Al Haeer Road Interchange Overpass 2 Abutments Geometry
Al Haeer Road Interchange Overpass 2 Abutments Geometry
664
+551.952
9.60 0.02
0.30 4.50 4.50 0.30 551.384 0.10 5.00 0.50 1.70
+549.694
D-B
D-A
1.97
+549.964 -
2.35
+549.424 -
TRANSITION SLAB 5%
4.99
10%
4.41
0.38
1.14
LEAN CONCRETE t=10 cm
1.00 1.00
1.02
14.29
14.00
14.00
13.71
12.03
12.03
V-02 V-03
10.11
- -
9.30
9.30
0.50 0.50 6.70 1.50 1.80
1.50
1.50
NOTES:
1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
3 0.10 10.60 0.10 2 0.10 10.00 0.10 3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
LEAN CONCRETE t=10 cm CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ELEVATION V-01 SECTION S-01 ERRORS.
S-01
-
00 10/11/2024 SUBMISSION FOR APPROVAL -
REVISION TABLE
0.50 0.60 8.40 0.60 0.50
1
4 Client:
0.10
8.20
V-02 V-03
Project:
- -
SECOND SOUTHERN RING ROAD
(SECTION 3)
6.50
PMCM: PMO:
5.00
0.10 0.10 ®
8.20
S-02 S-02
- -
Designer:
10.00
0.02
0.50
Contractor:
1.00
1.70
0.30 0.30
0.70
1.50 1.50
9.60
Status:
SHOP DRAWINGS
1.80
Drawing Title:
0.10
RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 001 00 01 of 06
8.20 8.20
6.50 1.70 1.70 6.50
0.70
0.30
0.70
0.30
4.06
3.48
1.85
1.85
14.06
13.99
13.48
13.41
9.30
9.30
1.85 6.35 1.80 1.80 6.35 1.85
1.50
ELEVATION V-02 ELEVATION V-03
NOTES:
SCALE 1:60 SCALE 1:60
UNITS IN m
- UNITS IN m
- 1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
4 0.10 10.00 0.10 3 2 0.10 10.00 0.10
1 3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
0.60 8.40 0.60 CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ERRORS.
TRANSITION SLAB
ASPHALT-IMPREGNATED LINEN
00 10/11/2024 SUBMISSION FOR APPROVAL -
var.
WITH 2CM THICKNESS
var.
REVISION TABLE
BITUMINOUS PAINT TWO COATS WITH 250-300
0.020
0.100 0.100
1.00 1.00
Project:
UNITS IN m ®
var.
DIMPLE DRAINAGE HDPE SHEET WITH DIMPLED
HEIGHT APPROX. 20 MM
9.30
Ø160 MM PIPE WITH CONNECTION TO EXTERNAL
RAINWATER NETWORK NATURAL GROUND LEVEL
0.054
Contractor:
0.10
1.50
BE TUCKED UP TO WRAP THE CONCRETE FOOTING AFTER
THE FORM REMOVAL. SECTION S-02 0.10 0.10 LEAN CONCRETE t=10 cm Drawing Number: Scales:
A1=1:500
SCALE 1:60 SCALE 1:60 RP01-RCRC-ACH-SSRR-03-D-04-B11-STR-GEN-SHD-00004-002-00 A3=1:1000
UNITS IN m UNITS IN m
-
Sheet:
RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 002 00 02 of 06
A+0.24
T1
Bt2
T2
T
Bt1
DOWN STAND
B+0.24
B+0.24
H
BEARING PLINTH
Bt4
Bt3
T4
Bt
T3
5%
A+0.24 A+0.24 A+0.24
A1-DOWN STAND 0.8 0.7 0.05 0.129 0.321 0.064 0.093 0.036 0.007
A1-BEARING PLINTH 0.8 0.7 0.05 0.129 0.321 0.183 0.131 0.075 0.127
A1 C.H.0+539.262
NOTES:
POINT X Y Z 1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
Client:
Project:
PMCM: PMO:
Designer:
Contractor:
Status:
SHOP DRAWINGS
Drawing Title:
RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 003 00 03 of 06
+552.782
+552.494 +553.070 D-B
9.60 -
0.30 4.50 4.50 0.30 0.02
0.10 5.00 0.50 1.70
1.98
2.37
+550.532 -
TRANSITION SLAB 5%
4.99
10%
4.41
0.38
1.14
LEAN CONCRETE t=10 cm
1.00 1.00
1.02
V-03
10.99
V-02
10.70
10.70
10.41
- -
8.72
8.72
6.80
6.00
6.00
0.50 0.50 6.70 1.50 1.10
1.50
1.50
3 0.10 10.60 0.10 2 0.10 9.30 0.10
NOTES:
LEAN CONCRETE t=10 cm
1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
ELEVATION V-01 SECTION S-01 2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
SCALE 1:60 SCALE 1:60
UNITS IN m
- UNITS IN m
- 4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ERRORS.
S-01
- 00 10/11/2024 SUBMISSION FOR APPROVAL -
REVISION TABLE
8.20
Project:
PMCM: PMO:
6.50
5.00
0.10 0.10
8.20
Designer:
9.30
S-02 S-02
- -
0.02
Contractor:
0.50
1.00
1.70
0.30 0.30
0.70
1.50 1.50
9.60 Status:
SHOP DRAWINGS
1.10
Drawing Title:
0.10
RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 004 00 04 of 06
8.20 8.20
6.50 1.70 1.70 6.50
0.70
0.30
0.70
0.30
4.14
3.57
10.84
10.69
3.30
10.27
3.30
10.11
6.00
6.00
3.30 4.90 1.10 1.10 4.90 3.30
1.50
1.50
4 0.10 9.30 0.10 3 2 0.10 9.30 0.10 1
9.60
Client:
0.020
var.
var.
0.100 0.100
Project:
BITUMINOUS PAINT TWO COATS WITH 250-300 DETAIL D-A PMCM: PMO:
var.
MICRONS THICKNESS SCALE 1:7.5
-
var.
®
UNITS IN m
6.00
SLOTED DRAINAGE UPVC CLASS 4 DOUBLE WALL
Ø160 MM PIPE WITH CONNECTION TO EXTERNAL Contractor:
0.054
ABUTMENT
ALL UNDERGROUND CONCRETE STRUCTURES MUST BE DAMP
PROOFED WITH BITUMINOUS EMULSION 250-300 MICRONS DFT.
DETAIL D-B
0.50 1.60 6.40 1.60 0.50
SCALE 1:25
UNITS IN m
-
Status:
SHOP DRAWINGS
Drawing Title:
1.50
1.50
AL HAEER ROAD INTERCHANGE OVERPASS 2
0.10 0.10
ABUTMENT 2 GEOMETRY
Drawing Number:
Huang Jiarui Yang Shuangxi
Scales:
DETAIL DRAINAGE BE TUCKED UP TO WRAP THE CONCRETE FOOTING AFTER
THE FORM REMOVAL.
SCALE 1:60
UNITS IN m
- RP01-RCRC-ACH-SSRR-03-D-04-B11-STR-GEN-SHD-00004-005-00 A1=1:500
A3=1:1000
SCALE 1:60 Sheet:
UNITS IN m
RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 005 00 05 of 06
A+0.24
T1
Bt2
T2
T
Bt1
DOWN STAND
B+0.24
B+0.24
H
BEARING PLINTH
Bt4
Bt3
T4
Bt
T3
5%
A+0.24 A+0.24 A+0.24
A2-DOWN STAND 0.8 0.7 0.05 0.129 0.321 0.086 0.071 0.014 0.029
A2-BEARING PLINTH 0.8 0.7 0.05 0.129 0.321 0.183 0.131 0.075 0.127
A2 C.H.0+685.758
NOTES:
POINT X Y Z 1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
1 682030.774 2709870.000 540.582 CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ERRORS.
Client:
Project:
PMCM: PMO:
Designer:
Contractor:
Status:
SHOP DRAWINGS
Drawing Title:
RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 006 00 06 of 06