
Triple-P Engineering Solutions LLC expanded its operations to
the Gulf region by establishing new branches in kingdom
of Saudi Arabia KSA & United Arab Emirates UAE. These branches allow us to
extend our expertise and services to a broader market and cater to the growing
demand in the region.

MISSION VISION VALUES


• Our mission is to deliver • We aspire to achieve a leading • We are here for our clients.
outstanding EPC and EPCM market position by delivering • We value our employees.
We specialize in delivering turnkey projects, services that not only meet but world-class EPC and EPCM • There is always room for
handling all aspects of Engineering, Procurement exceed our clients expectations. services. improvement.

and Construction across various industries both By employing optimized • Our commitment to upholding the • We make sensible use of our
engineering methodologies highest quality, health, safety, and resources.
Greenfield & brown field. environmental standards serves as • Honesty is the best policy.
the foundation for our progressive
growth.

4 5
TRIPLE-P ENGINEERIN L.L.C.

03
2025

Quality, Q Quality
Management System.
Health, We aim to satisfy our clients requirements,

Safety
totally and consistently. To achieve this we adopted a
policy to establish, maintain and develop an effective

&
and efficient Quality Management System certified
to ISO-9001/2008.

Environment
H S E
We are committed to:
Minimizing Environmental Impact: Continuous Improvement:
We strive to reduce our environmental footprint We are committed to enhancing our performance on
through pollution prevention, the reduction of natural QHSE issues and ensuring compliance with specified
resource consumption, emissions & waste recycling. customer requirements.
Applying Technical Skills: Setting Objectives:
We integrate our technical expertise into all aspects of We establish quality and HSE performance objectives,
health, safety, and environmental (HSE) considerations measure results, and continually assess and improve
in the design and construction of our projects. our processes and services through an effective
Open Communication: management system.
We prioritize transparent communication to ensure a Emergency Preparedness: We recognize that our staff is the single most important
clear understanding of our Quality, Health, Safety, and We plan for, respond to & recover from emergencies, resource in the achievement of QHSE policy and so we
Environmental (QHSE) policies, standards, programs & crises & business disruptions to ensure the safety and encourage a positive and open culture communication
performance. security of our people at all times. and education ensuring that everyone is empowered
to contribute using a wide range of methods, (Traning,
standards, procedures & practices).
6
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Market & Business


In today’s complex and fast-changing business world, EPC and EPCM contractors are very important.
They help manage resources, schedules & costs. Making them key partners in ensuring that projects succeed
in many different industries.

EPC EPCM
Engineering, Procurement & Construction VS Engineering, Procurement
(Turnkey projects / design & build) & Construction Management

Management role client retains ultimate


Full responsibility by contractor
responsibility

Client retains most risks contractor manages


Contractor assumes all risks
processes

Fixed price contract Flexible pricing costs managed by client

Limited client control Greater client control

Large-scale projects requiring Projects needing flexibility and client


expertise involvement

Our expertise allows us to handle every aspect of project, ensuring efficient and effective results tailored to
meet the unique needs of each client and their specific requirements. At Triple-P we focus on delivering end to end
solutions for projects in different industries, including both Greenfield and brownfield developments:

04
• Upstream oil & gas (onshore / offshore).
• Petrochemicals.
• Chemical.
• Green & renewable energy.
• Industrial.

Our ability to turn ideas into realities sets us apart With


our diverse range of services that includes:

• Basic Engineering (FEED).


• Detailed engineering (Design, 3D Model & Analysis).
• Consulting.
• Procurement services.
• Construction (Small & Medium Project).
• Project & Construction Management (Large Projects).

8 9
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

05
Capabilities Piping / Pipeline & Layout.

• Plant 3D modeling & layout.


• Development of Plot Plans and Equipment layouts.
• Clash detection & resolution.
Our capability to offer a seamless integration
• Layout optimization.
of project management, engineering, procurement,
• Piping material Specification.
and construction expertise, ensuring efficient
• Pipe stress analysis CAESAR II (Static & Dynamic).
coordination, effective communication, and
• Piping supports design.
streamlined project execution.
• Isometrics and Bill of Materials (BOM-MTO-BOQ).
• Piping General Arrangements (GA).
• Onshore pipeline calculations & alignment sheets.

Engineering,

Process Engineering. Mechanical & Material. Structural & Civil. Technical Safety & Loss
• Process Simulation studies. • Packaged equipment. • Structural optimization. prevention.
• Steady state flow assurance. • Static equipment design (pressure vessels & Tanks). • Offshore topside Design. • Fire and Gas layouts.
• PFD / P&ID development. • Rotating equipment (selection). • Weight Control & Optimization. • Hazard area drawings & schedules.
• Line Designation List (LDT). • Vendor selection, requisitions, technical bid evaluations. • Onshore plant structures. • QRA.
• Heat & Material Balance. • Materials selection reports. • Pipe racks and Pipe ways/ sleepers. • SIL assessment and classification.
• Tie-In Schedules. • Painting, Coating, Insulation and Cathodic protection. • Foundation design. • Consequence analysis.
• Cause & Effect diagrams. • Valve and piping specification. • Brown-field modifications. • Blast & explosion analysis.
• Operation, isolation & control philosophies. • HAZID & HAZOP chairing.
• Start-up/down, relief, blow down.
• Flare systems.

10 11
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Electrical & Instrument. Offshore Structure & Sub-sea


• Power generation systems - gas turbine and • Assessment and push over analysis
Diesel generators. • Topside weight control analysis, and modifications
• Power system analysis and studies MV and LV. • Pile capacity re-evaluation
• Single line diagram • Spud can checks
• Power factor improvement. • Sub sea installation and foundation systems
• Voltage drop • Sub sea pipe lines stress analysis
• Protection relay co-ordination • Foundation of vibrating equipment’s
• Earthing / lightning systems • On shore pipe racks and steel structures
• Motor sizing, selection, power consumption and • Blast proof building analysis
starting calculations. • Offshore Hull Tanks and Sloshing analysis
• Emergency power systems design • Fixed offshore analysis ( In-place, Dynamics,
• Hazardous area equipment selection and specification. Fatigue, Installation)
• Control & Instrumentation system specification. • Floaters, Hulls, and Jack-Up rigs
• PLC , SCADA and BMS design
• Wiring digram, I/O lists
• Low current systems design ( PABX, IP systems, CCTV
• Cable sizing and Raceways design Load flow
• Short circuit
• Panels selection / specifications
• Lighting design in-door/out-door

12 13
TRIPLE-P ENGINEERIN L.L.C.
2025

Piping / Pipeline
•Seamless and Welded Carbon Products ,
St.St ,Special Alloys.
•Size range: ½” nominal through 60” OD
Wall Thickness up through 4” thick &
heavier
• Specifications & Grades:

Construction &
• A-106 Grade B/C
• SA-106 Grade B/C
• A-333, Grade 1/6

Commissioning.
• API 5L & X-Grades through X-80
• A-53 Grade B
• SA-53 Grade B
• A-519
• A-513 Type 5 (DOM)
• Rolled and Welded A-671 & A672
• Equivalent standards • Early processing facilities.
• Skidded equipment & Packages.
Process & FF Pumps
• Offshore platforms (Topside )
• Positive Displacement Pumps “Gear ,Vane
& Piston”. • Onshore O&G Gas Gathering Stations.

Procurement, • Centrifugal Pumps.


• ANSI & API Process Pumps.
• Axial Flow Pumps.
• O&G Treatment Plants.
• Pumping stations.
• Screw Pumps & Chopper Pumps . • Storage Tanks.
• Circulator Pumps.
• Fire fighting station.
• Fire Pumps “UL&FM”.
• Multistage Pumps. • Plant Upgrades & Tie-in.

Structural Steel & Plates. • Processing / separation Plants.


( Chemicals, Gases, etc.
• Structural Steel .
“Beams , Sections , Bars & Plates “ • Lube Oil /Grease Blending Plants.
• Applicable Standards .
“EN 10025, EN 10219, API, BS,…..”

VALVES & FITTINGS


• Industrial Valves Gate ,Globe ,Check ,Ball
& Plug
• Chock & Control Valves.
• Butterfly Valves .
• Fittings & Flanges .

14
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Shutdowns, turnarounds At Triple-P we developed a structured methodology for managing shutdowns, turnarounds
and demolishing effectively. Their approach emphasizes:

& demolishing • Comprehensive Planning:


detailed planning to ensure all aspects of the
Shutdowns, turnarounds & demolishing are critical processes in the operation of industrial plants, jop are covered. This includes risk assessments
particularly in sectors such as oil and gas, manufacturing, and chemical processing. These events involve and contingency planning to address potential
planned interruptions to perform maintenance, upgrades, or repairs, ensuring that facilities operate issues proactively.
efficiently and safely. Understanding the typical phases involved in these processes is essential for effective
HOT TAP • Collaboration and Communication:
management we foster open communication among all teams
involved in the process. By ensuring that everyone
is aligned on objectives and timelines, we minimize
misunderstandings and enhance efficiency.
• Use of Technology:
we utilize software tools for project management and
real-time data analysis to track performance against
established benchmarks.
• Post-Turnaround Analysis:
we conduct thorough evaluations to assess
what worked well and what could be improved.
This continuous improvement mindset helps us
refine the process for future projects.
By following these principles, we aim to achieve
optimal results during shutdowns, turnarounds
& demolishing while minimizing downtime and
maximizing operational efficiency.

DEMOLITION

SHOUDWON

16 17
07
TRIPLE-P ENGINEERING L.L.C.
2025

Thank you for being an important part of our journey. Your support and
collaboration have been crucial to our success. Together, we will continue to work
towards a brighter future.
CLIENTS & PARTNERS

06 PROJECTS
HIGHLIGHTS
All projects references are available upon request.

18
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Supply & installation of new


suspension polymerization
reactor (PLY-3E).
Client: Egyptian petrochemical company (EPC)
Sector: Petrochmicals
Scope: EPC project - ( Turnkey )

Description:
The multi-disciplinary project includes detailed
engineering, procurement, construction,
pre-commissioning, commissioning, start up &
performance test for:

• PVC suspension polymerization reactor (ASME U


stamp), Cooling baffles & charging pumps.
• Agitator unit with separated lubrication system
& mechanical seal system. ( Including all auxiliary
systems ).
• Civil foundations, piles, steel structure & supports.
• Piping tie-in & hot tapping.
• Instruments, DCS, control valves & relief valves.
• Electrical works, Cables, cable trays & lighting fixtures.
• Fire fighting equipment, deluge valve, fire
detection & alarm system.
• Utilities.

20 21
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Between 2018 and 2024, Triple-P successfully


EL AB PROJE CTS
executed a series of comprehensive projects at ElAB
Petrochemical Plant. These initiatives were strategically
designed to enhance product quality and significantly increase
production capacity. By implementing advanced technologies
and optimizing operational processes.

The multi-disciplinary projects includes detailed


engineering, procurement, construction of ASME Vessels
fabrication, Civil, structural steel, E&I, interconnecting piping,
supports, tie-ins, hot taping, utilities, pre-commissioning,
commissioning, start up & performance tests for: • PVC suspension polymerization reactor (ASME U
2018 •Reformat chloride treater (940-V3). stamp), Cooling baffles &charging pumps .
•Net gas chloride treater (400-V9).
• Agitator unit with separated lubrication system
2021 •Transalkaylation process unit: & mechanical seal system. ( Including all auxiliary
Reactor 600-R2 ASME U stamped. systems ).
Feed heater 600-E14 ASME U stamped.
• Civil foundations, piles, steel structure & supports.
Water break tank 600-V7 ASME U stamped.
Piping tie-in & hot tapping. Instruments,
2023 •ELAB New Area Expansion study. DCS, control valves, relief valves & manual valves.
•ELAB Revamp ITB Preparationstudy.
• Cables, cable trays & lighting fixtures.

• Fire fighting equipment, deluge valve, fire


detection & alarm system.

• Utilities.

22 23
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

South Abu Zenima


Petroleum
Sector: Offshore oil & gas
Scope: Engineering / Construction

MUZHIL offshore platform


installations & start-up.
Scope included the installation of:
• Open drain system, closed drainsystem, flare, pumps...etc.
• Process & firefighting piping works.
• Electrical cables, panels, cable trays & lighting fixtures.
• Instruments, wellhead control panel.
• Structural steel supports.
• Fire fighting equipment, deluge valve, fire detection
& alarm system.
MUZHIL offshore platform high
pressure injection pumps system
detailed engineering.

Scope included:
• Process simulation & sizing.
• Piping 3D model, isometrics, general
arrangement & bill of material.
• E & I works .
• Structural steel supports.
• Equipment skids design.

24 25
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Shell Lubricants Project: Shell lubricants 6th October plant


upgrade plan.
Sector : Industrial
Scope : Engineering / Construction

The 2 phase project are a major upgrade plan to shell


lubricants 6th October plant.

2014 Phase-1 included:


• Project visibility study.
• Detailed engineering & procurement for:
- Installation of 2 new additives tanks
(6m width x 10.5m hight) & 5 tone blending unit.
Egypt.

- 2 trucks unloading stations with pumps,


sampling points & distribution manifold.
- Civil foundations, admin building expansion,
tanks dike walls & road crossing.
- Interconnecting piping & supports.
- Electrical infrastructure upgrade,
Instrumentation & heat tracing.
- HSE & EIA.
- Fire fighting & detection upgrade.
- All utilities upgrade plans.

2015 Phase-2 included:


• Fabrication / construction of:
- 2 new additives tanks (6m width x 10.5m hight)
- 2 trucks unloading platform & distribution
manifold.
- Civil foundations, admin building expansion,
tanks dike walls & road crossing.
- Interconnecting piping & supports.
- Electrical transformer
- Fire fighting network.
• Supply of:
- 5 tone blending unit.
- Unloading stations pumps.
- Instrumentation & heat tracing.
- Fire detection.

26 27
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

2019 ALX backup upgrade 2022 Alx replacement of existing vaporizers


The 3 phase project is Un upgrade to AL facility based A detailed engineering for adding two vaporizers on
on (EZDK) Alexandria to increase the capacity from existing foundations and modeling modifications for
7600 Nm3/hr to 9100 Nm3/hr. inlet and outlet headers and utilities relocation

Air Liquid 2019 TCI remote operation phase 3


The project is preparation for AL LIN & lox backup
2023 Acetylene Sadat Plant Protection and Earthing
Inspect existing earthing / Protection system versus

Egypt system at TCI SanMar for petrochemical industries


located in port said to be remotely operated
(unmanned).
original design, declare if the current system is adequate
and provide recommendation for safe operation.

2023 EFS-Sokhna project jushi integration


The long-term partnership has 2019 Sokhna basin pipeline Detailed engineering for the installation of a redundant
fostered better resource coordination, A detailed engineering & construction supervision for standby gaseous oxygen delivery station. including tie-
adherence to time lines and effective 2 underground 2.2km pipelines to connect AL existing in points, preliminary sizes, control valves and other
communication. facilities at EZZ steel plant, SG plant & Jushi plant at instruments
Elain El Sokhna industrial area.
2024 Alx3 power transformer
2020 Al EZZ / JUSHI Elain El Sokhna backup upgrade Replacing the starting method of the GAN compressor
A detailed engineering of two pressure reducing & from DOL to Star delta through adding MV switch gear
shutdown stations on both facilities. and auto transformer and all related civil works

2021 JUSHI MODIFICATIONS 2020 PROJECT 2024 Alx ezdk sigma new cooling tower
Adding valves & instruments on LIN Backup system, Design Farming structure to replace existing cooling
upgrading LIN truck filling system towers with new cooling towers

2021 Cables Defects Replacement


Inspect defected main cables due to underground
water and figure solutions and methodology to replace
the cables following detailed design and BOQ

Sector: industrial gases


Scope: Engineering & Construction supervision

2019 Triple P Engineering entered into a service agreement with Air Liquide Egypt to serve as their
engineering consultant and construction supervisor. Since then, Triple P has successfully completed
several projects focused on upgrading Air Liquide’s facilities in Egypt. These initiatives aim to enhance
production capacity, automate services, and improve operational safety.

28 29
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Almajd Warner
Lewis.
Projects: Jet A1 storage & fueling stations
Sector : Oil& gas (aviation fuel)
Scope : Engineering

AlMajd Warner Lewis is a privately owned company


specializing in aviation fuel solutions. With over 25 years of
experience, they focus on designing and implementing hydrant
systems for airports to ensure efficient fuel delivery.

Over the past few years, Triple P has collaborated closely


with Al Majd Warner Lewis on several key projects. This partnership
has focused on developing comprehensive engineering
documentation for:

2014 Khashm al-aan camps airport jet-a1 fuel storage &


Fuelling station.

2018 Dirab airport jet-a1 fuel storage & fuelling station.

2024 Al-Alamein International Airport Fuel Depot

The multi-disciplinary projects included:


• 3D modelling.
• Underground / aboveground jet fuel storage tanks.
• Interconnecting piping & supports.
• Loading & unloading stations.
• Fuel filtering & monitoring system.
• Instrument & control.
• Fire fighting equipment, fire detection & alarm system.
• Utilities.

30 31
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Egyptian Natural Gas company


(GASCO).
Project: NFBA fresh water fire water
Storage tank & pumps
Sector : Natural gas sector (firefighting)
Scope : Engineering

GASCO’s fire fighting system initially relied on


brackish water, which led to equipment malfunctions,
increased maintenance costs, and rapid corrosion. To
address these challenges and enhance system longevity,
they have decided to switch to using freshwater instead.
This change aims to improve the reliability and efficiency
of their fire fighting operations while reducing the overall
maintenance cost.

The multi-disciplinary project includes detailed


engineering & 3D modelling of the fresh water
fire water storage tank & pumps (NFBA).

• Storage tank mechanical design.


• Civil foundations for the storage tank,
Diesel pump, 2 electrical pumps & juki pump.
• Electrical cables, panels, cable trays &
lighting fixtures.
• Instruments & control panels.
• Enter connecting piping & Structural steel
supports.
• Fire fighting equipment, deluge valve, fire
detection & alarm system.

32 33
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Egyptian Bioethanol
Company (EBIOL).
Project: FEED & ITB preparation for bio-ethanol production plant.
Sector : Renewable energy.
Scope : Engineering.

Triple P’s project scope includes developing the Front-End Engineering Design (FEED) and preparing
the Invitation to Bid (ITB) package for constructing a greenfield facility for ethanol production at Damietta
Port. This facility is designed to have a capacity of 100,000 tons per annum (TPA), utilizing beet molasses with
a purity of 99.8%.

The successful completion of the ITB package is a significant step forward in advancing this important
project for the Egyptian Bio Ethanol Company (EBIOL).

34 35
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

North Sinai
Petroleum
Company
(NOSPCO).
Sector: Oil & Gas
Scope: Engineering consultancy / Construction
2015 • Kamose gas field development.
Triple P has been selected to review the detailed
engineering documentation for the Kamose offshore
platform & early process facility by NOSPCO.
The detailed engineering documentation included
process, offshore pipeline, subsea, structural, piping,
mechanical, instrumentation, electrical, loss prevention,
procurement and safety deliverables necessary for
construction and operation of the platform

2019 • Kamose offshore platform topside Installations


of electrical, instrument, firefighting & safety equipment,
cables, cable trays & panels.

36 37
TRIPLE-P ENGINEERIN L.L.C. TRIPLE-P ENGINEERIN L.L.C.
2025 2025

Modular process skids.


Skidded equipment, often referred to as modular process skids, is designed to include all necessary

COOP.
components for a specific process or system mounted on a single platform. This approach allows for easier
transportation, installation, and commissioning compared to traditional methods where individual parts are
assembled on-site.

Triple P’s expertise in skid design/construction not only meets the functional requirements of their
Lupe oil additives
clients but also adheres to industry standards for safety and reliability. The designs are optimized for specific
metering skid.
applications, ensuring that the equipment performs effectively while minimizing the risk of vibration and
alignment issues during operation.

Spirax Sarco Petrozenima


Condensate Pumps High pressure water
Skid. injection skids.

Shotec Egypt
Oily water loading
pumps skid.

38 39
We invite you to

Contact us

Offices. Yard & Work Shop.


e2 October Industrial Park, IDG admin New Industrial area - Umm Deraa
Area 6 October City, Giza, EGY. Umm Alquwain, UAE

Triple P Engineeign & Construction L.L.C Sadat industrial zone, area (6), plot
ABUDHABI, UAE 6250, Sadat city, Monofia, Egypt

Triple P Engineering Industries O27 - E2 October Industrial Park IDG


Umm ALquwain, UAE admin area - 6 October City - Giza

King Fahd Bin Abdul Aziz Road, 3603


Al Qashlah Dist, Dhahran, KSA

: +2 01206622726
: www.ppp-eng.com : +966 580990304
: [email protected] : +971 56 776 0001

You might also like