0% found this document useful (0 votes)
8 views2 pages

Anonymous@2024 12 01 22 38 02 - Ml-C-500-Anonymous@2024 12 01 22 38 02-20241201223947226

Uploaded by

jesus franco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views2 pages

Anonymous@2024 12 01 22 38 02 - Ml-C-500-Anonymous@2024 12 01 22 38 02-20241201223947226

Uploaded by

jesus franco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Model 500 Maintenance Manual (Rev 41)

5-12-41 (Rev 35)

INSPECTION PHASE 41
Date: _______________
Registration Number: _______________
Serial Number: _______________
Total Time: _______________
1. Description
A. Phase 41 consists of items to be inspected at the first 3700 hours and every 1200 hours thereafter on airplanes -0001
thru -0489 except Airplanes incorporating SB55-3 and Airplanes -0001 thru -0489 incorporating bird strike
configuration (Airplanes registered in the Netherlands or France).
B. Inspection items are given in the sequence of the zone in which the inspection is completed. A description of the
inspection, as well as the Item Code Number are supplied for cross-reference to section 5-10-01. Frequently, tasks
give more information about each inspection. These tasks are found in the individual chapters of this manual.
C. The right portion of each page gives space for the mechanic's and inspector's initials and remarks. You can use
copies of these pages as a checklist while you complete the tasks in this Inspection Phase.
2. General Inspection Criteria
A. As you complete each of the inspection tasks in this Inspection Phase, examine the adjacent area while access is
available to find conditions that need more maintenance.
B. If it is necessary to replace a component or to make a change to a system while you complete a task, do the task
again before the system or component is returned to service.
C. (Phase) Inspection Kits are available for some Inspection Phase Documents. They supply consumable materials used
to complete the inspection item(s) given for the interval. Refer to the Model 500 Illustrated Parts Catalog, Introduction,
Phase Inspection Kit List to find applicable part numbers.
ITEM CODE TASK ZONE MECH INSP REMARKS
NUMBER

A551005 Horizontal Stabilizer - Inspect. Task 55-10-00-261 331, 332

*** End of Phase 41 Inspection Items ***

Copyright © Textron Aviation Inc. Page 1 of 1


Retain printed data for historical reference only. For future maintenance, use only current data. Print Date: Sun Dec 01 20:39:47 CST 2024
Model 500 Maintenance Manual (Rev 41)
55-10-00 (Rev 40)

TASK 55-10-00-261
9. Horizontal Stabilizer X-Ray Inspection
A. Perform X-Ray inspection.
(1) Inspect the horizontal stabilizer leading edge ribs for cracks. Use the applicable test procedure described in the
Model 500 Series Nondestructive Testing Manual, Part 2, Horizontal Stabilizer Leading Edge Ribs.
(2) A single crack of less than 0.750 inch in length is permitted in each rib.
(3) More than one crack in one rib or cracks in excess of 0.750 inch will require replacement of the rib(s) in
accordance with SB500-55-03.
END OF TASK

Copyright © Textron Aviation Inc. Page 1 of 1


Retain printed data for historical reference only. For future maintenance, use only current data. Print Date: Sun Dec 01 20:39:49 CST 2024

You might also like