Material Estimate for Al Akaba Project
Material Estimate for Al Akaba Project
Unit
Total
Price
Ground Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
Amount (Taka)
PART :B
Area Sft 9011 9011 9011 9011 9011 9011 9011 2262 65,339
Qty Sft 565 6,925 6,925 6,925 6,925 6,925 6,925 4,965 47080 80.00 3,766,400.00
Qty Sft 8,690 3,557 3,557 3,557 3,557 3,557 3,557 2,158 32190 50.00 1,609,500.00
Unit
Total
Price
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
Amount
Ground
PART :B
(Taka)
Floor
4. M.S Work WITH LABOUR
Weather Coat
Enamel Paint
French Polish
Window Sft 677 1,855 1,855 1,855 1,855 1,855 1,855 978 12785 240.00 3,068,400.00
PART : B 14,481,950.55
Page 14
6900
20254
23104
23104
23104
23104
23104
23104
23104
23104
25932
25932
26926
26926
AL AKABA MOSTAFA PORT CITY Estimate of Materials
Ground Floor
2nd Floor
Amount (Taka)
Unit
Pile Foundation
1st Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
Total
Price
Basement
PART :C
Floor
7. Plumbing Work
Ground Floor
2nd Floor
Amount (Taka)
Unit
1st Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
Total
Price
Foundation
Basement
PART :C
Floor
Pile
GI fittings LS 1235 75.00 92625
UPVC Pipe 0
2" Rft 150 75.00 11250
4" Rft
S.S. Rft 2,450 100.00 245000
W.S. Rft 2,450 100.00 245000
R.S. Rft 1,125 100.00 112500
6" Rft
S.S. Rft 575 200.00 115000
W.S. Rft 575 200.00 115000
8" Rft 78 350.00 27300
1.5" Rft 1435 60.00 86100
Long Trap 145 650.00 94250
4" vent cowl Nos 37 150.00 5550
2" vent cowl Nos 6 100.00 600
Valve
2.5 " gate valve 3 600.00 1800
2" 3 500.00 1500
1.5" 4 400.00 1600
1.25" 20 350.00 7000
1" 2 325.00 650
.75" 106 300.00 31800
.5" 2 275.00 550
1.5" non return valve 2 750.00 1500
Inspection pit 44 4,000.00 176000
Water pump
3 HP 4 8,500.00 34000
Labour Charge LS 69825 12.00 837900
PART : C 4,918,550.00
Page 16
Nos
AL AKABA MOSTAFA PORT CITY Estimate of Materials
Basement Floor
Ground Floor
2nd Floor
Unit
1st Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
Total
Price
PART :D
8. Electrical Work
SB
Total
Price
Basem
d Floor
Groun
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
PART :D
2nd
3rd
ent
4th
5th
6th
7th
1st
SDB ( A,B)
out : 20A,SP,MCB,10KA
16A,SP,MCB,10KA
EXPOSED CONDUIT :
30 mm dia rm 56 35.00
Concealed conduit
Unit
Total
Price
Ground
Basem
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
PART :D
2nd
3rd
ent
4th
5th
6th
7th
1st
30 mm dia rm 623 40.00
1C-70mm2 rm 15 705.00
1C-150mm2 rm 25 1,545.00
1C-240mm2 rm 35 2,370.00
Amount (Taka)
321,750.00
27,900.00
88,160.00
103,500.00
32,200.00
19,500.00
75,000.00
33,660.00
5,120.00
82,740.00
6,996.00
0.00
5,200.00
7,150.00
26,410.00
40,000.00
1,900.00
Page 17
Amoun
(Taka)
t
52,000.00
52,000.00
52,000.00
52,000.00
8,500.00
86,000.00
76,000.00
30,000.00
85,400.00
53,000.00
93,100.00
5,000.00
3,500.00
1,960.00
87,500.00
37,500.00
Amoun Page 18
(Taka)
t
24,920.00
108,000.00
67,500.00
58,520.00
42,250.00
12,000.00
7,475.00
9,250.00
10,575.00
38,625.00
82,950.00
67,000.00
95,000.00
1,047,375.00
3,324,086.00
Page 19
AL AKABA MOSTAFA PORT CITY Estimate of Materials
9. Machinery & Equipment
Standby Generator
Nos. 1 600,000.00 600,000.00
Intercom
Lot 1 345,000.00 345,000.00
PART : E 9,005,000.00
SUMMARY
1 Construction Area :
Typical floor 9011 7 63,077.00 sft
PART :A 46,992,049.79 tk
PART : B 14,481,950.55 tk
PART : C 4,918,550.00 tk
PART : D 3,324,086.00 tk
PART : E 9,005,000.00 tk
TOTAL : 78,721,636.34 tk
5 3" C.C WORK (a ) Paking Floor 8773 cft 1:3:6 1053 3948 78957
6 R.C.C WORK
a) Pile Work 13145 cft 1:11/2:3 2892 3023 3023 11173 5887 0 5696 10226 0 21809
b) pile cap 4261 1:11/2:3 937 980 980 3622 3556 3357 6913
c) Column & Shear Wall 3135 cft 1:11/2:3 690 721 721 26961 2665 350 0 705 3245 4300
Page No.-01
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg
Ratio of Picket in Brick in 2
c Description of Work Quantity Mixing Nos.
Chips in
Nos. 5
Gray(bag) white(kg) cft. 8mm 10mm 12mm 16mm 20mm Total
Local Sylhet m
m
d) Grade Beam 1255 cft 1:2:4 226 289 289 10793 1067 1575 526 1688 3789
h) U.G.W.R 609 cft 1:2:4 110 140 140 518 250 1348 1598
i) Septic tank 455 cft 1:2:4 82 105 105 3913 654 654
SUB TOTAL ( Foundation Level) 6217 0 36335 5258 120624 19044 87758 5887 2829 7044 15013 8290 0 39063
Page No.-02
GROUND FLOOR
a) Column & Shear Wall 735 cft 1:11/2:3 162 169 169 625 350 0 352 3245 3947
g) Parking Floor Slab 5245 cft 1:2:4 944 1206 1206 45107 9333 9333
a) Apartment (Drivers, Guard, etc.) 8408 sft 1:3 336.32 168.16 1261.20
SUB TOTAL (G. Floor) 1822 168 4523 1462 48341 625 21132 0 9853 400 352 3245 0 13850
Page No.-03
FIRST FLOOR
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg
Ratio of Picket Brick in
c Description of Work Quantity Chips 2
Mixing Gray(bag) white(kg) Local Sylhet in Nos. Nos. 8mm 10mm 12mm 16mm 20mm 5
Total
in cft. m
m
1 R.C.C. WORK
a) Column & Shear Wall 695 cft 1:11/2:3 153 160 160 591 275 0 295 2478 3048
b) Slab and Stair 4356.76 cft 1:2:4 784 1002 1002 37468 8566 2166 10732
c) Beam 1316 cft 1:2:4 237 303 303 1119 1300 862 1775 3937
d) False Slab,Lintel & Sunshade 65 cft 1:2:4 12 15 15 559 573 668 557 1798
e) Drop Wall & Railing 112 cft 1:2:4 20 26 26 963 0
3 10" BRICK WORK 150 cft 1:6 6.00 53 1725
4 5" BRICK WORK 17555 sft 1:4 438.88 2282 87775
5 3/4" Thick Plaster
a) In Side Wall 35544 sft 1:6 390.98 2950
b) Out Side Wall 3265 sft 1:4 48.98 271
6 1/2" Thick Plaster( Ceiling) 8545 sft 1:4 85.45 427
7 TILE WORK (Floor Tiles) [1.5" Thick Morter]
a) Apartment 7095 sft 1:3 283.80 141.90 1064
b) Stair 574 sft 1:3 22.96 11.48 86
c) Stair & Lift Lobby 287 sft 1:3 11.48 5.74 43
d) Kitchen,Kitchen Verandah & S.Bed 125 sft 1:3 5.00 2.50 19
f) Toilet 600 sft 1:3 24.00 12.00 90
8 TILE WORK (Wall Tiles) [1" Thick Morter]
a) ALL wall 2478 sft 1:3 61.95 49.56 372
22 MILD STEEL (a) 40 Grade
(b) 60 Grade 19515 Kg.
SUB TOTAL (1st. Floor) 2585 223 9162 1505 38990 1709 89500 573 10809 2723 1157 4253 0 19515
Page No.-04
SECOND FLOOR
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg
Ratio of Picket Brick in
c Description of Work Quantity Chips 2
Mixing Gray(bag) white(kg) Local Sylhet in Nos. Nos. 8mm 10mm 12mm 16mm 20mm 5
Total
in cft. m
m
1 R.C.C. WORK
a) Column & Shear Wall 695 cft 1:11/2:3 153 160 160 591 275 0 295 2478 3048
b) Slab and Stair 4356.76 cft 1:2:4 784 1002 1002 37468 8566 2166 10732
c) Beam 1316 cft 1:2:4 237 303 303 1119 1300 862 1775 3937
d) False Slab,Lintel & Sunshade 65 cft 1:2:4 12 15 15 559 573 668 557 1798
e) Drop Wall & Railing 112 cft 1:2:4 20 26 26 963 0
3 10" BRICK WORK 150 cft 1:6 6.00 53 1725
4 5" BRICK WORK 17555 sft 1:4 438.88 2282 87775
5 3/4" Thick Plaster
a) In Side Wall 35544 sft 1:6 390.98 2950
b) Out Side Wall 3265 sft 1:4 48.98 271
6 1/2" Thick Plaster( Ceiling) 8545 sft 1:4 85.45 427
7 TILE WORK (Floor Tiles) [1.5" Thick Morter]
a) Apartment 7095 sft 1:3 283.80 141.90 1064
b) Stair 574 sft 1:3 22.96 11.48 86
c) Stair & Lift Lobby 287 sft 1:3 11.48 5.74 43
d) Kitchen,Kitchen Verandah & S.Bed 125 sft 1:3 5.00 2.50 19
f) Toilet 600 sft 1:3 24.00 12.00 90
8 TILE WORK (Wall Tiles) [1" Thick Morter]
a) ALL wall 2478 sft 1:3 61.95 49.56 372
22 MILD STEEL (a) 40 Grade
(b) 60 Grade 19515 Kg.
SUB TOTAL (1st. Floor) 2585 223 9162 1505 38990 1709 89500 573 10809 2723 1157 4253 0 19515
Page No.-05
THIRD FLOOR
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg
Ratio of Picket Brick in
c Description of Work Quantity Chips 2
Mixing Gray(bag) white(kg) Local Sylhet in Nos. Nos. 8mm 10mm 12mm 16mm 20mm 5
Total
in cft. m
m
1 R.C.C. WORK
a) Column & Shear Wall 695 cft 1:11/2:3 153 160 160 591 275 0 295 2478 3048
b) Slab and Stair 4356.76 cft 1:2:4 784 1002 1002 37468 8566 2166 10732
c) Beam 1316 cft 1:2:4 237 303 303 1119 1300 862 1775 3937
d) False Slab,Lintel & Sunshade 65 cft 1:2:4 12 15 15 559 573 668 557 1798
e) Drop Wall & Railing 112 cft 1:2:4 20 26 26 963 0
3 10" BRICK WORK 150 cft 1:6 6.00 53 1725
4 5" BRICK WORK 17555 sft 1:4 438.88 2282 87775
5 3/4" Thick Plaster
a) In Side Wall 35544 sft 1:6 390.98 2950
b) Out Side Wall 3265 sft 1:4 48.98 271
6 1/2" Thick Plaster( Ceiling) 8545 sft 1:4 85.45 427
7 TILE WORK (Floor Tiles) [1.5" Thick Morter]
a) Apartment 7095 sft 1:3 283.80 141.90 1064
b) Stair 574 sft 1:3 22.96 11.48 86
c) Stair & Lift Lobby 287 sft 1:3 11.48 5.74 43
d) Kitchen,Kitchen Verandah & S.Bed 125 sft 1:3 5.00 2.50 19
f) Toilet 600 sft 1:3 24.00 12.00 90
8 TILE WORK (Wall Tiles) [1" Thick Morter]
a) ALL wall 2478 sft 1:3 61.95 49.56 372
22 MILD STEEL (a) 40 Grade
(b) 60 Grade 19515 Kg.
SUB TOTAL (1st. Floor) 2585 223 9162 1505 38990 1709 89500 573 10809 2723 1157 4253 0 19515
Page No.-06
FOURTH FLOOR
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg
Ratio of Picket Brick in
c Description of Work Quantity Chips 2
Mixing Gray(bag) white(kg) Local Sylhet in Nos. Nos. 8mm 10mm 12mm 16mm 20mm 5
Total
in cft. m
m
1 R.C.C. WORK
a) Column & Shear Wall 695 cft 1:11/2:3 153 160 160 591 275 0 295 2478 3048
b) Slab and Stair 4356.76 cft 1:2:4 784 1002 1002 37468 8566 2166 10732
c) Beam 1316 cft 1:2:4 237 303 303 1119 1300 862 1775 3937
d) False Slab,Lintel & Sunshade 65 cft 1:2:4 12 15 15 559 573 668 557 1798
e) Drop Wall & Railing 112 cft 1:2:4 20 26 26 963 0
3 10" BRICK WORK 150 cft 1:6 6.00 53 1725
4 5" BRICK WORK 17555 sft 1:4 438.88 2282 87775
5 3/4" Thick Plaster
a) In Side Wall 35544 sft 1:6 390.98 2950
b) Out Side Wall 3265 sft 1:4 48.98 271
6 1/2" Thick Plaster( Ceiling) 8545 sft 1:4 85.45 427
7 TILE WORK (Floor Tiles) [1.5" Thick Morter]
a) Apartment 7095 sft 1:3 283.80 141.90 1064
b) Stair 574 sft 1:3 22.96 11.48 86
c) Stair & Lift Lobby 287 sft 1:3 11.48 5.74 43
d) Kitchen,Kitchen Verandah & S.Bed 125 sft 1:3 5.00 2.50 19
f) Toilet 600 sft 1:3 24.00 12.00 90
8 TILE WORK (Wall Tiles) [1" Thick Morter]
a) ALL wall 2478 sft 1:3 61.95 49.56 372
22 MILD STEEL (a) 40 Grade
(b) 60 Grade 19515 Kg.
SUB TOTAL (1st. Floor) 2585 223 9162 1505 38990 1709 89500 573 10809 2723 1157 4253 0 19515
Page No.-07
FIFTH FLOOR
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg
Ratio of Picket Brick in
c Description of Work Quantity Chips 2
Mixing Gray(bag) white(kg) Local Sylhet in Nos. Nos. 8mm 10mm 12mm 16mm 20mm 5
Total
in cft. m
m
1 R.C.C. WORK
a) Column & Shear Wall 695 cft 1:11/2:3 153 160 160 591 275 0 295 2478 3048
b) Slab and Stair 4356.76 cft 1:2:4 784 1002 1002 37468 8566 2166 10732
c) Beam 1316 cft 1:2:4 237 303 303 1119 1300 862 1775 3937
d) False Slab,Lintel & Sunshade 65 cft 1:2:4 12 15 15 559 573 668 557 1798
e) Drop Wall & Railing 112 cft 1:2:4 20 26 26 963 0
3 10" BRICK WORK 150 cft 1:6 6.00 53 1725
4 5" BRICK WORK 17555 sft 1:4 438.88 2282 87775
5 3/4" Thick Plaster
a) In Side Wall 35544 sft 1:6 390.98 2950
b) Out Side Wall 3265 sft 1:4 48.98 271
6 1/2" Thick Plaster( Ceiling) 8545 sft 1:4 85.45 427
7 TILE WORK (Floor Tiles) [1.5" Thick Morter]
a) Apartment 7095 sft 1:3 283.80 141.90 1064
b) Stair 574 sft 1:3 22.96 11.48 86
c) Stair & Lift Lobby 287 sft 1:3 11.48 5.74 43
d) Kitchen,Kitchen Verandah & S.Bed 125 sft 1:3 5.00 2.50 19
f) Toilet 600 sft 1:3 24.00 12.00 90
8 TILE WORK (Wall Tiles) [1" Thick Morter]
a) ALL wall 2478 sft 1:3 61.95 49.56 372
22 MILD STEEL (a) 40 Grade
(b) 60 Grade 19515 Kg.
SUB TOTAL (1st. Floor) 2585 223 9162 1505 38990 1709 89500 573 10809 2723 1157 4253 0 19515
Page No.-08
SIXTH FLOOR
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg
Ratio of Picket Brick in
c Description of Work Quantity Chips 2
Mixing Gray(bag) white(kg) Local Sylhet in Nos. Nos. 8mm 10mm 12mm 16mm 20mm 5
Total
in cft. m
m
1 R.C.C. WORK
a) Column & Shear Wall 695 cft 1:11/2:3 153 160 160 591 275 0 295 2478 3048
b) Slab and Stair 4356.76 cft 1:2:4 784 1002 1002 37468 8566 2166 10732
c) Beam 1316 cft 1:2:4 237 303 303 1119 1300 862 1775 3937
d) False Slab,Lintel & Sunshade 65 cft 1:2:4 12 15 15 559 573 668 557 1798
e) Drop Wall & Railing 112 cft 1:2:4 20 26 26 963 0
3 10" BRICK WORK 150 cft 1:6 6.00 53 1725
4 5" BRICK WORK 17555 sft 1:4 438.88 2282 87775
5 3/4" Thick Plaster
a) In Side Wall 35544 sft 1:6 390.98 2950
b) Out Side Wall 3265 sft 1:4 48.98 271
6 1/2" Thick Plaster( Ceiling) 8545 sft 1:4 85.45 427
7 TILE WORK (Floor Tiles) [1.5" Thick Morter]
a) Apartment 7095 sft 1:3 283.80 141.90 1064
b) Stair 574 sft 1:3 22.96 11.48 86
c) Stair & Lift Lobby 287 sft 1:3 11.48 5.74 43
d) Kitchen,Kitchen Verandah & S.Bed 125 sft 1:3 5.00 2.50 19
f) Toilet 600 sft 1:3 24.00 12.00 90
8 TILE WORK (Wall Tiles) [1" Thick Morter]
a) ALL wall 2478 sft 1:3 61.95 49.56 372
22 MILD STEEL (a) 40 Grade
(b) 60 Grade 19515 Kg.
SUB TOTAL (1st. Floor) 2585 223 9162 1505 38990 1709 89500 573 10809 2723 1157 4253 0 19515
Page No.-09
SEVENTH FLOOR
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg
Ratio of Picket Brick in
c Description of Work Quantity Chips 2
Mixing Gray(bag) white(kg) Local Sylhet in Nos. Nos. 8mm 10mm 12mm 16mm 20mm 5
Total
in cft. m
m
1 R.C.C. WORK
a) Column & Shear Wall 735 cft 1:11/2:3 162 169 169 625 145 0 234 2145 2524
b) Slab and Stair 4356.76 cft 1:2:4 784 1002 1002 37468 6556 1245 7801
c) Beam 1316 cft 1:2:4 237 303 303 1119 945 342 2555 3842
d) False Slab,Lintel & Sunshade 65 cft 1:2:4 12 15 15 559 573 1668 1180 3421
e) Drop Wall & Railing 112 cft 1:2:4 20 26 26 963 0
3 10" BRICK WORK 150 cft 1:6 6.00 53 1725
4 5" BRICK WORK 9765 sft 1:4 244.13 1269 48825
5 3/4" Thick Plaster
a) In Side Wall 25455 sft 1:6 280.01 2113
b) Out Side Wall 7414 sft 1:4 111.21 615
6 1/2" Thick Plaster( Ceiling) 8545 sft 1:4 85.45 427
7 TILE WORK (Floor Tiles) [1.5" Thick Morter]
a) Apartment 7095 sft 1:3 283.80 141.90 1064
b) Stair 574 sft 1:3 22.96 11.48 86
c) Stair & Lift Lobby 287 sft 1:3 11.48 5.74 43
d) Kitchen,Kitchen Verandah & S.Bed 125 sft 1:3 5.00 2.50 19
f) Toilet 600 sft 1:3 24.00 12.00 90
8 TILE WORK (Wall Tiles) [1" Thick Morter]
a) ALL wall 2478 sft 1:3 61.95 49.56 372
22 MILD STEEL (a) 40 Grade
(b) 60 Grade 17588 Kg.
SUB TOTAL (1st. Floor) 2351 223 7666 1514 38990 1743 50550 573 9314 2425 576 4700 0 17588
Page No.-10
ROOF TOP FLOOR
Cement in bag/kg. Sand in cft Stone MILD STEEL 60 Grade in kg 2
Ratio of Picket Brick in
c Description of Work Quantity Chips 5
Mixing Gray(bag) white(kg) Local Sylhet in Nos. Nos. 8mm 10mm 12mm 16mm 20mm Total
in cft. m
1 R.C.C. WORK (a) Parapet Wall 324 cft 1:2:4 58 75 75 2916 m 0
b) Column & Shear Wall 322 cft 1:2:4 58 74 74 274 0
c) Slab and Stair 2234 cft 1:2:4 402 514 514 19212 4564 1676 6240
d) Beam 657 cft 1:2:4 118 151 151 5650 558 768 435 1766 2969
e) False Slab,Lintel & Sun Shade 32 cft 1:2:4 6 7 7 275 230 708 556 1494
g) O.H.W.T 650 cft 1:2:4 117 150 150 5850 850 850
4 10" BRICK WORK 45 cft 1:6 1.80 16 518
5 5" BRICK WORK 7500 sft 1:4 187.50 975 37500
6 3/4" Thick Plaster (a) In side wall 7575 sft 1:6 83.32 629
b) Out Side Wall 3765 sft 1:4 56.48 312
7 1/2" Thick Plaster (a) Ceiling 730 sft 1:4 7.30 37
b) O.H.W.T 1456 sft 1:4 14.56 73
c) Parapet Wall 4800 sft 1:4 48.00 240
8 TILE WORK(Floor Tiles) [1.5" Thick Morter]
a) Community / Office / Management Room 3576 sft 1:3 143.04 71.52 536.40
b) Stair & Lift Lobby 287 sft 1:3 11.48 5.74 43.05
d) Toilet 214 sft 1:3 8.56 4.28 32.10
10 LIME TERRACING 2630 cft 7:02:02 23670
28 MILD STEEL (a) 40 Grade Kg.
(b) 60 Grade 11553 Kg.
SUB TOTAL (Roof top) 1321 82 3863 970 33904 832 61688 230 6890 2232 435 1766 0 11553
GRAND TOTAL 27224 1812 107361 18236 475801 32501 758127 10128 93740 28439 23318 43519 0 199144
Page No.-11
SUMMARY
Shylhet Picket in
ITEM NAME Gray(bag) White Local Stone chips Bricks in nos MS Rod
Sand nos
Cement Sand
GRAND TOTAL : 27224 1812 107361 18236 475801 32501 758127 199144
Grand Total :
37841089.79
Labour Charge
Civil Works
Civil Works
2287 1 140 320180.00
Total : 9150960.00
Total : PART -A :
46992049.79
Page No.-12