Alemalkef Geto
Alemalkef Geto
Site handover
1 Site clearing m² 250.74 2
2 pit excavation m³ 54.15 3 1
3 Backfill under hard core m³ 26.06 3 13
250 mm thick basaltic stone m² 89.00
4 hardcore 4 3
5 Lean concrete Under masonry m² 27.06 1 2
6 C-25 concrete In grade beams m³ 5.69 1 8
C-25 concrete In 100 mm thick floor m² 161.68
7 slab 2 4,9
8 Form work To grade beams, errection m² 55.96 3 13
Form work To grade beams, m² 55.96
9 dismantling 1 6
10 Dia 6 mm deformed bar kg 6.00 7
11 Dia 8 mm deformed bar kg 180.00 7
400 mm thick basaltic stone m³ 54.15
12 masonry, below ground surface. 10 5
400 mm thick basaltic stone m³ 16.25
13 masonry, above ground surface. 4 12
14 C-25 In elevation columns m³ 1.98 1 16
15 C-25 In roof beams m³ 4.54 1 17
16 Form work For elevation columns m² 10.32 1 7
17 Form work For roof beams, errection m² 55.96 7 14
Form work For roof beams, dismantling m² 56.96
18 1 15
19 Dia 8 mm deformed bar kg 77.70 15
20 Dia 12 mm deformed bar kg 217.03 15
21 Class C, 200 mm thick HCB wall m² 229.25 21 18
22 Class C, 100 mm thick HCB wall m² 54.53 21 21
23 Roof cover, USG 30 m² 223.26 4 27
G-30 galvanized flat metal sheet m 48.80
24 gutter 2 23,30
Eucalyptus wood Horizontal truss m 358.15
25 members. Size dia.100 mm 7 15
Eucalyptus wood vertical & diagonal m 105.40
26 truss members. Size dia.80 mm 7 15
30 Tid wood Facia board m 68.20 1 37
33 MD Type D2: Size 700 x 2100 mm No. 5.00 2 32
3 coats of Plaster To internal wall m² 324.03
36 surface 15 21,22
3 coats of Plaster To external wall m² 191.37
37 surface 15 21,22
38 Two coats of plastering m² 62.25 15 21,22
48 mm thick trowel finished cement m² 18.00
39 sand screed (1:3) to receive PVC tile 3 36
40 PVC floor tile, 2 mm thick m² 18.00 1 39,47,48,49
41 PVC skirting, 60 mm wide m² 54.60 1 40
42 Terrazzo floor tile, 20 mm thick. m² 54.00 3 39
Terrazzo skirting stuck to wall, 100 m² 85.80
43 mm wide. 3 42
Project completion
Indirect costs
Site office 1500 birr/mon
Project manager 6000 birr/mon
office and site engineers 6000 birr/mon
Car for service 7500 birr/mon
other expenses 10000 birr/mon
Table Resourse Break Down
Fill
05 Foundation m3 76
06 Hardcore m3 71
Sub-Base
08 Hard core 25 cm thick m2 89
TOTAL TO SUMMARY……………………BIRR
Reinforced super-structure
08 C-25 in elevation columns m3 5.10
Form work
Sub structure normal finish to:-
14 Grade beam (erection) m2 138
Grade beam (dismantling)
Reinforcement
Sub structure
20 Diameter 6 mm (bending) kg 6
Diameter6 mm (placing)
Diameter6 mm (placing)
03) ROOFING
01 Roof cover in precoated or galvanized EGA -500 (t= 0.5 mm) m² 124.0
Ribed HCB
Daily laborer 70 5670
Gang leader 2.5 202.5
Mason 1.25 101.25
Cement 1.5 121.5
Sand 0.48 38.88
Daily laborer
Plasterer
Cement (qtl)
Sand (m3)
Fuel (lit)
Daily laborer
Plasterer
Cement (qtl)
Sand (m3)
Fuel (lit)
Eucalyptus diam 8 cm (ml)
Nails (kg)
Daily laborer
Tiller
Cement (qtl)
Sand (m3)
Terrazzo tile (m2)
Fuel (lit)
Daily laborer
Tiller
Cement (qtl)
Sand (m3)
Terrazzo skirting (ml)
Fuel (lit)
Item no Description Unit
A-SUB STRUCTURE
2. CONCRETE WORK
2.01
5 cm lean concrete quality C-5, 150 kg of cement/m3, under
2.03 Provide, cut and fix in position sawn zigba wood or steel
formwork to:
a) To grade beams m2
2.04
Mild steel reinforcement according to structural drawings. Price
includes cutting, bending, placing in position and tying wire.
3. MASONERY WORK
B-SUPER STRUCTURE
1. CONCRETE WORK
1.01
Reinforced concrete quality C-25,360 kg of cement/m3 filled in
to form work and vibrated around rod reinforcement (formwork
and reinforcement measured separately)
a) In elevation columns m3
b) In suspended beams m3
1.02
150mm thick floor slab according to the detail structural drawing
m3
1.03 Provide, cut and fix in position sawn zigba wood or steel
formwork to:
a) To elevation columns m2
b) To suspended floor beams m2
1.04
Mild steel reinforcement according to structural drawings. Price
includes cutting, bending, placing in position and tying wire.
2. MASONRY WORK
2.01
20cm thick HCB wall which can satisfy the designed strength ,
bedded in cement mortar (1:3).Price shall include mortar bed
m²
3.01 Roof cover in precoated or galvanized EGA -500 (t= 0.5 mm),
fixed to wood purlins,price shall include ridge cap, and bolts.
(Purlins measured separately and roof measured in horizontal
projection) m²
3.02 Supply and fix G-28 galvanized flat metal sheet gutter and
copings per the detail drawing. Price shall include all necessary
accessories including metal bracket holder. Development length
=500 mm ml
3.03 Vally Gutter (detail is Nessorar) ml
4.01 Supply and fix 40mm. thick flush wood door with hard wood
frames and both sides covered with best quality 4mm. thick ply
wood. Price includes approved quality lock, hinges, three coats
of varnish paint, door stopper and all necessary accessories to
comp
D1 size:700x2100 mm. No
D2 size:800x2100 mm No
5. METAL WORK
5.01 Windows and Doors are manufactured from LTZ profile all as per
the engineers approval and window door schedule. Unit price
includes one coat of antirust and two coats of syntatic enamel
paint, door stopper, best quality lock with handle and other
necessar
a) WINDOWS
W4 Size 1800x1100 mm No
6. FINISHING
.................. 25,373.00
.................. 16,501.00
................. 61,257.00
.................. 35,603.50
.................. 24,118.00
.................. 10,395.00
.................. 2,178.0
.................. 54,630.0
t house 242,405.50
c tank 40,902.60
TOTTAL 283,308.10
Item no Description Unit
A-SUB STRUCTURE
2. CONCRETE WORK
a) bottom slab m3
b) for upper slab and holes m3
3.03
steel reinforcement according to structural drawings. Price
includes cutting, bending, placing in position and tying wire.
b) Dia 8 mm kg
c) Dia 12 mm kg
3.04 Provide, cut and fix in position sawn zigba wood or steel
formwork to:
a) for bottom slab m2
b) for upper slab and man holes m2
Total carried to Summary...................................................................
4. block work
4.01 15cm thick HCB wall bedded in cement mortar (1:3) m2
total caried to summary
5. finishing
apply three coats of plastering in cement mortar (1:3) mix ratio
5.01 m2
to internal wall surface
total caried to summary
.................. 3,650.55
.................. 4,125.00
52.00
19.79
52.00
40,902.60