Al Haeer Road Interchange Overpass 2 Abutments Geometry

AL HAEER ROAD INTERCHANGE OVERPASS 2 ABUTMENTS GEOMETRY

Uploaded by

Syed Munawar Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views6 pages

Al Haeer Road Interchange Overpass 2 Abutments Geometry

AL HAEER ROAD INTERCHANGE OVERPASS 2 ABUTMENTS GEOMETRY

Uploaded by

Syed Munawar Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

+551.

664
+551.952
9.60 0.02
0.30 4.50 4.50 0.30 551.384 0.10 5.00 0.50 1.70

+549.694
D-B
D-A

1.97
+549.964 -

2.35
+549.424 -
TRANSITION SLAB 5%

4.99
10%

4.41

0.38
1.14
LEAN CONCRETE t=10 cm

1.00 1.00
1.02
14.29

14.00

14.00
13.71
12.03

12.03
V-02 V-03

10.11
- -
9.30

9.30
0.50 0.50 6.70 1.50 1.80
1.50

1.50
NOTES:
1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
3 0.10 10.60 0.10 2 0.10 10.00 0.10 3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
LEAN CONCRETE t=10 cm CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ELEVATION V-01 SECTION S-01 ERRORS.

SCALE 1:60 SCALE 1:60


UNITS IN m
- UNITS IN m
-

S-01
-
00 10/11/2024 SUBMISSION FOR APPROVAL -

REVISION TABLE
0.50 0.60 8.40 0.60 0.50
1
4 Client:
0.10

8.20

V-02 V-03
Project:
- -
SECOND SOUTHERN RING ROAD
(SECTION 3)
6.50

PMCM: PMO:
5.00

0.10 0.10 ®
8.20

S-02 S-02
- -
Designer:
10.00

0.02
0.50

Contractor:
1.00

1.70

0.30 0.30
0.70

1.50 1.50

9.60
Status:
SHOP DRAWINGS
1.80

Drawing Title:
0.10

AL HAEER ROAD INTERCHANGE OVERPASS 2


3 0.10 10.60 0.10 ABUTMENT 1 GEOMETRY
2

Designed: Drawn: Checked: Approved: Date:


PLAN VIEW V-01 Zhang Guojin 10/11/2024
S-01 Huang Jiarui Huang Jiarui Yang Shuangxi
SCALE 1:60 - Drawing Number: Scales:
UNITS IN m - RP01-RCRC-ACH-SSRR-03-D-04-B11-STR-GEN-SHD-00004-001-00 A1=1:500
A3=1:1000
Sheet:

RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 001 00 01 of 06
8.20 8.20
6.50 1.70 1.70 6.50

0.70

0.30

0.70
0.30
4.06

3.48
1.85

1.85
14.06

13.99

13.48
13.41
9.30

9.30
1.85 6.35 1.80 1.80 6.35 1.85

LEAN CONCRETE t=10 cm


LEAN CONCRETE t=10 cm
1.50

1.50
ELEVATION V-02 ELEVATION V-03
NOTES:
SCALE 1:60 SCALE 1:60
UNITS IN m
- UNITS IN m
- 1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
4 0.10 10.00 0.10 3 2 0.10 10.00 0.10
1 3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
0.60 8.40 0.60 CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ERRORS.

TRANSITION SLAB

ASPHALT-IMPREGNATED LINEN
00 10/11/2024 SUBMISSION FOR APPROVAL -

var.
WITH 2CM THICKNESS

var.
REVISION TABLE
BITUMINOUS PAINT TWO COATS WITH 250-300
0.020

MICRONS THICKNESS Client:


0.020

0.100 0.100
1.00 1.00

Project:

DRAIN PERFORATED UPVC CLASS 4 DOUBLE SECOND SOUTHERN RING ROAD


WALL 80MM PIPE
(SECTION 3)
BITUMINOUS PAINT TWO COATS WITH 250-300
MICRONS THICKNESS
DETAIL D-A PMCM: PMO:
SCALE 1:7.5
-
var.

UNITS IN m ®

var.
DIMPLE DRAINAGE HDPE SHEET WITH DIMPLED
HEIGHT APPROX. 20 MM

SN 200 GR/M2 GEOTEXTILE GEOTEXTIL 0.500 Designer:


ANTI-PUNCTURE PROTECTION
0.280 0.220 DECK

SLOTED DRAINAGE UPVC CLASS 4 DOUBLE WALL


9.30

9.30
Ø160 MM PIPE WITH CONNECTION TO EXTERNAL
RAINWATER NETWORK NATURAL GROUND LEVEL
0.054

Contractor:
0.10

ALL UNDERGROUND CONCRETE STRUCTURES MUST BE DAMP


ABUTMENT
PROOFED WITH BITUMINOUS EMULSION 250-300 MICRONS DFT. DETAIL D-B
SCALE 1:25
UNITS IN m
-
Status:
SHOP DRAWINGS
Drawing Title:

0.50 1.60 6.40 1.60 0.50 AL HAEER ROAD INTERCHANGE OVERPASS 2


ABUTMENT 1 GEOMETRY
POLYETHYLENE VAPOR BARRIER SHALL BE PLACED
BETWEEN CONCRETE BLINDING AND CONCRETE FOOTING Designed: Drawn: Checked: Approved: Date:
LEAVING EXTRA WIDTH ON BOTH SIDES WHICH SHALL THEN Zhang Guojin 10/11/2024
Huang Jiarui Huang Jiarui Yang Shuangxi
DETAIL DRAINAGE
1.50

1.50
BE TUCKED UP TO WRAP THE CONCRETE FOOTING AFTER
THE FORM REMOVAL. SECTION S-02 0.10 0.10 LEAN CONCRETE t=10 cm Drawing Number: Scales:
A1=1:500
SCALE 1:60 SCALE 1:60 RP01-RCRC-ACH-SSRR-03-D-04-B11-STR-GEN-SHD-00004-002-00 A3=1:1000
UNITS IN m UNITS IN m
-
Sheet:

RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 002 00 02 of 06
A+0.24

T1

Bt2
T2
T

Bt1
DOWN STAND

B+0.24
B+0.24
H
BEARING PLINTH

Bt4

Bt3
T4
Bt

T3
5%
A+0.24 A+0.24 A+0.24

DOWN STAND details BEARING PLINTH details


BRIDGE SUPPORT DETAIL SCALE 1:40 SCALE 1:40
SCALE 1:12.5 UNITS IN m UNITS IN m
UNITS IN m

PARAMETER TABLE FOR BEARING PLINTH AND DOWN STAND

ELEMENT A(m) B(m) T ( m) Bt( m) H( m) T1( m) T2( m) T3( m) T4( m)

A1-DOWN STAND 0.8 0.7 0.05 0.129 0.321 0.064 0.093 0.036 0.007

PARAMETER TABLE FOR BEARING PLINTH AND DOWN STAND

ELEMENT A(m) B(m) T ( m) Bt( m) H( m) Bt1( m) Bt2( m) Bt3( m) Bt4( m)

A1-BEARING PLINTH 0.8 0.7 0.05 0.129 0.321 0.183 0.131 0.075 0.127

A1 C.H.0+539.262

NOTES:
POINT X Y Z 1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.

1 682099.732 2709703.074 536.164


(1) These levels are the bottom levels of 4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ERRORS.
blinding but the marking done is of top of
2 682098.011 2709712.925 536.164 blinding.
(2) The levels are +536.174
3 682108.453 2709714.749 536.164

00 10/11/2024 SUBMISSION FOR APPROVAL -


4 682110.174 2709704.898 536.164
REVISION TABLE

Client:

Project:

SECOND SOUTHERN RING ROAD


(SECTION 3)

PMCM: PMO:

Designer:

Contractor:

Status:
SHOP DRAWINGS
Drawing Title:

AL HAEER ROAD INTERCHANGE OVERPASS 2


ABUTMENT 1 GEOMETRY

Designed: Drawn: Checked: Approved: Date:

Huang Jiarui Huang Jiarui Zhang Guojin Yang Shuangxi 10/11/2024


Drawing Number: Scales:
A1=1:500
RP01-RCRC-ACH-SSRR-03-D-04-B11-STR-GEN-SHD-00004-003-00 A3=1:1000
Sheet:

RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 003 00 03 of 06
+552.782
+552.494 +553.070 D-B
9.60 -
0.30 4.50 4.50 0.30 0.02
0.10 5.00 0.50 1.70

+550.802 +551.072 D-A

1.98

2.37
+550.532 -
TRANSITION SLAB 5%

4.99
10%
4.41

0.38
1.14
LEAN CONCRETE t=10 cm

1.00 1.00
1.02

V-03

10.99
V-02
10.70

10.70
10.41

- -
8.72

8.72
6.80
6.00

6.00
0.50 0.50 6.70 1.50 1.10
1.50

1.50
3 0.10 10.60 0.10 2 0.10 9.30 0.10
NOTES:
LEAN CONCRETE t=10 cm
1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
ELEVATION V-01 SECTION S-01 2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
SCALE 1:60 SCALE 1:60
UNITS IN m
- UNITS IN m
- 4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ERRORS.

S-01
- 00 10/11/2024 SUBMISSION FOR APPROVAL -

REVISION TABLE

0.50 0.60 8.40 0.60 0.50 Client:


1
4
0.10

8.20

Project:

V-02 V-03 SECOND SOUTHERN RING ROAD


- - (SECTION 3)

PMCM: PMO:
6.50
5.00

0.10 0.10
8.20

Designer:
9.30

S-02 S-02
- -
0.02

Contractor:
0.50
1.00

1.70

0.30 0.30
0.70

1.50 1.50

9.60 Status:
SHOP DRAWINGS
1.10

Drawing Title:
0.10

3 0.10 AL HAEER ROAD INTERCHANGE OVERPASS 2


10.60 0.10
2 ABUTMENT 2 GEOMETRY

PLAN VIEW V-01 Designed: Drawn: Checked: Approved: Date:


S-01
SCALE 1:60 - Huang Jiarui Huang Jiarui Zhang Guojin Yang Shuangxi 10/11/2024
UNITS IN m - Drawing Number: Scales:
A1=1:500
RP01-RCRC-ACH-SSRR-03-D-04-B11-STR-GEN-SHD-00004-004-00 A3=1:1000
Sheet:

RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 004 00 04 of 06
8.20 8.20
6.50 1.70 1.70 6.50

0.70
0.30
0.70

0.30

4.14
3.57

10.84
10.69
3.30
10.27

3.30

10.11
6.00

6.00
3.30 4.90 1.10 1.10 4.90 3.30
1.50

1.50
4 0.10 9.30 0.10 3 2 0.10 9.30 0.10 1

LEAN CONCRETE t=10 cm LEAN CONCRETE t=10 cm NOTES:


ELEVATION V-02 ELEVATION V-03 1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
SCALE 1:60 SCALE 1:60 3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
UNITS IN m
- UNITS IN m
-
4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ERRORS.

9.60

0.60 8.40 0.60


TRANSITION SLAB

00 10/11/2024 SUBMISSION FOR APPROVAL -


ASPHALT-IMPREGNATED LINEN
WITH 2CM THICKNESS REVISION TABLE

Client:
0.020

BITUMINOUS PAINT TWO COATS WITH 250-300


MICRONS THICKNESS 0.020

var.
var.
0.100 0.100

Project:

SECOND SOUTHERN RING ROAD


DRAIN PERFORATED UPVC CLASS 4 DOUBLE
WALL 80MM PIPE 1.00 1.00 (SECTION 3)

BITUMINOUS PAINT TWO COATS WITH 250-300 DETAIL D-A PMCM: PMO:

var.
MICRONS THICKNESS SCALE 1:7.5
-
var.

®
UNITS IN m

DIMPLE DRAINAGE HDPE SHEET WITH DIMPLED


HEIGHT APPROX. 20 MM
Designer:
0.500
SN 200 GR/M2 GEOTEXTILE GEOTEXTIL
ANTI-PUNCTURE PROTECTION 0.280 0.220 DECK
6.00

6.00
SLOTED DRAINAGE UPVC CLASS 4 DOUBLE WALL
Ø160 MM PIPE WITH CONNECTION TO EXTERNAL Contractor:
0.054

RAINWATER NETWORK NATURAL GROUND LEVEL


0.10

ABUTMENT
ALL UNDERGROUND CONCRETE STRUCTURES MUST BE DAMP
PROOFED WITH BITUMINOUS EMULSION 250-300 MICRONS DFT.
DETAIL D-B
0.50 1.60 6.40 1.60 0.50
SCALE 1:25
UNITS IN m
-
Status:
SHOP DRAWINGS
Drawing Title:
1.50

1.50
AL HAEER ROAD INTERCHANGE OVERPASS 2
0.10 0.10
ABUTMENT 2 GEOMETRY

Designed: Drawn: Checked: Approved: Date:


POLYETHYLENE VAPOR BARRIER SHALL BE PLACED LEAN CONCRETE t=10 cm Zhang Guojin 10/11/2024
BETWEEN CONCRETE BLINDING AND CONCRETE FOOTING
LEAVING EXTRA WIDTH ON BOTH SIDES WHICH SHALL THEN
SECTION S-02 Huang Jiarui

Drawing Number:
Huang Jiarui Yang Shuangxi
Scales:
DETAIL DRAINAGE BE TUCKED UP TO WRAP THE CONCRETE FOOTING AFTER
THE FORM REMOVAL.
SCALE 1:60
UNITS IN m
- RP01-RCRC-ACH-SSRR-03-D-04-B11-STR-GEN-SHD-00004-005-00 A1=1:500
A3=1:1000
SCALE 1:60 Sheet:
UNITS IN m
RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 005 00 05 of 06
A+0.24

T1

Bt2
T2
T

Bt1
DOWN STAND

B+0.24
B+0.24
H
BEARING PLINTH

Bt4

Bt3
T4
Bt

T3
5%
A+0.24 A+0.24 A+0.24

DOWN STAND details BEARING PLINTH details


BRIDGE SUPPORT DETAIL SCALE 1:40 SCALE 1:40
SCALE 1:12.5 UNITS IN m UNITS IN m
UNITS IN m

PARAMETER TABLE FOR BEARING PLINTH AND DOWN STAND

ELEMENT A(m) B(m) T ( m) Bt( m) H( m) T1( m) T2( m) T3( m) T4( m)

A2-DOWN STAND 0.8 0.7 0.05 0.129 0.321 0.086 0.071 0.014 0.029

PARAMETER TABLE FOR BEARING PLINTH AND DOWN STAND

ELEMENT A(m) B(m) T ( m) Bt( m) H( m) Bt1( m) Bt2( m) Bt3( m) Bt4( m)

A2-BEARING PLINTH 0.8 0.7 0.05 0.129 0.321 0.183 0.131 0.075 0.127

A2 C.H.0+685.758

NOTES:
POINT X Y Z 1.ALL DRAWINGS ARE BASED ON TENDER DRAWINGS AND SPECIFICATIONS.
2.THE ABUTMENT BACKFILL MATERIAL HAS BEEN CONSIDERED WITH A DENSITY OF 18kN/m³.
3.THE HEIGHT OF THE BEARING SYSTEM OF THE BRIDGE IS 50cm.
4.BEFORE CONSTRUCTION, THE ELEVATION AND COORDINATES SHOULD BE CAREFULLY
1 682030.774 2709870.000 540.582 CHECKED. CONSTRUCTION CAN PROCEED ONLY AFTER CONFIRMING THAT THERE ARE NO
ERRORS.

2 682036.931 2709863.030 540.582

3 682028.987 2709856.012 540.582

00 10/11/2024 SUBMISSION FOR APPROVAL -


4 682022.830 2709862.982 540.582
REVISION TABLE

Client:

Project:

SECOND SOUTHERN RING ROAD


(SECTION 3)

PMCM: PMO:

Designer:

Contractor:

Status:
SHOP DRAWINGS
Drawing Title:

AL HAEER ROAD INTERCHANGE OVERPASS 2


ABUTMENT 2 GEOMETRY

Designed: Drawn: Checked: Approved: Date:

Huang Jiarui Huang Jiarui Zhang Guojin Yang Shuangxi 10/11/2024


Drawing Number: Scales:
A1=1:500
RP01-RCRC-ACH-SSRR-03-D-04-B11-STR-GEN-SHD-00004-006-00 A3=1:1000
Sheet:

RP01 RCRC ACH SSRR 03 D 04 B11 STR GEN SHD 00004 006 00 06 of 06