Expedite Construction Work of Approach Slab - 09.01.2025

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

Expedite Construction Work of Approach Slab - 09.01.2025

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

LNMIPL/NHAI/Kap-Thali-Kodg/NH 66/2024-25/

09.01.2025

To,
The Authorized Signatory
Kodungallur Highways Pvt. Limited
Triprayar East Nada-680565

Project: Independent Engineering Services for Six Laning from Kappirikkad to


Thalikkulam to Kodungallur Section of NH-66 (OLD NH-17) from Design Ch.335+850 to
Design Ch.369+015 to Design Ch.397+750 in the state of Kerala on Hybrid Annuity
Mode (HAM) under Bharatmala Priyojana .

Subject: Urgent Request to Expedite Construction Work of Approach Slab for


Minor Bridge at
KM 369+064 with Proper Safety Arrangements - Reg

Dear Sir,
This is to bring to your attention that the construction work of the approach slab for
the minor bridge at KM 369+064 is progressing at a slow pace, despite several
reminders issued earlier. Meanwhile, the existing operational traffic movement in the
area continues without the required approach slab, posing significant safety risks to
road users.

Considering the critical nature of the situation, we request you to


1. Expedite the completion of the approach slab construction work without
further delays.
2. Ensure that proper safety arrangements, especially during night hours, are
implemented
at the site. This includes adequate lighting, signage, barricades, and
deployment of trained
personnel to manage traffic and ensure public safety.

It is executed with utmost priority to avoid accidents and to ensure compliance with
the
prescribed standards.

Kindly provide us with an updated work schedule and a detailed plan for
implementing safety
measures at the earliest.

Thanks & Regards,


For L.N. Malviya Infra Projects Private Limited,
In Association with M/s Intratech Civil Solutions & Consultant.
Team Leader
Independent Engineer.

CC:1) The Project Director, PIU, NHAI, Cochin – For information.


2) The Project Coordinator, LNMIPL, Bhopal – for information.