1. Legal Form of Bidder ................................................................................................................ 3
2
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
1
Whether an individual Bidder or a Bidder Consortium. In the case of a Bidder Consortium, the names of all Consortium Members of
the Bidder Consortium must be approved in writing by SWPC.
2
Single Corporate Entity
3
Or Shareholders' Agreement, Consortium Agreement, Development Agreement, Memorandum and Articles of Association etc.
3
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
2. Bidder Consortium4
Other
Lead Technical Member 1
No. Information Required Member Member (etc.)
1 Name
2 Address
3 Name and Position of Point of Contact
4 Telephone / Fax / E-Mail
5 Legal Form
6 Ultimate Parent Company Name and Address
7 Net Assets / Shareholders Funds of Parent
Company (financial year 2022)
8 Principal Role in Project5
9 Organisational Documents Attached
10 Provision of audited financial statements for the
Parent Company’s financial years 2020, 2021
and 2022
11 Current long term unsecured Parent Company
foreign currency credit rating (S&P, Moody’s,
Others)
12 Value of contribution in Consortium (if more
than one member)
13 Share of voting and economic interest in
Project Company
14 Joint Venture Agreement6
4
The above information is to be provided in respect of each Consortium Member within the Bidder Consortium.
5
e.g. Project development, construction, operation and maintenance, engineering, design etc.
6
Or Shareholders' Agreement, Consortium Agreement, Development Agreement, Memorandum and Articles of Association etc.
4
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
7
Bidder to provide each relevant Technical Form Sheet Section 6 for each Contractor comprising the “EPC Contractor”
(whether due to a consortium and / or contract splitting arrangement) and any principal sub-contractor and in respect of a
party (if applicable) who is accepting joint liability for the overall performance of the EPC Contract (or “providing a wrap”). In
the event the EPC Contractor is a consortium, Bidder must also provide Technical Form Sheet Section 1 (and the specified
attachments) in relation to such EPC Contractor.
5
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
PROJECT NO. 1
Bidder to submit additional Technical Form Sheet Section 4 for EPC Contractor’s water transmission
projects No. 2, 3, etc. as well as for principal sub-contractors
6
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
7
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Bidder to submit additional Technical Form Sheets Section 6 for O&M Contractor’s water
transmission projects No. 2, 3, etc, as well as for principal sub-contractors
8
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The named countries of origin of the main equipment will be considered in sub-clause 18.3.3 of the
WTA (draft version attached as part of Part V of the RFP).
It shall be noted that after Bid submission, listed manufacturers of main equipment cannot be
changed without the written formal approval by SWPC.
Address of
Manufacturer including
Type of Main Equipment Name of Manufacturer country of origin
Pipeline
1. [●] [●]
2. [●] [●]
3. [●] [●]
Main pumps
1. [●] [●]
2. [●] [●]
3. [●] [●]
Booster pumps
1. [●] [●]
2. [●] [●]
3. [●] [●]
Pump motors
1. [●] [●]
2. [●] [●]
3. [●] [●]
VSD
1. [●] [●]
2. [●] [●]
3. [●] [●]
Instrumentation and Control
System
1. [●] [●]
2. [●] [●]
3. [●] [●]
9
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Note (Mandatory information) – A reference list must be attached for each type of main equipment
including but not limited to the following information:
• Name of Manufacturer (including Ultimate Parent Company)
• Name of plant / client
• Type, size and main parameters
• Year of commissioning
• Relevant operational parameters (commissioning year, hours of operation, etc.)
10
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
8
Bidder to submit additional Technical Form Sheets Section 8 for Company’s Engineer No. 2 and 3
11
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Bidder to submit additional Technical Form Sheet Section 9 for water transmission projects No. 2, 3,
etc.
12
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The Bidder must as such explain his understanding of the objectives of the assignment and stated
and implied requirements of the Technical Specifications, highlight the issues of importance, and
explain the technical approach they would adopt to address them. The approach paper should explain
the methodologies & technologies which are to be adopted and demonstrate the compatibility of those
with the proposed approach. The approach should also include a brief quality plan which outlines
processes, procedures and associated resources applied to meet the requirements and indicate how
risks will be managed and what contribution will be made regarding value engineering and
management.
The Bidder must attach his approach paper to this page. The approach paper should not be longer
than 3 pages.
13
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The Implementation Schedule should be made available in hard copy and electronic copy using the
latest MS Project of MS office format.
Contract Start
Milestones Date
Effective Date [●]9
Financial close / NTP (Scheduled Closing Date) [●]10
• civil works for buildings and disposal facilities for Off-Spec Water
• civil works for other components (station piping, valve shafts, flow
control valve group, etc.)
Riyadh Water Special Facility - Milestones Mechanical, Electrical, Instrumentation, Control &
Automation Completion
Milestones Date
Mechanical Completion of
• regulating tanks
• physical connection Riyadh Water Special Facility with the IWTP at the
Riyadh Inlet Connection Point
14
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
• regulating tanks
15
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
• civil works for other components (station piping, valve shafts, flow
control valve group, etc.)
16
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
• civil works of Outlet Special Facilities with new connection pipelines for
connecting the IWTP with existing / future DWTSO facilities (e.g.
reservoir stations) owned and operated by the DWTSO
• connection piping for Outlet Special Facilities with new city gates
17
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
18
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Milestones Date
Completion of Start-up Test of ESF at Ghanman
Completion of Connection of ESF at Ghanman
Energisation Date of ESF at Ghanman
Start of Trial Run at Ghanman
Start of Performance Test at Ghanman
Start of Reliability Test Run at Ghanman
Scheduled ESF Provisional Acceptance Date / Transfer to NGSA at [●]23
Ghanman
• civil works for IWTP Majmaah branch line, related secondary branch
lines and related auxiliary systems
• civil works for IWTP Shaqra branch line, related secondary branch lines
and related auxiliary systems
• civil works for IWTP other branch lines and related auxiliary systems
• civil works for RQ IWTP Initial Pumping Station PS1 at Riyadh and
related buildings
• IWTP Majmaah branch line, related secondary branch lines and related
auxiliary systems incl. flushing, filling, disinfection
• IWTP Shaqra branch line, related secondary branch line and related
auxiliary systems incl. flushing, filling, disinfection
23 Scheduled ESF Provisional Acceptance Date, as per section 1.9 of the ITB
19
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
• IWTP other branch lines and related auxiliary systems incl. flushing,
filling, disinfection
Note: The Company is required to submit an implementation schedule (milestone) as per the
above format, and in addition, the Company shall submit a detailed implementation program
as per the above milestone dates and in line with the RFP requirements.
24 Date may not be earlier than the Scheduled WSF Provisional Acceptance Date and the Scheduled ESF Provisional
Acceptance Date, as per section 1.9 of the ITB
25 Scheduled Project Commercial Operation Date, as per section 1.9 of the ITB
20
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
21
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The Bidder shall list in the table below the key personnel to be engaged for this project and include any
relevant document required to demonstrate the suitable level of experience and qualifications for each
role and project responsibilities.
22
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
23
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Pipeline
Main pumps
Booster pumps
Pump motors
VSD
Instrumentation
and Control
System
Other Equipment
Transformers
Flow Meters
Etc.
24
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Bidders should briefly outline their procedures in relation to the project and attach any relevant
documentation such as ISO 9001 certification, etc.
25
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The Health & Safety Plan should also include an outline methodology of risk assessments, health &
safety audits, safety check lists and confirmation that all necessary allowances have been made for
these procedures and the required personal protective and other equipment, training, inductions and
control, etc.
Bidders should briefly outline their procedures in relation to the project and attach any relevant
documentation such as OSHAS 18001 certification, etc.
26
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The Environmental & Social Management Plan should include the approach to develop the project
ESIA and an indication of how this plan will be developed and audited to ensure compliance via an
ESMP. Confirmation should be provided that that all necessary allowances have been made for these
procedures.
Bidders should briefly outline their procedures in relation to the project and attach any relevant
documentation such as ISO 14001 certification, etc.
A Management, Operation & Maintenance Plan should include, as a minimum, the Bidder’s approach
towards overall asset management, monitoring and maintenance which should be integrated with an
outline control philosophy for the plant which considers interfaces with supporting utilities and
intelligent solutions to optimize efficiencies where possible. It should also specifically address odour
and sludge management compliance and detail of proposed solutions.
Such a plan should also detail the daily and monthly reports & communication protocols which will be
provided to SWPC in terms of performance specification compliance as well as operational and
maintenance monitoring reporting.
The Bidder must attach his outline MOM Plan to this page. The plan should not be longer than 3
pages.
28
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
In addition, the Bidder provide duly filled Technical Data Sheets, using the templates attached to the
Technical Form Sheet Section 20, for the following Components:
• Water Special Facility (Riyadh Water Special Facility, Ghanman Water Special Facility, Buraydah Water
Special Facility, Outlet Water Special Facilities); and
• IWTP.
For the Electrical Special Facility, separated submissions will be requested in an Addendum to the RFP.
29
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The Performance Guarantees are divided in the following Components forming the Project:
30
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.
The Water Quality Specifications shall be as set out in the tables A to H below:
31
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
32
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to daily
climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32)); The
normally observed value of TOC in the network should be < 1 mg C/l during the normal operation and < 2
mg C/l in newly commissioned or repaired systems.]
33
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
34
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
35
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
27 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba and
helminth eggs , And other pollutants that cause a biological change.28 RDL means the Reference Dose Level as per WHO
36
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
37
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of 2 litres/day1 for
one year, will result in an effective dose of 0.1 mSv/year]
[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed Concentration or
Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = + + + ≤1
𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
38
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
39
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.
The Water Quality Specifications shall be as set out in the tables A to H below:
40
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
41
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to daily
climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32)); The
normally observed value of TOC in the network should be < 1 mg C/l during the normal operation and < 2
mg C/l in newly commissioned or repaired systems.]
2.4 Water Quality Specifications Table C - Inorganic Chemicals Parameters (Trace Elements)
Parameter Unit PCV Guarantee
Antimony (H)* mg/l 0.02
Arsenic (H)** mg/l 0.01
Barium (H) mg/l 1.3
Boron (H) mg/l 2.4
Cadmium (H) mg/l 0.003
Chromium (H) mg/l 0.05
Lead (H) mg/l 0.01
Manganese mg/l 0.4
Mercury (Inorganic) (H) mg/l 0.006
Molybdenum mg/l 0.07
Nickel (H) mg/l 0.07
42
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
43
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
44
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Dichloromethane (methylene
mg/l 0.02
chloride) (H)
1,2-Dichloropropane (H) mg/l 0.04
1,3-Dichloropropene (H) mg/l 0.02
Di(2-ethylhexyl)phthalate (H) mg/l 0.008
1,4-Dioxane (H) mg/l 0.05
Hexachlorobutadiene (H) mg/l 0.0006
Nitrilotriacetic acid (H) mg/l 0.2
Styrene (H) mg/l 0.02
Tetrachloroethene (H) mg/l 0.04
Toluene (H) mg/l 0.7
Trichloroethane mg/l 0.02
Trichloroethene (H) mg/l 0.02
Vinyl chloride (H) mg/l 0.0003
Xylene (H) mg/l 0.5
(H) = Health value
29 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba and
helminth eggs , And other pollutants that cause a biological change.30 RDL means the Reference Dose Level as per WHO
45
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
46
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of 2 litres/day1 for
one year, will result in an effective dose of 0.1 mSv/year]
[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed Concentration or
Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = + + + ≤1
𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
47
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
48
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.
The Water Quality Specifications shall be as set out in the tables A to H below:
49
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
50
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to daily
climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32)); The
normally observed value of TOC in the network should be < 1 mg C/l during the normal operation and < 2
mg C/l in newly commissioned or repaired systems.]
51
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
52
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
53
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
31 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba
and helminth eggs , And other pollutants that cause a biological change.
32 RDL means the Reference Dose Level as per WHO
Note:
* Initial screening for Gross Alpha or Gross Beta activity to determine whether the activity concentrations are below levels at which no
further action is required. If initial screening levels exceed the above then investigation and monitoring of individual radionuclide
should follow immediately. The limits for the individual radionuclide should be in accordance with Table G.33 Total
Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
54
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of 2 litres/day1 for
one year, will result in an effective dose of 0.1 mSv/year]
55
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed Concentration or
Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = + + + ≤1
𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
• C = Measured concentration in mg/l
• PCV = Prescribed Concentration or Value in mg/l]
56
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.
57
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
58
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The Water Quality Specifications shall be as set out in the tables A to H below:
59
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to daily
climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32)); The
normally observed value of TOC in the network should be < 1 mg C/l during the normal operation and < 2
mg C/l in newly commissioned or repaired systems.]
4.6 Water Quality Specifications Table C - Inorganic Chemicals Parameters (Trace Elements)
60
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
61
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
62
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
63
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
33 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba
and helminth eggs , And other pollutants that cause a biological change.
34 RDL means the Reference Dose Level as per WHO
Note:
* Initial screening for Gross Alpha or Gross Beta activity to determine whether the activity concentrations are below levels at which no
further action is required. If initial screening levels exceed the above then investigation and monitoring of individual radionuclide
should follow immediately. The limits for the individual radionuclide should be in accordance with Table G.35 Total
Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
64
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of 2 litres/day1 for
one year, will result in an effective dose of 0.1 mSv/year]
65
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed Concentration or
Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = + + + ≤1
𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
• C = Measured concentration in mg/l
• PCV = Prescribed Concentration or Value in mg/l]
66
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
67
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Note: Guaranteed maximum noise levels and subsequent requirements may be adjusted dependent on the
ambient noise baseline which shall be confirmed as part of the ESIA.
68
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
69
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
70
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
71
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Percentage of Technical
Initial Operating 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Contracted Range
Capacity
Design
Operating 60% 70% 80% 90% 100%
Range
Correction Factor ECR1 0 [●] [●] [●] [●] [●] 1.0 1.0 1.0 1.0 1.0
Percentage of Technical
Contracted Operating 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Capacity Range
Design
Operating 60% 70% 80% 90% 100%
Range
Correction Factor ECR2 0 [●] [●] [●] [●] [●] 1.0 1.0 1.0 1.0 1.0
72
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
73
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
To determine the minimum added fluoride component in un-bottled drinking water according to
daily climate temperatures, it will be calculated as follows:
Fluoride concentration = 0.34 / d, where d = 0.038+ (0.0062x (daily C temperature x 9/5 +32));
The normally observed value of TOC in the network should be < 1 mg C/l during the normal
operation and < 2 mg C/l in newly commissioned or repaired systems.]
74
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
75
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
76
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
77
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
35 Total Coliform bacteria should be 0 at plant production outlet and not more than 5% positive samples on transfer and distribution
systems.
Legionella, Pseudomonas aeruginosa and Sulphite reducing bacteria testing needs to be conducted randomly in the in the
distribution network as an indicator for detecting possible contamination or where observations associated with taste, odour and
colour problems. Target should be Zero organism.
Drinking water shall be free at all times from algae, mould, parasites, insects and their eggs, larvae, protozoa including Amoeba
and helminth eggs , And other pollutants that cause a biological change.
36 RDL means the Reference Dose Level as per WHO
Note:
* Initial screening for Gross Alpha or Gross Beta activity to determine whether the activity concentrations are below levels at which no
further action is required. If initial screening levels exceed the above then investigation and monitoring of individual radionuclide
should follow immediately. The limits for the individual radionuclide should be in accordance with Table G.
78
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
(a) The following additive formula shall also be satisfied:
Σ Ci/PCVi ≤ 1.0
Where:
• Ci = the measured activity concentration of radionuclide i
• PCVi = Prescribed Concentration or Value of radionuclide i that, at an intake of
2 litres/day1 for one year, will result in an effective dose of 0.1 mSv/year]
79
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
[Note:
The sum of the ratio of the measured concentration of each to its respective Prescribed
Concentration or Value should not exceed 1:
𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 𝐶 𝐷𝐵𝐶𝑀 𝐶 𝐵𝐷𝐶𝑀 𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚
𝑇𝐻𝑀 = 𝑃𝑉𝐶 𝐵𝑟𝑜𝑚𝑜𝑓𝑜𝑟𝑚 + 𝑃𝑉𝐶 𝐷𝐵𝐶𝑀 + 𝑃𝑉𝐶 𝐵𝐷𝐶𝑀 + 𝑃𝑉𝐶 𝐶ℎ𝑙𝑜𝑟𝑜𝑓𝑜𝑟𝑚 ≤ 1
• C = Measured concentration in mg/l
• PCV = Prescribed Concentration or Value in mg/l]
80
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
81
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
The Company herewith attach the following supporting performance guarantee letters (signed with company
stamp) from the main equipment suppliers/process technology providers including the following (as a
minimum);
Form Sheet C21 must be completed and signed with company stamp by each member of the Project
Company/Consortium.
82
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
1: SCOPE OF WORKS
Location of
technical & details
including Brief description,
Included
Capacity information, additional
as per
Scope of Works Item (if drawings, summary or
the RFP
relevant) schedules, comment (Max.
[Y/N]
calculations, 150 words/item)
specifications, etc.
in Volume 3
1 IWTP
1.1 Pipeline
83
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
2: PIPELINE
Location of
technical &
details
Brief
including
Design description,
Included information,
standards additional
Item as per the drawings,
& codes summary or
RFP [Y/N] schedules,
applied comment (Max.
calculations,
150 words/item)
specifications,
etc. in Volume
3
A detailed hydraulic
profile and hydraulic
calculations of the
Facility including the
necessary connections
and a detailed pipeline
layout (also including
the following):
1 • Steady state
analysis
• Transient analysis
• Vent and drain
calculation
• Static calculation
• Loss calculation
• etc.
Construction Works
(including the following)
• Survey and soil
investigations
• Preparation,
stacking out, grading
• Access works
• Protection of pipes in
2 Easement Land
• Excavation
• Installation of
pipeline incl. NDT
• Coating and lining
• Backfill and
restoration
• Pipemarkers
• etc.
Specification and design
details complying with
3
the requirements of the
RFP.
84
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Location of
technical &
details
Brief
including
Design description,
Included information,
standards additional
Item as per the drawings,
& codes summary or
RFP [Y/N] schedules,
applied comment (Max.
calculations,
150 words/item)
specifications,
etc. in Volume
3
Civil Works -
Preparatory (including
the following)
• Surveys
• Earthworks,
levelling, grading,
back-filling, etc.
1 • Geotechnical design
of the project
structures
foundations
• Ground
Improvement
• Slope Protection
• etc.
Structural design
(including the following)
• Structural loading
• Structural analysis
and design
• Buildings finishes
and external
2 waterproofing
• Buildings rainwater
drainage
• Building signage
• Building energy
efficiency
• Building services
requirements
Specification and design
details complying with
the civil, structural
3 design life, durability
and serviceability
requirements of the
RFP.
85
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Location of
technical &
details
Brief
including
Design description,
Included information,
standards additional
Item as per the drawings,
& codes summary or
RFP [Y/N] schedules,
applied comment (Max.
calculations,
150 words/item)
specifications,
etc. in Volume
3
Infrastructure design
(including the following)
• Surface water
drainage
• Water network
4
• Site access
circulation and
egress
• Parking facilities
• External lighting
Details required by the
RFP with regards to the
following:
• Access
• Site perimeter
5 lighting, security &
access control
• Security system of
project components
• Fire strategy &
details
86
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
4: MAIN DELIVERABLES
Brief
Location of technical &
description,
details including
Included as additional
information, drawings,
Item per the RFP summary or
schedules, calculations,
[Y/N] comment
specifications, etc. in
(Max. 150
Volume 3
words/item)
Suitable relevant project
experience with specific
details of the EPC and
1
O&M contractors and their
experience as well as team
qualifications
Suitable & Innovative
2 Project Methodology /
Approach
Project Implementation
3 Schedule (clearly indicating
the critical path)
Project Delivery Resources
available to the project
(staffing, sub-contractors,
4 technology & equipment
suppliers) including
organograms for the EPC
and O&M teams
Quality Control Plan,
5
system & procedures
Health & Safety Plan,
6
system & procedures
Environmental
7 Management Plan &
procedures
Management, Operation &
Maintenance Plan &
8 procedures (incl. Asset
Management System + risk
management)
Technical Data Submission
(incl. Technical Data
9
Sheets and supporting
information)
87
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Brief
Location of technical &
description,
details including
Included as additional
information, drawings,
Item per the RFP summary or
schedules, calculations,
[Y/N] comment
specifications, etc. in
(Max. 150
Volume 3
words/item)
11 Typical Drawings
13 Transient Analysis
88
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Section in the
RFP Requirement
proposal/Reference
1.) Description of Facility and general information about the Project:
Description of the basic design of civil works,
mechanical works, electrical works, etc.
General description of the Facility, its main features, and
its operation
Comprehensive description and explanation of the
chlorination concept of the Facility
Steady state analysis
Transient analysis
Vent and drain calculations
Availability calculations to demonstrate planned
outages / unplanned outages are in accordance with the
reliability requirements
Energy demand calculations
List of Standards, codes and regulations applied for
design, construction and testing of the Facility
Detailed time schedule for design, construction and
commissioning
Construction approach, phases of construction,
commissioning and operation of the Facility
89
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Section in the
RFP Requirement
proposal/Reference
Cooling water systems
Surge protection systems
Services water system;
Chlorination dosing facilities
Water disposal facilities
Water quality monitoring system
Waste water, sewage treatment and storm water
collection systems treatment systems;
Service compressed air systems
Meter and monitoring systems
Fire alarm and detection, fire protection and fire fighting
systems.
3.) Description of major electrical works, systems, equipment and components including
and auxiliaries, such as:
Electrical power system philosophy
Main electrical equipment including auxiliary systems.
4.) Description of major instrumentation and control, systems, equipment and
components including and auxiliaries, such as:
General control and protection system;
Description and layout of central control rooms and
station control rooms;
Description of interfaces
Leak and leak location detection system
Cybersecurity system
5.) Description of major Civil works, including:
Preparation and development works incl. geotechnical
works, as surveys, earthworks, levelling, grading, back-
filling, etc., geotechnical design of the project structures
foundations, ground improvement, slope protection,
reparation and development works
Water supply, electricity supply, during construction
Foundations
Buildings and structures;
Administration buildings
Control Centers
Fencing including doors and gates
Sewage drainage, storm water and other waste water
drainage and discharge systems;
Ventilation and air conditioning;
Major equipment for transport, handling and unloading
at site; and
90
IWTP 4: Riyadh-Qassim IWTP RFP: Part IV
Form Sheets
Section in the
RFP Requirement
proposal/Reference
Civil design criteria including (i) proposed methods of
corrosion protection for reinforced concrete and steel
structures and (ii) proposed concrete surface protection
systems.
6.) Project specific and typical drawings of all major components and structures of the
Facility and as defined in the RFP:
Project location map with areas temporarily used during
construction for laydown, warehouses, workshops;
Typical P&I diagrams
General layout plans, Facility locations, etc.
Site plan, layout for Facilities, indication of fenced areas,
indication of areas temporarily used.
General layout drawings of stations
Typical drawings for station components, tanks,
systems, etc.
Typical pipeline drawings
Single line diagrams
ICT for the control network, telephone network, etc.
General layout indicating rerouted installations (if
applicable);
System flow diagram
Electrical equipment layout drawings;
Civil works design and architectural overall drawings;
Civil works standard design drawings;
7.) Environmental Data and Aspects, such as:
Description of type of monitoring measures
Nature and estimated quantities of waste water, waste
water treatment and disposal methods
Ambient noise distribution report proving that the
applied noise abatement measures are sufficient to
meet the required noise levels at site boundary Noise
pressure levels.