3826.S01.SMPL - Ga.1000.p00.2 - Plans & Sections - FST Tank (5.11dia. X 3.9m)
3826.S01.SMPL - Ga.1000.p00.2 - Plans & Sections - FST Tank (5.11dia. X 3.9m)
3826.S01.SMPL.GA.1000.P00.2 0
400 PROJECT: 3826 Chapel Row
Sikagard 63N Ø70mm
Sikatop 107 CLIENT: MEIC
Corrugated Duct
LOCATION: London
225
CUGLATON SK-B
160
Base Slab High Strength non Revision: Layout: Scale: TECN. (D/A): JoaoS
shrink grout infill 1:75
P00.2 A3 CHECKED: CarlosG 12.11.2024
100
M16 Bolt Anchor
Top Band APPROV: RobertF 12.11.2024
189
420x297
425
Precast Concrete S01
Coping Detail STATUS: SUITABILITY:
A A
.
For Information
.. . .
.
750
slope 7.0º P00.2 12.11.2024 LuisF CarlosG Updated Levels
Stressing Panel
NOTES:
450
1. All dimensions in millimeters unless stated otherwise. Do not scale any items from this drawing.
Circumferentail 2. Where applicable, the precast identification label will reference the unit type and number based
1no. HK Assembly
Post-Tensioning By on the manufacturing sequence of units. Note that it is the responsibility of the installation team/
Internal Face: anchors 12.9mmø super strand
Plan Layout +93755 main contractor to record the as built installation order of the precast units.
U3 Finish Internal Face:
1:75 1062
600
300
3900
TWL+93230 B16-125 Longitudinal Bars 3. Units to be lifted level.
GL+93300 985 Center to Center B10-300 Transverse Bars
GWL+92800 4. Coring of holes in wall and roof panels to be carried out by Shay Murtagh Ltd personnel only.
39 75 76
159
150
189
6
R7
74
5. Rate of first fill of tank to be in the range of 600mm to 800mm per 24hrs at uniform rate.
R77
External Face: External Face:
B16-125 Longitudinal Bars 6. Post-tensioning carried out using 12.9mmø greased & polyethylene coated superstrand.
Steel Mould Finish
600
Panel Height
150
+89668
189
R76
75
74
93
+89590 Insitu concrete =C35/45
221
7°
300
39
R77
Circumferentail 9. The mohair rolled finish shall be achieved by firstly levelling and screeding the concrete to
726
+88942 17 20 20 17 21
Post-Tensioning By produce a uniform plain or rigid surface. The screed shall then be wood float finished under
331 95 145 95 145 146
60°
12.9mmø super strand light pressure to eliminate any surface imperfections. Finally, when the concrete has hardened
300
Section of Stressing Panel sufficiently, a mohair roller shall be used to produce a uniform surface free from trowel marks.
Section A Section Through Wall Units 10. Ring beam links adjacent to the stressing units can be moved, re-drilled and post fixed using a
175
1:75 1:20 chemical adhesive to aid the installation / placement of the stressing unit.
300
600 Exposed Aggregate Surface
15. Backfill material to be type 6N free draining material, refer to design report for parameters.
40mm Steel leveling Shim
Top Reinforcement
300
7284 T.B.C.
Tekla Structures