Fdas - Sprinkler - Fire Pump - Fire Pump Room For RFQ
Fdas - Sprinkler - Fire Pump - Fire Pump Room For RFQ
GENERAL REQUIREMENTS:
Mobilization N/A 1 Lot
Technical Supervision & Management. N/A 1 Lot
Tools, Equipments/Scaffoldings N/A 1 Lot
Positioning of Equipment at site/Shipment/RIGGING N/A 1 Lot
Temporary Facility N/A 1 Lot
Permits & Licenses: Internal/Local N/A 1 Lot
FIELD ACCEPTANCE TEST/WITNESSED BY OWNER, CONTRACTOR, BFP N/A 1 Lot
Permits & Licenses: Internal/Local, building permit and other related compliances. N/A 1 Lot
Factory Acceptance Test by GMC Representative. N/A 1 Lot
BILL OF QUANTIES.
ENGINE DRIVEN FIRE PUMP, Diesel driven pump, Horizontal Split Case, 2500 GPM, 152.25 psi, 1750 rpm, clockwise, water
1.1 medium, discharge 8 inches, suction 10 inches, Impeller 496 mm, effeciency 70% Maximum HP 357. UL / FM 1 set
1.2 Jockey Pump, Vertical inline, 45 GPM @ 180 psi @ 7.5 HP. UL / FM 1 Set
Controllers for FP & JP Type: GPY (WYE-DELTA), Manufacturer:Tornatech, Rating : HP, Listing :UL-Listed and FM Approved,
1.3 Enclosure: NEMA 2. Shoule be in the same brand with the engine driven pump. UL / FM 1 set
1.4 Standardard Accessories : PRV, Sunction & discharge gauges, Air release valves, Water flowmeters, Standard DIESEL tank, UL / FM 1 lot
1.5 Engine Exhaust System Complete with thermal Insulations, Aluminum Cladding, & Sway brackets for vibrations UL / FM 1 lot
1.6 OTHERS : Delivery of imported Equipments & accessories , rigging, & positioning of equipment/s at site UL / FM 1 lot
1.7 Factory Acceptance Testing, GMC Engineering Represetative. UL / FM 1 lot
PUMP HOUSE CONSTRUCTION & RESERVE TANK PREPARATION per NFPA 20 & 22 Standards
COMPLETE PUMP HOUSE : Steel construction, reinforced, flooring, Epoxy painted with 3 sides concrete (CHB) wall Paint, Finished,
1.8 Naturally Ventilated, Sprinkler protection for Extra, hazard Occupancy, Complete with Lighting & switches NFPA 20 1 lot
1.9 Machine foundation in accordance with the supplied engine driven firepump. Anchor bolts with vibration dampener. Mechanical Code 2012 1 Lot
2 Electrical power supply for the pump room to all the load side of the room. Labor and materials. EE National Standard 1 Lot
2.1 Construction Consumables N/a 1 Lot
PIPES & FITTINGS, MACHINE CONNECTIONS, ACCESSORIES, FOUNDATION, BRACKETS & SUPPORTS TO COMPLETE THE SYSTEM
2.2 ALARM CHECK VALVE, 200MM COMPLETE WITH, ACCESSORIES, Alarm Gong, retard chamber, drain line, In-out UL / FM 1 Set
2.3 Anti Vortex Plates : anti turbulence, 10 inches pipe. NFPA 20 2 Sets
2.4 Pipe Suction Clamps/plates for concrete cylindrical tank UL / FM 1 Lot
2.5 Complete Sensing lines (1-FP & 1-JP): COPPER OR STAINLESS UL / FM 1 Set
PIPES & FITTINGS, MACHINE CONNECTIONS, ACCESSORIES, FOUNDATION, BRACKETS & SUPPORTS TO COMPLETE THE SYSTEM
4.3 OIL, LUBRICANTS, GASKETS, BOLTS & NUTS & ANCHORS, SIDE BRACKETS, OTHERS UL / FM 1 Lot
4.4 SADDLE & SUPPORTS
Pump room Brackets & Supports for Pipelines: Fixed metal with Concrete foundation, 100mm Vertical pipe support, 200mm pipe
saddle & saddle cover with double fixing bolt & nuts, Anchored with 12mm base plates through 4-16mm anchor bolts, complete
with epoxy primer & double top coated paintings: excavation included 200mm G.I. U-bolt sets : Fixed at Pump room UL / FM 1 set
REGULATORY COMPLIANCE
4.5 As Built Plan, Sign and Sealed. 4 Original Copies. 1 Lot
4.6 BFP Installation Clearance 1 Lot
4.7 BFP Inspection 1 Lot
Foot note:
* - Varies on the contractor's design and actual layout.
PUMP ROOM P AND ID.
BILL OF MATERIALS
SPRINKLER SYSTEM:
Sprinkler heads shall be recessed, upright, pendent, vertical side wall, horizontal side wall
type as required, 12mm. dia. and/or 13.5mm. dia. orifice, 12mm. dia. and/or 19mm. dia. NFPA 13 and
pipe threads, rated at 68 degrees Centigrade, 93 degrees C, and/or 121 degrees C. 583 Pcs
25
Sprinklers in areas with suspended ceiling the escutcheon plates shall be chrome on center
of the ceiling boards. Sprinkler shall be 93 degrees Centigrade at the Kitchen, Mechanical
room, Genset room and Parking areas with standard orifice glass bulb upright type or
pendent type, and brass finish. Sprinkler shall be 68 degrees Centigrade at the offices and
residential with Quick response orifice glass bulb recessed type, chrome finish UL/FM
Sprinkler K-Factor shall be as per design (see design plans)
138 meters
30 meters
Sub-Total
STANDARD QTY Unit Matl Cost Labor Cost Amount
Consumables (Weld rods, cutting & grinding discs, paints, ptfe tapes, grease, oils, others) 1 Lot
Sub-Total
STANDARD QTY Unit Matl Cost Labor Cost Amount
UNIVERSAL FLOOR CONTROL MODULE: UL/FM, VICTAULIC UM assy, 100 MM
FLOOR CONTROL VALVE, C/W
Sub-Total
STANDARD QTY Unit Matl Cost Labor Cost Amount
FIRE DETECTION AND ALARM CONTROL SYSTSM (FDACS)
Fire Alarm Control Panel (FACP) CONTROLS & DEVICES: UL LISTED/LPCB LISTED
Addressable FACP NFPA 72 1 Sets
Booster Power Supply (BPS) NFPA 72 1 Sets
Addessable Smoke Detector (ASD) NFPA 72 2 Sets
Addressable Manual Pull Station (MCP) NFPA 72 9 Sets
Single Control Module (SCM) NFPA 72 1 Sets
Conventional Horn Strobe NFPA 72 9 Sets
Beam Detector NFPA 72 4 Sets
Beam Refleftor NFPA 72 8 Sets
Addressable input module NFPA 72 7 Sets
Conventional Zone Module NFPA 72 3 Sets
Valve Superviory Switch NFPA 72 3 Sets
Water Flow Switch NFPA 72 3 Sets
End of Line Resistor (EOL) NFPA 72 4 Sets
Sub-Total
STANDARD QTY Unit Matl Cost Labor Cost Amount
30 meters
84 meters 75 meters
14 meters
FIRE MAINS TO WH 25 AND WH B.
Stadard Requirement for Fire Mains
FIRE CODE OF THE PHILIPPES' RA 9514 & ITS RIRR
NFPA 24 STANDARDS FOR THE INSTALLATION OF PRIVATE FIRE SERVICE
MAINS AND THEIR APPURTENANCES
NFPA 25 STANDARDS FOR THE INSPECTION, TESTING, & MAINTENANCE
(ITM) OF WATER BASED FIRE PROTECTION SYSTEM
ASTM STANDARDS
GENERAL REQUIREMENTS:
Mobilization/Demobilization/Inspection-Coordinations
Technical Supervision & Management
Tools, Equipments/Scaffoldings
Provision of Lifting Equipment
Temporary Facility :
Design, Working Plans, As-built Plans Sign & Seal
FIELD ACCEPTANCE TEST/WITNESSED BY OWNER,
CONTRACTOR, BFP
BILL OF MATERIALS
Painting Works. Sanding, rust converters, primer application, double coating. 1 Lot
535 589
107 118
107 118
214 235
107 118
1177 1295
642 706
385.2 424
535 589
107 118
107 118
214 235
107 118
FIRE MAINS TO WH 25 AND WH B.
Stadard Requirement for Fire Mains
GENERAL REQUIREMENTS:
BILL OF MATERIALS
HYDRANTS & STAND PIPES FOR WB 25 & WHB
FIRE MAINS TO WH 25 AND WH B.
Stadard Requirement for Fire Mains
FIRE CODE OF THE PHILIPPES' RA 9514 & ITS RIRR
NFPA 24 STANDARDS FOR THE INSTALLATION OF PRIVATE FIRE SERVICE
MAINS AND THEIR APPURTENANCES
NFPA 25 STANDARDS FOR THE INSPECTION, TESTING, & MAINTENANCE
(ITM) OF WATER BASED FIRE PROTECTION SYSTEM
ASTM STANDARDS
GENERAL REQUIREMENTS:
Mobilization/Demobilization/Inspection-Coordinations
Technical Supervision & Management
Tools, Equipments/Scaffoldings
Provision of Lifting Equipment
Temporary Facility :
Design, Working Plans, As-built Plans Sign & Seal
FIELD ACCEPTANCE TEST/WITNESSED BY OWNER,
CONTRACTOR, BFP
STANDARD
BILL OF MATERIALS
250 lm
150 lm
32 lm
20 lm
1 Lot
12 pcs
2 pcs
16 pcs
4 pcs
6 pcs
4 pcs
8 pcs
4 pcs
10 pcs
1 pcs
4 pcs
4 pcs
1 pcs
1 pcs
2 pcs
2 pcs
2 pcs
1 Lot
1 Lot
1 Lot
Fire Mains to
WH 25.
24 lm 85 M
1 Lot RAIN
WATER
TANK
RAIN
WATER
TANK
6 pcs
12 pcs
6 pcs
6 pcs
6 pcs
6 pcs
6 pcs
6 pcs
6 pcs
6 pcs
6 pcs
6 pcs dia 30
1 Lot Radius 15 m
Height 4
3.1416
area 706.86 sq. meter
Vol 2827.44 Cu. Meter
2500
WH B
WH 25
Fire
Mains to
WH B.
65 m
Fire
Pump
RAIN Room
WATER
TANK
Fire
Pump
RAIN Room
WATER
TANK
General Project Gantt Chart
Objective: FSIC Compliance for 2025 commitment.
1 Site preparations:
1.1 Rehabilitation of Rain water collection tank.
1.1.1 Drain water
1.1.2 Cleaning of debris
1.1.3 Epoxy Coating.
1.1.4 Installation of net cover
1.1.5 Installation of 4" Stub out pipe for boiler use.
1.1.6 Installation of 10" discharge pipes 2 units with anti Vortex
2 Project Proper.
2.1 Fire Pump acquisition. (Could be short as 2 Months). Often make to order.
Note: Project can run simultaneously if needed. The project lead time may v
Lead Time
Weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Month 1 2 3 4 5 6
eded. The project lead time may vary from 5 Months to 9 Months of construction from the date of PO release.
Not a critical for the project.
Project time line.
22 23 24
6