A202 - Foundation Drawing For STS-6000K&STS-3000K&JUPITER-6000K&JUPITER-3000K

The document outlines the technical requirements and foundation drawing for smart transformer stations STS-6000K, STS-3000K, JUPITER-6000K, and JUPITER-3000K. It specifies dimensions, weight limits, oil specifications, and construction guidelines to ensure proper installation and safety. Additionally, it emphasizes the need for the foundation to be above the highest local water level and includes restrictions on reproduction of the document's content.

Uploaded by

Lindy Portsu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
477 views2 pages

A202 - Foundation Drawing For STS-6000K&STS-3000K&JUPITER-6000K&JUPITER-3000K

The document outlines the technical requirements and foundation drawing for smart transformer stations STS-6000K, STS-3000K, JUPITER-6000K, and JUPITER-3000K. It specifies dimensions, weight limits, oil specifications, and construction guidelines to ensure proper installation and safety. Additionally, it emphasizes the need for the foundation to be above the highest local water level and includes restrictions on reproduction of the document's content.

Uploaded by

Lindy Portsu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

A

Covered here to
Seal the gaps between base frame and prevent external
foundation with concrete/cement around STS water from
flowing back

Ground level
OIL TRAY
Concrete OIL TRAY
pillar
Cable entry

Please reserved the oil tray top opening of the


width direction, for the arc pressure relief
Ambient soil
SIPHON

A A-A STS side


B-B STS side

concrete wall Bricks that can be removable,when cable routing.

The technical requirement:


OPEN OPEN OPEN 1.The container shall be place in the center of the foundation. Height of the foundation
is minimum requirement that can be increased according to other site condition.
2.The outline of the smart transformer station is length*width:6058mm*2438mm.
3.The ladder to access cable cellar should not block the low voltage and MV cables in
and out .The insulation ladder is recommended to be put in front of the door when
maintenance.
4.Weight of STS-6000K or JUPITER-6000K is no more than 22 t. and transformer oil is
SIPHON Cable entry mineral oil, non-corrosive. And the Volume of transformer oil is about 3850L (about
OPEN 3.4t).
OPEN
B B 5.Weight of STS-3000K or JUPITER-3000K is no more than 15 t. and transformer oil is mineral oil,
noncorrosive.And the Volume of transformer oil is about 2280L (about 2.0t).
OIL TRAY Cable entry
6.Other dimension shall be determined according to onsite conditions.
7.The concrete mechanical strength, reinforced steel bar quantity and distribution should
OPEN OPEN be determined based on load-stress calculation and local civil construction regulation.
SIPHON 8.The foundation drawing scheme is for reference only, and the specific design and
construction shall be subject to the construction unit.
9.The foundation must be higher than the local historical highest water level and the STS
shall be located at least 300 mm higher than the foundation.
TITLE:
Foundation Drawing For
STS-6000K&STS-3000K&JUPITER-6000K&JUPITER-3000K

DWG NO.:
DRAW: lifengguang DATE: 13-Jan-23 UNIT'S: mm DWG VER
THESE DRAWINGS AND SPECIFICATION ARE *
OPEN OPEN THE PROPERTY OF HUAWEI TECH Co.,LTD. CHKD: qijunchen DATE:13-Jan-23 FINISH: * A
OPEN AND SHOULD NOT BE REPRODUCED COPIED
ITEM NO.:
OR USED IN ANY MANNER WITHOUT VRFD: wanggewen DATE:13-Jan-23 MASS(Kg): ITEM REV
THE PRIOR WRITTEN CONSENT OF HUAWEI *
DETIAL VIEW TECH Co.,LTD.
APPD: zhoupeng DATE:13-Jan-23 SCALE: 1:1
2:1 PRODUCT: STS-6000K&STS-3000K&JUPITER-6000K&JUPITER-3000K SHEET: 1 of 2 MAT'L: *
The technical requirement:
1.The container shall be place in the center of the foundation. Height of the foundation
is minimum requirement that can be increased according to other site condition.
2.The outline of the smart transformer station is length*width:6058mm*2438mm.
3.The ladder to access cable cellar should not block the low voltage and MV cables in
and out .The insulation ladder is recommended to be put in front of the door when
maintenance.
4.Weight of STS-6000K or JUPITER-6000K is no more than 22 t. and transformer oil is
mineral oil, non-corrosive. And the Volume of transformer oil is about 3850L (about
3.4t).
5.Weight of STS-3000K or JUPITER-3000K is no more than 15 t. and transformer oil is mineral oil,
noncorrosive.And the Volume of transformer oil is about 2280L (about 2.0t).
6.Other dimension shall be determined according to onsite conditions.
7.The concrete mechanical strength, reinforced steel bar quantity and distribution should
be determined based on load-stress calculation and local civil construction regulation.
8.The foundation drawing scheme is for reference only, and the specific design and
construction shall be subject to the construction unit.
9.The foundation must be higher than the local historical highest water level and the STS
shall be located at least 300 mm higher than the foundation.

TITLE:
Foundation Drawing For
STS-6000K&STS-3000K&JUPITER-6000K&JUPITER-3000K

DWG NO.:
DRAW: lifengguang DATE: 13-Jan-23 UNIT'S: mm DWG VER
THESE DRAWINGS AND SPECIFICATION ARE *
THE PROPERTY OF HUAWEI TECH Co.,LTD. CHKD: qijunchen DATE:13-Jan-23 FINISH: * A
AND SHOULD NOT BE REPRODUCED COPIED
ITEM NO.:
OR USED IN ANY MANNER WITHOUT VRFD: wanggewen DATE:13-Jan-23 MASS(Kg): ITEM REV
THE PRIOR WRITTEN CONSENT OF HUAWEI *
TECH Co.,LTD.
APPD: zhoupeng DATE:13-Jan-23 SCALE: 1:1
PRODUCT: SHEET: MAT'L: *
STS-6000K&STS-3000K&JUPITER-6000K&JUPITER-3000K 2 of 2