0% found this document useful (0 votes)
53 views13 pages

Excel Tubes Beton

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views13 pages

Excel Tubes Beton

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Prelim Tubes Beton 2

Bentang Arah X = 7 m
Bentang Aray Y = 7 m
Jumlah Bentang Arah X = 3 buah
Jumlah Bentang Arah Y = 3 buah
Jumlah lantai = 3 buah
Luas Bangunan = 1323 m2
>1200
OK!

XY
Mutu Beton (Fc') = K300
= 25 Mpa

Mutu Tulangan (Fy) = 420 Mpa

ZX Z
ZY
PRELIM BALOK
Data Balok
B = 350 mm
H = 500 mm
Bentang = 7000 mm
Diameter Tulangan Lentur = 16 mm
Diameter Tulangan Sengkang = 10 mm
Selimut Beton = 40 mm

a. Batasan Dimensi Balok berdasarkan SNI 2847 2019 Pasal 18.6.2.1

d = 442 mm

Ln = 6500 mm

cek = Ln 4d
6500 1768
OKE!

b. 𝑏𝑤 ≥ 0,3ℎ 𝑎𝑡𝑎𝑢 250 𝑚

bw = 350 mm
0,3h = 150 mm

cek = 𝑏𝑤 ≥ 0,3ℎ
350 ≥ 150
OKE !

c.

bw = 350
bkol = 500
hkol = 500
4hkol = 375

Cek = 350 ≤ 500 +( 2 × 375 )


= 350 ≤ 1250
OKE !
Data Kolom 1.1 Geometri Balok
b = 500 mm Lebar Balok b = 300 mm
h = 500 mm Tinggi Balok h = 500 mm
L = 5000 mm Panjang Balok L = 7000 mm
cc = 40 mm Selimut Bersih Cc = 40 mm
Hbalok = 500 mm Panjang Kolom C1 = 500 mm
Ln = 3500 mm Lebar Kolom C2 = 500 mm
1.2 Material
Kuat Tekan fc' = 25 mm
Kuat Leleh Baja Tulangan Longitudinal fy = 420 mm
Kuat Leleh Baja Tulangan Transversal fyv = 240 mm
Diameter Agregat dagg = 40 mm
1.3 Diameter Tulangan
Diameter Tulangan Longitudinal db = 300 mm
Diameter Tulangan Pinggang dbt = 500 mm
Diameter Tulangan Sengkang ds = 7000 mm
DATA KOLOM

1.1 GEOMETRI KOLOM

Sisi Pendek Kolom b = 500


Sisi Panjang Kolom h = 500
Tinggi Kolom L = 5000
Selimut Bersih cc = 40
Tinggi Balok hb = 500
Tinggi Bersih Kolom Ln = 4500

1.2 Material

Kuat Tekan fc' = 25


Kuat Leleh Baja Tulangan Longitudinal fy = 420
Kuat Leleh Baja Tulangan Transversal fyv = 420
Diameter Agregat dagg = 10

1.3 Diameter Tulangan

Diameter Tulangan Longitudinal db = 22


Diameter Tulangan Sengkang ds = 13

1.4 Diameter Tulangan

Jumlah tulangan X nx = 6
Jumlah tulangan Y ny = 6
Jumlah Tulangan Total Longitudinal n = 20

PRELIM KOLOM

DIGUNAKAN UKURAN KOLOM 500 x500


dengan tulangan 6D22

1.1.1 Dimensi penampang terkecil ≥ 300

CEK = 500 ≥ 300 OKE !

1.1.2

cek = 500/500 ≥
1 ≥
OKE

1.2 Cek Konfigurasi Penulangan


Tulangan Lentur 6D22 diameter 22 6 buah

As = 6 x 1/4 x 22/7 x 222


= 2281.7142857 mm2

𝜌g = "2281,714 " /(500 𝑥 500)

= 0.0091268571

CEK = 0,01 < 0,009127 < 0,06

1.3 DESAIGN TULANGAN GESER


Dimensi 500 x 500

Panjang h = 500
Lebar b = 500
Luas Kotor Ag = 250000
Panjang L = 5000
Kuat Tekan Fc' = 25
Tegangan Leleh Fy = 420
Diameter D = 13

Ln L -( h+b/2) = 4500
hc b - 2 (40 - 1/2db = 433
Ach = 176400
As 6 x 1/4 x 22/7 x 132 = 796.714286

= 3.22610949

= 2.31964286

= 3.22610949

1.4 Menentukan Spasi

a. 1/4 x b = 125 mm
b. 6 x d tul. Lentur = 132 mm
c.hx = 2/3 x hc = 288.66666667 mm

= 120.44444444 mm
OK !
SYARAT, 100< S0 <150. OK
digunakan smax = 100 mm

As-hoop = 322.61094914 mm2

AS > As-hoop = 796.71428571 >


OK !
mm
mm
mm
mm
mm
mm

Mpa
Mpa
Mpa
mm

mm
mm

bh
bh
bh

0.4
0.4
OKE

mm
mm
mm
mm
mm
mm
mm

mm
mm
mm2
mm2

TERBESAR
322.610949

You might also like