RQ IWTP - RFP - Part IV - Technical Form Sheet

Uploaded by

barış aydın
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views92 pages

RQ IWTP - RFP - Part IV - Technical Form Sheet

Uploaded by

barış aydın
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 92

IWTP 4: Riyadh Qassim

Independent Water Transmission


Pipeline (IWTP)

Request for Proposals


Part IV: Form Sheets
Technical Form Sheet C
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

IWTP 4: Riyadh-Qassim Independent


Water Transmission Pipeline (IWTP)

Request for Proposals

➢ Part I: Instructions to Bidders


➢ Part II: Technical Specifications
➢ Part III: Drawings and Diagrams
➢ Part IV: Form Sheets
➢ Part V: Draft Project Agreements

1
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Table of Contents
1. Legal Form of Bidder ................................................................................................................ 3

2. Bidder Consortium .................................................................................................................... 4

3. General Information about EPC Contractor ............................................................................... 5

4. Project References of EPC Contractor ..................................................................................... 6

5. General Information about O&M Contractor ............................................................................. 7

6. Project References of O&M Contractor .................................................................................... 8

7. List of Manufacturers of Main Equipment ................................................................................. 9

8. General Information about Company's Engineer ................................................................... 11

9. Project References of Company's Engineer ........................................................................... 12

10. Technical Project Methodology/Approach .............................................................................. 13

11. Implementation Schedule ....................................................................................................... 14

12. Bidder’s Experience ................................................................................................................ 21

13. Organization & Staffing ........................................................................................................... 22

14. Schedule of Sub-contractors .................................................................................................. 23

15. Schedule of Equipment & Technology Suppliers ................................................................... 24

16. Quality Control Practices & Procedures ................................................................................. 25

17. Health & Safety Plan & Procedures ........................................................................................ 26

18. Environmental & Social Management Plan & Procedures ..................................................... 27

19. Management, Operation & Maintenance Plan & Procedures ................................................ 28

20. Technical Data Submission .................................................................................................... 29

21. Performance Guarantee ......................................................................................................... 30

22. Summary of Technical Submission ........................................................................................ 83

23. Technical Information to be provided with Proposal (mandatory) .......................................... 89

2
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

1. Legal Form of Bidder


No Information Required Response
1 Name of Bidder1
2 Address
3 Name and Position of Authorised Representative
4 Telephone / Fax / E-Mail
5 Legal Form2
6 Capitalisation
7 Organisational Charts Attached
8 Constitutional Documents and Joint Venture Agreement3
Attached

1
Whether an individual Bidder or a Bidder Consortium. In the case of a Bidder Consortium, the names of all Consortium Members of
the Bidder Consortium must be approved in writing by SWPC.
2
Single Corporate Entity
3
Or Shareholders' Agreement, Consortium Agreement, Development Agreement, Memorandum and Articles of Association etc.

3
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

2. Bidder Consortium4

Other
Lead Technical Member 1
No. Information Required Member Member (etc.)
1 Name
2 Address
3 Name and Position of Point of Contact
4 Telephone / Fax / E-Mail
5 Legal Form
6 Ultimate Parent Company Name and Address
7 Net Assets / Shareholders Funds of Parent
Company (financial year 2022)
8 Principal Role in Project5
9 Organisational Documents Attached
10 Provision of audited financial statements for the
Parent Company’s financial years 2020, 2021
and 2022
11 Current long term unsecured Parent Company
foreign currency credit rating (S&P, Moody’s,
Others)
12 Value of contribution in Consortium (if more
than one member)
13 Share of voting and economic interest in
Project Company
14 Joint Venture Agreement6

4
The above information is to be provided in respect of each Consortium Member within the Bidder Consortium.
5
e.g. Project development, construction, operation and maintenance, engineering, design etc.
6
Or Shareholders' Agreement, Consortium Agreement, Development Agreement, Memorandum and Articles of Association etc.

4
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

3. General Information about EPC Contractor7

No Information Required Response


1 Name
2 Address (Head Office)
3 Name and Position of Point of Contact
4 Telephone / Fax / E-Mail
5 Legal Form
6 Principal Area of Business
7 No. of Staff in Principal Business Engineers:
Others:
8 Number of Potable Water Transmission Projects
Successfully Completed
9 Parent Company
Net Assets / Shareholders Funds (2020, 2021 and
2022)
10 Parent Company
Net Income (2020, 2021 and 2022)
11 Provision of audited financial statements for Parent
Company’s financial years 2020, 2021 and 2022.
12 Current long term unsecured Parent Company foreign
currency credit rating (S&P, Moody’s, Others)

7
Bidder to provide each relevant Technical Form Sheet Section 6 for each Contractor comprising the “EPC Contractor”
(whether due to a consortium and / or contract splitting arrangement) and any principal sub-contractor and in respect of a
party (if applicable) who is accepting joint liability for the overall performance of the EPC Contract (or “providing a wrap”). In
the event the EPC Contractor is a consortium, Bidder must also provide Technical Form Sheet Section 1 (and the specified
attachments) in relation to such EPC Contractor.

5
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

4. Project References of EPC Contractor

PROJECT NO. 1

No Information Required Response


1 Name of Project
2 Location of Project
3 Name of Project Company
4 Name of Developer(s)
5 Type of Project
6 Number of Pumping Stations and Rated Total
Capacity of the Project
7
Capacity of Largest Pumping Station
8 Number and Capacity of Storage Tanks
Total Pipeline length
9 Status of Project Under Operation since:
10 Value of Contract
11 Principal Manufacturers of Main Equipment:
12 Duration of Construction Period
13 Commercial Operation Date of Project

Please do not include projects under development or under construction.

Bidder to submit additional Technical Form Sheet Section 4 for EPC Contractor’s water transmission
projects No. 2, 3, etc. as well as for principal sub-contractors

6
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

5. General Information about O&M Contractor


No Information Required Response
1 Name
2 Address (Head Office)
3 Name and Position of Point of Contact
4 Telephone / Fax / E-Mail
5 Legal Form
6 Principal Area of Business
7 No. of Staff in Principal Business Engineers:
Others:
8 No. and total capacity (in m3/day) of water
transmission projects successfully operated
9 Parent Company
Net Assets / Shareholders Funds (2020, 2021 and
2022)
10 Parent Company
Net Income (2020, 2021 and 2022)
11 Provision of audited financial statements for Parent
Company’s financial years 2020, 2021 and 2022
12 Current long term unsecured Parent Company foreign
currency credit rating (S&P, Moody’s, Others)
13 Safety record (LTIFR/fatalities 2020, 2021 and 2022)

7
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

6. Project References of O&M Contractor


WATER TRANSMISSION PROJECT NO. 1

No Information Required Response


1 Name of Project
2 Location of Project
3 Name of Project Company
4 Name of Developer(s)
5 Type of Project
6 Number of Pumping Stations and Rated Total
Capacity
7
Capacity of Largest Pumping Station
8 Number and Capacity of Storage Tanks
9 Total Pipeline Length
10 Maximum Pumping Head in System
11 Commercial Operation Date
12 Period, in which the contractor provided O&M
services
13 Annual Operating Budget (US$ million)
14 Operating profile (e.g. base load, variable daily
profile)
15 Number of employees (total)
16 Number of local employees (actual and as % of total
employees)

Please do not include projects under development or under construction

Bidder to submit additional Technical Form Sheets Section 6 for O&M Contractor’s water
transmission projects No. 2, 3, etc, as well as for principal sub-contractors

8
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

7. List of Manufacturers of Main Equipment


The Bidder shall list in the table below the manufacturers of the defined main equipment to be
engaged for this Project and name the related manufacturers address including country of origin.
Maximum three manufacturers shall be listed for each type of main equipment. Additionally listed
manufacturers or equipment will not be considered.

The named countries of origin of the main equipment will be considered in sub-clause 18.3.3 of the
WTA (draft version attached as part of Part V of the RFP).

It shall be noted that after Bid submission, listed manufacturers of main equipment cannot be
changed without the written formal approval by SWPC.

Address of
Manufacturer including
Type of Main Equipment Name of Manufacturer country of origin
Pipeline
1. [●] [●]
2. [●] [●]
3. [●] [●]
Main pumps
1. [●] [●]
2. [●] [●]
3. [●] [●]
Booster pumps
1. [●] [●]
2. [●] [●]
3. [●] [●]
Pump motors
1. [●] [●]
2. [●] [●]
3. [●] [●]
VSD
1. [●] [●]
2. [●] [●]
3. [●] [●]
Instrumentation and Control
System
1. [●] [●]
2. [●] [●]
3. [●] [●]

9
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Note (Mandatory information) – A reference list must be attached for each type of main equipment
including but not limited to the following information:
• Name of Manufacturer (including Ultimate Parent Company)
• Name of plant / client
• Type, size and main parameters
• Year of commissioning
• Relevant operational parameters (commissioning year, hours of operation, etc.)

10
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

8. General Information about Company's Engineer


COMPANY’S ENGINEER NO. 18

No Information Required Response


1 Name
2 Address (Head Office)
3 Name and Position of Point of Contact
4 Telephone / Fax / E-Mail
5 Legal Form
6 Principal Area of Business
7 No. of Staff in Principal Business Engineers:
Others:
8 No. of Potable Water Transmission Projects
Successfully Overseen

8
Bidder to submit additional Technical Form Sheets Section 8 for Company’s Engineer No. 2 and 3

11
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

9. Project References of Company's Engineer

WATER TRANSMISSION PROJECT NO. 1

No Information Required Response


1 Name of Project
2 Location of Project
3 Name of Project Company
4 Name of Developer(s)
5 Type of Project
6 Rated Capacity
7 Status of Project Under Construction:
Under Operation:
8 Value of Contract
9 Principal Manufacturers of Main Equipment
10 Duration of Construction Period
11 Commercial Operation Date

Bidder to submit additional Technical Form Sheet Section 9 for water transmission projects No. 2, 3,
etc.

12
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

10. Technical Project Methodology/Approach


The approach paper must respond to the scope of work and outline the proposed technical approach
/ methodology to design, construct and operate the Facility. The approach paper should articulate
what added value the Bidder will provide in achieving the stated objectives for the Project and how
compliance with minimum technical specifications will be achieved as set out in Part II of the RFP.

The Bidder must as such explain his understanding of the objectives of the assignment and stated
and implied requirements of the Technical Specifications, highlight the issues of importance, and
explain the technical approach they would adopt to address them. The approach paper should explain
the methodologies & technologies which are to be adopted and demonstrate the compatibility of those
with the proposed approach. The approach should also include a brief quality plan which outlines
processes, procedures and associated resources applied to meet the requirements and indicate how
risks will be managed and what contribution will be made regarding value engineering and
management.

The Bidder must attach his approach paper to this page. The approach paper should not be longer
than 3 pages.

Name : ___________________________ Authorized Signature :


______________________

Name of Bidder : ___________________________ Date : ______________________

13
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

11. Implementation Schedule


The Bidders are required to submit a detailed estimated Implementation Schedule of the proposed
works to be attached to this page. The Implementation Schedule should detail, as a minimum, the
main planning and deliver components of the project from inception up to the construction completion
and PCOD, considering all aspects of the project including long lead time items, time related to
approvals by the Employer and regulatory authorities, etc. The Implementation Schedule should also
clearly indicate the project’s critical path.

The Implementation Schedule should be made available in hard copy and electronic copy using the
latest MS Project of MS office format.

Contract Start
Milestones Date
Effective Date [●]9
Financial close / NTP (Scheduled Closing Date) [●]10

Riyadh Water Special Facility - Site Preparation


Milestones Date
Identifying and securing permits for construction
Completion of all survey & investigation works
Start of Easement Land mobilization
Start of Easement Land preparation
Design & engineering
Procurement & sub-contracts

Riyadh Water Special Facility - Milestones Civil Works Completion


Milestones Date
Civil Works Completion of
• civil works for regulating tanks

• civil works for buildings and disposal facilities for Off-Spec Water

• civil works for other components (station piping, valve shafts, flow
control valve group, etc.)

Riyadh Water Special Facility - Milestones Mechanical, Electrical, Instrumentation, Control &
Automation Completion
Milestones Date
Mechanical Completion of
• regulating tanks

• mechanical, electrical, automation, control and instrumentation


equipment

• physical connection to electrical power source

• physical connection Riyadh Water Special Facility with Riyadh HPT-2


at the Riyadh DWSTO Inlet Interconnection Point

• physical connection Riyadh Water Special Facility with the IWTP at the
Riyadh Inlet Connection Point

• metering and monitoring system

9 Execution of WTA, as per section 1.9 of the ITB


10 To be the date falling 90 Days after the Effective Date, in accordance with the WTA

14
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Riyadh Water Special Facility - Pre-Commissioning & Commissioning


Milestones Date
Completion of Start-up Test of
• pipeline, incl. hydrostatic testing

• regulating tanks

Completion of Connection to Riyadh DWSTO Inlet Interconnection Point


Scheduled DWTS Interconnection Date [●]11
Requirement for water supply from the Riyadh HPT-2 to Riyadh Water [●]12
Special Facility
Water supply to the IWTP [●]13
Start of Trial Run
Start of Performance Test
Start of Reliability Test Run
Scheduled WSF Provisional Acceptance Date / Transfer to DWTSO [●]14

Ghanman Water Special Facility - Site Preparation


Milestones Date
Identifying and securing permits for construction
Completion of all survey & investigation works
Start of Easement Land mobilization
Start of Easement Land preparation
Design & engineering
Procurement & sub-contracts

Ghanman Special Facility - Milestones Civil Works Completion


Milestones Date
Civil Works Completion of
• civil works for buildings

Ghanman Water Special Facility - Milestones Mechanical, Electrical, Instrumentation, Control


& Automation Completion
Milestones Date
Mechanical Completion of
• mechanical, electrical, automation, control and instrumentation
equipment

Ghanman Water Special Facility - Pre-Commissioning & Commissioning


Milestones Date
Completion of Start-up Test
Start of Trial Run
Start of Performance Test
Start of Reliability Test Run
Scheduled WSF Provisional Acceptance Date / Transfer to DWTSO [●]15

11 Scheduled DWTS Interconnection Date, as per section 1.9 of the ITB


12 Date may not be earlier than the Scheduled DWTS Interconnection Date, as per section 1.9 of the ITB
13 Date may not be earlier than the Scheduled DWTS Interconnection Date, as per section 1.9 of the ITB
14 Scheduled Provisional Acceptance Date for WSF, as per section 1.9 of the ITB
15 Scheduled Provisional Acceptance Date for WSF, as per section 1.9 of the ITB

15
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Buraydah Water Special Facility - Site Preparation


Milestones Date
Identifying and securing permits for construction
Completion of all survey & investigation works
Start of Easement Land mobilization
Start of Easement Land preparation
Design & engineering
Procurement & sub-contracts

Buraydah Water Special Facility - Milestones Civil Works Completion


Milestones Date
Civil Works Completion of
• Al Shamisiyah highpoint reservoir station

• civil works for other components (station piping, valve shafts, flow
control valve group, etc.)

Buraydah Water Special Facility - Milestones Mechanical, Electrical, Instrumentation, Control


& Automation Completion
Milestones Date
Mechanical Completion of
• connection pipelines

• Al Shamisiyah highpoint reservoir station

• mechanical, electrical, control and instrumentation equipment of


Buraydah Water Special Facility

• physical connection to electrical power source

• physical connection Buraydah Water Special Facility with the RQ


IWTP at the Buraydah Outlet Connection Point

• being ready for physical connection Buraydah DWTSO Outlet


Interconnection point

• metering and monitoring system

Buraydah Water Special Facility - Pre-Commissioning & Commissioning


Milestones Date
Completion of Start-up Test of
• piping, incl. hydrostatic testing

• Al Shamisiyah highpoint reservoir station

Completion of Connection to Buraydah Outlet Connection Point


Completion of Connection to Buraydah DWTSO Outlet Interconnection
Point
Scheduled DWTS Interconnection Date [●]16
Receiving water from the IWTP [●]17
Start of Trial Run
Start of Performance Test
Start of Reliability Test Run
Scheduled WSF Provisional Acceptance Date / Transfer to DWTSO [●]18

16 Scheduled DWTS Interconnection Date, as per section 1.9 of the ITB


17 Date may not be earlier than the Scheduled Interconnection Date, as per section 1.9 of the ITB
18 Scheduled WSF Provisional Acceptance Date, as per section 1.9 of the ITB

16
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Outlet Special Facility - Site Preparation


Milestones Date
Identifying and Securing Permits for Construction
Completion of all survey & investigation works
Start of Easement Land mobilization
Start of Easement Land preparation
Design & engineering
Procurement & sub-contracts

Outlet Special Facility - Milestones Civil Works Completion


Milestones Date
Civil Works Completion of
• civil works of Outlet Special Facilities with new strategic tanks

• civil works of Outlet Special Facilities with new city gates

• civil works of Outlet Special Facilities with new connection pipelines for
connecting the IWTP with existing / future DWTSO facilities (e.g.
reservoir stations) owned and operated by the DWTSO

• civil works of Outlet Special Facilities with new connection pipelines


for connecting the IWTP with existing WDSO facilities (e.g. city gates)
owned and operated by the WDSO

Outlet Special Facility - Milestones Mechanical, Electrical, Instrumentation, Control &


Automation Completion
Milestones Date
Mechanical Completion of:
• connection piping for Outlet Special Facilities with new strategic tanks

• connection piping for Outlet Special Facilities with new city gates

• connection piping for Outlet Special Facilities with new connection


pipelines for connecting the IWTP with existing / future DWTSO
facilities (e.g. reservoir stations) owned and operated by the DWTSO

• connection piping for Outlet Special Facilities with new connection


pipelines for connecting the IWTP with existing WDSO facilities (e.g.
city gates) owned and operated by the WDSO

• mechanical, electrical, control and instrumentation equipment of Outlet


Special Facilities with new strategic tanks

• mechanical, electrical, control and instrumentation equipment of Outlet


Special Facilities with new city gates

• mechanical, electrical, control and instrumentation equipment of Outlet


Special Facilities with new connection pipelines for connecting the
IWTP with existing / future DWTSO facilities (e.g. reservoir stations)
owned and operated by the DWTSO

• mechanical, electrical, control and instrumentation equipment of Outlet


Special Facilities with new connection pipelines for connecting the
IWTP with existing WDSO facilities (e.g. city gates) owned and
operated by the WDSO

17
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

• connection to electricity distribution system of all components

• physical connection Outlet Special Facilities with IWTP

• metering and monitoring system

Outlet Special Facility - Pre-Commissioning & Commissioning - Outlet Special Facility


Milestones Date
Completion of Start-up Test of
• Outlet Special Facilities with new strategic tanks

• Outlet Special Facilities with new city gates

• Outlet Special Facilities with new connection pipelines for connecting


the IWTP with existing / future DWTSO facilities (e.g. reservoir stations)
owned and operated by the DWTSO

• Outlet Special Facilities with new connection pipelines for connecting


the IWTP with existing WDSO facilities (e.g. city gates) owned and
operated by the WDSO
Completion of Connection to OSF Outlet Connection Points
Scheduled DWTS Interconnection Date [●]19
Receiving water from the IWTP [●]20
Start of Trial Run
Start of Performance Test
Start of Reliability Test Run
Scheduled WSF Provisional Acceptance Date / Transfer to DWTSO [●]21

Electrical Special Facility - Site Preparation


Milestones Date
Identifying and securing permits for construction
Completion of all survey & investigation works
Start of Easement Land mobilization
Start of Easement Land preparation
Design & engineering
Procurement & sub-contracts

Electrical Special Facility - Milestones Civil Works, Mechanical, Electrical, Instrumentation,


Control & Automation Completion
Milestones Date
Mechanical Completion of
• mechanical, electrical, automation, control and instrumentation
equipment at Ghanman

• physical connection ESF with Facility at Ghanman

• metering and monitoring system at Ghanman

Electrical Special Facility - Pre-Commissioning & Commissioning


Milestones Date
Scheduled Electrical Connection Date at Ghanman [●]22

19 Scheduled DWTS Interconnection Date, as per section 1.9 of the ITB


20 Date may not be earlier than the Scheduled Interconnection Date, as per section 1.9 of the ITB
21 Scheduled WSF Provisional Acceptance Date, as per section 1.9 of the ITB
22 Scheduled Electrical Connection Date, as per section 1.9 of the ITB

18
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Milestones Date
Completion of Start-up Test of ESF at Ghanman
Completion of Connection of ESF at Ghanman
Energisation Date of ESF at Ghanman
Start of Trial Run at Ghanman
Start of Performance Test at Ghanman
Start of Reliability Test Run at Ghanman
Scheduled ESF Provisional Acceptance Date / Transfer to NGSA at [●]23
Ghanman

IWTP - Site Preparation


Milestones Date
Identifying and securing permits for construction
Completion of all survey & investigation works
Finalization of ESIA including all required studies
Start of Site and Easement Land mobilization
Start of Site and Easement Land preparation
Design & engineering
Procurement & sub-contracts

IWTP - Milestones Civil Works Completion


Milestones Date
Civil Works Completion of
• civil works for IWTP main pipeline between Riyadh and Buraydah and
related auxiliary systems

• civil works for IWTP Majmaah branch line, related secondary branch
lines and related auxiliary systems

• civil works for IWTP Shaqra branch line, related secondary branch lines
and related auxiliary systems

• civil works for IWTP other branch lines and related auxiliary systems

• civil works for RQ IWTP Initial Pumping Station PS1 at Riyadh and
related buildings

• civil works for RQ IWTP Intermediate Pumping Station PS2 at Ghanman


and related buildings

IWTP - Milestones Mechanical, Electrical, Instrumentation, Control & Automation Completion


Milestones Date
Pipe supply IWTP main pipeline between Riyadh and Buraydah
Mechanical Completion of
• IWTP main pipeline between Riyadh and Buraydah and related auxiliary
systems incl. flushing, filling, disinfection

• IWTP Majmaah branch line, related secondary branch lines and related
auxiliary systems incl. flushing, filling, disinfection

• IWTP Shaqra branch line, related secondary branch line and related
auxiliary systems incl. flushing, filling, disinfection

23 Scheduled ESF Provisional Acceptance Date, as per section 1.9 of the ITB

19
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

• IWTP other branch lines and related auxiliary systems incl. flushing,
filling, disinfection

• mechanical, electrical, control and instrumentation equipment of RQ


IWTP Initial Pumping Station PS1 and related auxiliary systems

• mechanical, electrical, control and instrumentation equipment of RQ


IWTP Intermediate Pumping Station PS2 and related auxiliary systems

• connection to ESF and electricity distribution system of all components


at Ghanman

• connection to electrical power source of all components at Buraydah

• metering and monitoring system

IWTP - Pre-Commissioning & Commissioning -


Milestones Date
Completion of Start-up Test of
• IWTP main pipeline, incl. hydrostatic testing

• IWTP Majmaah branch line, incl. hydrostatic testing

• IWTP Shaqra branch line, incl. hydrostatic testing

• IWTP other branch lines, incl. hydrostatic testing

• RQ IWTP Initial Pumping Station PS1 incl. energization, etc.

• RQ IWTP Intermediate Pumping Station PS2 incl. energization, etc.

Completion of Inlet Connection Equipment


Completion of Outlet Connection Equipment
Requirement for water supply from Riyadh Water Special Facility to IWTP
Water supply from IWTP to the Buraydah Water Special Facility
Water supply from IWTP to the Outlet Special Facilities
Start of Trial Run [●]24
Start of Performance Test
Start of Reliability Test Run

Facility - Commercial Operation Testing


Milestones Date
Start Dependable Capacity Test
Readiness for commercial operation
Scheduled Project Commercial Operation Date [●]25

Note: The Company is required to submit an implementation schedule (milestone) as per the
above format, and in addition, the Company shall submit a detailed implementation program
as per the above milestone dates and in line with the RFP requirements.

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________

24 Date may not be earlier than the Scheduled WSF Provisional Acceptance Date and the Scheduled ESF Provisional
Acceptance Date, as per section 1.9 of the ITB
25 Scheduled Project Commercial Operation Date, as per section 1.9 of the ITB

20
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

12. Bidder’s Experience


The experience of the Bidder or joint venture partners in the case of an unincorporated joint venture
or consortium is required to briefly describe their experience relevant to this project and in this regard
and attach relevant details to this schedule.

Employer, contact Description of contract Value of work Date competed


person and
telephone number

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________

21
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

13. Organization & Staffing


The Bidders should propose the structure and composition of their team i.e. the main disciplines
involved, the key staff member / expert responsible for each discipline, and the proposed technical and
support staff and site staff. The roles and responsibilities of each key staff member / expert should be
set out as job descriptions. In the case of an association / joint venture / consortium, it should, indicate
how the duties and responsibilities are to be shared. The Bidder must attach his / her organization and
staffing proposals to this page, with a clear indication of how compliance with relevant Saudization
Policies will be achieved. SWPC expects that a minimum of eight positions should be reflected in the
organisation chart, including all senior managers and officers. The organization chart shall be
appended in the form completed and duly agreed with SWPC prior to signing the WTA.

The Bidder shall list in the table below the key personnel to be engaged for this project and include any
relevant document required to demonstrate the suitable level of experience and qualifications for each
role and project responsibilities.

Project Years relevant


Role Name Nationality Qualifications
Responsibility experience

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________

22
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

14. Schedule of Sub-contractors


The Bidders shall list in the table below the proposed Sub-Contractors to be engaged for this project
and include any relevant document required to demonstrate the suitable level of experience and
qualifications for performing the nature and extent of work allocated to each Sub-Contractor.

Name and address of proposed Nature and extent of work Approximate


sub-contractor percentage of
contract value

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________

23
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

15. Schedule of Equipment & Technology Suppliers


The Bidders shall list in the table below the proposed Equipment & Technology Suppliers to be
engaged for this project and include any relevant documents (specifically Quality Control Certification
i.e. ISO 9001), data sheets, performance guarantees and warranties relevant to major components
and equipment of the Facility.

Details of Equipment Supplier/Manufacturer Estimated lead time


Data Sheets
Facility component (Name, Country, Contact, Quality Control for equipment
submitted [Y/N]
Accreditation/Certification, etc.) delivery
Main Equipment

Pipeline

Main pumps

Booster pumps

Pump motors

VSD

Instrumentation
and Control
System
Other Equipment

Transformers

Flow Meters

Etc.

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________

24
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

16. Quality Control Practices & Procedures


The quality control practices and procedures which will ensure compliance with stated Technical
Specifications, Proven Technology and international best practices, should be attached to this page.

Bidders should briefly outline their procedures in relation to the project and attach any relevant
documentation such as ISO 9001 certification, etc.

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________

25
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

17. Health & Safety Plan & Procedures


Bidders are required to develop an outline Health & Safety Plan which is project specific and details
the approach and procedures to be implemented as part of the project to ensure the overall health &
safety compliance with international best practices and the Saudi Arabian Labour Law, Environmental
Law and other regulations, applied throughout the project lifecycle including the planning, design,
construction, operation and maintenance and handover stages.

The Health & Safety Plan should also include an outline methodology of risk assessments, health &
safety audits, safety check lists and confirmation that all necessary allowances have been made for
these procedures and the required personal protective and other equipment, training, inductions and
control, etc.

Bidders should briefly outline their procedures in relation to the project and attach any relevant
documentation such as OSHAS 18001 certification, etc.

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________

26
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

18. Environmental & Social Management Plan & Procedures


Bidders are required to develop an outline Environmental & Social Management Plan (ESMP) which
is project specific and details the approach and procedures to be implemented as part of the project
to ensure protection of the environment and community as well as compliance with relevant
international best practices and GAMEP (PME) regulations during the design, construction, operation
and maintenance stages of the project.

The Environmental & Social Management Plan should include the approach to develop the project
ESIA and an indication of how this plan will be developed and audited to ensure compliance via an
ESMP. Confirmation should be provided that that all necessary allowances have been made for these
procedures.

Bidders should briefly outline their procedures in relation to the project and attach any relevant
documentation such as ISO 14001 certification, etc.

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________
27
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

19. Management, Operation & Maintenance Plan & Procedures


Bidders are required to develop an outline Management, Operation & Maintenance (MOM) Plan which
is project specific and details the approach and procedures to be implemented as part of the project
to ensure overall efficient operation and maintenance of the facility, as well as define adequate
management structures to ensure compliance with best practices.

A Management, Operation & Maintenance Plan should include, as a minimum, the Bidder’s approach
towards overall asset management, monitoring and maintenance which should be integrated with an
outline control philosophy for the plant which considers interfaces with supporting utilities and
intelligent solutions to optimize efficiencies where possible. It should also specifically address odour
and sludge management compliance and detail of proposed solutions.

Such a plan should also detail the daily and monthly reports & communication protocols which will be
provided to SWPC in terms of performance specification compliance as well as operational and
maintenance monitoring reporting.

The Bidder must attach his outline MOM Plan to this page. The plan should not be longer than 3
pages.

Name : _________________________ Authorized Signature :


______________________

Name of Bidder : __________________ Date :


___________________________________

28
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

20. Technical Data Submission


Bidders shall attach to this Technical Form Sheet Section 20 all relevant technical data including system
flow diagrams, system descriptions, designs calculations, drawings, specifications, data sheets etc. which
should be summarized, clear and practically grouped per section of the proposed works for ease of
evaluation. Please also refer to the Technical Specifications of the RFP (Part II) for guidelines in terms of
requirements for technical documents to be submitted with the Bid.

In addition, the Bidder provide duly filled Technical Data Sheets, using the templates attached to the
Technical Form Sheet Section 20, for the following Components:

• Water Special Facility (Riyadh Water Special Facility, Ghanman Water Special Facility, Buraydah Water
Special Facility, Outlet Water Special Facilities); and
• IWTP.

For the Electrical Special Facility, separated submissions will be requested in an Addendum to the RFP.

Name : _________________________ Authorized Signature : ______________________

Name of Bidder : __________________ Date : ___________________________________

29
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

21. Performance Guarantee


The Company herewith confirm and guarantee full compliance with all performance specifications of the
Water Transmission Agreement, its appendices and addenda as follows (with reference to the WTA).

The Performance Guarantees are divided in the following Components forming the Project:

• Riyadh Water Special Facility


• Ghanman Water Special Facility
• Buraydah Water Special Facility
• Outlet Special Facilities
• IWTP
• Electrical Special Facility26

26 Note to Bidder: To be communicated as part of addendum

30
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

1: Guaranteed Performance Riyadh Water Special Facility

1.1 Performance of the Riyadh Water Special Facility


DESCRIPTION UNIT Requirement Guarantee
Maximum guaranteed capacity from m³/day 685,000
the Riyadh DWTSO Inlet
Interconnection Point to the Riyadh
Water Special Facility at all
incoming water conditions in
compliance with Water Quality
Specifications as per below tables
Maximum guaranteed capacity from m³/day 685,000
the Riyadh Water Special Facility to
the Riyadh Inlet Connection Point at
all incoming water conditions in
compliance with Water Quality
Specifications as per below tables
Pressure range at Riyadh DWTSO bar To be coordinated
Inlet Interconnection Point for with DWTSO
continuous operation
Pressure range at Riyadh Inlet bar To be defined by the
Connection Point Company
Continuous Operating Range of % of
Riyadh Water Special Facility from Maximum
0% to 100%
....... to ........ Guaranteed
Capacity
Continuous storage capacity of the m³
Riyadh Water Special Facility 6 x 170,000
regulating tanks
Noise levels at a distance of one dB(A)
meter from the noise source and max. 85
within major Facility buildings
Noise levels at the Short Term dB(A)
max. 60
Easement Land boundary
Maximum electrical capacity (peak MVA
-
capacity) requirement

Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.

The Water Quality Specifications shall be as set out in the tables A to H below:

31
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

1.2 Water Quality Specifications Table A - Physical parameters


Parameter Unit PCV Guarantee
Color pt/Co <15
Total Dissolved Solids >100 (min)
mg/l < 600 (new facilities)
< 1000 (max)
Turbidity NTU <=5
Temperature °C <40
pH 6.5-8.5
Taste Dilution number Not objectionable
Odor Dilution number Not objectionable
Residual Free Chlorine (H) 0.2 - 0.5
mg/l

Chlorine Dioxide mg/l 0.1-0.7


Calcium Hardness mg/l as CaCO3 >30
Total Hardness mg/l as CaCO3 ≤300
Langelier Saturation Index 0.0-0.3
("LSI")

(H) = Health value

32
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

1.3 Water Quality Specifications Table B - Inorganic Chemicals Parameters


Parameter Unit PCV Guarantee
Aluminium mg/l 0.2
Ammonia (as NH3) mg/l 0.5
Chloride mg/l 250
Copper (H) mg/l 2
Fluoride (H)* mg/l 1.5
Iron mg/l 0.3
Nitrate (as nitrate) (H) mg/l 50
(short term exposure)
Nitrite (as nitrite) (H) mg/l 3
(short term exposure)
Sodium mg/l 200
Sulfate mg/l 250
Zinc mg/l 3
(H) = Health value

[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to daily
climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32)); The
normally observed value of TOC in the network should be < 1 mg C/l during the normal operation and < 2
mg C/l in newly commissioned or repaired systems.]

1.4 Water Quality Specifications Table C - Inorganic Chemicals Parameters (Trace


Elements)
Parameter Unit PCV Guarantee
Antimony (H)* mg/l 0.02
Arsenic (H)** mg/l 0.01
Barium (H) mg/l 1.3
Boron (H) mg/l 2.4
Cadmium (H) mg/l 0.003
Chromium (H) mg/l 0.05
Lead (H) mg/l 0.01
Manganese mg/l 0.4
Mercury (Inorganic) (H) mg/l 0.006
Molybdenum mg/l 0.07

33
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Nickel (H) mg/l 0.07
Selenium (H) mg/l 0.04
Uranium (H) mg/l 0.03
(H) = Health value

1.5 Water Quality Specifications Table D - Miscellaneous Organic Parameters (mostly


pesticides)
Parameter Unit PCV Guarantee
Acrylamide (H) mg/l 0.0005
Alachlor (H) mg/l 0.02
Aldicarb (H) 0.01
mg/l (applies to aldicarb
sulfoxide and aldicarb
sufone)
Aldrin & Dieldrin (H) 0.00003
mg/l (for combined aldrin and
dieldrin)
Atrazine (H) mg/l 0.1
Carbofuran mg/l 0.007
Chlordane (H) mg/l 0.0002
Chlorotoluron (H) mg/l 0.03
Chlorpyrifos (H) mg/l 0.03
Cyanazine (H) mg/l 0.0006
Cyanide mg/l 0.07
2,4-D [(2,4-Dichlorophe-noxy) 0.03
acetic acid] (H) mg/l
(applies as free acid)
2,4 DB [(2,4-Dichlorophe-noxy)
mg/l 0.09
butyric acid] (H)
DDT (H) mg/l 0.001
1,2-Dibromo-3-chloropropane
mg/l 0.001
(H)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Dichloroprop/Dichlorprop-P
mg/l 0.1
(DALAPON) (H)

34
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Dimethoate (H) mg/l 0.006
Endrine (H) mg/l 0.0006
Epichlorohydrin (H) mg/l 0.0004
Ethylbenzene (H) mg/l 0.3
Ethylenediamine tetraacetic 0.6
acid (EDTA) (H) mg/l
(applies to the free acid)
Isoproturon (H) mg/l 0.009
Lindane (H) mg/l 0.002
MCPA mg/l 0.002
Mecoprop (H) mg/l 0.01
Methoxychlor (H) mg/l 0.02
Metolachlor/s-Metolachlor (H) mg/l 0.01
Microcystins (H) mg/l 0.001
Molinate (H) mg/l 0.006
Pendimethalin (H) mg/l 0.02
Pentachlorophenol (H) mg/l 0.009
Perchlorate (H) mg/l 0.07
Simazine (H) mg/l 0.002
2,4,5-T (H) mg/l 0.009
2,4,6-Trichlorophenol (H) mg/l 0.2
Terbuthylazine (TBA) (H) mg/l 0.007
Trifluralin (H) mg/l 0.02
(H) = Health value

1.6 Water Quality Specifications Table E - Organic Parameters


Parameter Unit PCV Guarantee

Benzene (H) mg/l 0.01


Benzo (a) - Pyrene (H) mg/l 0.0007
Chlorobenzene (mono
mg/l 0.3
chlorobenzene MCB)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-dichlorobenzene (H) mg/l 1
1,4-dichlorobenzene (H) mg/l 0.3
1,2-dichloroethane (H) mg/l 0.03

35
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee

1,2-dichloroethene (H) mg/l 0.05


Dichloromethane (methylene
mg/l 0.02
chloride) (H)
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Di(2-ethylhexyl)phthalate (H) mg/l 0.008
1,4-Dioxane (H) mg/l 0.05
Hexachlorobutadiene (H) mg/l 0.0006
Nitrilotriacetic acid (H) mg/l 0.2
Styrene (H) mg/l 0.02
Tetrachloroethene (H) mg/l 0.04
Toluene (H) mg/l 0.7
Trichloroethane mg/l 0.02
Trichloroethene (H) mg/l 0.02
Vinyl chloride (H) mg/l 0.0003
Xylene (H) mg/l 0.5
(H) = Health value

1.7 Water Quality Specifications Table F - Microbial Parameters


Parameter Unit PCV
Enterococci (H) Number/100
0
ml
Escherichia coli (E. coli) (H) Number/100
0
ml
Total Coliform (bacteria)27 Number/100
0 on 95% of samples
ml
(H) = Health value

27 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba and
helminth eggs , And other pollutants that cause a biological change.28 RDL means the Reference Dose Level as per WHO

36
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

1.8 Water Quality Specifications Table G1 – Radioactive Parameters


Parameter Unit PCV
Gross Alpha activity (H)* Bq/l 0.5
Gross Beta activity (H) Bq/l 1
Radioactivity (except mSv/(Annual
0.1
potassium 40) (H) RDL)28
(H) = Health value

1.9 Water Quality Specifications Table G2 - Radionuclides Parameters


Parameter Unit PCV
Uranium-238 (H) Bq/l 3
Uranium-234 (H) Bq/l 2.8
Thorium-230 (H) Bq/l 0.7
Radium-226 (H) Bq/l 0.5
Lead-210 (H) Bq/l 0.2
Polonium-210 (H) Bq/l 0.1
Thorium-232 (H) Bq/l 0.6
Radium-228 (H) Bq/l 0.2
Thorium-228 (H) Bq/l 1.9
Caesium-134 (H) Bq/l 7.2
Caesium-137 (H) Bq/l 10.5
Strontium-90 (H) Bq/l 4.9
Iodine-131 (H) Bq/l 6.2
Tritium (H) Bq/l 7,716
Carbon-14 Bq/l 236
Plutonium-239 Bq/l 0.56
Radon Bq/l 300
Potassium 40 Bq/l 22
(H) = Health value

28 RDL means the Reference Dose Level as per WHO


Note:
* Initial screening for Gross Alpha or Gross Beta activity to determine whether the activity concentrations are below levels at which no
further action is required. If initial screening levels exceed the above then investigation and monitoring of individual radionuclide
should follow immediately. The limits for the individual radionuclide should be in accordance with Table G.29 Total
Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.

37
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of 2 litres/day1 for
one year, will result in an effective dose of 0.1 mSv/year]

1.10 Water Quality Specifications Table H - Disinfection and Chlorinated By-Products


Parameter Unit PCV
Bromate (H) mg/l 0.01
Bromodichloromethane
mg/l 0.06
(BDCM) (H)
Bromoform (H) mg/l 0.1
Carbon Tetrachloride (H) mg/l 0.004
Chlorate (H) mg/l 0.7
Chlorite (H) mg/l 0.7
Chloroacetic acid (H) mg/l 0.02
Chloroform (H) mg/l 0.3
Cyanogen Chloride mg/l 0.07
Dibromoacetonitrile (H) mg/l 0.07
Dibromochloromethane (H)
mg/l 0.1
(DBCM)
Dichloroacetic acid (H) 0.05
mg/l
(applies to free acid)
Dichloroacetonitrile (H) mg/l 0.02
Monochloramine (H) mg/l 3
N-Nitrosodimethylamine
mg/l 0.0001
(NDMA) (H)
Sodium dichloroisocyanurate 50mg/l
mg/l
(40mg/l as cyanuric acid)
Trichloroacetic acid (H) mg/l 0.2
Total Trihalomethanes (THMs)
mg/l Refer to the note
(H)
(H) = Health value

[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed Concentration or
Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = + + + ≤1
𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚

38
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

• C = Measured concentration in mg/l


• PCV = Prescribed Concentration or Value in mg/l]

39
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

2: Guaranteed Performance Ghanman Water Special Facility

2.1 Performance of the Al Qulayyib Water Special Facility


DESCRIPTION UNIT Requirement Guarantee
Maximum guaranteed capacity from m³/day 175,000
the Ghanman DWTSO Inlet
Interconnection Point to the
Ghanman Water Special Facility at
all incoming water conditions in
compliance with Water Quality
Specifications as per below tables
Maximum Guaranteed Capacity from m³/day 175,000
the Ghanman Water Special Facility
to the Ghanman Inlet Connection
Point at all incoming water conditions
in compliance with Water Quality
Specifications as per below tables
Pressure range at Ghanman bar To be coordinated
DWTSO Inlet Interconnection Point with DWTSO
for continuous operation
Pressure range at Ghanman Inlet bar To be defined by the
Connection Point Company
Continuous Operating Range of % of
Ghanman Water Special Facility Maximum
0% to 100%
from ....... to ........ Guaranteed
Capacity
Noise levels at a distance of one dB(A)
meter from the noise source and max. 85
within major Facility buildings
Noise levels at the Short Term dB(A)
max. 60
Easement Land boundary

Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.

The Water Quality Specifications shall be as set out in the tables A to H below:

40
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

2.2 Water Quality Specifications Table A - Physical parameters


Parameter Unit PCV Guarantee
Color pt/Co <15
Total Dissolved Solids >100 (min)
mg/l < 600 (new facilities)
< 1000 (max)
Turbidity NTU <=5
Temperature °C <40
pH 6.5-8.5
Taste Dilution number Not objectionable
Odor Dilution number Not objectionable
Residual Free Chlorine(H) 0.2 - 0.5
mg/l

Chlorine Dioxide mg/l 0.1-0.7


Calcium Hardness mg/l as CaCO3 >30
Total Hardness mg/l as CaCO3 ≤300
Langelier Saturation Index 0.0-0.3
("LSI")

(H) = Health value

41
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

2.3 Water Quality Specifications Table B - Inorganic Chemicals Parameters


Parameter Unit PCV Guarantee
Aluminium mg/l 0.2
Ammonia (as NH3) mg/l 0.5
Chloride mg/l 250
Copper (H) mg/l 2
Fluoride (H)* mg/l 1.5
Iron mg/l 0.3
Nitrate (as nitrate) (H) mg/l 50
(short term exposure)
Nitrite (as nitrite) (H) mg/l 3
(short term exposure)
Sodium mg/l 200
Sulfate mg/l 250
Zinc mg/l 3
(H) = Health value

[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to daily
climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32)); The
normally observed value of TOC in the network should be < 1 mg C/l during the normal operation and < 2
mg C/l in newly commissioned or repaired systems.]

2.4 Water Quality Specifications Table C - Inorganic Chemicals Parameters (Trace Elements)
Parameter Unit PCV Guarantee
Antimony (H)* mg/l 0.02
Arsenic (H)** mg/l 0.01
Barium (H) mg/l 1.3
Boron (H) mg/l 2.4
Cadmium (H) mg/l 0.003
Chromium (H) mg/l 0.05
Lead (H) mg/l 0.01
Manganese mg/l 0.4
Mercury (Inorganic) (H) mg/l 0.006
Molybdenum mg/l 0.07
Nickel (H) mg/l 0.07

42
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Selenium (H) mg/l 0.04
Uranium (H) mg/l 0.03
(H) = Health value

2.5 Water Quality Specifications Table D - Miscellaneous Organic Parameters (mostly


pesticides)
Parameter Unit PCV Guarantee
Acrylamide (H) mg/l 0.0005
Alachlor (H) mg/l 0.02
Aldicarb (H) 0.01
mg/l (applies to aldicarb
sulfoxide and aldicarb
sufone)
Aldrin & Dieldrin (H) 0.00003
mg/l (for combined aldrin and
dieldrin)
Atrazine (H) mg/l 0.1
Carbofuran mg/l 0.007
Chlordane (H) mg/l 0.0002
Chlorotoluron (H) mg/l 0.03
Chlorpyrifos (H) mg/l 0.03
Cyanazine (H) mg/l 0.0006
Cyanide mg/l 0.07
2,4-D [(2,4-Dichlorophe-noxy) 0.03
acetic acid] (H) mg/l
(applies as free acid)
2,4 DB [(2,4-Dichlorophe-noxy)
mg/l 0.09
butyric acid] (H)
DDT (H) mg/l 0.001
1,2-Dibromo-3-chloropropane
mg/l 0.001
(H)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Dichloroprop/Dichlorprop-P
mg/l 0.1
(DALAPON) (H)
Dimethoate (H) mg/l 0.006

43
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Endrine (H) mg/l 0.0006
Epichlorohydrin (H) mg/l 0.0004
Ethylbenzene (H) mg/l 0.3
Ethylenediamine tetraacetic 0.6
acid (EDTA) (H) mg/l
(applies to the free acid)
Isoproturon (H) mg/l 0.009
Lindane (H) mg/l 0.002
MCPA mg/l 0.002
Mecoprop (H) mg/l 0.01
Methoxychlor (H) mg/l 0.02
Metolachlor/s-Metolachlor (H) mg/l 0.01
Microcystins (H) mg/l 0.001
Molinate (H) mg/l 0.006
Pendimethalin (H) mg/l 0.02
Pentachlorophenol (H) mg/l 0.009
Perchlorate (H) mg/l 0.07
Simazine (H) mg/l 0.002
2,4,5-T (H) mg/l 0.009
2,4,6-Trichlorophenol (H) mg/l 0.2
Terbuthylazine (TBA) (H) mg/l 0.007
Trifluralin (H) mg/l 0.02
(H) = Health value

2.6 Water Quality Specifications Table E - Organic Parameters


Parameter Unit PCV Guarantee

Benzene (H) mg/l 0.01


Benzo (a) - Pyrene (H) mg/l 0.0007
Chlorobenzene (mono
mg/l 0.3
chlorobenzene MCB)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-dichlorobenzene (H) mg/l 1
1,4-dichlorobenzene (H) mg/l 0.3
1,2-dichloroethane (H) mg/l 0.03
1,2-dichloroethene (H) mg/l 0.05

44
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee

Dichloromethane (methylene
mg/l 0.02
chloride) (H)
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Di(2-ethylhexyl)phthalate (H) mg/l 0.008
1,4-Dioxane (H) mg/l 0.05
Hexachlorobutadiene (H) mg/l 0.0006
Nitrilotriacetic acid (H) mg/l 0.2
Styrene (H) mg/l 0.02
Tetrachloroethene (H) mg/l 0.04
Toluene (H) mg/l 0.7
Trichloroethane mg/l 0.02
Trichloroethene (H) mg/l 0.02
Vinyl chloride (H) mg/l 0.0003
Xylene (H) mg/l 0.5
(H) = Health value

2.7 Water Quality Specifications Table F - Microbial Parameters


Parameter Unit PCV
Enterococci (H) Number/100
0
ml
Escherichia coli (E. coli) (H) Number/100
0
ml
Total Coliform (bacteria)29 Number/100
0 on 95% of samples
ml
(H) = Health value

29 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba and
helminth eggs , And other pollutants that cause a biological change.30 RDL means the Reference Dose Level as per WHO

45
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

2.8 Water Quality Specifications Table G1 – Radioactive Parameters


Parameter Unit PCV
Gross Alpha activity (H)* Bq/l 0.5
Gross Beta activity (H) Bq/l 1
Radioactivity (except mSv/(Annual
0.1
potassium 40) (H) RDL)30
(H) = Health value

2.9 Water Quality Specifications Table G2 - Radionuclides Parameters


Parameter Unit PCV
Uranium-238 (H) Bq/l 3
Uranium-234 (H) Bq/l 2.8
Thorium-230 (H) Bq/l 0.7
Radium-226 (H) Bq/l 0.5
Lead-210 (H) Bq/l 0.2
Polonium-210 (H) Bq/l 0.1
Thorium-232 (H) Bq/l 0.6
Radium-228 (H) Bq/l 0.2
Thorium-228 (H) Bq/l 1.9
Caesium-134 (H) Bq/l 7.2
Caesium-137 (H) Bq/l 10.5
Strontium-90 (H) Bq/l 4.9
Iodine-131 (H) Bq/l 6.2
Tritium (H) Bq/l 7,716
Carbon-14 Bq/l 236
Plutonium-239 Bq/l 0.56
Radon Bq/l 300
Potassium 40 Bq/l 22
(H) = Health value

30 RDL means the Reference Dose Level as per WHO


Note:
* Initial screening for Gross Alpha or Gross Beta activity to determine whether the activity concentrations are below levels at which no
further action is required. If initial screening levels exceed the above then investigation and monitoring of individual radionuclide
should follow immediately. The limits for the individual radionuclide should be in accordance with Table G.31 Total
Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.

46
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of 2 litres/day1 for
one year, will result in an effective dose of 0.1 mSv/year]

2.10 Water Quality Specifications Table H - Disinfection and Chlorinated By-Products


Parameter Unit PCV
Bromate (H) mg/l 0.01
Bromodichloromethane
mg/l 0.06
(BDCM) (H)
Bromoform (H) mg/l 0.1
Carbon Tetrachloride (H) mg/l 0.004
Chlorate (H) mg/l 0.7
Chlorite (H) mg/l 0.7
Chloroacetic acid (H) mg/l 0.02
Chloroform (H) mg/l 0.3
Cyanogen Chloride mg/l 0.07
Dibromoacetonitrile (H) mg/l 0.07
Dibromochloromethane (H)
mg/l 0.1
(DBCM)
Dichloroacetic acid (H) 0.05
mg/l
(applies to free acid)
Dichloroacetonitrile (H) mg/l 0.02
Monochloramine (H) mg/l 3
N-Nitrosodimethylamine
mg/l 0.0001
(NDMA) (H)
Sodium dichloroisocyanurate 50mg/l
mg/l
(40mg/l as cyanuric acid)
Trichloroacetic acid (H) mg/l 0.2
Total Trihalomethanes (THMs)
mg/l Refer to the note
(H)
(H) = Health value

[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed Concentration or
Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = + + + ≤1
𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚

47
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

• C = Measured concentration in mg/l


• PCV = Prescribed Concentration or Value in mg/l]

48
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

3: Guaranteed Performance Buraydah Water Special Facility

3.1 Performance of the Buraydah Water Special Facility


DESCRIPTION UNIT Requirement Guarantee
Maximum guaranteed capacity from m³/day 282,000
the Buraydah Outlet Connection
Point to the Buraydah Water
Special Facility at all incoming water
conditions in compliance with Water
Quality Specifications as per below
tables
Maximum guaranteed capacity from m³/day 282,000
the Buraydah Water Special Facility
to the Buraydah DWTSO Outlet
Interconnection Point at all incoming
water conditions in compliance with
Water Quality Specifications as per
below tables
Pressure range at Buraydah bar To be coordinated
DWTSO Outlet Interconnection Point with DWTSO
for continuous operation
Pressure range at Buraydah Outlet bar To be defined by the
Connection Point Company
Continuous Operating Range of % of
Buraydah Water Special Facility from Maximum
0% to 100%
....... to ........ Guaranteed
Capacity
Noise levels at a distance of one dB(A)
meter from the noise source and max. 85
within major Facility buildings
Noise levels at the Short Term dB(A)
max. 60
Easement Land boundary

Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.

The Water Quality Specifications shall be as set out in the tables A to H below:

49
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

3.2 Water Quality Specifications Table A - Physical parameters


Parameter Unit PCV Guarantee
Color pt/Co <15
Total Dissolved Solids >100 (min)
mg/l < 600 (new facilities)
< 1000 (max)
Turbidity NTU <=5
Temperature °C <40
pH 6.5-8.5
Taste Dilution number Not objectionable
Odor Dilution number Not objectionable
Residual Free Chlorine (H) mg/l 0.2 - 0.5
Chlorine Dioxide mg/l 0.1-0.7
Calcium Hardness mg/l as CaCO3 >30
Total Hardness mg/l as CaCO3 ≤300
Langelier Saturation Index
0.0-0.3
("LSI")
(H) = Health value

3.3 Water Quality Specifications Table B - Inorganic Chemicals Parameters


Parameter Unit PCV Guarantee
Aluminium mg/l 0.2
Ammonia (as NH3) mg/l 0.5
Chloride mg/l 250
Copper (H) mg/l 2
Fluoride (H)* mg/l 1.5
Iron mg/l 0.3
Nitrate (as nitrate) (H) mg/l 50
(short term exposure)
Nitrite (as nitrite) (H) mg/l 3
(short term exposure)
Sodium mg/l 200
Sulfate mg/l 250
Zinc mg/l 3
(H) = Health value

50
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to daily
climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32)); The
normally observed value of TOC in the network should be < 1 mg C/l during the normal operation and < 2
mg C/l in newly commissioned or repaired systems.]

3.4 Water Quality Specifications Table C - Inorganic Chemicals Parameters (Trace


Elements)
Parameter Unit PCV Guarantee
Antimony (H)* mg/l 0.02
Arsenic (H)** mg/l 0.01
Barium (H) mg/l 1.3
Boron (H) mg/l 2.4
Cadmium (H) mg/l 0.003
Chromium (H) mg/l 0.05
Lead (H) mg/l 0.01
Manganese mg/l 0.4
Mercury (Inorganic) (H) mg/l 0.006
Molybdenum mg/l 0.07
Nickel (H) mg/l 0.07
Selenium (H) mg/l 0.04
Uranium (H) mg/l 0.03
(H) = Health value

3.5 Water Quality Specifications Table D - Miscellaneous Organic Parameters (mostly


pesticides)
Parameter Unit PCV Guarantee
Acrylamide (H) mg/l 0.0005
Alachlor (H) mg/l 0.02
Aldicarb (H) 0.01
mg/l (applies to aldicarb
sulfoxide and aldicarb
sufone)
Aldrin & Dieldrin (H) 0.00003
mg/l (for combined aldrin and
dieldrin)
Atrazine (H) mg/l 0.1

51
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Carbofuran mg/l 0.007
Chlordane (H) mg/l 0.0002
Chlorotoluron (H) mg/l 0.03
Chlorpyrifos (H) mg/l 0.03
Cyanazine (H) mg/l 0.0006
Cyanide mg/l 0.07
2,4-D [(2,4-Dichlorophe-noxy) 0.03
acetic acid] (H) mg/l
(applies as free acid)
2,4 DB [(2,4-Dichlorophe-noxy)
mg/l 0.09
butyric acid] (H)
DDT (H) mg/l 0.001
1,2-Dibromo-3-chloropropane
mg/l 0.001
(H)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Dichloroprop/Dichlorprop-P
mg/l 0.1
(DALAPON) (H)
Dimethoate (H) mg/l 0.006
Endrine (H) mg/l 0.0006
Epichlorohydrin (H) mg/l 0.0004
Ethylbenzene (H) mg/l 0.3
Ethylenediamine tetraacetic 0.6
acid (EDTA) (H) mg/l
(applies to the free acid)
Isoproturon (H) mg/l 0.009
Lindane (H) mg/l 0.002
MCPA mg/l 0.002
Mecoprop (H) mg/l 0.01
Methoxychlor (H) mg/l 0.02
Metolachlor/s-Metolachlor (H) mg/l 0.01
Microcystins (H) mg/l 0.001
Molinate (H) mg/l 0.006
Pendimethalin (H) mg/l 0.02
Pentachlorophenol (H) mg/l 0.009

52
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Perchlorate (H) mg/l 0.07
Simazine (H) mg/l 0.002
2,4,5-T (H) mg/l 0.009
2,4,6-Trichlorophenol (H) mg/l 0.2
Terbuthylazine (TBA) (H) mg/l 0.007
Trifluralin (H) mg/l 0.02
(H) = Health value

3.6 Water Quality Specifications Table E - Organic Parameters


Parameter Unit PCV Guarantee

Benzene (H) mg/l 0.01


Benzo (a) - Pyrene (H) mg/l 0.0007
Chlorobenzene (mono
mg/l 0.3
chlorobenzene MCB)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-dichlorobenzene (H) mg/l 1
1,4-dichlorobenzene (H) mg/l 0.3
1,2-dichloroethane (H) mg/l 0.03
1,2-dichloroethene (H) mg/l 0.05
Dichloromethane (methylene
mg/l 0.02
chloride) (H)
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Di(2-ethylhexyl)phthalate (H) mg/l 0.008
1,4-Dioxane (H) mg/l 0.05
Hexachlorobutadiene (H) mg/l 0.0006
Nitrilotriacetic acid (H) mg/l 0.2
Styrene (H) mg/l 0.02
Tetrachloroethene (H) mg/l 0.04
Toluene (H) mg/l 0.7
Trichloroethane mg/l 0.02
Trichloroethene (H) mg/l 0.02
Vinyl chloride (H) mg/l 0.0003
Xylene (H) mg/l 0.5

53
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee

(H) = Health value

3.7 Water Quality Specifications Table F - Microbial Parameters


Parameter Unit PCV
Enterococci (H) Number/100
0
ml
Escherichia coli (E. coli) (H) Number/100
0
ml
Total Coliform (bacteria)31 Number/100
0 on 95% of samples
ml
(H) = Health value

3.8 Water Quality Specifications Table G1 – Radioactive Parameters


Parameter Unit PCV
Gross Alpha activity (H)* Bq/l 0.5
Gross Beta activity (H) Bq/l 1
Radioactivity (except mSv/(Annual
0.1
potassium 40) (H) RDL)32
(H) = Health value

3.9 Water Quality Specifications Table G2 - Radionuclides Parameters


Parameter Unit PCV
Uranium-238 (H) Bq/l 3
Uranium-234 (H) Bq/l 2.8
Thorium-230 (H) Bq/l 0.7
Radium-226 (H) Bq/l 0.5
Lead-210 (H) Bq/l 0.2

31 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba
and helminth eggs , And other pollutants that cause a biological change.
32 RDL means the Reference Dose Level as per WHO
Note:
* Initial screening for Gross Alpha or Gross Beta activity to determine whether the activity concentrations are below levels at which no
further action is required. If initial screening levels exceed the above then investigation and monitoring of individual radionuclide
should follow immediately. The limits for the individual radionuclide should be in accordance with Table G.33 Total
Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.

54
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV


Polonium-210 (H) Bq/l 0.1
Thorium-232 (H) Bq/l 0.6
Radium-228 (H) Bq/l 0.2
Thorium-228 (H) Bq/l 1.9
Caesium-134 (H) Bq/l 7.2
Caesium-137 (H) Bq/l 10.5
Strontium-90 (H) Bq/l 4.9
Iodine-131 (H) Bq/l 6.2
Tritium (H) Bq/l 7,716
Carbon-14 Bq/l 236
Plutonium-239 Bq/l 0.56
Radon Bq/l 300
Potassium 40 Bq/l 22
(H) = Health value

[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of 2 litres/day1 for
one year, will result in an effective dose of 0.1 mSv/year]

3.10 Water Quality Specifications Table H - Disinfection and Chlorinated By-Products


Parameter Unit PCV
Bromate (H) mg/l 0.01
Bromodichloromethane
mg/l 0.06
(BDCM) (H)
Bromoform (H) mg/l 0.1
Carbon Tetrachloride (H) mg/l 0.004
Chlorate (H) mg/l 0.7
Chlorite (H) mg/l 0.7
Chloroacetic acid (H) mg/l 0.02
Chloroform (H) mg/l 0.3
Cyanogen Chloride mg/l 0.07
Dibromoacetonitrile (H) mg/l 0.07

55
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV


Dibromochloromethane (H)
mg/l 0.1
(DBCM)
Dichloroacetic acid (H) 0.05
mg/l
(applies to free acid)
Dichloroacetonitrile (H) mg/l 0.02
Monochloramine (H) mg/l 3
N-Nitrosodimethylamine
mg/l 0.0001
(NDMA) (H)
Sodium dichloroisocyanurate 50mg/l
mg/l
(40mg/l as cyanuric acid)
Trichloroacetic acid (H) mg/l 0.2
Total Trihalomethanes (THMs)
mg/l Refer to the note
(H)
(H) = Health value

[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed Concentration or
Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = + + + ≤1
𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
• C = Measured concentration in mg/l
• PCV = Prescribed Concentration or Value in mg/l]

56
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

4: Guaranteed Performance Outlet Special Facility

4.1 Performance of the Outlet Special Facility


DESCRIPTION UNIT Requirement Guarantee
Maximum guaranteed capacity from m³/day see Table 4.2 below
the OSF Outlet Connection Point to
the WDS Interconnection Point or
DWTSO OSF Outlet Interconnection
Point at all incoming water conditions
in compliance with Water Quality
Specifications as per below tables
Maximum guaranteed continuous m³/day see Table 4.3 below
storage capacity of the Outlet
Special Facility storage tanks as per
below table
Pressure range at WDS bar In line with the
Interconnection Point / DWTSO OSF DWTSO Equipment /
Outlet Interconnection Point for WDSO Equipment
continuous operation
Pressure range at OSF Outlet bar To be defined by the
Connection Point Company
Pressure range at WDS bar To be coordinated
Interconnection Point with WDSO
Pressure range at DWTSO OSF bar To be coordinated
Outlet Interconnection Point with DWTSO
Continuous Operating Range of % of
Outlet Special Facility from ....... to Maximum
0% to 100%
........ Guaranteed
Capacity
Noise levels at a distance of one dB(A)
meter from the noise source and max. 85
within major Facility buildings
Noise levels at the Short Term dB(A)
max. 60
Easement Land boundary

Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.

4.2 Maximum guaranteed capacities Outlet Special Facilities


Outlet Special Facility Required Maximum
Guaranteed
Transmission Capacity Guarantee
(m³/day)
Ghanman Outlet Special Facility 40,000
Industrial City Sudair Outlet Special Facility 40,000

57
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Outlet Special Facility Required Maximum


Guaranteed
Transmission Capacity Guarantee
(m³/day)
Existing Majmaah 2 CG Outlet Special Facility 22,000
DWTSO Majmaah ST Outlet Special Facility 22,000
Existing Majmaah 1 CG Outlet Special Facility 22,000
Hurmah ST Outlet Special Facility 10,000
Umm Sedre CG Outlet Special Facility 500
Artawiyah ST Outlet Special Facility 14,000
Al Shahba CG Outlet Special Facility 2,500
Umm Al Jamajm CG Outlet Special Facility 6,000
KFAC Outlet Special Facility 20,000
Existing Al Ghat CG Outlet Special Facility 10,000
DWTSO Al Ghat ST Outlet Special Facility 55,000
Al Hesi ST Outlet Special Facility 15,000
Existing Huraymila CG Outlet Special Facility 11,000
Malham ST Outlet Special Facility 24,000
Thadiq ST Outlet Special Facility 11,000
Tharmida ST Outlet Special Facility 4,000
Existing Marat CG Outlet Special Facility 13,000
Al Berrah CG Outlet Special Facility 1,000
Dahinah CG Outlet Special Facility 2,000
DWTSO Shaqra ST Outlet Special Facility 30,000
DWTSO Al Quarna ST Outlet Special Facility 270,000

4.3 Maximum guaranteed continuous storage capacities Outlet Special Facilities


Outlet Special Facility Required Maximum
Continuous Storage
Capacity Guarantee
(m³)
Ghanman Outlet Special Facility -
Industrial City Sudair Outlet Special Facility -
Existing Majmaah 2 CG Outlet Special Facility -
DWTSO Majmaah ST Outlet Special Facility -
Existing Majmaah 1 CG Outlet Special Facility -

58
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Outlet Special Facility Required Maximum


Continuous Storage
Capacity Guarantee
(m³)
Hurmah ST Outlet Special Facility 2x15,000 (ST) +
2x3,000 (ODT)
Umm Sedre CG Outlet Special Facility 2x1,000 (ODT)
Artawiyah ST Outlet Special Facility 2x50,000 (ST) +
2x5,000 (ODT)
Al Shahba CG Outlet Special Facility 2x5,000 (ODT)
Umm Al Jamajm CG Outlet Special Facility 2x5,000 (ODT)
KFAC Outlet Special Facility -
Existing Al Ghat CG Outlet Special Facility -
DWTSO Al Ghat ST Outlet Special Facility -
Al Hesi ST Outlet Special Facility 2x15,000 (ST)
Existing Huraymila CG Outlet Special Facility -
Malham ST Outlet Special Facility 2x40,000 (ST)
Thadiq ST Outlet Special Facility 2x25,000 (ST) +
2x5,000 (ODT)
Tharmida ST Outlet Special Facility 2x10,000 (ST)
Existing Marat CG Outlet Special Facility -
Al Berrah CG Outlet Special Facility 2x1,500 (ODT)
Dahinah CG Outlet Special Facility 2x5,000 (ODT)
DWTSO Shaqra ST Outlet Special Facility -
DWTSO Al Quarna ST Outlet Special Facility -

The Water Quality Specifications shall be as set out in the tables A to H below:

4.4 Water Quality Specifications Table A - Physical parameters


Parameter Unit PCV Guarantee
Color pt/Co <15
Total Dissolved Solids >100 (min)
mg/l < 600 (new facilities)
< 1000 (max)
Turbidity NTU <=5

59
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Temperature °C <40
pH 6.5-8.5
Taste Dilution number Not objectionable
Odor Dilution number Not objectionable
Residual Free Chlorine (H) mg/l 0.2 - 0.5
Chlorine Dioxide mg/l 0.1-0.7
Calcium Hardness mg/l as CaCO3 >30
Total Hardness mg/l as CaCO3 ≤300
Langelier Saturation Index
0.0-0.3
("LSI")
(H) = Health value

4.5 Water Quality Specifications Table B - Inorganic Chemicals Parameters


Parameter Unit PCV Guarantee
Aluminium mg/l 0.2
Ammonia (as NH3) mg/l 0.5
Chloride mg/l 250
Copper (H) mg/l 2
Fluoride (H)* mg/l 1.5
Iron mg/l 0.3
Nitrate (as nitrate) (H) mg/l 50
(short term exposure)
Nitrite (as nitrite) (H) mg/l 3
(short term exposure)
Sodium mg/l 200
Sulfate mg/l 250
Zinc mg/l 3
(H) = Health value

[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to daily
climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32)); The
normally observed value of TOC in the network should be < 1 mg C/l during the normal operation and < 2
mg C/l in newly commissioned or repaired systems.]

4.6 Water Quality Specifications Table C - Inorganic Chemicals Parameters (Trace Elements)

60
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Antimony (H)* mg/l 0.02
Arsenic (H)** mg/l 0.01
Barium (H) mg/l 1.3
Boron (H) mg/l 2.4
Cadmium (H) mg/l 0.003
Chromium (H) mg/l 0.05
Lead (H) mg/l 0.01
Manganese mg/l 0.4
Mercury (Inorganic) (H) mg/l 0.006
Molybdenum mg/l 0.07
Nickel (H) mg/l 0.07
Selenium (H) mg/l 0.04
Uranium (H) mg/l 0.03
(H) = Health value

4.7 Water Quality Specifications Table D - Miscellaneous Organic Parameters (mostly


pesticides)
Parameter Unit PCV Guarantee
Acrylamide (H) mg/l 0.0005
Alachlor (H) mg/l 0.02
Aldicarb (H) 0.01
mg/l (applies to aldicarb
sulfoxide and aldicarb
sufone)
Aldrin & Dieldrin (H) 0.00003
mg/l (for combined aldrin and
dieldrin)
Atrazine (H) mg/l 0.1
Carbofuran mg/l 0.007
Chlordane (H) mg/l 0.0002
Chlorotoluron (H) mg/l 0.03
Chlorpyrifos (H) mg/l 0.03
Cyanazine (H) mg/l 0.0006
Cyanide mg/l 0.07
2,4-D [(2,4-Dichlorophe-noxy)
mg/l 0.03
acetic acid] (H)

61
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


(applies as free acid)
2,4 DB [(2,4-Dichlorophe-noxy)
mg/l 0.09
butyric acid] (H)
DDT (H) mg/l 0.001
1,2-Dibromo-3-chloropropane
mg/l 0.001
(H)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Dichloroprop/Dichlorprop-P
mg/l 0.1
(DALAPON) (H)
Dimethoate (H) mg/l 0.006
Endrine (H) mg/l 0.0006
Epichlorohydrin (H) mg/l 0.0004
Ethylbenzene (H) mg/l 0.3
Ethylenediamine tetraacetic 0.6
acid (EDTA) (H) mg/l
(applies to the free acid)
Isoproturon (H) mg/l 0.009
Lindane (H) mg/l 0.002
MCPA mg/l 0.002
Mecoprop (H) mg/l 0.01
Methoxychlor (H) mg/l 0.02
Metolachlor/s-Metolachlor (H) mg/l 0.01
Microcystins (H) mg/l 0.001
Molinate (H) mg/l 0.006
Pendimethalin (H) mg/l 0.02
Pentachlorophenol (H) mg/l 0.009
Perchlorate (H) mg/l 0.07
Simazine (H) mg/l 0.002
2,4,5-T (H) mg/l 0.009
2,4,6-Trichlorophenol (H) mg/l 0.2
Terbuthylazine (TBA) (H) mg/l 0.007
Trifluralin (H) mg/l 0.02
(H) = Health value

62
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

4.8 Water Quality Specifications Table E - Organic Parameters


Parameter Unit PCV Guarantee

Benzene (H) mg/l 0.01


Benzo (a) - Pyrene (H) mg/l 0.0007
Chlorobenzene (mono
mg/l 0.3
chlorobenzene MCB)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-dichlorobenzene (H) mg/l 1
1,4-dichlorobenzene (H) mg/l 0.3
1,2-dichloroethane (H) mg/l 0.03
1,2-dichloroethene (H) mg/l 0.05
Dichloromethane (methylene
mg/l 0.02
chloride) (H)
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Di(2-ethylhexyl)phthalate (H) mg/l 0.008
1,4-Dioxane (H) mg/l 0.05
Hexachlorobutadiene (H) mg/l 0.0006
Nitrilotriacetic acid (H) mg/l 0.2
Styrene (H) mg/l 0.02
Tetrachloroethene (H) mg/l 0.04
Toluene (H) mg/l 0.7
Trichloroethane mg/l 0.02
Trichloroethene (H) mg/l 0.02
Vinyl chloride (H) mg/l 0.0003
Xylene (H) mg/l 0.5
(H) = Health value

4.9 Water Quality Specifications Table F - Microbial Parameters


Parameter Unit PCV
Enterococci (H) Number/100
0
ml
Escherichia coli (E. coli) (H) Number/100
0
ml

63
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV


Total Coliform (bacteria)33 Number/100
0 on 95% of samples
ml
(H) = Health value

4.10 Water Quality Specifications Table G1 – Radioactive Parameters


Parameter Unit PCV
Gross Alpha activity (H)* Bq/l 0.5
Gross Beta activity (H) Bq/l 1
Radioactivity (except mSv/(Annual
0.1
potassium 40) (H) RDL)34
(H) = Health value

4.11 Water Quality Specifications Table G2 - Radionuclides Parameters


Parameter Unit PCV
Uranium-238 (H) Bq/l 3
Uranium-234 (H) Bq/l 2.8
Thorium-230 (H) Bq/l 0.7
Radium-226 (H) Bq/l 0.5
Lead-210 (H) Bq/l 0.2
Polonium-210 (H) Bq/l 0.1
Thorium-232 (H) Bq/l 0.6
Radium-228 (H) Bq/l 0.2
Thorium-228 (H) Bq/l 1.9
Caesium-134 (H) Bq/l 7.2
Caesium-137 (H) Bq/l 10.5
Strontium-90 (H) Bq/l 4.9

33 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba
and helminth eggs , And other pollutants that cause a biological change.
34 RDL means the Reference Dose Level as per WHO
Note:
* Initial screening for Gross Alpha or Gross Beta activity to determine whether the activity concentrations are below levels at which no
further action is required. If initial screening levels exceed the above then investigation and monitoring of individual radionuclide
should follow immediately. The limits for the individual radionuclide should be in accordance with Table G.35 Total
Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.

64
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV


Iodine-131 (H) Bq/l 6.2
Tritium (H) Bq/l 7,716
Carbon-14 Bq/l 236
Plutonium-239 Bq/l 0.56
Radon Bq/l 300
Potassium 40 Bq/l 22
(H) = Health value

[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of 2 litres/day1 for
one year, will result in an effective dose of 0.1 mSv/year]

4.12 Water Quality Specifications Table H - Disinfection and Chlorinated By-Products


Parameter Unit PCV
Bromate (H) mg/l 0.01
Bromodichloromethane
mg/l 0.06
(BDCM) (H)
Bromoform (H) mg/l 0.1
Carbon Tetrachloride (H) mg/l 0.004
Chlorate (H) mg/l 0.7
Chlorite (H) mg/l 0.7
Chloroacetic acid (H) mg/l 0.02
Chloroform (H) mg/l 0.3
Cyanogen Chloride mg/l 0.07
Dibromoacetonitrile (H) mg/l 0.07
Dibromochloromethane (H)
mg/l 0.1
(DBCM)
Dichloroacetic acid (H) 0.05
mg/l
(applies to free acid)
Dichloroacetonitrile (H) mg/l 0.02
Monochloramine (H) mg/l 3
N-Nitrosodimethylamine
mg/l 0.0001
(NDMA) (H)

65
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV


Sodium dichloroisocyanurate 50mg/l
mg/l
(40mg/l as cyanuric acid)
Trichloroacetic acid (H) mg/l 0.2
Total Trihalomethanes (THMs)
mg/l Refer to the note
(H)
(H) = Health value

[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed Concentration or
Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = + + + ≤1
𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
• C = Measured concentration in mg/l
• PCV = Prescribed Concentration or Value in mg/l]

66
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

5: Guaranteed Performance IWTP

5.1 Performance of the IWTP


DESCRIPTION UNIT Requirement Guarantee
Contracted Capacity m³/day 820,000
Initial Contracted Capacity m³/day 685,000
Supplementary Contracted m³/day 135,000
Capacity
Maximum guaranteed capacity m³/day see Table 5.2 below
from the Riyadh Inlet Connection
Point to the Outlet Connection
Points at all incoming water
conditions in compliance with
Water Quality Specifications as per
below tables
Maximum Contracted Specific Net kWh/m3 0.46
Electricity Consumption for PS1,
which equals the electricity
imported from the Grid for
transporting a cubic meter of water
by PS1 for any Contract Year, up
to the Initial Contracted Capacity
Maximum Contracted Specific Net kWh/m3 1.62
Electricity Consumption for PS2,
which equals the electricity
imported from the Grid for
transporting a cubic meter of water
by PS2 for any Contract Year, up
to the Contracted Capacity
Annual Contracted Specific Net kWh/m3 Refer to Table 5.3
Electricity Consumption (according below
to WTA Appendix A8)
Correction Curve for Contracted - Refer to table 5.4
Specific Net Electricity below
Consumption for PS1 (according to
WTA Appendix A8)
Correction Curve for Contracted - Refer to table 5.4
Specific Net Electricity below
Consumption for PS2 (according to
WTA Appendix A8)
Continuous operation at minimum bar To be defined by
pressure at Riyadh Inlet Company
Connection Point
Continuous operation at minimum bar To be defined by
pressure at Ghanman Inlet Company
Connection Point

67
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

DESCRIPTION UNIT Requirement Guarantee


Guaranteed Average Facility % >=98
Availability
Continuous Operating Range of % of
IWTP from ....... to ........ Contracted 0% to 100%
Capacity
Maximum guaranteed continuous m³
storage capacity Ghanman Interim 2x25,000
Tanks
Maximum guaranteed continuous m³
storage capacity Al Ghat Interim 2x25,000
Tanks
Maximum guaranteed continuous m³
storage capacity Huraymila Interim 2x50,000
Tanks
Total daily chemical consumption mg for daily
consumable per Final Contracted Final To be defined by
Capacity Contracted Company
Capacity
Noise levels at a distance of one dB(A)
meter from the noise source and max. 85
within major Facility buildings
Noise levels at the Site boundary dB(A) max. 60
Noise levels within all offices and dB(A)
max. 40
the laboratory
Maximum power demand from for MVA
14
PS1
Maximum power demand for PS2 MVA 55

Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.

5.2 Maximum guaranteed capacities at Outlet Connection Points


Connection Points Type of Connection Point Branch Maximum
capacity
(m³/d)
Ghanman OSF Outlet OSF Outlet Connection Point Main pipeline 40,000
Connection Point
Industrial City Sudair OSF OSF Outlet Connection Point Main pipeline 40,000
Outlet Connection Point
Existing Majmaah 2 CG OSF OSF Outlet Connection Point Main pipeline 22,000
Outlet Connection Point

68
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Connection Points Type of Connection Point Branch Maximum


capacity
(m³/d)
DWTSO Majmaah ST OSF OSF Outlet Connection Point Majmaah branch 2,000
Outlet Connection Point
Existing Majmaah 1 CG OSF OSF Outlet Connection Point Majmaah branch 22,000
Outlet Connection Point
Hurmah ST OSF Outlet OSF Outlet Connection Point Majmaah branch 10,000
Connection Point
Umm Sedre CG OSF Outlet OSF Outlet Connection Point Majmaah branch 500
Connection Point
Artawiyah ST OSF Outlet OSF Outlet Connection Point Majmaah branch 14,000
Connection Point
Al Shahba CG OSF Outlet OSF Outlet Connection Point Majmaah branch 2,500
Connection Point
Umm Al Jamajm OSF Outlet OSF Outlet Connection Point Majmaah branch 6,000
Connection Point
KFAC OSF Outlet Connection OSF Outlet Connection Point Main pipeline 20,000
Point
Existing Al Ghat CG OSF Outlet OSF Outlet Connection Point Main pipeline 10,000
Connection Point
DWTSO Al Ghat ST OSF Outlet OSF Outlet Connection Point Main pipeline 55,000
Connection Point
Buraydah Outlet Connection Outlet Connection Point Main pipeline 282,000
Point
Al Hesi ST OSF Outlet OSF Outlet Connection Point Malham branch 15,000
Connection Point
Huraymila CG OSF Outlet OSF Outlet Connection Point Malham branch 11,000
Connection Point
Malham ST OSF Outlet OSF Outlet Connection Point Malham branch 24,000
Connection Point
Thadiq ST OSF Outlet OSF Outlet Connection Point Tharmida branch 11,000
Connection Point
Tharmida ST OSF Outlet OSF Outlet Connection Point Tharmida branch 4,000
Connection Point
Existing Marat CG OSF Outlet OSF Outlet Connection Point Tharmida branch 13,000
Connection Point
Al Berrah CG OSF Outlet OSF Outlet Connection Point Tharmida branch 1,000
Connection Point
Dahinah CG OSF Outlet OSF Outlet Connection Point Dahinah branch 2,000
connection point

69
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Connection Points Type of Connection Point Branch Maximum


capacity
(m³/d)
DWTSO Shaqra ST OSF Outlet OSF Outlet Connection Point Shaqra branch line 30,000
Connection Point
DWTSO Al Quarna ST OSF OSF Outlet Connection Point Shaqra branch line 270,000
Outlet Connection Point
As Suh Future Interconnection Future Interconnection Point Dahinah branch 500
Point

70
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

5.3 Annual Contracted Specific Net Electricity Consumption (according to WTA


Appendix A8)

Contract Year N ECR1n ECR2n


Contracted Specific Net Contracted Specific Net
Electricity Consumption (in Electricity Consumption (in
kWh/m³) at PS1 for Contract kWh/m³) at PS2 for Contract
Year n Year n

CY1 [●] [●]

CY2 [●] [●]

CY3 [●] [●]

CY4 [●] [●]

CY5 [●] [●]

CY6 [●] [●]

CY7 [●] [●]

CY8 [●] [●]

CY9 [●] [●]

CY10 [●] [●]

CY11 [●] [●]

CY12 [●] [●]

CY13 [●] [●]

CY14 [●] [●]

CY15 [●] [●]

CY16 [●] [●]

CY17 [●] [●]

CY18 [●] [●]

CY19 [●] [●]

CY20 [●] [●]

CY21 [●] [●]

CY22 [●] [●]

71
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

CY23 [●] [●]

CY24 [●] [●]

CY25 [●] [●]

CY26 [●] [●]

CY27 [●] [●]

CY28 [●] [●]

CY29 [●] [●]

CY30 [●] [●]

CY31 [●] [●]

CY32 [●] [●]

CY33 [●] [●]

CY34 [●] [●]

CY35 [●] [●]

5.4 Correction Curve for ECR1⬚ ⬚


⬚ and ECR2⬚ (according to WTA Appendix A8)

Percentage of Technical
Initial Operating 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Contracted Range
Capacity
Design
Operating 60% 70% 80% 90% 100%
Range

Correction Factor ECR1 0 [●] [●] [●] [●] [●] 1.0 1.0 1.0 1.0 1.0

Percentage of Technical
Contracted Operating 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Capacity Range

Design
Operating 60% 70% 80% 90% 100%
Range

Correction Factor ECR2 0 [●] [●] [●] [●] [●] 1.0 1.0 1.0 1.0 1.0

72
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

5.5 Water Quality Specifications Table A - Physical parameters


Parameter Unit PCV Guarantee
Color pt/Co <15
Total Dissolved Solids >100 (min)
mg/l < 600 (new facilities)
< 1000 (max)
Turbidity NTU <=5
Temperature °C <40
pH 6.5-8.5
Taste Dilution number Not objectionable
Odor Dilution number Not objectionable
Residual Free Chlorine (H) mg/l 0.2 - 0.5
Chlorine Dioxide mg/l 0.1-0.7
Calcium Hardness mg/l as CaCO3 >30
Total Hardness mg/l as CaCO3 ≤300
Langelier Saturation Index
0.0-0.3
("LSI")
(H) = Health value

5.6 Water Quality Specifications Table B - Inorganic Chemicals Parameters


Parameter Unit PCV Guarantee
Aluminium mg/l 0.2
Ammonia (as NH3) mg/l 0.5
Chloride mg/l 250
Copper (H) mg/l 2
Fluoride (H)* mg/l 1.5
Iron mg/l 0.3
Nitrate (as nitrate) (H) mg/l 50
(short term exposure)
Nitrite (as nitrite) (H) mg/l 3
(short term exposure)
Sodium mg/l 200
Sulfate mg/l 250
Zinc mg/l 3
(H) = Health value

73
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to
daily climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32));
The normally observed value of TOC in the network should be < 1 mg C/l during the normal
operation and < 2 mg C/l in newly commissioned or repaired systems.]

5.7 Water Quality Specifications Table C - Inorganic Chemicals Parameters (Trace


Elements)
Parameter Unit PCV Guarantee
Antimony (H)* mg/l 0.02
Arsenic (H)** mg/l 0.01
Barium (H) mg/l 1.3
Boron (H) mg/l 2.4
Cadmium (H) mg/l 0.003
Chromium (H) mg/l 0.05
Lead (H) mg/l 0.01
Manganese mg/l 0.4
Mercury (Inorganic) (H) mg/l 0.006
Molybdenum mg/l 0.07
Nickel (H) mg/l 0.07
Selenium (H) mg/l 0.04
Uranium (H) mg/l 0.03
(H) = Health value

5.8 Water Quality Specifications Table D - Miscellaneous Organic Parameters (mostly


pesticides)
Parameter Unit PCV Guarantee
Acrylamide (H) mg/l 0.0005
Alachlor (H) mg/l 0.02
Aldicarb (H) 0.01
mg/l (applies to aldicarb
sulfoxide and aldicarb
sufone)
Aldrin & Dieldrin (H) 0.00003
mg/l (for combined aldrin and
dieldrin)
Atrazine (H) mg/l 0.1

74
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Carbofuran mg/l 0.007
Chlordane (H) mg/l 0.0002
Chlorotoluron (H) mg/l 0.03
Chlorpyrifos (H) mg/l 0.03
Cyanazine (H) mg/l 0.0006
Cyanide mg/l 0.07
2,4-D [(2,4-Dichlorophe-noxy) 0.03
acetic acid] (H) mg/l
(applies as free acid)
2,4 DB [(2,4-Dichlorophe-noxy)
mg/l 0.09
butyric acid] (H)
DDT (H) mg/l 0.001
1,2-Dibromo-3-chloropropane
mg/l 0.001
(H)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Dichloroprop/Dichlorprop-P
mg/l 0.1
(DALAPON) (H)
Dimethoate (H) mg/l 0.006
Endrine (H) mg/l 0.0006
Epichlorohydrin (H) mg/l 0.0004
Ethylbenzene (H) mg/l 0.3
Ethylenediamine tetraacetic 0.6
acid (EDTA) (H) mg/l
(applies to the free acid)
Isoproturon (H) mg/l 0.009
Lindane (H) mg/l 0.002
MCPA mg/l 0.002
Mecoprop (H) mg/l 0.01
Methoxychlor (H) mg/l 0.02
Metolachlor/s-Metolachlor (H) mg/l 0.01
Microcystins (H) mg/l 0.001
Molinate (H) mg/l 0.006
Pendimethalin (H) mg/l 0.02
Pentachlorophenol (H) mg/l 0.009

75
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV Guarantee


Perchlorate (H) mg/l 0.07
Simazine (H) mg/l 0.002
2,4,5-T (H) mg/l 0.009
2,4,6-Trichlorophenol (H) mg/l 0.2
Terbuthylazine (TBA) (H) mg/l 0.007
Trifluralin (H) mg/l 0.02
(H) = Health value

76
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

5.9 Water Quality Specifications Table E - Organic Parameters


Parameter Unit PCV Guarantee

Benzene (H) mg/l 0.01


Benzo (a) - Pyrene (H) mg/l 0.0007
Chlorobenzene (mono
mg/l 0.3
chlorobenzene MCB)
1,2-Dibromo-ethane (H) mg/l 0.0004
1,2-dichlorobenzene (H) mg/l 1
1,4-dichlorobenzene (H) mg/l 0.3
1,2-dichloroethane (H) mg/l 0.03
1,2-dichloroethene (H) mg/l 0.05
Dichloromethane (methylene
mg/l 0.02
chloride) (H)
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Di(2-ethylhexyl)phthalate (H) mg/l 0.008
1,4-Dioxane (H) mg/l 0.05
Hexachlorobutadiene (H) mg/l 0.0006
Nitrilotriacetic acid (H) mg/l 0.2
Styrene (H) mg/l 0.02
Tetrachloroethene (H) mg/l 0.04
Toluene (H) mg/l 0.7
Trichloroethane mg/l 0.02
Trichloroethene (H) mg/l 0.02
Vinyl chloride (H) mg/l 0.0003
Xylene (H) mg/l 0.5
(H) = Health value

5.10 Water Quality Specifications Table F - Microbial Parameters


Parameter Unit PCV
Enterococci (H) Number/100
0
ml
Escherichia coli (E. coli) (H) Number/100
0
ml

77
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV


Total Coliform (bacteria)35 Number/100
0 on 95% of samples
ml
(H) = Health value

5.11 Water Quality Specifications Table G1 – Radioactive Parameters


Parameter Unit PCV
Gross Alpha activity (H)* Bq/l 0.5
Gross Beta activity (H) Bq/l 1
Radioactivity (except mSv/(Annual
0.1
potassium 40) (H) RDL)36
(H) = Health value

5.12 Water Quality Specifications Table G2 - Radionuclides Parameters


Parameter Unit PCV
Uranium-238 (H) Bq/l 3
Uranium-234 (H) Bq/l 2.8
Thorium-230 (H) Bq/l 0.7
Radium-226 (H) Bq/l 0.5
Lead-210 (H) Bq/l 0.2
Polonium-210 (H) Bq/l 0.1
Thorium-232 (H) Bq/l 0.6
Radium-228 (H) Bq/l 0.2
Thorium-228 (H) Bq/l 1.9
Caesium-134 (H) Bq/l 7.2
Caesium-137 (H) Bq/l 10.5
Strontium-90 (H) Bq/l 4.9
Iodine-131 (H) Bq/l 6.2

35 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba
and helminth eggs , And other pollutants that cause a biological change.
36 RDL means the Reference Dose Level as per WHO
Note:
* Initial screening for Gross Alpha or Gross Beta activity to determine whether the activity concentrations are below levels at which no
further action is required. If initial screening levels exceed the above then investigation and monitoring of individual radionuclide
should follow immediately. The limits for the individual radionuclide should be in accordance with Table G.

78
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV


Tritium (H) Bq/l 7,716
Carbon-14 Bq/l 236
Plutonium-239 Bq/l 0.56
Radon Bq/l 300
Potassium 40 Bq/l 22
(H) = Health value

[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of
2 litres/day1 for one year, will result in an effective dose of 0.1 mSv/year]

5.13 Water Quality Specifications Table H - Disinfection and Chlorinated By-Products


Parameter Unit PCV
Bromate (H) mg/l 0.01
Bromodichloromethane
mg/l 0.06
(BDCM) (H)
Bromoform (H) mg/l 0.1
Carbon Tetrachloride (H) mg/l 0.004
Chlorate (H) mg/l 0.7
Chlorite (H) mg/l 0.7
Chloroacetic acid (H) mg/l 0.02
Chloroform (H) mg/l 0.3
Cyanogen Chloride mg/l 0.07
Dibromoacetonitrile (H) mg/l 0.07
Dibromochloromethane (H)
mg/l 0.1
(DBCM)
Dichloroacetic acid (H) 0.05
mg/l
(applies to free acid)
Dichloroacetonitrile (H) mg/l 0.02
Monochloramine (H) mg/l 3
N-Nitrosodimethylamine
mg/l 0.0001
(NDMA) (H)
Sodium dichloroisocyanurate mg/l 50mg/l

79
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Parameter Unit PCV


(40mg/l as cyanuric acid)
Trichloroacetic acid (H) mg/l 0.2
Total Trihalomethanes (THMs)
mg/l Refer to the note
(H)
(H) = Health value

[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed
Concentration or Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = 𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 + 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 + 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 + 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚 ≤ 1
• C = Measured concentration in mg/l
• PCV = Prescribed Concentration or Value in mg/l]

80
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

5: Guaranteed Performance Electrical Special Facility

Note to Bidder: To be communicated as part of addendum.

81
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

6: Performance Guarantee Supporting Documentation

The Company herewith attach the following supporting performance guarantee letters (signed with company
stamp) from the main equipment suppliers/process technology providers including the following (as a
minimum);

• Main and booster pumps


• Pump motors
• Variable Speed Drives (VSDs)
• Major metering, monitoring and EICA equipment and systems
• Solar PV equipment;
• Electrical Load List; and
• Details and consumption rates of other process consumables
• Chemical injection skids (if applicable)

Name : _________________________ Authorized Signature : ______________________

Name of Bidder : __________________ Date : ___________________________________

Form Sheet C21 must be completed and signed with company stamp by each member of the Project
Company/Consortium.

82
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

22. Summary of Technical Submission


Bidders shall complete the green shaded cells of this Technical Form Sheet Section 22 to provide a
summary of all relevant technical compliance data with clear references of where details can be found within
their submission. A brief description, additional summary or comment can be added should it be relevant or
beneficial to reviewers.

1: SCOPE OF WORKS

Location of
technical & details
including Brief description,
Included
Capacity information, additional
as per
Scope of Works Item (if drawings, summary or
the RFP
relevant) schedules, comment (Max.
[Y/N]
calculations, 150 words/item)
specifications, etc.
in Volume 3

1 IWTP

1.1 Pipeline

1.2 Pumping Stations

1.3 Interim Tanks

1.4 Auxiliary System

1.5 Electrical Equipment

1.6 I&C System

1.7 Civil Works

Riyadh Water Special Facility


2 and all Relevant
Components
Ghanman Water Special
3 Facility and all Relevant
Components
Buraydah Water Special
4 Facility and all Relevant
Components
Outlet Special Facilities and
5
all Relevant Components
Electrical Special Facility and
6
all Relevant Components

83
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

2: PIPELINE

Location of
technical &
details
Brief
including
Design description,
Included information,
standards additional
Item as per the drawings,
& codes summary or
RFP [Y/N] schedules,
applied comment (Max.
calculations,
150 words/item)
specifications,
etc. in Volume
3
A detailed hydraulic
profile and hydraulic
calculations of the
Facility including the
necessary connections
and a detailed pipeline
layout (also including
the following):
1 • Steady state
analysis
• Transient analysis
• Vent and drain
calculation
• Static calculation
• Loss calculation
• etc.
Construction Works
(including the following)
• Survey and soil
investigations
• Preparation,
stacking out, grading
• Access works
• Protection of pipes in
2 Easement Land
• Excavation
• Installation of
pipeline incl. NDT
• Coating and lining
• Backfill and
restoration
• Pipemarkers
• etc.
Specification and design
details complying with
3
the requirements of the
RFP.

84
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

3: CIVIL, STRUCTURAL & BUILDINGS

Location of
technical &
details
Brief
including
Design description,
Included information,
standards additional
Item as per the drawings,
& codes summary or
RFP [Y/N] schedules,
applied comment (Max.
calculations,
150 words/item)
specifications,
etc. in Volume
3
Civil Works -
Preparatory (including
the following)
• Surveys
• Earthworks,
levelling, grading,
back-filling, etc.
1 • Geotechnical design
of the project
structures
foundations
• Ground
Improvement
• Slope Protection
• etc.
Structural design
(including the following)
• Structural loading
• Structural analysis
and design
• Buildings finishes
and external
2 waterproofing
• Buildings rainwater
drainage
• Building signage
• Building energy
efficiency
• Building services
requirements
Specification and design
details complying with
the civil, structural
3 design life, durability
and serviceability
requirements of the
RFP.

85
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Location of
technical &
details
Brief
including
Design description,
Included information,
standards additional
Item as per the drawings,
& codes summary or
RFP [Y/N] schedules,
applied comment (Max.
calculations,
150 words/item)
specifications,
etc. in Volume
3
Infrastructure design
(including the following)
• Surface water
drainage
• Water network
4
• Site access
circulation and
egress
• Parking facilities
• External lighting
Details required by the
RFP with regards to the
following:
• Access
• Site perimeter
5 lighting, security &
access control
• Security system of
project components
• Fire strategy &
details

86
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

4: MAIN DELIVERABLES

Brief
Location of technical &
description,
details including
Included as additional
information, drawings,
Item per the RFP summary or
schedules, calculations,
[Y/N] comment
specifications, etc. in
(Max. 150
Volume 3
words/item)
Suitable relevant project
experience with specific
details of the EPC and
1
O&M contractors and their
experience as well as team
qualifications
Suitable & Innovative
2 Project Methodology /
Approach
Project Implementation
3 Schedule (clearly indicating
the critical path)
Project Delivery Resources
available to the project
(staffing, sub-contractors,
4 technology & equipment
suppliers) including
organograms for the EPC
and O&M teams
Quality Control Plan,
5
system & procedures
Health & Safety Plan,
6
system & procedures
Environmental
7 Management Plan &
procedures
Management, Operation &
Maintenance Plan &
8 procedures (incl. Asset
Management System + risk
management)
Technical Data Submission
(incl. Technical Data
9
Sheets and supporting
information)

10 System Flow Diagram

87
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Brief
Location of technical &
description,
details including
Included as additional
information, drawings,
Item per the RFP summary or
schedules, calculations,
[Y/N] comment
specifications, etc. in
(Max. 150
Volume 3
words/item)

11 Typical Drawings

12 Steady State Analysis

13 Transient Analysis

Vent and Drain


14
Calculations
Electricity Consumption
15
Calculation
Facility Chlorination
16
Assessment

88
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

23. Technical Information to be provided with Proposal (mandatory)

Section in the
RFP Requirement
proposal/Reference
1.) Description of Facility and general information about the Project:
Description of the basic design of civil works,
mechanical works, electrical works, etc.
General description of the Facility, its main features, and
its operation
Comprehensive description and explanation of the
chlorination concept of the Facility
Steady state analysis
Transient analysis
Vent and drain calculations
Availability calculations to demonstrate planned
outages / unplanned outages are in accordance with the
reliability requirements
Energy demand calculations
List of Standards, codes and regulations applied for
design, construction and testing of the Facility
Detailed time schedule for design, construction and
commissioning
Construction approach, phases of construction,
commissioning and operation of the Facility

Operational philosophy of the Facility


Monitoring and metering concept
Maintenance philosophy, maintenance schedule
activities including major overhauls, replacements, etc.

Details of operation, maintenance and training.


Interface definitions and concept of management
Potable water online monitoring, sampling and analysis
concept;
Comprehensive design calculations for the pumping
stations of the Facility
Spare parts lists and spare parts handling /
management approach
Description of computerized maintenance tools for
protective, preventive and corrective maintenance and
its tracking.
2.) Description of major mechanical works, systems, equipment and components
including and auxiliaries, such as:
Pipeline
Pumping Stations and Pressure Increasing Stations
Pumps, motors and VSDs

89
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Section in the
RFP Requirement
proposal/Reference
Cooling water systems
Surge protection systems
Services water system;
Chlorination dosing facilities
Water disposal facilities
Water quality monitoring system
Waste water, sewage treatment and storm water
collection systems treatment systems;
Service compressed air systems
Meter and monitoring systems
Fire alarm and detection, fire protection and fire fighting
systems.
3.) Description of major electrical works, systems, equipment and components including
and auxiliaries, such as:
Electrical power system philosophy
Main electrical equipment including auxiliary systems.
4.) Description of major instrumentation and control, systems, equipment and
components including and auxiliaries, such as:
General control and protection system;
Description and layout of central control rooms and
station control rooms;
Description of interfaces
Leak and leak location detection system
Cybersecurity system
5.) Description of major Civil works, including:
Preparation and development works incl. geotechnical
works, as surveys, earthworks, levelling, grading, back-
filling, etc., geotechnical design of the project structures
foundations, ground improvement, slope protection,
reparation and development works
Water supply, electricity supply, during construction
Foundations
Buildings and structures;
Administration buildings
Control Centers
Fencing including doors and gates
Sewage drainage, storm water and other waste water
drainage and discharge systems;
Ventilation and air conditioning;
Major equipment for transport, handling and unloading
at site; and

90
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets

Section in the
RFP Requirement
proposal/Reference
Civil design criteria including (i) proposed methods of
corrosion protection for reinforced concrete and steel
structures and (ii) proposed concrete surface protection
systems.
6.) Project specific and typical drawings of all major components and structures of the
Facility and as defined in the RFP:
Project location map with areas temporarily used during
construction for laydown, warehouses, workshops;
Typical P&I diagrams
General layout plans, Facility locations, etc.
Site plan, layout for Facilities, indication of fenced areas,
indication of areas temporarily used.
General layout drawings of stations
Typical drawings for station components, tanks,
systems, etc.
Typical pipeline drawings
Single line diagrams
ICT for the control network, telephone network, etc.
General layout indicating rerouted installations (if
applicable);
System flow diagram
Electrical equipment layout drawings;
Civil works design and architectural overall drawings;
Civil works standard design drawings;
7.) Environmental Data and Aspects, such as:
Description of type of monitoring measures
Nature and estimated quantities of waste water, waste
water treatment and disposal methods
Ambient noise distribution report proving that the
applied noise abatement measures are sufficient to
meet the required noise levels at site boundary Noise
pressure levels.

91