0% found this document useful (0 votes)
57 views1 page

3826.S01.SMPL - Ga.1000.p00.2 - Plans & Sections - FST Tank (5.11dia. X 3.9m)

Uploaded by

nmcarlos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

3826.S01.SMPL - Ga.1000.p00.2 - Plans & Sections - FST Tank (5.11dia. X 3.9m)

Uploaded by

nmcarlos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Drawing No: CDE No:

3826.S01.SMPL.GA.1000.P00.2 0
400 PROJECT: 3826 Chapel Row
Sikagard 63N Ø70mm
Sikatop 107 CLIENT: MEIC
Corrugated Duct
LOCATION: London

225
CUGLATON SK-B

160
Base Slab High Strength non Revision: Layout: Scale: TECN. (D/A): JoaoS
shrink grout infill 1:75
P00.2 A3 CHECKED: CarlosG 12.11.2024

100
M16 Bolt Anchor
Top Band APPROV: RobertF 12.11.2024
189
420x297

Strand Precast TITLE:


Cone
Ring Beam Wall Joint Detail Wall Panel Plans & Sections
1:10 FST Tank(5.11dia. x 3.9m)

425
Precast Concrete S01
Coping Detail STATUS: SUITABILITY:
A A
.

For Information
.. . .
.

1:15 Suitable for information


REVISION BOX
Prestressed & REV. DATE DRAWN BY CHECKED DESCRIPTION
Post Tensioned
Screed with Panel P00.1 31.10.2024 LuisF CarlosG For Information

750
slope 7.0º P00.2 12.11.2024 LuisF CarlosG Updated Levels

Stressing Panel
NOTES:

450
1. All dimensions in millimeters unless stated otherwise. Do not scale any items from this drawing.

Circumferentail 2. Where applicable, the precast identification label will reference the unit type and number based
1no. HK Assembly
Post-Tensioning By on the manufacturing sequence of units. Note that it is the responsibility of the installation team/
Internal Face: anchors 12.9mmø super strand
Plan Layout +93755 main contractor to record the as built installation order of the precast units.
U3 Finish Internal Face:
1:75 1062

600
300

3900
TWL+93230 B16-125 Longitudinal Bars 3. Units to be lifted level.
GL+93300 985 Center to Center B10-300 Transverse Bars
GWL+92800 4. Coring of holes in wall and roof panels to be carried out by Shay Murtagh Ltd personnel only.

39 75 76
159
150

189
6
R7
74
5. Rate of first fill of tank to be in the range of 600mm to 800mm per 24hrs at uniform rate.

R77
External Face: External Face:
B16-125 Longitudinal Bars 6. Post-tensioning carried out using 12.9mmø greased & polyethylene coated superstrand.
Steel Mould Finish

600
Panel Height

B10-300 Transverse Bars Stressing values:


3640

Section of Standard Panel Max. Initial = 50kN


3900

5106 Internal Face:


2no. HK Max. Final = 120kN
Tank Diameter U3 Finish 7. Joints between wall panels are treated with "SIKA-TOP 107" compound followed by 2no coats
1062 Assembly anchors
of SIKAGARD 63N to be applied to all internal joints.
985 Center to Center
1803 1500 1803 300 8. Concrete grade:
+89890 600 Precast concrete =C40/50

150
+89668

189
R76

75
74

93
+89590 Insitu concrete =C35/45
221

300

39
R77
Circumferentail 9. The mohair rolled finish shall be achieved by firstly levelling and screeding the concrete to
726

+88942 17 20 20 17 21
Post-Tensioning By produce a uniform plain or rigid surface. The screed shall then be wood float finished under
331 95 145 95 145 146
60°

12.9mmø super strand light pressure to eliminate any surface imperfections. Finally, when the concrete has hardened
300

Section of Stressing Panel sufficiently, a mohair roller shall be used to produce a uniform surface free from trowel marks.

Section A Section Through Wall Units 10. Ring beam links adjacent to the stressing units can be moved, re-drilled and post fixed using a
175

1:75 1:20 chemical adhesive to aid the installation / placement of the stressing unit.

0.985m Walls Location 11. Standards:


of P/TDuct Centers Reinforcing bars to BS. 4449-2005,
1:25 Fabric mesh to BS. 4483-2005,
Prestressing strand to BS. 5896-standard,
Post-tensioning strand to BS. 5896-super.
Hydrotite CJ Hydrophilic
Waterbar 100mm cover Wall to Ring Beam & Ring 12. The tank design assumes that the maximum ground water occurs 0.5m below ground level.
Beam to base interface,
Waterstop KEY exposed aggregate surface 13. Minimum ground bearing capacity 150kPa

Sikagard 63N Ring Beam to be Cast 14. Tolerances


B12 Lacers 300 with C32/40 Concrete Inside tank diameter = +/- 30mm
Inside launder channel radius = +/- 15mm
Floor Screed A142 B12-300 U-Bars Inside and
Inside coping diameter = +/- 30mm
Mesh Troughout Outside Wall Units
Level of coping = +/- 10mm over 10m length

300
600 Exposed Aggregate Surface
15. Backfill material to be type 6N free draining material, refer to design report for parameters.
40mm Steel leveling Shim
Top Reinforcement
300
7284 T.B.C.
Tekla Structures

Total Base Diameter Bottom Reinforcement


T.B.C.
Elevation
1:75 Wall Unit to Base Detail
1:20
| |